PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL PROJECT …
Transcript of PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL PROJECT …
107539 301000
LINCOLN
107539
FT.
FT.
LINCOLN COUNTY
US 84 AT FAIR RIVER
BM
310.3
To Monticello
641.03
1,520.54
NONE
NONE
NONE NONEFAIR RIV
ER
LIT
TLE
84
To Brookhaven
27
26
DIC
KE
RS
ON
LN.
FAIR RIV
ER DR.
x
E.O.P. STA. 535+00
RIVERFAIR
RIVERFAIR
STEVE L
OOP RD.
5
6
74.9BR. NO.
STP-0015-01(135)
STP-0015-01(135)
STP-0015-01(135)
B.O.P STA. 519+80
{
EQUATIONS EXCEPTIONS
LENGTH DATA
LENGTH OF ROADWAY
LENGTH OF BRIDGES
LENGTH OF PROJECT (NET)
LENGTH OF PROJECT (GROSS)
LENGTH OF EXCEPTIONS
FT.
FT.
FT.
MI.
MI.
MI.
MI.
MI.
0.288
0.167
0.121
0.000
0.288
0.00
879.51
1,520.54
1
SCALES
PLAN
PROFILE
LAYOUT
HOR.VERT.
STATE OF MISSISSIPPI
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
1 IN.= 50 FT.
1 IN.= 50 FT.1 IN.= 5 FT.
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
DESIGN CONTROL
ADT ( ) = : ADT ( ) =
DHV = : D = % T= %
MPH = V (SPEED DESIGN)
1 IN.= 1,000 FT.
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
TIT
LE
PERMITS ACQUIRED BY MDOT
NATIONWIDE #14
NATIONWIDE (OTHER)*
GENERAL*
INDIVIDUAL (404)*
WETLANDS AND WATERS PERMITS
WATERS WETLANDS
APPROVED BY:
STORMWATER PERMIT
S
N
Y
N
N N
N
Y
NO STORMWATER PERMIT REQUIRED (<1 ACRE)
Y
S
N
REQUIRED, CNOI SUBMITTED BY MDOT
REQUIRED, SCNOI TO BE SUBMITTED BY
N
(DISTURBED AREA=5 ACRES)
CONTRACTOR (1 TO 4.99 ACRES)
COUNTY
FEDERAL PROJECT NO.
DATE
REVISIO
NS
BY
APPROVED:
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
P S & E DATE: 12/01/2020
DEPUTY EXECUTIVE DIRECTOR / CHIEF ENGINEER
EXECUTIVE DIRECTOR
1
STATESHEET
NO.PROJECT NUMBER
.
MISSISSIPPI
/
BRIDGE STRUCTURES REQ'D.
BOX BRIDGES REQ'D.
COUNTY LINE
TOWN CORPORATION LINE
SECTION LINE
RAILROAD
SURVEY LINE
BRIDGES
CONVENTIONAL SYMBOLS
EXISTING ROAD OR TRAVELED WAY
PROPOSED ROAD OR TRAVELED WAY
NOTE
INDICATES APPROXIMATE
LOCATION OF PROJECT.
PASCAGOULA
GULFPORT
LUCEDALE
HATTIESBURG
LAUREL
MC COMB
BROOKHAVEN
PORT
GIBSON
NATCHEZ
VICKSBURGFOREST
MERIDIA
N
YAZOO
CITY
KOSCIU
SKO
WEST
POINT
COLUMBUS
GREEN
WO
OD
INDIA
NO
LA
GREEN
VIL
LE
GRENADA
HOUSTON
OXFORD
BA
TES
VIL
LE
CLA
RK
DALE
HOLLY
SPRINGSNEW
ALBANY
TUPEL
O
FU
LT
ON
CORINTH
ABERDEEN
JACKSON
(APPROX. MIDDLE OF PROJECT)
STATE MAP
LAT. 31°32'58.25"N LONG. 90°16'34.68"W
1/14/2021
12:30
TI
TL
E.dgn
PM
P.E.
GENERAL INDEX
PROJECTTHISINCLUDED
SHEETWITHBEGIN
9001
8001
7501
7001
6001
5001
4001
3001
2001
1001
1ROADWAY . . . . . . . . . . . . . . . . . . . .
PERMANENT SIGNS . . . . . . . . . . .
TRAFFIC SIGNALS . . . . . . . . . . . . .
ITS COMPONENTS . . . . . . . . . . . . .
LIGHTING . . . . . . . . . . . . . . . . . . . .
(RESERVED) . . . . . . . . . . . . . . . . . . .
ROADWAY STANDARD DWGS . .
BRIDGE . . . . . . . . . . . . . . . . . . . . . .
CROSS SECTIONS . . . . . . . . . . . . .
BOX CULVERT STD. DRAWINGS (LRFD)
BOX CULVERT STD. DRAWINGS (STD. SPEC.)
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . .
. . . .
SL SL SL
/
FMS CON. NO.
SP-0015-01(113) 101000
1
01/14/21
REVIS
ED PER
MIT BLO
CK
TM
1
STATE PROJECT NO.
MISS.
DA
TE
RE
VISIO
NB
Y
WORKING NUMBER
FILENAME:
DESIGN TEAM CHECKED DATE
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
PL
AN
1/28/2021
4:58
DI.dgn
PM
1
2DI-1
3GENERAL NOTES GN-1
TS-1
-
TS-2
TS-3
4
5
6
DATE SHEET NO. BY
DATEDESCRIPTION OF SHEET NO. NO. DATEDESCRIPTION OF SHEET NO. NO.SH.WKG.REVISIONSH.WKG.REVISION
DETAILED INDEX
TITLE SHEET (1)
DETAILED INDEX & GENERAL NOTES (2)
EQ-2
10
12
14
PLAN REVISIONS
WK-5
GPS-CN
SUMMARY OF QUANTITIES
WK-3
WK-4
SPECIAL DESIGN SHEETS (11)
23
24
22
ECP-4
26
25
27CONSTRUCTION SIGNING CS-1
RWC-1
RWC-2
QUANTITY SHEETS (4)
PLAN & PROFILE SHEETS (7)
EC-1EROSION CONTROL
30
9001 - 9007
PROJ. NUM.:
COUNTY:
DI.DGN
DI-1
01/2020 2
TCP-4
MENDROP ENGINEERING RESOURCES, LLC
BL-1
GRAPHICAL SOIL BORING LOGS GL-1
GRAPHICAL SOIL BORING LOGS GL-2
TOTAL SHEETS
SP-1
21
SQS-1
11
EQ-1
13
ESTIMATED QUANTITIES - TRAFFIC CONTROL SIGNS
15
SUBSURFACE SOIL PROFILE
6354
6355
118
WK-6
WK-7
16
17
SURVEY CONTROL SHEET
VS-1VEGETATION SCHEDULE
6359TCPQ-1
RD-1 6403
GT-1 6404
107539/301000FMS CON:
RURAL DRIVEWAYS
TCP-5
TCP-9
TYPICAL GRADING TRANSITION BETWEEN CUTS AND FILLS
PS & E PLANS -DATE 12/01/20
TRAFFIC CONTROL PLAN MOBILE OPERATIONS MULTI LANE ROADS AND TWO- LANE ROADS
STP-0015-01(135)
MER, LLC
ESTIMATED QUANTITIES - SUMMARY OF TRAFFIC CONTROL ITEMS, EARTHWORK
ESTIMATED QUANTITIES - PERMANENT EROSION CONTROL ITEMS, CLEARING AND GRUBBING
EASEMENT COORDINATES
6425MDS-1MISCELLANEOUS DETAIL SHEET
RIGHT - OF - WAY MARKERS
SHEET NUMBER
ECD-3
ECD-13
ECD-4
TYPICAL TEMPORARY EROSION/SEDIMENT CONTROL APPLICATIONS
DETAILS OF SEDIMENT BARRIER APPLICATIONS
DETAILS OF SILT FENCE INSTALLATION
DITCH CHECK STRUCTURES, TYPICAL APPLICATIONS AND DETAILS
TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL MEASURES,
DETAILS OF EROSION CONTROL WATTLE DITCH CHECK
DETAIL OF EROSION CONTROL SILT DIKE DITCH CHECKS
ROCK DITCH CHECK
ECD-1
ECD-2
ECD-5
ECD-6
ECD-7
ECD-8
ECD-9
ECD-10
ECD-11
ECD-12
SILT FENCE AND HAY BALE DITCH CHECKS
ECD-22
ECD-21
ECD-14
INLET PROTECTION TYPICAL APPLICATIONS AND DETAILS
INLET PROTECTION DETAILS FOR COARSE AGGREGATE ON GRADES AND SAGS
INLET PROTECTION DETAILS OF WATTLES
INLET PROTECTION DETAILS OF MANUFACTURED INLET PROTECTION DEVICE
ECD-15
ECD-16 ECD-17
ECD-18
TEMPORARY CULVERT STREAM CROSSING
TEMPORARY STREAM DIVERSION
ECD-20
ECD-19
DETAILS OF EROSION CONTROL SANDBAG DITCH CHECK
SEDIMENT RETENTION BARRIER
ROCK FILTER DAM
STABILIZED CONSTRUCTION ENTRANCE
INLET PROTECTION DETAILS OF SAND BAG
FLOATING TURBIDITY CURTAIN
TEMPORARY STREAM DIVERSION (BOX EXTENSIONS)
ROCK DITCH CHECK WITH SUMP EXCAVATION AND ROCK FILTER DAM
DETAILS OF TYPICAL DITCH TREATMENT
DITCH TREATMENT INSTALLATION DETAIL FOR SOIL REINFORCING MAT
EROSION CONTROL BLANKET ECB-1
DT-1A
DT-1
TYPICAL TEMPORARY EROSION CONTROL MEASURES (SLOPE DRAIN AND TYPE A SILT BASIN)
TYPICAL TEMPORARY EROSION CONTROL MEASURES (TYPE B SILT BASIN)
BAS-A
BAS-B
TRAFFIC CONTROL DRUM PLACEMENT AND SHOULDER CLOSURE DETAIL
LOCATION OF R16-3 SIGNS
RIGHT - OF - WAY MARKER RW-1
TCP-16
TCP-15
HIGHWAY SIGN AND BARRICADE DETAILS FOR CONSTRUCTION PROJECTS TCP-8
6101
6102
6103
6104
6105
6106
6107
6108
6109
6110
6111
6112
6113
6114
6115
6116
6117
6118
6119
6120
6121
6122
6123
6124
6125
6126
6131
6366
6365
6358
6401
STANDARD DRAWINGS - ROADWAY SHEETS (CONTINUED)
STANDARD DRAWINGS - ROADWAY SHEETS (38)
-----
TRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT OF 65 OR 70 MPH
(INTERSTATE AND OTHER 4-LANE DIVIDED HIGHWAYS)
(MEDIAN LANE OR OUTSIDE LANE CLOSURE) (EXTENDED PERIOD)
TRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT OF 65 OR 70 MPH
(INTERSTATE AND OTHER 4-LANE DIVIDED HIGHWAYS)
(MEDIAN LANE OR OUTSIDE LANE CLOSURE) (WORK DAY ONLY)
STP-0015-01(135)
US 84
AT FAIR RIVER
LINCOLN
FMS CONST. No. 107539/301000
8001 - 8038-----
INFORMATION BRIDGE SHEETS (38)
LONGITUDINAL FILL STONE DIKETYPICAL SECTION - RIPRAP REVETMENT, LONGITUDINAL PEAKED AND
TYPICAL SECTION - STONE TIEBACK AND TRANSVERSE STONE DIKE
7TS-4TYPICAL SECTION - ROCK CHUTES
TS-5 8
SITE PLAN - US 84 AT FAIR RIVER
SITE PLAN - US 84 AT FAIR RIVER
EROSION CONTROL PLAN - US 84 AT FAIR RIVER
LONGITUDINAL STONE DIKE
TYPICAL SECTION SHEETS (5)
9
TYPICAL SECTION - HAUL ROUTE
WK-8
WK-9
18
19
PLAN / PROFILE - HAUL ROUTE NO. 1
PLAN / PROFILE - HAUL ROUTE NO. 2
20
-----
9011 - 9012-----HAUL ROUTE NO. 2
HAUL ROUTE NO. 1
CROSS SECTIONS (12)
28
29
TYPICAL SECTION - PIER SCOUR COUNTERMEASURES RIPRAP
PLAN / PROFILE - LONGITUDINAL STONE DIKE
PLAN / PROFILE - LONGITUDINAL STONE DIKE
PLAN / PROFILE - LONGITUDINAL STONE DIKE WEST
BORING LOCATIONS
DETAILED INDEX
6190FENCE: ALUMINUM OR GALVANIZED FERROUS METAL GATE AG-1
9008 - 9010
PROJECT NO. 07-0015-01-701-10 (FOR INFORMATION ONLY)
TM01/14/21 1 & 3
STATE PROJECT NO.
MISS.
DA
TE
RE
VISIO
NB
Y
WORKING NUMBER
SHEET NUMBERFILENAME:
DESIGN TEAM CHECKED DATE
RO
AD
WA
Y
DESIG
N
DIVISIO
NMIS
SIS
SIP
PI D
EP
AR
TM
EN
T
OF
TR
AN
SP
OR
TA
TIO
N
PL
AN
1/28/2021
4:58
GN.dgn
PM
COUNTY:
PROJ. NUM.:
1
GN.DGN
GENERAL NOTES
GN-1
STP-0015-01(135)
MER 01/2020
STP-0015-01(135)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
GENERAL NOTES
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
3
22
107539/301000FMS CON:
LINCOLN
FAIR RIVER
US 84 AT
23
24
25
NOT APPLY TO THE CURRENT PHASE
THE CONTRACTOR SHALL COVER ANY TEMPORARY TRAFFIC CONTROL SIGNS SHOWN IN THE TRAFFIC CONTROL PLAN THAT DO
BY THE ENGINEER.
CONTROL PLAN AS DIRECTED BY THE ENGINEER. ALL CONFLICTING SIGNS SHALL BE COVERED OR REMOVED AS DIRECTED
THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR FROM ADJACENT PROJECT(S) IN IMPLEMENTING THE TRAFFIC
THOSE DESIGNATED ON THE PLANS TO BE BLACK LEGEND AND BORDER ON WHITE BACKGROUND.
FLUORESCENT ORANGE SHEETING SHALL BE USED ON ALL CONSTRUCTION AND TRAFFIC CONTROL SIGNS EXCEPT FOR
CODY PICKELL 601-624-4026
3915 BEASLEY RD. JACKSON, MS 39213
D. C-SPIRE
TOMMY CUPIT 601-833-6449
1536 MONTICELLO ST. NE BROOKHAVEN, MS 39601
C. LINCOLN RURAL WATER ASSN. INC.
DAVID GOSS 601-835-4728
520 HWY. 51 SOUTH BROOKHAVEN, MS 39601
B. ENTERGY
BARRY BUCHANAN 251-654-7196
107 ST. FRANCES ST. MOBILE, AL 36602
A. UNITIFIBER
LIST OF PUBLIC UTILITIES
WIRE FENCE BACKING WILL BE REQUIRED FOR ALL SILT FENCE. (SEE WK. NO. ECD-3)
EXCEPT AS PROVIDED BY SPECIFIC PAY ITEMS INCLUDED IN THE PLANS.
SOME WORK IS REQUIRED OUTSIDE THE PROJECT LIMITS. NO ADDITIONAL COMPENSATION WILL BE MADE FOR SUCH WORK
DESIGNING, DRAWING, AND CONSTRUCTING THE FACILITY SHALL BE INCLUDED IN THE PRICE BID FOR CONTRACT ITEMS.
THE PUBLIC THAT MAY BE ABOVE THE EXCAVATION OR ANY STRUCTURES ADJACENT TO THE EXCAVATION. ALL COSTS FOR
SYSTEM THAT IS DEEMED NECESSARY TO PREVENT A FAILURE AND PROTECT THE PERSONS WORKING NEAR THE EXCAVATION,
EXERCISED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING WHAT BRACING, SHORING, OR GROUND SUPPORT
PROPERTIES. THEREFORE, THE RISK OF A FAILURE OCCURRING DURING EXCAVATION REQUIRES THAT EXTREME CAUTION BE
WORK ON STRUCTURES FOR THIS PROJECT REQUIRES EXCAVATION IN THE IMMEDIATE VICINITY OF TRAFFIC AND ADJACENT
IN ADVANCE OF CONSTRUCTION.
MUST COORDINATE DIRECTLY WITH THE INVOLVED UTILITY OWNERS TO HAVE UNDERGROUND UTILITY LINES FIELD LOCATED
THE ENGINEER CAN NOT AND DOES NOT WARRANT THAT THIS INFORMATION IS COMPLETE OR ACCURATE. THE CONTRACTOR
ON FILE WITH THE DEPARTMENT SHOWING THE APPROXIMATE LOCATION OF UTILITIES RELOCATED WITHIN THE RIGHT-OF-WAY.
THE ENGINEER. UTILITIES THAT WERE FOUND TO BE IN CONFLICT WITH CONSTRUCTION HAVE BEEN RELOCATED. PERMITS ARE
UTILITIES ON THE DRAWINGS ARE SHOWN IN THEIR ORIGINAL LOCATION BASED UPON THE BEST INFORMATION AVAILABLE TO
AND BRIDGE CONSTRUCTION.
BACK FILLED AND TAMPED IN ACCORDANCE WITH SECTION 203 OF THE MISSISSIPPI STANDARD SPECIFICATIONS FOR ROAD
VOIDS CREATED BY THE REMOVAL OF, BUT NOT LIMITED TO, POSTS, CONCRETE ANCHORS, AND FOOTINGS SHALL BE
WILL BE MADE FOR REPLACEMENT OR REPAIR OF DAMAGED ITEMS.
OR REPAIR, AS DIRECTED BY THE ENGINEER, ANY STRUCTURES DAMAGED DURING THE LIFE OF THE CONTRACT. NO PAYMENT
INLETS, APRONS, AND BRIDGES FROM DAMAGE WHICH MIGHT OCCUR DURING CONSTRUCTION. THE CONTRACTOR SHALL REPLACE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING STRUCTURES SUCH AS, BUT NOT LIMITED TO, PIPES,
25% SHRINKAGE FACTOR USED IN THE EARTHWORK CALCULATIONS IS FOR DESIGN ESTIMATING PURPOSES ONLY.
ALL PLASTIC DRUMS SHALL HAVE A BALLASTING COLLAR MADE FROM RECYCLED TRUCK TIRES OR OTHER SUITABLE MATERIAL.
ALL TRAFFIC CONTROL DEVICES ON THIS PROJECT SHALL COMPLY WITH THE PART VI MUTCD (LATEST EDITION).
AS NECESSARY TO FIT FIELD CONDITIONS.
THE LOCATION AND SPACING OF SIGNS, SHOWN ON THE TRAFFIC CONTROL PLANS, ARE APPROXIMATE AND MAY BE ADJUSTED
2+50 TO 4+30. TEMPORARY CULVERT STREAM CROSSINGS WILL BE PERMITTED AT THE REMAINING LOCATION(S).
NO TEMPORARY CULVERT STREAM CROSSINGS WILL BE ALLOWED FOR THE SITE AT STATIONS 10+00 TO 12+50, 17+50 TO 23+50, 1+00 TO 2+00 AND
THE RETROREFLECTIVE SIGN SHEETING ON RIGID, TEMPORARY TRAFFIC CONTROL (ORANGE) SIGNS SHALL BE MINIMUM TYPE IX.
INFORMATION.
FROM THE PROJECT ENGINEER. SEE NOTICE TO BIDDERS ENTITLED MATERIAL STORAGE UNDER BRIDGES FOR MORE
STORAGE OF FLAMMABLE MATERIALS WILL NOT BE ALLOWED UNDER ANY BRIDGE STRUCTURES WITHOUT WRITTEN APPROVAL
THE TEST HOLE LOCATIONS.
THE DEPARTMENT DOES NOT GUARANTEE THAT THE MATERIALS PRESENTED IN THE REPORT ARE NECESSARILY FOUND OUTSIDE OF
AUGER LOGS, AND BORING LOCATIONS ARE INCLUDED IN THE PLANS. THE FULL REPORT IS ON FILE AND IS AVAILABLE FOR EXAMINATION.
A GEOTECHNICAL INVESTIGATION HAS BEEN PERFORMED FOR THIS PROJECT. A SUBSURFACE SOIL PROFILE, SOIL BORINGS, HAND
THOSE AREAS DESIGNATED IS NOT REQUIRED. THE AREA TO BE CLEARED SHALL BE THE MINIMUM NECESSARY FOR CONSTRUCTION.
CLEARING LIMITS SHOWN ARE THE MAXIMUM LIMITS UNLESS OTHERWISE APPROVED BY THE ENGINEER. CLEARING OF AREAS OTHER THAN
IT IS THE BIDDER'S RESPONSIBILITY TO CHECK AND SEE IF ANY ADDENDA HAVE BEEN POSTED FOR THIS PROJECT.
BIDDERS ARE ADVISED THAT HARD COPIES OF ANY ADDENDA FOR THIS PROJECT WILL NOT BE MAILED.
ALL ADDENDA TO THESE PLANS WILL BE POSTED TO WWW.MDOT.MS.GOV UNDER THE PROPOSAL ADDENDA COLUMN.
IT IS THE END USER’S RESPONSIBILITY TO ENSURE ALL ELEMENTS ARE INTERPRETED CORRECTLY REGARDLESS OF COLOR.
USERS OF THESE DRAWINGS. ALTHOUGH THE INTENT IS TO CATEGORIZE EVERYTHING AS EITHER EXISTING OR PROPOSED,
IF COLORS ARE USED ON PLAN/PROFILE SHEETS, THEY ARE INTENDED TO VISUALLY EASE THE LOCATION OF ELEMENTS FOR
SHALL BE ABSORBED IN OTHER ITEMS OF WORK.
ALL ITEMS OF WORK ASSOCIATED WITH THE INSTALLATION OF A CONSTRUCTION ENTRANCE (NOT INCLUDING HAUL ROUTES 1 & 2)
NECESSARY WITH THE APPROVAL OF THE PROJECT ENGINEER.
THE CONTRACTOR IS RESPONSIBLE FOR FIELD -VERIFICATION OF EXISTING GRADES AND MAKING ADJUSTMENTS AS
IN THE PLANS SHALL BE INCLUDED IN THE CONTRACTOR'S EROSION CONTROL PLAN PRIOR TO SUBMITTING FOR APPROVAL.
PRIOR TO COMMENCEMENT OF WORK AND MAINTAIN THE PLAN DURING CONSTRUCTION. ANY ADDITIONAL SILT BASINS NOT SHOWN
DURING CONSTRUCTION. THE CONTRACTOR SHALL SUBMIT AN EROSION CONTROL PLAN AT THE PRE CONSTRUCTION CONFERENCE OR
OF THE CONTRACTOR TO ENSURE THAT SILT DOES NOT LEAVE THE RIGHT OF WAY OR CONTAMINATE WATERS OF THE U. S.
THE EROSION CONTROL DEVICES REFERENCED IN THESE PLANS ARE A MINIMUM REQUIREMENT. IT IS THE RESPONSIBILITY
THE CONTRACTOR AS DIRECTED BY THE ENGINEER, THE COST OF WHICH SHALL BE ABSORBED IN OTHER ITEMS BID.
ROADWAY SIGNS THAT ARE IN CONFLICT WITH CONSTRUCTION OF THIS PROJECT SHALL BE REMOVED AND RELOCATED BY
1T
M01/14/21
AD
DED/D
ELE
TED
GENER
AL
NOTES
1