PIPING & VENT SYMBOL LIST
Transcript of PIPING & VENT SYMBOL LIST
CONTROL VALVE (TWO-WAY)
PIPING & VENT SYMBOL LIST
SYMBOL: DESCRIPTION:
PITCH PIPE IN DIRECTION
UNION/FLANGE
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
NEW CONNECTION
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
MIXING VALVE
CONTROL VALVE (THREE-WAY)
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
TRIPLE DUTY VALVE (IN-LINE TYPE)
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATIONFOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
NATURAL GASG
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
SAFETY RELIEF VENTSV
DRAINDPP
GAS REGULATOR VENTGV
NOT ALL SYMBOLS MAY APPLY.
METERM
PUMP
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
FLOW SWITCHF
TEMPERATURE SENSOR WITH WELLT
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
PIPING ABBREVIATION KEY
ABBR: DESCRIPTION:
ABOVE FINISHED FLOORAFF
MIXING VALVEMV
NC NEW CONNECTION
N.C. NORMALLY CLOSED
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
TYPICALTYP
EQUIPMENT CALLOUT ENDING IN E (AS-E) DENOTES EXISTING EQUIPMENTAS-E
OA OUTSIDE AIR
EXHAUST/RELIEF AIREA
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
1VIEW NAME1/8" = 1'-0"
1
M101
14
32
T101
SIMDETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAILREFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAILREFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVEPROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBEADDITIONAL INFORMATION ABOUTWORK REQUIRED, SPECIFIC TO THESHEET AND/OR DETAIL
NO R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE KEY:
NEW WORK BY THIS CONTRACTOR(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN(LIGHT SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR(DARK SHORT DASHED LINE)
GENERAL NOTES:
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS,EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANYCONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING VENTING AND PIPING ARE SHOWN. VERIFY EXISTING CONDITIONS BEFORESTARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR WATER HEATER AND BOILER FLUES,COMBUSTION AIR DUCTS, AND ALL PIPING BEFORE FABRICATION. INCLUDE RISES AND DROPS ASREQUIRED BECAUSE OF EXISTING FIELD CONDITIONS.
4. CUT AND PATCH WALLS AS REQUIRED TO COMPLETE WORK. OBTAIN WRITTEN PERMISSION FROMA/E BEFORE CUTTING OF PENETRATING STRUCTURAL WALLS OR BOND BEAMS.
5. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEWEQUIPMENT, PIPING, OR VENTING TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER ARRANGENEW EQUIPMENT, PIPING, OR VENTING IN SUCH A FASHION THAT IT DOES NOT CONFLICT WITHEXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR INSTALLATIONOF NEW EQUIPMENT, PIPING, OR VENTING AT NO ADDITIONAL COST TO THE OWNER.
6. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO MAINTAIN EXISTING DOMESTIC COLD ANDHOT WATER SYSTEMS IN SERVICE DURING CONSTRUCTION.
7. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY REASON.MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW SYSTEMS AREINSTALLED.
8. MAINTAIN EXISTING DOMESTIC COLD AND HOT WATER SYSTEMS IN SERVICE UNTIL NEW SYSTEM ISCOMPLETE AND READY FOR TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKESWITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY ORCOMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
9. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, FLUES, PIPING, ETC. ARE DIAGRAMMATIC ANDMAY NOT REFLECT EXACT INSTALLATION CONDITIONS. INCLUDE ALL OFFSETS AND FITTINGSREQUIRED FOR A COMPLETE INSTALLATION.
10. DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CLEARANCES.11. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFYNON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OFNECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THEATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH FABRICATION OREQUIPMENT ORDERS. REFER TO SECTIONS 22 05 00 AND 23 05 00 FOR COORDINATION DRAWINGREQUIREMENTS.
12. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKEREASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS.
13. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TOCOORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TOOTHERS.
14. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL CHANGESREQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN.
15. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.16. MAINTAIN EQUIPMENT MFR'S RECOMMENDED SERVICE CLEARANCES.17. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS,
SWITCHES, AND DISCONNECTS.18. PROVIDE, OR EXTEND AS REQUIRED, CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED
EQUIPMENT. PAD SHALL EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.19. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NON-
STRUCTURAL BUILDING ELEMENTS.20. WHERE DISTURBED BY WORK ON THIS PROJECT, REPAIR THE SPRAY APPLIED INSULATION ON THE
CEILING OF THE MECHANICAL ROOM TO MATCH EXISTING.21. IN THE EVENT MATERIAL SUSPECTED OF CONTAINING ASBESTOS (ACM) ARE ENCOURAGED, DO
NOT DISTURB AND INFORM THE A/E IMMEDIATELY SO TESTING AND ABATEMENT CAN BEARRANGED BY THE OWNER.
PLUMBING EQUIPMENT LIST
THE EQUIPMENT AND FIXTURE SCHEDULES ARE FOR THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR SHALLVERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIEDOR NOT.
CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO THE CONTRACTOR AND TOINDICATE THE QUALITY REQUIRED. CONTRACTOR IS RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESEDRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES PRECEDENCEOVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE BASIS OF DESIGN.
CP-1 (BLDG. HWC PUMP)
DOMESTIC HOT WATER CIRCULATING PUMP - VARIABLE SPEED, LEAD-FREE BRONZE OR STAINLESS STEELCONSTRUCTION, PERMANENTLY LUBRICATED SEALED BEARINGS, MECHANICAL SEAL, OIL LUBRICATED, ECM MOTOR WITHINTEGRATED VARIABLE SPEED CONTROL AND THERMAL OVERLOAD PROTECTION, ONE SET OF DRY CONTACTS FORSTATUS OUTPUT TO BMS, FLANGED CONNECTIONS, RATED FOR 125 PSIG AT 225F, MANUFACTURER PROVIDED PUMPBODY INSULATION KIT, UL LISTED.
30 GPM @ 35 FEET OF HEAD, 1/2 HP, 200/1/60
AQUASTAT - ADJUSTABLE SETTING OF 90F TO 180F WITH STRAP-ON REMOTE SENSOR BULB, UL LISTED.
ACCEPTABLE MFRS: B&G (ECOCIRC XL 55-45), GRUNDFOS (MAGNA SERIES)
CP-2 (STORAGE TANK CIRC. PUMP)
DOMESTIC HOT WATER CIRCULATING PUMP - VARIABLE SPEED, LEAD-FREE BRONZE OR STAINLESS STEELCONSTRUCTION, PERMANENTLY LUBRICATED SEALED BEARINGS, MECHANICAL SEAL, OIL LUBRICATED, ECM MOTOR WITHINTEGRATED VARIABLE SPEED CONTROL AND THERMAL OVERLOAD PROTECTION, ONE SET OF DRY CONTACTS FORSTATUS OUTPUT TO BMS, FLANGED CONNECTIONS, RATED FOR 125 PSIG AT 225F, MANUFACTURER PROVIDED PUMPBODY INSULATION KIT, UL LISTED.
CP-2: 12 GPM @ 20 FEET OF HEAD, 1/6 HP, 115/1/60.
AQUASTAT - ADJUSTABLE SETTING OF 90F TO 180F WITH STRAP-ON REMOTE SENSOR BULB, UL LISTED.
ACCEPTABLE MFRS: B&G (ECOCIRC XL 36-45), GRUNDFOS (MAGNA SERIES)
ET-1
EXPANSION TANK - WELDED BLACK STEEL CONSTRUCTION, ASME STAMPED, GUARANTEED AIRTIGHT AND LEAKPROOF,STAINLESS STEEL SYSTEM CONNECTION, HEAVY DUTY BUTYL DIAPHRAGM AND RIGID POLYPROPYLENE LINERMECHANICALLY BONDED TO TANK TO PROVIDE 100% NON-CORROSIVE WATER RESERVOIR. DIAPHRAGM AND LINERSHALL BE APPROVED FOR USE IN POTABLE WATER SYSTEMS. ALL WETTED COMPONENTS SHALL BE OF FDA APPROVEDMATERIALS. PROVIDE STANDARD SCHRADER AIR VALVE FOR FIELD CHARGING. TANK SHALL BE LEAD-FREE ASDESCRIBED IN THE SAFE DRINKING WATER ACT 2014 (0.25% MAX. LEAD).
TANK SHALL HAVE A WORKING TEMPERATURE OF 200F AND WORKING PRESSURE OF 125 PSIG. MINIMUM TANK VOLUMESHALL BE 25 GALLONS WITH MINIMUM ACCEPTING VOLUME OF 19 GALLONS. FACTORY PRE-CHARGE TO 55 PSIG.
ACCEPTABLE MFRS - AMTROL (THERM-X-TROL), TACO (PAX SERIES), WESSELS (TX)
MV-1
MIXING VALVE - MULTIPLE HI/LO MASTER THERMOSTATIC MIXING VALVE ARRANGEMENT FOR TEMPERED WATERCONTROL. ALL BRONZE/BRASS CONSTRUCTION, ROUGH BRASS FINISH, UNION INLETS WITH STRAINERS, COMBINATIONCHECK STOPS OR SEPARATE SUPPLY CHECK VALVES AND SHUTOFF VALVES, DIAL THERMOMETER ON OUTLET. MOUNTASSEMBLY ON UNISTRUT STAND WITH MIXING VALVE ABOUT 4 FT. ABOVE FLOOR.
RATED FOR 116 GPM OUTPUT MAXIMUM AT 10 PSI DIFFERENTIAL AND 8 GPM OUTPUT MINIMUM BASED ON CONTINUOUSRECIRCULATION. UNIT SHALL MIX 140F HOT WATER SUPPLY AND 40F COLD WATER SUPPLY FOR 105F OUTLET.
PROVIDE FIELD ADJUSTMENT BY FACTORY AUTHORIZED REPRESENTATIVE. UNIT SHALL BE ASSE 1017 LISTED ANDAPPROVED. ASSEMBLY SHALL COMPLY WITH FEDERAL ACT S.3874.
ACCEPTABLE MFRS - LEONARD (TM-LF SERIES), BRADLEY (HL), POWERS (LFSH1430 SERIES), LAWLER (800 PI SERIES)
T-1 & 2
DOMESTIC HOT WATER STORAGE TANK - VERTICAL GLASS-LINED, HEAVY GAUGE STEEL JACKET, BAKED ENAMEL FINISH,200 GALLON CAPACITY, 30" DIAMETER X 71" HIGH, MAGNESIUM ANODE ROD(S), FIBERGLASS OR FOAM INSULATIONTOMEET LATEST ASHRAE/IES 90.1B STANDARD, 2" INLET AND OUTLET, DRAIN AND RELIEF VALVE OPENINGS, ASME T&PRELIEF VALVE, 11" X 15" HANDHOLE, 150 PSIG WORKING PRESSURE, ASME STAMPED, 5-YEAR WARRANTY.
ACCEPTABLE MFRS - STATE (PVG SERIES), CEMLINE (JST SERIES)
WH-1 & 2
WATER HEATER - GAS-FIRED, CONDENSING, SEALED COMBUSTION, VERTICAL, MINIMUM 94% EFFICIENT, METAL CABINET,BAKED ENAMEL FINISH, ASME STAMPED, GLASS-LINED STEEL OR STAINLESS STEEL TANK, 160 PSI WORKING PRESSURE,FIBERGLASS OR FOAM INSULATION, BRASS WATER CONNECTIONS AND DRAIN VALVE, ASME APPROVED T&P RELIEFVALVE, MULTIPLE MAGNESIUM ANODE RODS, HIGH TEMPERATURE GAS SHUT-OFF, AUTOMATIC WATER THERMOSTAT,BUILT-IN GAS REGULATING VALVE, ADJUSTABLE TEMPERATURE RANGE, 3-YEAR WARRANTY, UL LISTED, COMPLIANT TONAECA, ASHRAE 90.1 AND ASHRAE 90A.
119 GALLON CAPACITY, 499,900 BTUH INPUT NATURAL GAS, 576 GPH RECOVERY AT 100F RISE.
7" W.C. GAS INLET PRESSURE.
ELECTRICAL REQUIREMENTS - 120/1/60 CIRCUIT FOR BLOWER AND CONTROLS, HARD-WIRED.
SET WATER TEMPERATURE AT 140F.
ACCEPTABLE MFRS: A.O. SMITH (CYCLONE MXi BTH), BRADFORD WHITE (EF SERIES)
PROVIDE A CONDENSATE DRAIN NEUTRALIZATION TANK FOR EACH WATER HEATER WITH TWO SPARE SETS OFNEULTRALIZING PELLETS. JJM BOILER WORKS JM-50 OR EQUIVALENT. DRAIN PIPING SHALL BE SCH. 40 STAINLESS STEELAND EXTENDED TO NEAREST FLOOR DRAIN.
KEYNAME
A.
B.
C.
D.
E.
F.
SCHEDULE GENERAL NOTES
DISCONNECT AND CONTROLLER STARTER FURNISHED AND
INSTALLED BY:
MFR = MANUFACTURER
EC = ELECTRICAL CONTRACTOR
MC = FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED
BY ELECTRICAL CONTRACTOR
MFR/EC = FURNISHED LOOSE BY MANUFACTURER
INSTALLED BY ELECTRICAL CONTRACTOR
DISCONNECT TYPE:
F = FUSED
NF = NON-FUSED
CONTROLLER STARTER TYPE:
FV = FULL VOLTAGE
WYE = WYE-DELTA
SS = SOLID STATE (SOFT START)
MS = MANUAL STARTER
VFD = VARIABLE FREQUENCY DRIVE
VFD/B = VARIABLE FREQUENCY DRIVE WITH BYPASS
FAN RPM SHALL NOT EXCEED 110% OF SCHEDULED VALUE,
WITH THE SCHEDULED WHEEL TYPE. SUBSTITUTION OF BI OR BIA
FANS FOR FC IS ACCEPTABLE IF EFFICIENCY IS NOT LOWER.
NO EQUIPMENT SHALL BE SELECTED ABOVE 90% OF MOTOR
NAME PLATE RATING.
MUST BE WITHIN +/- 10% OF SCHEDULED RPM.
SCHEDULE GENERAL NOTES
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M000
ME
CH
AN
ICA
L C
OV
ER
SH
EE
TS
PE
NC
ER
TO
WE
R B
OIL
ER
RE
PLA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NOTES:1. REFER TO KJWW SPECIFICATIONS 23 52 33.14B FOR ADDITIONAL INFORMATION.2. PROVIDE WITH NEUTRALIZER FOR BOILER AND FLUE CONDENSATE INCLUDING ALL ASSOCIATED DRAIN PIPING IN ACCORDANCE WITH MFR'S RECOMMENDATIONS.3. PROVIDE VENT AND COMBUSTION AIR DUCT IN ACCORDANCE WITH MFR’S RECOMMENDATIONS.4. PROVIDE WITH CSD-1 CONTROLS.5. BOILER GAS REGULATOR SHALL BE CAPABLE OF 4” W.C. MINIMUM GAS PRESSURE.
BOILER SCHEDULE - HOT WATER
TAG NAME
MAX. DIMENSIONS
FUELTURNDOWN
RATIO INPUT MBH OUTPUT MBH EWT °F LWT °FOPERATING
PRESSURE PSI
ELECTRICAL
MANUFACTURER MODEL NOTESLENGTH WIDTH HEIGHT VOLTAGE PHASES
DISCONNECT CONTROLLER/ STARTER
BY (NOTE A)TYPE (NOTE
B) BY (NOTE A) SCCR
BLR-1 46" 28.3" 79.1" NG 7"W.C. 3:1 1500 1420 150 180 60 200 V 3 E.C. FV MFR 5000 THERMAL SOLUTIONS EVCA 1500 NOTES 1, 2, 3, 4 & 5
BLR-2 46" 28.3" 79.1" NG 7"W.C. 3:1 1500 1420 150 180 60 200 V 3 E.C. FV MFR 5000 THERMAL SOLUTIONS EVCA 1500 NOTES 1, 2, 3, 4 & 5
BLR-3 46" 28.3" 79.1" NG 7"W.C. 3:1 1500 1420 150 180 60 200 V 3 E.C. FV MFR 5000 THERMAL SOLUTIONS EVCA 1500 NOTES 1, 2, 3, 4 & 5
NOTES: 1.REFER TO KJWW SPECIFICATIONS 23 21 23 FOR ADDITIONAL INFORMATION. 2.PUMP CONTROLLED THRU BOILER CONTROL PANEL. 3.PROVIDE SHAFT GROUNDING AS REQUIRED IN THE MOTOR SPECIFICATION 23 05 13.
PUMP SCHEDULE
TAGNAME
AREASERVED GPM
PUMP FT.HEAD ATDESIGN
MINIMUMPUMP
EFFICIENCYINLETSIZE OUTLET SIZE
IMPELLERSIZE BHP
ELECTRICAL (NOTE 1)
MANUFACTURER MODEL NOTESHP
(NOTE E) RPM VOLTAGE PHASES
DISCONNECT CONTROLLER/ STARTER
BY(NOTE A)
TYPE(NOTE B)
BY(NOTE A)
TYPE(NOTE C)
P-1 BLR-1 95.0 40.00 71.6 2" 2" 6.500 1.78 2 1725 200 V 3 E.C. F BLR MFR FV B & G E-90 2AB NOTES 1 & 2
P-2 BLR-2 95.0 40.00 71.6 2" 2" 6.500 1.78 2 1725 200 V 3 E.C. F BLR MFR FV B & G E-90 2AB NOTES 1 & 2
P-3 BLR-3 95.0 40.00 71.6 2" 2' 6.500 1.78 2 1725 200 V 3 E.C. F BLR MFR FV B & G E-90 2AB NOTES 1 & 2
P-4 HEATING 390.0 60.00 80 4" 3" 8.250 7.79 10 1770 200 V 3 E.C. F E.C. VFD B & G E-1510 3BD NOTES 1 & 3
P-5 HEATING 390.0 60.00 80 4" 3" 8.250 7.79 10 1770 200 V 3 E.C. F E.C. VFD B & G E-1510 3BD NOTES 1 & 3
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
WH-2
WH-1
T-2
T-1
ET-1
MV-1
BLR-1
BLR-2
BLR-3
NC
NC
4" G
4" GEXISTING GAS
REGULATOR
EXISTING GAS METER
1 1/4" GV 3/4" GV (TYP.3)
CP-1
1
1
1
1
CP-2
5 2
1" D
DISCHARGE INTOFLOOR DRAIN
NCNC
MOUNT NEUTRALIZERON WALL ABOUT 12" AFF.
3
1 1/4" HWC
2 1/2" CW
2" G
2" HW
3"HW
3"CW
2 1/2" HW140
4
PROVIDE NEW 4" CONCRETEHOUSEKEEPING PAD.
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
D3
D3
D2
D2
D1
WH-1
WH-2
ST-1
ST-2
ET-1 MV-1, PROVIDE WITH SUPPORTSTAND AND ANCHOR TOHOUSEKEEPING PAD.
BLR-1
BLR-2
BLR-3
2" G (TYP.3)
4" G
NC
4" G
NC
1 1/2" G (TYP.2)
EXISTING
GAS METER
EXISTING GAS
REGULATOR
NC
2" G
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M100
PLU
MB
ING
FLO
OR
PLA
NS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO R HT
1/4" = 1'-0"2FIRST FLOOR PLAN - PLUMBING
NO R HT
1/4" = 1'-0"1FIRST FLOOR PLAN DEMOLITION - PLUMBING
3PLUMBING ISOMETRIC
NOTES:1. REFER TO 1/M200 FOR DOMESTIC WATER FLOW DIAGRAM AND REQUIRED PIPING DEMOLITION WORK.
NOTES:1. REFER TO 2/M200 FOR DOMESTIC WATER FLOW DIAGRAM.
DEMOLITION KEYNOTES:1. REMOVE CIRCULATION PUMPS SERVING EXISTING HEAT
EXCHANGERS AND DOMESTIC HOT WATER STORAGE TANKS ANDCONTROL WIRING.
2. REMOVE HEAT EXCHANGERS AND ASSOCIATED PIPING. DOMESTICCOLD WATER BRANCH PIPING SHALL BE REMOVED BACK TO MAINAND PREPARE FOR NEW CONNECTION.
3. REMOVE DOMESTIC HOT WATER BOILER, ASSOCIATED PIPING ANDCONTROLS.
KEYNOTES:1. ARRANGE PIPING TO ALLOW FUTURE REMOVAL AND REPLACEMENT
OF EQUIPMENT WITH THE LEAST AMOUNT OF PIPE DISASSEMBLY.2. ROUTE BOILER GAS REGULATOR VENT PIPING TO OUTDOORS.
LOCATE TERMINATIONS BETWEEN WINDOWS AND AS HIGH ASPOSSIBLE DIRECTLY UNDER PRECAST PANEL. TERMINATE VENTSWITH ELBOW POINTED DOWN AND INSECT SCREEN. SEAL ALLEXTERIOR WALL PENETRATIONS WATER TIGHT.
3. NEUTRALIZER SHALL BE JJM BOILER WORKS JM-50 OREQUIVALENT. PROVIDE WITH 2 SETS OF REPLACEMENT PELLETS.
4. 1" SCH. 40 316 STAINLESS STEEL DRAIN PIPE CONNECTED TOBOTTOM OF CHIMNEY LINER TEE AND EXTENDED ALONG WALL TONEUTRALIZER AND FLOOR DRAIN. MOUNT PIPE TO WALL ABOUT 18"ABOVE FLOOR WITH 1/4"/FT SLOPE TO DRAIN.
5. EXTEND 1-1/4" GAS REGULATOR VENT FROM MIDAMERICANENERGY REGULATOR OVER AND ABOVE WINDOW AND TERMINATENEXT TO OTHER GAS VENTS WITH ELBOW POINTING DOWN ANDREMOVABLE INSECT SCREEN. COORDINATE REQUIREMENTS WITHMIDAMERICAN ENERGY. COORDINATE ROUTING WITH A/E.
25
NOTES:1. AS PART OF THIS PROJECT THE ENTIRE DOMESTIC WATER HEATING
SYSTEM INCLUDING BOILER, PLATE FRAME HEAT EXCHANGERS,STORAGE TANKS, CIRCULATING PUMPS AND ALL ASSOCIATED PIPINGAND CONTROLS WITHIN THE BOILER ROOM SHALL BE DEMOLISHED. NOTALL PIPING AND COMPONENTS TO BE DEMOLISHED ARE SHOWN ONTHIS PLAN VIEW. REFER TO 1/M200 FOR PIPING DEMOLITION.
2. DOMESTIC COLD AND HOT WATER SHALL BE MAINTAINED IN OPERATIONTHROUGHOUT THE CONSTRUCTION PERIOD EXCEPT FOR SCHEDULEDOUTAGES AS COORDINATED WITH OWNER.
3. A SINGLE OUTAGE (9:00 A.M. to 5:00 P.M. ON A WEEK DAY) IS PERMITTEDTO MAKE THE SWITCH-OVER TO THE NEW DOMESTIC WATER HEATERS(WH-1 & WH-2). THE OUTAGE SHALL BE COORDINATED AND SCHEDULEDWITH THE OWNER AT LEAST ONE WEEK IN ADVANCE.
4. SHORTER OUTAGES MAY BE REQUIRED TO COMPLETE INSTALLATION OFNEW STORAGE TANKS (ST-1 & ST-2) AND MIXING VALVE (MV-1),SCHEDULE OUTAGE WITH OWNER.
5. ENSURE THE NEW DOMESTIC HOT WATER SYSTEM IS PROPERLYFLUSHED AND DISINFECTED EACH TIME BEFORE BEING PUT INTOOPERATION.
6. PRIME AND PAINT ALL EXTERIOR GAS VENT PIPING TO MATCH BUILDINGWALL. COLOR SELECTED BY A/E.
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
P-4
WH-2
WH-1
T-2
T-1
ET-1
MV-1
ET-2
BLR-1
BLR-2
BLR-3
P-1
P-2
P-3
6" HWR
6" HWS
6" HWS
P-5
AIR SEPARATOR
4" HWS
6" HWS
4" HWR 3" HWS
4" HWR
3" HWS6" HWS
ENLARGE CONCRETE PAD AS REQUIREDTO ACCOMMODATE NEW EQUIPMENT.
ENLARGE CONCRETE PADS AS REQUIREDTO ACCOMMODATE NEW PUMPS.
CHEMICAL POT FEEDER
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
4" HWS
6" HWS
4" HWR 3" HWS
4" HWR
3" HWS
REMOVE AND REUSE CHEMICALPOT FEEDER. REFER TO 2/M201FOR NEW PIPING.
REMOVEEXPANSION TANK
1
1
1
2
REMOVE AIRSEPARATOR.
REMOVE SECONDARY PUMPS
AIR SEPARATOR
6" DECOUPLER
6" HWS
4" HWS
4" HWR
3" HWS
4" HWR
3" HWS
NC
6" HWS
BLR-1
EXTEND HOUSEKEEPINGPAD AS REQUIRED. P-4
P-5
P-2
P-3
P-1
BLR-2
BLR-3
6" HWS
6" HWR
6" HWS
NC
6" HWS4" HWS
ET-2
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M101
HE
AT
ING
FLO
OR
PLA
NS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO R HT
1/4" = 1'-0"1FIRST FLOOR PLAN - PIPING
NO R HT
1/4" = 1'-0"2FIRST FLOOR PLAN DEMOLITION - PIPING
NO SCALE3PIPING ISOMETRIC
NOTES:1. THE EXISTING HEATING WATER SYSTEM SHALL NOT BE DISABLED
UNTIL HEATING IS NO LONGER NEEDED IN THE BUILDING. THE NEWHEATING SYSTEM SHALL BE COMPLETE, TESTED, BALANCED ANDFULLY OPERATIONAL BY SEPTEMBER 1, 2017.
2. REMOVE EXISTING BOILER AND ALL ASSOCIATED PUMPS, PIPING ANDCONTROLS.
3. PROVIDE EQUIPMENT AND PIPING COORDINATION DRAWINGS FOR A/EAPPROVAL BEFORE BEGINNING WORK. REFER TO SECTION 23 05 00.
4. NEATLY ROUTE ALL DRAIN PIPING TO THE NEAREST FLOOR DRAIN.COORDINATE ROUTING WITH A/E TO MAXIMIZE ACCESS AND AVOID TRIPHAZARDS.
KEYNOTES:1. REMOVE HEATING BOILER AND ASSOCIATED PUMP, PIPING AND
CONTROLS.2. REMOVE DOMESTIC WATER BOILER AND ASSOCIATED PUMP, PIPING
AND CONTROLS.
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
3
M10218"Ø FLUE
12
"Ø F
LU
E
8"Ø FLUE (TYP.3)
WH-1
WH-2 BLR-1
BLR-2
BLR-3
2
1
4
5
ALL FLUES SHALL BE DOUBLE WALL UPTO CONNECTION TO CHIMNEY LINERBOOT TEE. REFER TO SECTION 23 51 00.
BOILER VENT DRAFTCONTROL PANEL.REFER TO SECTION 2351 00.
3
6
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
3
M102
EXISTING LOUVER TO REMAIN.
REMOVE DAMPER, ACTUATORAND ALL ASSOCIATED CONTROLS.
REMOVE ALL BOILER FLUESBACK TO CONNECTION TOCHIMNEY.
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M102
FLU
E &
IN
TA
KE
FLO
OR
PLA
NS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00N
O R HT
1/4" = 1'-0"1FIRST FLOOR PLAN - NEW WORK
NO R HT
1/4" = 1'-0"2FIRST FLOOR PLAN - DEMOLITION
1/4" = 1'-0"3FLUE SECTION
KEYNOTES:1. ORIGINAL BUILDING DRAWINGS SHOW A 24" DIAMETER CHIMNEY FLUE
GROUTED IN ON ALL SIDES. THE M.C. SHALL REMOVE AND REINSTALLTHE MASONRY CHIMNEY ENCLOSURE ON FIRST FLOOR AND CHIMNEYLINER AND GROUT AS REQUIRED TO INSTALL A NEW CHIMNEY LINER.THE M.C. SHALL VERIFY THE EXISTING CHIMNEY FLUE INSIDEDIAMETER, MATERIAL AND CONDITION AND REPORT IT TO ENGINEERBEFORE BEGINNING WORK.
2. FURNISH AND INSTALL WATER HEATER VENTS AND COMBUSTION AIRINTAKES WITH CONCENTRIC VENT TERMINATIONS IN ACCORDANCEWITH WATER HEATER MFR'S RECOMMENDATIONS. INSTALLCONCENTRIC VENTS CENTERED BETWEEN WINDOWS AND AS HIGH ASPOSSIBLE (DIRECTLY UNDER PRECAST PANEL). COORDINATE THEEXACT PLACEMENT OF THE WALL PENETRATIONS WITH THE A/E PRIORTO STARTING WORK TO ENSURE CODE REQUIRED CLEARANCESFROM WINDOWS ARE MET. SEAL WALL PENETRATIONS WATERTIGHT.PRIME AND PAINT EXTERIOR PORTION OF VENTS TO MATCH EXTERIORWALL COLOR.
3. PROVIDE DRAFT CONTROL DAMPER IN THE OUTLET FLUE OF EACHBOILER. REFER TO SECTION 23 51 00 FOR CONTROL DAMPERSPECIFICATIONS AND ASSOCIATED CONTROLS.
4. 8" COMBUSTION AIR. COMBUSTION AIR DUCT SIZES AND INSTALLATIONSHALL BE IN ACCORDANCE WITH THE BOILER MFR'SRECOMMENDATIONS. M.C. SHALL VERIFY SIZES AND REQUIREMENTSWITH THE BOILER MFR. AND INCLUDE ASSOCIATED COSTS IN BID.REFER TO SECTION 23 51 00 FOR ADDITIONAL REQUIREMENTS.
5. PROVIDE 12" DEEP GALVANIZED SHEET METAL PLENUM ON THEBACKSIDE OF THE EXISTING LOUVER. PROVIDE 45 DEGREE CHAMFERAT TOP OF PLENUM TO CONNECT COMBUSTION AIR DUCTS TO. SLOPEBOTTOM OF PLENUM SUCH THAT ANY MOISTURE IN THE PLENUM WILLDRAIN OUT THROUGH LOUVER. PROVIDE 24"W x 18"H INSULATEDACCESS DOOR IN THE PLENUM TO CLEAN BACKSIDE OF LOUVER.INSULATE THE ENTIRE PLENUM ON THE OUTSIDE WITH 2" THICK DUCTBOARD INSULATION.
6. PROVIDE 3/4" SCH. 40 316 STAINLESS STEEL PIPING WITH TRAP FROMTHE BOTTOM OF THE FLUE TEE AT EACH BOILER TO THENEUTRALIZER AND FLOOR DRAIN.
NEW 18" DIA. CHIMNEY LINER.REFER TO SECTION 23 51 00FOR REQUIREMENTS. FIELDVERIFY EXACT LENGTH OFNEW CHIMNEY REQUIRED.
BOOT TEE WITH 1" DRAINCONNECTION.
EXTEND 1" SCH. 40 316 STAINLESSSTEEL DRAIN PIPE TO NEUTRALIZERAND FLOOR DRAIN. REFER TO2/M100 FOR CONTINUATION.
LEVEL 1
0'-0"
LEVEL 2
10'-10"
LEVEL 3
18'-8"
LEVEL 4
27'-4"
LEVEL 8
62'-0"
LEVEL 9
70'-8"
ROOF
79'-2"
CHIMNEY
99'-6"(FIELD VERIFY)
PROVIDE RAIN CAP ANDWATERTIGHT FLASHING ATTOP OF MASONRY CHIMNEYENCLOSURE. PRIME ANDPAINT RAIN CAP ANDEXPOSED CHIMNEY LINERAND FLASHING. COLORSELECTED BY A/E.
TT
M
4"G
4"CW
6"HWR
6"HWS
1/2"NCW
A
HWC
HW
C
1-1
/2"G
REMOVE DOMESTIC WATER BOILERINCLUDING ALL ASSOCIATEDPIPING, FLUE AND CONTROLS.
REMOVE PLATE AND FRAME HEATEXCHANGER INCLUDING ALLASSOCIATED PUMPS AND PIPING.
REMOVEEXPANSION TANK.
REMOVE DOMESTIC HOTWATER STORAGE TANKAND ALL ASSOCIATEDPIPING.
4"HWHWC
REMOVE DOMESTIC HOTWATER CIRC. PUMP ANDPIPING.
REFER TO 1/M201 FORCONTINUATION.
HWC
CP-1
3"HW
A
MV-1
CP-2ET-1
REFER TO HEATING WATERFLOW DIAGRAM 2/M201 FORCONTINUATION.
2"C
W
2"C
W
2"H
W
1-1/4"HWC
2-1/2"CW3"CW4"CW
4"HW
1-1/4"HWC
1-1/2"HW
2"G 2"G
1 1/2"G
3"H
W
2"H
W140
2"H
W140
2-1/2"HW140
1"
2-1/2"HW140
4"G
4"G
6
6
2-1
/2"
2"
2"
2"
NEW CONNECTION TO EXISTING STRAINER.REMOVE AND CLEAN STRAINER SCREEN.
11
11
3 3
2
4
3 3
5
WH-1
1-1/2"
2-1/2"
PROVIDE 208 VAQUASTAT.
WH-2
T-1 T-2
ROUTE TO NEARESTFLOOR DRAIN.
ROUTE TO NEARESTFLOOR DRAIN.
ROUTE TO NEARESTFLOOR DRAIN.
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M200
DO
ME
ST
IC W
AT
ER
FLO
W D
IAG
RA
MS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO SCALE
DOMESTIC HOT WATER FLOW DIAGRAM - DEMOLITION
NO SCALE
DOMESTIC HOT WATER FLOW DIAGRAM
KEYNOTES:1. PROVIDE VACUUM RELIEF VALVE BETWEEN TANK AND VALVE.2. PROVIDE CONDENSATE NEUTRALIZER, REFER TO PLUMBING MATERIAL
LIST UNDER WATER HEATER.3. PIPE SAFETY RELIEF, TANK DRAIN AND CONDENSATE TO FLOOR
DRAIN.4. BALANCE FLOW THRU WATER HEATERS TO MATCH.5. PROVIDE AQUASTAT TO CONTROL STORAGE TANK CIRCULATION PUMP
AND SET TO 130°F (ADJ).6. PIPE CONNECTIONS TO THE WATER HEATERS AND DOMESTIC HOT
WATER STORAGE TANKS SHALL BE REVERSE RETURN AS SHOWN TOEQUALIZE FLOW THROUGH THEM.
1
2
M
M
4"H
WS
4"H
WS
4"H
WS
4"H
WS
4"HWR
P-EP-EP-E
REFER TO DOMESTIC WATER FLOWDIAGRAM 2/201 FORCONTINUATION.
AS-E
PRV-E
BFP-E PRV-E
ET-E
P
HEATING RETURN
BLR-E (DHW)
EXISTING BYPASS(POT)FEEDER.
SYSTEM PUMP P-E
SYSTEM PUMP P-E
ET-E
HEATING SUPPLY
ET-E
HX-E HX-E
4"HWR
4"HWS
1/2"NCW
DHW(DOMESTIC HOT
WATER)
DHW
P-E
T
3"H
WS
3"H
WR3"H
WS
3"H
WR
BLR-E
T
FS
BLR-E
T
FS
3"H
WS
3"H
WR
BLR-E
T
FS
PP
PP
4"G 4"G
2"G
2"G 2"G
6"H
WS
6"H
WS
6" DECOUPLER
4"G 4"G
3"H
WR
3"H
WR
3"H
WR
6"HWR
3"H
WS
FS
3"H
WS
FS
3"H
WS
P
FS
6"HWS6"HWS
VFD
P
VFD
P
BLR-3BLR-2BLR-1
PUMP P-3
(95 GPM)
PUMP P-2
(95 GPM)
PUMP P-1
(95 GPM)
PUMP P-4 (390 GPM)
BFP-E
FROM BLDG.
EXISTING BYPASS(POT)FEEDER.
TO BLDG.
REFER TO DOMESTIC WATER FLOWDIAGRAM 2/M200 FOR CONTINUATION
T
AS-1
AIR SEPARATOR. REFERTO SECTION 23 21 00.
AUTOMATIC AIR VENT. REFERTO SECTION 23 21 00.
PUMP P-5 (390 GPM)
RELOCATE CHEMICALPOT FEEDER ANDPROVIDE NEW PIPING.
ET-2 BLADDER EXPANSIONTANK WITH 158 GALLON FULLACCEPTANCE. 50 PSI INITIALPRESSURIZATION.
P P
1"
6" SUCTION & DISCHARGEPIPING (TYP.)
3/4"
3/4"
NEW CONNECTION TOEXISTING 6" VALVE.
NEW CONNECTIONTO 6" HWS. 111
3 3 3
2 (TYP.)
4
(TYP.)6(TYP.)5
DP
DIFFERENTIAL PRESSURETRANSDUCER TOCONTROL P-4 & P-5 VFDSPEEDS.
P
1"
NC 7
8
1"
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M201
HE
AT
ING
WA
TE
R F
LO
W D
IAG
RA
MS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO SCALE
HEATING WATER FLOW DIAGRAM - DEMOLITION
NO SCALE
HEATING WATER FLOW DIAGRAM
NOTES:1. REMOVE EXISTING BOILER AND ALL ASSOCIATED PUMPS, PIPING AND
CONTROLS.2. PROVIDE EQUIPMENT AND PIPING COORDINATION DRAWINGS FOR A/E
APPROVAL BEFORE BEGINNING WORK. REFER TO SECTION 23 05 00.3. NEATLY ROUTE ALL DRAIN PIPING TO THE NEAREST FLOOR DRAIN.
COORDINATE ROUTING WITH A/E TO MAXIMIZE ACCESS AND AVOID TRIPHAZARDS.
KEYNOTES:1. PRESSURE GAUGE WITH SNUBBER PER SECTION 23 09 13. PROVIDE
SINGLE GAUGE WITH 3/8" FLEXIBLE COPPER TUBING, BALL VALVES ANDTAPS AS SHOWN ON DIAGRAM.
2. FLOW SWITCH AND PRESSURE/TEMPERATURE GAUGE PROVIDED BYBOILER MANUFACTURER, INSTALLED BY MECHANICAL CONTRACTOR.WIRE FLOW SWITCH TO BOILER CONTROL PANEL.
3. INSTALL SAFETY RELIEF VALVE PROVIDED BY BOILER MANUFACTURER.PIPE FULL-SIZE TO DRAIN. SUPPORT SOLIDLY.
4. SYSTEM TEMPERATURE SENSOR PROVIDED BY BOILER MANUFACTURER,WIRED TO BOILER CONTROL PANELS.
5. ROUTE 3/4" BOILER GAS VENT PIPING TO OUTDOORS.6. PROVIDE NEUTRALIZER FOR BOILER AND FLUE CONDENSATE AND ROUTE
TO FLOOR DRAIN. NEUTRALIZER SHALL BE JJM BOILER MODEL JM-50. ALLCONDENSATE DRAIN PIPING SHALL BE SCH. 40 316 STAINLESS STEEL.
7. PRESSURE REGULATING AND MAKE-UP WATER VALVE. SET AT 50 PSIGDISCHARGE PRESSURE. REFER TO SECTION 23 21 00 FORSPECIFICATIONS.
8. PRESSURE RELIEF VALVE. SET AT 100 PSIG. REFER TO SECTION 23 21 00FOR SPECIFICATIONS.
2
1
S
6"HWS
6"HWS
6" DECOUPLER
6"HWR
HW
R
HW
R
HW
R
HW
S
HW
S
HW
S
FS
BLR-2BLR-3 BLR-1
P-5
P-3
FS
FS
P-2 P-1
LWT
EWT
111LWT
EWT
LWT
EWT
WIRING. (TYP.)
PROVIDE OATEMP SENSOR
2 2 2
3
MASTERBOILER
CONTROLLER
ON/OFFON/OFFON/OFF
BOILER OPERATION:HEATING WATER SYSTEM WILL HAVE THREE GAS-FIRED CONDENSING BOILERS AND PRIMARY/SECONDARYCONFIGURATION. HEATING WATER BOILERS SHALL HAVE UNIT MOUNTED CONTROLS AND A BOILER MANAGEMENTCONTROL PANEL PROVIDED BY THE BOILER MANUFACTURER OR UNIT MOUNTED CONTROLS THAT ARE ABLE TO BEDESIGNATED AS A MASTER CONTROLLER.
SEQUENCE OF OPERATION:WHEN BOILER MASTER CONTROLLER IS ENABLED IT SHALL ENABLE THE LEAD BOILER, OPEN THE ASSOCIATED TWO-POSITION ISOLATION VALVE, AND ENERGIZE THE ASSOCIATED PRIMARY PUMP AND ENABLE THE SECONDARY SYSTEMPUMP. ONLY ONE SECONDARY PUMP SHALL RUN AT A TIME, START/STOP AND SWITCHING BETWEEN LEAD AND LAGPUMP SHALL BE CONTROLLED THRU SECONDARY PUMP CONTROL PANEL.
BOILER CONTROLLER SHALL MODULATE BURNER FIRING RATE AS REQUIRED TO MAINTAIN THE SYSTEM HEATINGWATER SUPPLY TEMPERATURE SETPOINT. THE BOILER MANAGEMENT CONTROL PANEL SHALL MAINTAIN THE SYSTEMHEATING WATER SUPPLY TEMPERATURE WITHIN +/- 5°F (ADJ.). THE MASTER BOILER MANAGEMENT CONTROL PANELCAN STAGE ON MULTIPLE BOILERS AT PART LOAD TO INCREASE THE EFFICIENCY OF THE PLANT.
MASTER BOILER CONTROLLER SHALL RESET HEATING WATER SUPPLY TEMPERATURE BASED ON OA TEMPERATURERESET SCHEDULE.
SECONDARY CONTROL PANEL SHALL AUTOMATICALLY ENABLE THE LAG HEATING WATER PUMP TO RUN IN THE EVENTTHE LEAD HEATING WATER PUMP FAILS TO OPERATE.
ALARMS, INTERLOCKS & SAFETIES:MC SHALL COORDINATE ALL SAFETY AND INTERLOCK REQUIREMENTS WITH BOILER MANUFACTURER. MC SHALLCOORDINATE AND PROVIDE THE INSTALLATION AND WIRING OF BOILER WATER DIFFERENTIAL PRESSURE/FLOWSWITCHES AND OTHER COMPONENTS PROVIDED WITH THE BOILER AS REQUIRED FOR PROPER OPERATION. MC SHALLPROVIDE AND TERMINATE ALL SAFETY AND INTERLOCK WIRING WITH BOILER CONTROL PANELS AS REQUIRED.
0 10 20 30 40 50 60 70 80
120
130
140
150
160
170
180
HW
S T
EM
P °
F
OUTSIDE AIR TEMP °F
HEATING WATER SUPPLY TEMPERATURERESET SCHEDULE
VFD
P-4VFD
DPS DPS
4
5
PROVIDE SYSTEM CONTROL PANEL, MODULATING DAMPER AT EACHBOILER, SENSORS AND WIRING AS SPECIFIED IN SECTION 23 51 00.
SEQUENCE OF OPERATION:
EACH DAMPER CIRCUIT SHALL BE INDEPENDENT OF EACH OTHERAND ENERGIZED BY AN OUTPUT FROM THE ASSOCIATED BOILER. THEDAMPER SHALL RECEIVE A SIGNAL FROM THE BOILER WHEN A CALLFOR HEAT IS REQUIRED. THE SIGNAL SHALL TRIGGER THE DAMPERTO OPEN AND TRIP A LIMIT SWITCH BUILT INTO THE ACTUATORWHICH SENDS A SIGNAL BACK TO THE BOILER PROVING IT IS OPEN.THE LIMIT SWITCH FOR DAMPER POSITION SHALL BE ADJUSTABLEAND SET DURING START-UP.
WITH A PROVEN OPEN DAMPER THE BOILER WILL START ITS PRE-PURGE CYCLE. AN ADJUSTABLE TIMING RELAY INCORPORATED INTHE DAMPER CONTROL WILL HOLD THIS DAMPER POSITION DURINGTHE BOILER PRE-PURGE CYCLE.
ONCE THE BOILER IS RUNNING THE DAMPER IS RELEASED FOR FULLMODULATION READING THE OUTLET PRESSURE AT THE BOILER ANDMODULATING THE DAMPER POSITION ACCORDINGLY. THE DAMPERCAN HAVE DIFFERENT PRESSURE SETTINGS DEPENDING ON THENEEDS OF THE SYSTEM OR FOR DIFFERENT BOILERS COMBINED INTHE SAME VENTING SYSTEM.
WHEN A BOILER SHUTS DOWN, THE DAMPER SHALL RETURN TO THECLOSED POSITION. EACH DAMPER SHALL BE SET TO A NORMALLYCLOSED POSITION TO PROHIBIT DRAFT THROUGH UNFIRED BOILERS.THE DAMPER CONTROL SHALL BE SET FOR A SAFETY POSITION OFFULLY CLOSED. IF THE SYSTEM HAS A FAILURE, THE DAMPER SHALLSPRING CLOSED AND SHUT DOWN THE BOILER.
DRAFT CONTROL MANUFACTURER'S REPRESENTATIVE SHALL BERESPONSIBLE FOR ENSURING THE DRAFT CONTROL SYSTEM ISPROPERLY INSTALLED. THE REPRESENTATIVE SHALL MAKE ALLNECESSARY SETTINGS FOR PROPER BOILER OPERATION ANDPERFORM COMPLETE START-UP OF THE SYSTEM.
DRAFTCONTROL
PANEL
ACT ACT ACT
BOILER FLUEMODULATINGDAMPER. (TYP.)
BLR-1 BLR-2 BLR-3
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
M300
CO
NT
RO
L D
IAG
RA
MS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7K
EV
MA
GK
EIS
TO
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO SCALE
HEATING WATER CONTROL DIAGRAM1
NOTES:1. M.C. SHALL PROVIDE ALL CONTROLS AND WIRING REQUIRED TO STAGE
AND CONTROL ALL BOILERS AND ASSOCIATED PRIMARY PUMPS INACCORDANCE WITH THE BOILER MFR'S RECOMMENDATIONS.
2. M.C. SHALL PROVIDE DIFFERENTIAL PRESSURE TRANSDUCERS ANDASSOCIATED WIRING TO THE VFDs FOR PUMPS P-5 AND P-6 TOMODULATE THE SPEED OF THE PUMPS. THE INITIAL DIFFERENTIALSETPOINT SHALL BE 10 PSIG, BUT THE M.C. SHALL VERIFY THE REQUIREDDIFFERENTIAL PRESSURE SETPOINT REQUIRED TO SATISFY THE MOSTREMOTE HEATING UNITS.
3. M.C. SHALL PROVIDE BOILER DRAFT CONTROLS AS SPECIFIED IN SECTION23 51 00 IN ACCORDANCE WITH MFR'S RECOMMENDATIONS INCLUDING ALLASSOCIATED WIRING.
4. ALL CONTROL WIRING SHALL BE INSTALLED IN CONDUIT.
KEYNOTES:1. PROVIDE WIRING BETWEEN EACH BOILER CONTROL PANEL, FLOW
SWITCHES, EXTERNAL SENSORS AND PRIMARY PUMPS.2. BOILER PUMP START/STOP. CONTROL THROUGH INDIVIDUAL BOILER
PANEL.3. PROVIDE TEMPERATURE SENSOR TO CONTROL BOILERS.4. PROVIDE SEPARATE DIFFERENTIAL PRESSURE TRANSDUCERS TO
CONTROL PUMPS P-4 AND P-5.5. COORDINATE THE PLACEMENT OF THE OUTSIDE AIR SENSOR WITH THE
A/E. LOCATE IN A SHADED LOCATION NEAR ENTRY CANOPY.
NO SCALE
BOILER DRAFT CONTROL2
ELECTRICAL ABBREVIATION KEY
AFF ABOVE FINISHED FLOOR
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
ABBR: DESCRIPTION:
TYP TYPICAL
C CONDUIT
UNO UNLESS NOTED OTHERWISE
1. ##-### INDICATES ELECTRICAL EQUIPMENT DEFINED IN ELECTRICAL SCHEDULES ORSPECIFICATION. REFER TO DRAWINGS CONTAINING ELECTRICAL SCHEDULES.PERMANENT NAMEPLATE SHALL MATCH FINAL EQUIPMENT NOMENCLATURE, NOTELECTRICAL EQUIPMENT TAG NAME, REFER TO SPECIFICATIONS.
LUMINAIRE KEY:
DEVICE KEY:
ELECTRICAL GENERAL NOTES:
LUMINAIRE
F1 = FIXTURE TAG1 = CIRCUIT NUMBERa = SWITCH DESIGNATION
*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THISINFORMATION. EX: F1 / 1 / a / NL
DEVICE+##" = MOUNTING (IF APPLICABLE)1 = CIRCUIT NUMBER
*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THISINFORMATION. EX: +##" / 1
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDSFOR ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATIONSDETAIL ON THIS PAGE FOR ADDITIONAL INFORMATION.
2. CIRCUIT NUMBERS ARE SHOWN FOR CIRCUIT IDENTIFICATION. CIRCUITING SHALLAGREE WITH NUMBERING ON THE PANEL PROVIDED. COMMON NEUTRALS MAY NOT BEUSED FOR BRANCH CIRCUITS. BALANCE THE LOAD ON PANEL AS EVENLY AS POSSIBLEBETWEEN EACH PHASE.
3. CIRCUITS SERVING EMERGENCY AND EXIT LUMINAIRES WILL BE RUN IN A SEPARATERACEWAY FROM ALL OTHER CIRCUITS.
4. FLUSH MOUNT ALL LIGHTING CONTROL DEVICES AT +42" FROM FLOOR (CENTERLINEDIMENSION), EXCEPT WHERE OTHERWISE NOTED. DEVICES MAY BE SURFACEMOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.
5. FLUSH MOUNT ALL DUPLEX RECEPTACLES AND TECHNOLOGY OUTLETS AT +18" FROMFLOOR (CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. RECEPTACLESAND OUTLETS MAY BE SURFACE MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.
6. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORSSHALL BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRETESTS OF THROUGH-PENETRATION FIRESTOPS.
7. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL LUMINAIRES WITH NEW ANDEXISTING DEVICES, EQUIPMEN, PIPING, DUCTWORK ETC.
8. CONTRACTOR SHALL VERIFY ALL EXISTING AND NEW EQUIPMENT LOCATIONS WITHPLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING THEACTUAL ELECTRICAL INSTALLATION, THIS CONTRACTOR SHALL ADJUST, LUMINAIRES,OUTLETS, OR CONNECTION LOCATIONS TO ACCOMMODATE EQUIPMENT.
9. ELECTRICAL EQUIPMENT SHALL BE MOUNTED TO AVOID IMPEDANCE OF, OPERATIONOF, AND/OR ACCESS TO ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OFELECTRICAL AND EQUIPMENT, ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR,SHALL BE APPROVED IN ADVANCE BY THE OTHER CONTRACTOR.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALLOPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR ATTHE EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BEGROUTED OR SEALED INTO OPENINGS.
11. CONTRACTOR SHALL REMOVE AND REINSTALL ALL CEILING TILES AS REQUIRED FORTHE EXECUTION OF ELECTRICAL WORK. CONTRACTOR SHALL REPLACE CEILING TILESWITH IDENTICAL MATERIAL WHERE DAMAGED BY THIS CONTRACTOR.
ELECTRICAL INSTALLATION NOTES:
VFD-# VARIABLE FREQUENCY DRIVE - REFER TO VFD SCHEDULE 26 29 23
N/A N/A FIRE ALARM ADDRESSABLE MONITOR MODULE(EXISTING)
MM
N/A N/A FIRE ALARM FLOW SWITCH TO MONITOR FIREPROTECTION SYSTEM (EXISTING)
FS
N/A N/A FIRE ALARM MONITOR SWITCH TO MONITORFIRE PROTECTION SYSTEM (EXISTING)
MS
CO N/A CARBON MONOXIDE DETECTOR (EXISTING)N/A
XM# EMERGENCY UNIT26 51 00
FIRE ALARM AUDIO/VISUAL NOTIFICATIONDEVICE - CEILING MOUNTED (EXISTING)
FIRE ALARM HEAT DETECTOR (EXISTING)H
26 24 19FCS-# FUSIBLE COMBINATION STARTER, REFER TO DISCONNECT AND STARTERSCHEDULE
26 24 19MS-# MANUAL STARTER, REFER TO DISCONNECT AND STARTER SCHEDULE
26 24 19MX-# MANUAL SWITCH, REFER TO DISCONNECT AND STARTER SCHEDULE
R-# RELAY 26 09 16
SW-1P 26 27 26 SWITCH - SINGLE POLE (EXISTING/DEMOLITION)
N/A N/A FUSED SWITCH (EXISTING/DEMOLITION)F
F# INDUSTRIAL/STRIP LIGHT LUMINAIRE26 51 00
DISCONNECT SWITCH
ELECTRICAL EQUIPMENT TAGS
TAG: DESCRIPTION:RELATED
SPECIFICATION
F# LUMINAIRE TYPE 26 51 00
JB 26 05 33 JUNCTION BOXJ
J
ECONN 26 05 33 ELECTRICAL CONNECTIONE
E
PANELBOARD - SURFACE MOUNT
ES ES 26 09 16 EMERGENCY STOP, N.C. CONTACT
FCS-# 26 24 19 COMBINATION STARTER
DUPLEX RECEPTACLE, 125V (EXISTING)
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:SPEC
SECTION:DESCRIPTION:
MX-#/MS-# 26 24 19 MANUAL SWITCH / STARTER
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
FDS-# 26 28 16
26 24 19FDS-# FUSIBLE DISCONNECT SWITCH, REFER TO DISCONNECT AND STARTERSCHEDULE
X
EXISTING INDUSTRIAL/STRIP LIGHT LUMINAIRE
AV
TC-# TIME CLOCK CONTROL 26 09 16
SW-3W 26 27 26 SWITCH - 3 WAY
3
ELECTRICAL PHASING NOTES:THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOTLIMITED TO, LIGHTING, POWER, AND SYSTEMS.
1. REFER TO [ARCHITECTURAL] DRAWINGS FOR GENERAL DESCRIPTION OF PHASES.REFER TO [CONSTRUCTION MANAGER/GENERAL CONTRACTOR/ARCHITECTS]INSTRUCTIONS FOR MORE DETAILS, PHASING SCHEDULES AND FORCONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGSDEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, ANDTECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THEREQUIREMENTS OF THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES,ETC. WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY LIGHTING, POWER AND SYSTEMS, ETC. AS NEEDED TOMAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT.
4. INSTALL TEMPORARY LIGHTING, CIRCUITS, ETC. AS NECESSARY TO KEEP ALLOCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
1VIEW NAME1/8" = 1'-0"
1
M101
14
32
T101
SIMDETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAILREFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAILREFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVEPROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBEADDITIONAL INFORMATION ABOUTWORK REQUIRED, SPECIFIC TO THESHEET AND/OR DETAIL
NO R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE KEY:
NEW WORK BY THIS CONTRACTOR(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN(LIGHT SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR(DARK SHORT DASHED LINE)
TEMPERATURE CONTROLS CONTRACTORT.C.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
BUILDING CODE: IBC 2009 EDITION
FIRE CODE: IFC 2009 EDITION
PLUMBING CODE: ILLINOIS PLUMBING CODE CURRENT EDITION
MECHANICAL CODE: IMC 2009 EDITION
ELECTRICAL CODE: NFPA 70 (NEC) 2008 EDITION
LIFE SAFETY CODE: NFPA 101 2000 EDITION
ENERGY CONSERVATION CODE: IECC 2015
LOCAL BUILDING CODE: CURRENT EDITION
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELDSURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONSAND REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING EQUIPMENT, LUMINAIRES, AND CONDUIT ARE SHOWN. VERIFYEXISTING CONDITIONS AND REPORT ANY CONFLICTS WITH NEW WORK BEFORESTARTING WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR WIREWAYS AND CONDUITS BEFOREFABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELDCONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS WORKAND SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIESARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS AREA OFWORK.
5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATEDWITH THEIR WORK.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OFCEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BYALL CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIORTO BIDDING.
7. WHERE EXISTING ELECTRICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITHNEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTORSHALL EITHER ARRANGE NEW EQUIPMENT, CONDUIT, OR DUCTWORK IN SUCH AFASHION THAT IT DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORKEXISTING ELECTRICAL SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT,PIPING, OR DUCTWORK.
ELECTRICAL RENOVATION NOTES:THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOTLIMITED TO, LIGHTING, POWER, AND SYSTEMS.
BRANCH CIRCUIT WIRING KEY
WIREID
2 WIRE 3 WIRE 4 WIRE
THHW/THWN COPPERCONDUCTORS
EQUIPMENTGROUNDINGCONDUCTOR CONDUIT
A# 2#12 3#12 4#12 1#12 3/4"
B# 2#10 3#10 4#10 1#10 3/4"
C# 2#8 3#8 4#8 1#10 3/4"
D# 2#6 3#6 4#6 1#10 1"
E# 2#4 3#4 4#4 1#8 1 1/4"
F# 2#2 3#2 4#2 1#8 1 1/4"
G# 2#1 3#1 4#1 1#6 1 1/2"
H# 2#1/0 3#1/0 4#1/0 1#6 2"
ALL BRANCH CIRCUITS SHALL INCLUDE THE EQUIPMENT GROUNDCONDUCTOR
ELECTRICAL SHEET INDEXE000 ELECTRICAL COVER SHEET
E101 LIGHTING FLOOR PLANS
E102 POWER AND SYSTEMS FLOOR PLANS
LC01 LIGHTING CONTACTOR DETAIL
LC02 EXTERIOR LIGHTING CONTROL DETAIL
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
E000
ELE
CT
RIC
AL C
OV
ER
SH
EE
TS
PE
NC
ER
TO
WE
R B
OIL
ER
RE
PLA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7D
ON
CR
AJA
RS
CH
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
[Key*:] REFER TO BRANCH CIRCUIT WIRING KEY ON THIS SHEET FOR CONDUCTOR SIZE AND QUANTITY
Total Amps: 65.48 58.43 65.06
Total Load: 7.75 kVA 7.01 kVA 7.7 kVA
DP-5-41 SPARE 20 A 1 0 0 -- -- SPACE DP-5-42 --
DP-5-39 SPARE 20 A 1 0 0 -- -- SPACE DP-5-40 --
DP-5-37 SPARE 20 A 1 0 0 -- -- SPACE DP-5-38 --
DP-5-35 SPARE 20 A 1 0 0 -- -- SPACE DP-5-36 --
DP-5-33 SPARE 20 A 1 0 0 -- -- SPACE DP-5-34 --
DP-5-31 SPARE 20 A 1 0 0 -- -- SPACE DP-5-32 --
DP-5-29 WH-1, WH-2, *A2 20 A 1 1.2 0 1 20 A SPARE DP-5-30
DP-5-27 SPARE 20 A 1 0 0 1 20 A SPARE DP-5-28
DP-5-25 BOILER VENT DRAFT CONTROL PANEL, *A2 15 A 1 1 0 1 20 A SPARE DP-5-26
-- DP-5-23 -- -- -- 0.45 0 1 20 A SPARE DP-5-24
DP-5-21 CP2, *A3 20 A 2 0.45 0.51 1 20 A CP-1, *A2 DP-5-22
DP-5-19 BOILER SHUTDOWN (EP/RELAYS), *A2 20 A 1 0.1 0.6 1 20 A Lighting, *A2 DP-5-20
-- DP-5-17 -- -- -- 1.12 1.12 -- -- -- DP-5-18 --
-- DP-5-15 -- -- -- 1.12 1.12 -- -- -- DP-5-16 --
DP-5-13 BLR-2, *A3 20 A 3 1.12 1.12 3 20 A BLR-3, *A3 DP-5-14
-- DP-5-11 -- -- -- 0.9 1.12 -- -- -- DP-5-12 --
-- DP-5-9 -- -- -- 0.9 1.12 -- -- -- DP-5-10 --
DP-5-7 P-3' *A3 20 A 3 0.9 1.12 3 20 A BLR-1, *A3 DP-5-8
-- DP-5-5 -- -- -- 0.9 0.9 -- -- -- DP-5-6 --
-- DP-5-3 -- -- -- 0.9 0.9 -- -- -- DP-5-4 --
DP-5-1 P-1, *A3 20 A 3 0.9 0.9 3 20 A P-2, *A3 DP-5-2
CKT NO. LOAD DESCRIPTION
OVERCURRENTPROTECTIONAMPS P
A B COVERCURRENTPROTECTIONP AMPS LOAD DESCRIPTION CKT NO.
Panel Notes:
LOCATION: MECHANICAL EQUIPMENT 114 DEMAND: 22.46 kVA
SCCR: 42,000 WIRE: 4
FED FROM: EDP-19 GROUND BUS PHASE: 3
MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye
TYPE: BOLT-ON MAIN: 100A MLO
PANEL NAME: DP-5 CONNECTED 22.5 kVA
[Key*:] REFER TO BRANCH CIRCUIT WIRING KEY ON THIS SHEET FOR CONDUCTOR SIZE AND QUANTITY, *E = EXISTING CIRCUIT BREAKER, LOAD AND WIRING; *EB= EXISTING CIRCUIT BREAKER, NEW LOAD, *NB =NEW CIRCUIT BREAKER, NEW LOAD AND WIRING; *RB = REPLACE EXSITING 10,000 AIC RATED CIRCUIT BREAKER WITH NEW 65,000 AIC RATED CIRCUIT BREAKER OF SAME AMPERAGE AS EXISTING
Total Amps: 127.7 120.65 127.28
Total Load: 15.22 kVA 14.48 kVA 15.17 kVA
-- EDP-29 SPACE -- -- 0 0 -- -- SPACE EDP-30 --
-- EDP-27 SPACE -- -- 0 0 -- -- SPACE EDP-28 --
-- EDP-25 SPACE -- -- 0 0 -- -- SPACE EDP-26 --
-- EDP-23 -- -- -- 7.7 3.73 -- -- -- EDP-24 --
-- EDP-21 -- -- -- 7.01 3.73 -- -- -- EDP-22 --
EDP-19 PANEL DP-5, *NB, *F4 20 A 3 7.75 3.73 3 70 A P-5 (REDUNDANT), *NB, *3C EDP-20
-- EDP-17 -- -- -- 0 0 -- -- -- EDP-18 --
-- EDP-15 -- -- -- 0 0 -- -- -- EDP-16 --
EDP-13 BOOSTER PUMPS,*RB 90 A 3 0 0 3 60 A SPARE? (BREAKER ON/NO LOAD DEFINED)... EDP-14
-- EDP-11 -- -- -- 0 0 -- -- -- EDP-12 --
-- EDP-9 -- -- -- 0 0 2 30 A TRASH COMPACTER, *RB EDP-10
EDP-7 PANEL 'DP2'; *E 100 A 3 0 0 -- -- -- EDP-8 --
-- EDP-5 -- -- -- 3.73 0 2 60 A PANEL 'DPE', *RB EDP-6
-- EDP-3 -- -- -- 3.73 0 1 20 A SPARE? (BREAKER ON/NO LOAD DEFINED)... EDP-4
EDP-1 P-4, *3C 60 A 3 3.73 0 1 20 A ENGINE BLOCK HEATER; *E EDP-2
CKT NO. LOAD DESCRIPTION
OVERCURRENTPROTECTIONAMPS P
A B COVERCURRENTPROTECTIONP AMPS LOAD DESCRIPTION CKT NO.
Panel Notes: EXISTING SIEMENS ITE TYPE CDP-7
LOCATION: MAINTENANCE 118 DEMAND: 44.86 kVA
SCCR: 65,000 WIRE: 4
FED FROM: GROUND BUS PHASE: 3
MOUNTING: SURFACE SOLID NEUTRAL VOLTS: 120/208 Wye
TYPE: BOLT-ON MAIN: 400A/MCB
PANEL NAME: EDP (EXISTING) CONNECTED 44.9 kVA
420 - 4-20mA FOLLOWER
PN - 3-15 PSI TRANSDUCER
CONTROL: MOL - MULTIPLE MOTOR OVERLOADS HAR - PASSIVE HARMONIC FILTER
CB - CIRCUIT BREAKER TO - MELTING THERMAL OVERLOADS LR - INPUT LINE REACTOR
FDS - FUSED DISCONNECT SWITCH *HA - HAND-OFF-AUTO DOOR SWITCH RFT - REMOTE FAULT TRIP
DS - DISCONNECT SWITCH *CT - CONTROL TRANSFORMER, FUSED, 120V RDR - REMOTE DRIVE RUN
LINE DISCONNECT: *ET - ELECTRONIC THERMAL OVERLOADS RSS - REMOTE START-STOP
18PWM - 18 PULSE PWM *MA - MANUAL SPEED ADJUSTMENT *SHZ - SKIP FREQUENCY CAPABILITY
12PWM - 12 PULSE PWM (INCLUDES * ITEMS) ISO - ISOLATION TRANSFORMER
PWM - PULSE WIDTH MODULATED SA - STANDARD ACCESSORIES TA - TWO CONVERTIBLE AUXILIARY CONTACTS
LINE DISCONNECT: REMARKS:
E - VARIABLE FREQUENCY DRIVE SCHEDULE
ITEM LINE DISC.DRIVE
BYPASS CONTROL
VOLTAGE DRIVE
NEMA ENCLOSURE REMARKS APPROVED MANUFACTURERSINPUT OUTPUT PH.H.P.
RATING TYPE
VFD-10 CB N/A 420 208 V 208 V 3 10 PWM 1 SA,LR,VARIABLETORQUE
ABB ACH 550 SERIESTOSHIBA Q9 SERIESDANFOSS VLT6000 SERIES
FS - FUSED SWITCH
MX - MANUAL SWITCH HL - HANDLE PADLOCK HASP
MS - MANUAL STARTER S/N - INSULATED NEUTRAL ASSEMBLY SS - START-STOP PUSHBUTTON IN DOOR
FV - FULL VOLTAGE *TA - TWO CONVERTIBLE AUXILIARY CONTACTS EI - ELECTRICAL INTERLOCK (2)-N.O. & (2)-N.C.
STARTER TYPE: *RP - RED PILOT LIGHT IN DOOR FA - 4-CONVERTIBLE AUXILIARY CONTACTS
*HA - HAND-OFF-AUTO IN DOOR GP - GREEN (OFF) PILOT LIGHT IN DOOR
CB - CIRCUIT BREAKER *EO - ELECTRONIC OVERLOAD TS - 2 SPEED SELECTOR SWITCH IN DOOR
NF - NON-FUSED *CT - CONTROL TRANSFORMER, FUSED 120V TO - MELTING THERMAL OVERLOADS
FU - FUSED SA - STANDARD ACCESSORIES (INCLUDES * ITEMS) PF - PHASE FAILURE RELAY (5 HP OR GREATER)
DISCONNECT TYPE: REMARKS:
NOTE: ALL DISCONNECTS (EXCEPT MANUAL STARTERS) SHALL BE HEAVY DUTY TYPE.
E - DISCONNECT AND STARTER SCHEDULE
ITEM
DISCONNECT TYPE &RATING CIRCUIT
VOLTAGE POLES
STARTER NEMAENCLOSURE REMARKS APPROVED MANUFACTURERSTYPE RATING NEMA SIZE TYPE
FCS-1A FU 30 A 208 V 3 1 FV 1 SA, FUSED AT 10 AMPS SQUARE D 8538 SCG32EATON TYPE ECNGENERAL ELECTRIC CR308SIEMENS CLASS 17
FDS-30A FU 30 A 208 V 3 1 FUSED AT 15 AMPS SQUARE D 3110 H321NEATON TYPE DHGENERAL ELECTRIC TYPE THSIEMENS TYPE HF
MS-1 16 A 120 V 1 0 MS 1 RP, TO, HL SQUARE D 2510 FG5PCUTLER-HAMMER TYPE MSGENERAL ELECTRIC CR101SIEMENS TYPE SMF
MS-2 16 A 208 V 2 0 MS 1 RP,TO,HL SQUARE D 2510 FG6PEATON TYPE MSGENERAL ELECTRIC CR101SIEMENS TYPE SMF
MX-1 30 A 120 V 1 0 MX 1 SQUARE D 2510 KG1EATON TYPE B2GENERAL ELECTRIC TYPE TCSIEMENS TYPE MMS
NOTE: VFD MUST BE PROVIDED WITH PID CONTROLS WITHALL COMPONENTS AND ACCESSORIES REQUIRED TO ALTERNATE PUMP RUN TIMES AND PROHIBIT BOTH PUMPSFROM RUNNING SIMULTANEOUSLY. CIRCUIT BREAKER SHALL BE RATED AT 42,000 AIC.
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
F1 /DP-5-20 /a
3/a 3/a
PANEL 'DP-5'
F1 /DP-5-20 /a
F1 /DP-5-20 /a F1 /DP-5-20 /a
F1 /DP-5-20 /a F1 /DP-5-20 /a
F1DP-5-20a
F1DP-5-20a
F1DP-5-20a
F1DP-5-20a
F1DP-5-20a
F1DP-5-20a
11
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
X X X X
X X X X
X
X
X
X
X
X
X
X
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
E101
LIG
HT
ING
FLO
OR
PLA
NS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7D
ON
CR
AJA
RS
CH
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO R HT
1/4" = 1'-0"1FIRST FLOOR PLAN - LIGHTING
KEYNOTES:
1. SURFACE MOUNT SWITCHES ON EXISTINGSTRUCTURE. COORDINATE EXACT LOCATION WITHEXISTING PIPING.
E#
SHEET NOTES:
1. REFER TO SHEET E000 FOR GENERAL ELECTRICALNOTES, ELECTRICAL INSTALLATION NOTES,RENNOVATION NOTES, ELECTRICAL SYMBOLS LIST,AND PANEL SCHEDULES.
2. COORDINATE NEW LIGHT FIXTURE LOCATIONS WITHNEW AND EXISTING PIPING, DUCTWORK, DEVICES ANDEQUIPMENT.
NO R HT
1/4" = 1'-0"2FIRST FLOOR PLAN DEMOLITION - LIGHTING
ALL LAMPS FOR THIS PROJECT SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR UNLESS OTHERWISE NOTED.LED LAMP CORRELATED COLOR TEMPERATURE 4000°K, COLOR RENDERING INDEX (CRI) AT OR ABOVE 85, UNLESS NOTED OTHERWISE.
CATALOG NUMBER SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND CATALOG NUMBER ONLY. THE COMPLETE DESCRIPTION ANDTHE SPECIFICATION SHALL BE COORDINATED WITH THE CATALOG NUMBER TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE FIRST MANUFACTURER LISTEDIS THE BASIS FOR DESIGN....
PAF - PAINT AFTER FABRICATION HL - HIGH / LOW LEVEL BALLAST PRS - ELECTRONIC PROGRAM RAPID START BALLAST
FINISH: DIM10 - 0-10V DIMMING BALLAST EM - EMERGENCY BATTERY / BALLAST/DRIVER
(TYPE) BALLAST/DRIVER: (TYPE) BALLAST:
O - OTHER (SEE DESCRIPTION) R - HIGH IMPACT OR ACRYLIC
WL - WALL O - OTHER (SEE DESCRIPTION N - NONE
CL - CEILING SURFACE LED - LIGHT EMITTING DIODE K - KSH12 .125" ACRYLIC
SP - SUSPENDED IN - INCANDESCENT P - POLYCARBONATE
RE - RECESSED FL - FLUORESCENT A - .125 ACRYLIC
(MTG) MOUNTING: (TYPE) LAMP TECHNOLOGY: (L/L) LENS / LOUVER:
LUMINAIRE SCHEDULE
ITEM DESCRIPTION
DIMENSIONS
MTG
ANSIWATT
S
LAMPS BALLAST
L/LAPPROVED
MANUFACTURERL W H DIA. TYPE QTY MODEL VOLTS TYPE
F1 48" INDUSTRIAL STRIP LIGHT,COLD-ROLLED STEEL HOUSING, MEDIUMDIFFUSE LENS, WHITE FINISH, U.L. LISTED.CABLE SUSPENSION TO 8'-0" AFF" OR ASREQUIRED. COORDINATE MOUNTING INEACH ROOM WITH OTHER TRADES ANDEXISTING CONDITIONS AS WELL ASPIPING AND DUCTWORK.
4'-0" 3 3/8" 3 1/4" SP 50 W LED 1 MAX 50 WATTMIN. 4000LUMENS4000K
120 V O METALUX SNLEDLITHONIA Z1LDHE WILLIAMS 75LCOLUMBIA LPT
J
J
JJ
E
E
E
E
E
E
EE
E
E
E
E
E
E
EE
E
H
MM
MM
FS
MS
H
J MM
E
E
E
EE
E
E
E
ES
ES
E
E E
E
E
E
E
J
J
JJ
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
H
MM
MM
FS
MS
H
J MM
R-2POWER RELAY MOUNTEDIN N.E.M.A. 1 ENCLOSUREON WALL ADJACENT TOBOILERS
BLR-1 CONTROL CONTACTS
(SEE FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATION)
120 VAC (EMERGENCY POWER)
NH
5 29/32"
C
ES
ES
BLR-1 CONTROL CONTACTS
BLR-2 CONTROL CONTACTS BLR-2 CONTROL CONTACTS
BLR-3 CONTROL CONTACTS
C
BLR-3 CONTROL CONTACTS
R-1POWER RELAY MOUNTEDIN N.E.M.A. 1 ENCLOSUREON WALL ADJACENT TOBOILERS
TYP. : COORDINATE BOILER CONTROL PANEL120V POWER SUPPLY, WIRING TERMINATIONS,REQUIREMENTS AND CONTACT TYPE WITH M.C.ALL BOILER SHUTDOWN CONTROL WIRING SHALLWIRING SHALL BE #12 AWG IN 1/2" CONDUIT.
O.L.'S
AQUASTAT FURNISHED AND MOUNTED BYMECHANICAL CONTRACTOR, WIRED BY E.C.CONTACT OPENS AT SET TEMPERATURETO STOP PUMP
MANUAL MOTOR STARTERWITH OVERLOAD
120 VOLTCIRCULATION PUMP
120 VOLT CIRCUIT
H N
4 1/4"
E
(SEE FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATION)
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
MAINTENANCE118
COMPACTOR119
BOOSTER PUMP
CONTROL PANEL
(7 1/2HP-QTY. 3)
THERMOSTAT
THERMOSTAT
UNIT HEATER CONTROL
TRANSFORMER
MOTORIZED
DAMPER
BLR-3
BLR-2
BLR-1
FDS-30A
FCS-1AFCS-1AFCS-1A
P-3
P-2
P-1VFD-10
VFD-10
MX-1
120V CO
SENSOR
AV
CO
AV
UNIT HEATER
EXISTING PANEL 'DPE'EXISTING PANEL 'DP2'
EXISTING MAIN
SWITCHBOARD
EXISTING PANEL 'EDP'
EXISTING AUTOMATIC
TRANSFER SWITCH
MX-1
PANEL 'DP-5'
MS-1MS-2
FDS-30A
FDS-30A
P-4P-5
WH-1
WH-2
R-2DP-5-25
R-1DP-5-25
AQUASTAT
CP-2
CP-2
AQUASTAT
EDP-20,22,24
DP-5-19
DP-5-8,10,12
DP-5-13,15,17
DP-5-14,16,18
DP-5-7,9,11
DP-5-2,4,6
DP-5-1,3,5
DP-5-21,23
DP-5-22
DP-5-29
DP-5-29
DP-5-25
BOILER VENTDRAFT CONTROLPANEL
EDP-1,3,5
1
4
5
2
AQUASTAT
6
7
8
8
8
DP-5-19
9
10
R-1DP-5-25
R-1DP-5-25
TC-1DP-5-25
11
MAIL ROOM102
MECHANICAL
EQUIPMENT114
STORAGE115
CORRIDOR117
B-3 S.H.BOILER #3
B-2 S.H.BOILER #2
B-1 S.H.BOILER #1
DHWBOILER
B-3 S.H.PUMP(1HP)
B- 2 S.H.PUMP(1HP)
B-1 S.H.PUMP(1HP)
DHW BOILERCIRC. PUMP(1/3 HP) #9
HEAT EXCH.CIRC. PUMP (.75HP)
P-4 CIRC.DHW PUMP(1/2HP)
HEATING CIRC.PUMP #1(7 1/2HP)
HEATING CIRC.PUMP #1(7 1/2HP)
120V CO
SENSOR
LOOP CIRC.PUMP MANUALSTARTER #11
DHW BOILERPUMP STARTER#2,4,6
HEAT EXCH.PUMP MANUALSTARTER #7
DHW RECIRC.PUMP MANUALSTARTER #15
CP-1 CONROLPANEL #1
CP-2 CONROLPANEL #1
B-1 S.H.BOILER #1STARTER
B-3 S.H.BOILER #3STARTER
B-2 S.H.BOILER #2STARTER
HEATING CIRC.PUMP #1STARTEREDP-1,3,5
HEATING CIRC.PUMP #2STARTEREDP-1,3,5
BOOSTER PUMP
CONTROL PANEL
(7 1/2HP-QTY. 3)
THERMOSTAT
THERMOSTAT
UNIT HEATER CONTROL
TRANSFORMER
MOTORIZED
DAMPER
P-5 DHWRECIRC. PUMP(1/8 HP)
AQUASTAT
LOOP CIRC.PUMP(1/4HP)
UNIT HEATER
AV
CO
AV
3
2
O.L.'S
240V AQUASTAT FURNISHED ANDMOUNTED BY MECHANICALCONTRACTOR, SERIES WIRED BYE.C. CONTACT OPENS AT SETTEMPERATURE TO STOP PUMP
MANUAL MOTORSTARTER WITHOVERLOAD
208 VOLTCIRCULATION PUMP
208 VOLT CIRCUIT
H H
4 1/4"
E
(SEE FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATION)
120 VOLT CIRCUIT
TIME SWITCH, FOR ALTERNATINGPUMPS
H N4 59/64"
TC
TC-1
(SEE FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATION)
P-4 VFD CONTROLTERMINALS
C
C
R-1POWER RELAYMOUNTED INN.E.M.A. 1ENCLOSURE ONWALL ADJACENTTO VFD-10
TYP. : COORDINATE PUMPCONTROL WIRING ANDTERMINATIONS WITH VFDMANUFACTURER. UTILIZE#18 AWG CONDUCTORSFOR ALL CONTROL WIRING.CONTROL POWER ISDERIVED FROM VFDTRANSFORMERS
SAFETYINTERLOCKWIRING TODISABLE P-4IF P-5 ISOPERATING
P-5 VFDCONTROLTERMINALS
START/STOPDIGITAL INPUTTERMINALS
START/STOPDIGITAL INPUTTERMINALS
'READY' RELAYOUTPUTTERMINALS
'RUNNING'RELAYOUTPUTTERMINALS
'READY' RELAYOUTPUTTERMINALS
'RUNNING'RELAYOUTPUTTERMINALS
SAFETYINTERLOCKWIRING TODISABLE P-5IF P-4 ISOPERATING
Tyso
n a
nd
Bill
y A
rch
ite
cts
, P
.C.
4000 M
ors
ay D
rive
Rockfo
rd,
IL
61107
(815)
229-8
222
FA
X: (8
15)
229-8
218
Sheet No:
ww
w.tysonandbill
y.c
om
Drn
.A
pp
d.
Pro
ject N
um
be
rD
ate
REVISION DATE
BO
ND
ING
CO
.C
ON
TR
AC
TO
R
OW
NE
RA
RC
HIT
EC
T
E102
PO
WE
R A
ND
SY
ST
EM
S F
LO
OR
PLA
NS
SP
EN
CE
R T
OW
ER
BO
ILE
RR
EP
LA
CE
ME
NT
111 2
0T
H S
TR
EE
T R
OC
K IS
LA
ND
, IL
12-9
810
3/2
3/1
7D
ON
CR
AJA
RS
CH
REFERENCE SCALE IN INCHES
0 1 2 3
ENGINEERINGCONSULTANTS 309.788.0673 FAX: 309.786.5967
www.kjww.com
623 26TH AVENUEQUAD CITIES, ILLINOIS 61201
PROJECT #
Illinois Design Firm Registration #184-000973
KJWW ENGINEERING RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATAARE THE EXCLUSIVE PROPERTY OF KJWW ENGINEERING AND SHALL NOT BE USEDOR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF KJWW ENGINEERING. © 2017 KJWW CORP.
The FUTURE.Built SMARTER.
®
00161450.00
NO SCALE3BOILER SHUTDOWN CONTROL
NO SCALE6CIRCULATION PUMP CP-1 CONTROL DIAGRAM
NO R HT
1/4" = 1'-0"1FIRST FLOOR PLAN - POWER
NO R HT
1/4" = 1'-0"2FIRST FLOOR PLAN DEMOLITION - POWER AND SYSTEMS
KEYNOTES:
1. ROUTE 4#2 AND 1#8 GROUND IN 1 1/4" CONDUIT TONEW 100A/3P CIRCUIT BREAKER INSTALLED INEXISTING PANEL 'EDP'. COORDINATE AND SCHEDULEANY DURATION OF POWER OUTAGES AND RACEWAYINSTALLATION ACROSS EXISTING CORRIDOR WITHOWNER TO MINIMIZE DISRUPTION OF OCCUPIEDBUILDING.
2. COORDINATE DOMESTIC WATER BOILER REMOVALAND WATER HEATER INSTALLATIONPHASING/SEQUENCE WITH MECHANICALCONTRACTOR.
3. DISCONNECT AND REMOVE EXISTING PUMPCOMBINATION STARTERS AND RETAIN ASSOCIATEDCONDUIT AND CONDUCTORS DERIVED FROMEXISTING PANEL EDP CIRCUITS 1,2, AND 3, 60A/3PCIRCUIT BREAKER SERVING THE (2) 5 HP PUMPSDESIGNATED TO BE REMOVED. CIRCUIT SHALL BEEXTENDED TO NEW VFD-10 SERVING NEW PUMP P-4.REFER TO 1/E102 FOR LOCATIONS.
4. EXTEND EXISTING 60 AMP CIRCUIT FROM EXISTINGPANEL EDP CIRCUITS 1, 2 AND 3 TO VFD INPUTTERINALS. UTILIZE 3#8 AND 1#8 GROUND IN 3/4"CONDUIT FOR CIRCUIT EXTENSION TO VFD ANDPUMP.
5. ROUTE FEEDER TO NEW 70A/3P CIRCUIT BREAKERINSTALLED IN EXISTING PANEL 'EDP'. COORDINATEAND SCHEDULE ANY DURATION OF POWER OUTAGESAND RACEWAY INSTALLATION ACROSS EXISTINGCORRIDOR WITH OWNER TO MINIMIZE DISRUPTIONOF OCCUPIED BUILDING.
6. REFER TO 4/E102 FOR CIRCULATION PUMP CP-2CONTROL DIAGRAM AND REQUIRMENTS.
7. REFER TO 6/E102 FOR CIRCULATION PUMP CP-2CONTROL DIAGRAM AND REQUIRMENTS.
8. REFER TO BOILER SHUTDOWN CONTROL DETAIL3/E102 FOR REQUIRMENTS.
9. REPLACE (1) 90A/1P CIRCUIT BREAKER, (1) 60A/2P AND(1) 30A/2P 10,000 AIC RATED CIRCUIT BREAKERS WITH65,000 AIC RATED CIRCUIT BREAKERS AND PROVIDE (1)NEW 100A/3P AND (1) 60A/3P 65,000 AIC CIRCUITBREAKER IN EXISTING PANEL 'EDP' WITH ANYREQUIRED MOUNTING KITS. PANEL IS A SIEMENS ITETYPE CDP-7 PANEL WITH A 400A/3P MAIN CIRCUITBREAKER. AT THE CONTRACTOR'S OPTION, THEPANEL INTERIOR AND ASSOCIATED CIRCUITBREAKERS, COVER MAY BE REPLACED WITH NEW65,000 AIC RATED INTERIOR AND CIRCUIT BREAKERS.REFER TO EXISTING PANEL SCHEDULE FORADDITIONAL INFORMATION. COORDINATE ANYOUTAGES WITH OWNER AND MINIMIZE POWEROUTAGE DURATIONS.
10. PROVIDE NEW TYPED PANEL DIRECTORY TO REFLECTLOADS REMOVED. CIRCUIT BREAKERS WITH BRANCHCIRCUIT CONDUCTORS REMOVED SHALL BE LABELEDSPARES. MAJORITY OF BOILER ROOM PUMPS ANDEQUIPMENT REMOVED ARE FED FROM THIS PANEL.
11. REFER TO 5/E102 FOR GENERAL VFD/PUMP CONTROLDIAGRAM AND CONTROL REQUIRMENTS. ROUTE 3#18AWG FROM VFD PID CONTROLS TO M.C. PROVIDEDPRESSURE SENSORS FOR VFD SPEED CONTROL FOREACH PUMP. COORDINATE LOCATION OF PRESSURESENSORS WITH M.C. PROVIDE PIEZO ALARM INSTANDARD EXNCLOSURE FOR EACH VFD ANDCONNECT TO VFD REMOTE ALARM CONTACTS.
E#
SHEET NOTES:
1. REFER TO SHEET E000 FOR GENERAL ELECTRICALNOTES, ELECTRICAL INSTALLATION NOTES,RENOVATION NOTES, PHASING NOTES, ELECTRICALSYMBOLS LIST, DISCONNECT AND STARTERSCHEDULE, VARIABLE FREQUANCY DRIVE SCHEDULEAND PANEL SCHEDULES.
2. COORDINATE NEW EQUIPMENT AND DEVICELOCATIONS WITH NEW AND EXISTING PIPING,DUCTWORK, DEVICES AND EQUIPMENT.
NO SCALE4CIRCULATION PUMP CP-2 CONTROL DIAGRAM
NO SCALE5PUMPCONTROL DETAIL