PIPELINE, PUMP & COMPRESSOR STATIONS
Engineering for a Better Future
2 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
63 years of engineering & construction experience worldwide More than 500 projects in 46 countries, with a
historical contract value of US$ 49 billion Employs more than 20,000 personnel worldwide Among the world’s top contractors since 1981
(Engineering News-Record (ENR)) 2018 Annual Revenue, comprising the revenues
of following business lines corresponding to USD 2.9 billion Engineering & Construction Power Real Estate Trade
Traded publicly in Borsa Istanbul (BIST) with a Market Cap of US$ 5 billion.
64 subsidiaries operating in America, Asia, Europe, Africa and Middle East
Signatory to UN Global Compact
Introducing
3 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Turnover Records
Year ENKA Group Turnover “Engineering & Construction only” Turnover
Share of onshore oil, gas, chemicals, and power projects in “Engineering & Construction only”
turnover (%) Total
2014 5,821 2,139 60.5% 1,295
2015 4,555 1,492 71.9% 1,073
2016 3,506 1,453 68.0% 988
2017 2,900 1,195 59.3% 708
2018 2,881 1,011 57% 650
Note: All amounts are annual figures in million US Dollars
50%
Power Generation
34%
Engineering & Construction
10%
Real Estate
6%
Trade
Turnover Distribution
4 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Current Projects
Oil & GasPower Plants InfrastructureBuilding Works
GNr Nr Project Name Country
1 1 West Qurna-I IOT Project Iraq
2 2 FGP 3GP Mechanical, Electrical and Instrumentation installation works (CW1519787) Kazakhstan
3 3 BTC Turkey for Provision of Fabrication and Construction Services Turkey
4 4 WQ0815 Produced Water 2 (PW2) Project Iraq
5 1 750 MW Samawa CCPP Iraq
6 2 750 MW Dhi-Qar CCPP Iraq
7 3 Nizhnekamsk 495 MW CCPP – Tatarstan Russia
8 4 Kazan 250 MW CCPP – Tatarstan Russia
9 1 Kosovo Motorway Project - Route 6 Kosovo
10 2 Namakhvani Hydro Power Plant Cascade Georgia
11 3 Umm Qasr Basra Multi Purpose Terminal (BMT), Quay Wall & Marine Works Iraq
12 4 Morava Corridor Motorway Serbia
13 1 SED New USA Embassy Compound in Dhahran Saudi Arabia
14 2 SED New USA Embassy Compound in Colombo Sri Lanka
15 3 SED New USA Embassy Compound in Hyderabad India
16 4 SED New USA Embassy Compound in Asuncion Paraguay
17 5 SED New USA Embassy Compound in Nairobi Kenya
18 6 SED New USA Embassy Compound in Mexico City Mexico
19 7 SED New USA Embassy Compound in Athens Greece
20 8 SED New USA Embassy Compound in Nassau The Bahamas
21 9 TAIF Busıness Center – Kazan, Tatarstan Russia
22 10 High Technological Multifunctional Medical Complex (HMMC) in St. Petersburg Russia
23 11 Tulun School Russia
5 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Pıpelıne, Pump & Compressor Statıons No Project Title Business Line Country Location Start Date Finish Date
1 Produced Water Treatment Facility Oil Gas, Petrochemicals Asia Iraq 2019-12-01 2020-04-01
2 Kashagan Oil Field Development Offshore Construction Works Oil Gas, Petrochemicals Asia Kazakhstan 2015-04-20 2016-10-01
3 Senimdi Kurylys Crude Shipment Capacity EPC Project Oil Gas, Petrochemicals Asia Kazakhstan 2014-07-29 2019-12-31
4 South Caucasus Pipeline Expansion (SCPX) Early Works and Facilities Project Oil Gas, Petrochemicals Asia Georgia 2014-02-07 2019-10-31
5 Senimdi Kurylys Master Contractor Services (Contract 1131939) Oil Gas, Petrochemicals Asia Kazakhstan 2013-12-01 2018-11-14
6 Senimdi Kurylys Master Contractor Services (1155538) Oil Gas, Petrochemicals Asia Kazakhstan 2013-12-01 2015-11-08
7 North Rumaila Crude Oil Turbo Pump Station (PS-1) Project Oil Gas, Petrochemicals Asia Iraq 2013-12-01 2016-04-23
8 TANAP - Trans Anatolian Natural Gas Pipeline Project - Engineering Services Oil Gas, Petrochemicals Eurasia Turkey 2013-05-01 2014-08-01
9 Senimdi Kurylys Construction Services (Contract 844780) Oil Gas, Petrochemicals Asia Kazakhstan 2011-06-01 2014-02-01
10 Senimdi Kurylys Construction Services (Contract 672887) Oil Gas, Petrochemicals Asia Kazakhstan 2009-05-21 2011-06-01
11 411 MW Yajva Combined Cycle Power Plant Power Plant Eurasia Russian Federation 2008-07-15 2011-08-01
12 Supply and Erection of Zawia Potable Water Pipeline Project Oil Gas, Petrochemicals Africa Libya 2007-06-23 2011-06-30
13 SGI-II Turnaround Mechanical Works Injection Booster Compr. (Contract 571501-4-1274) Oil Gas, Petrochemicals Asia Kazakhstan 2007-02-01 2007-10-01
14 Zawia Desalination Plant Project (Sea Water Thermal (MED-TVC) Plant) Oil Gas, Petrochemicals Africa Libya 2006-07-11 2012-02-29
15 Kashagan Oil Field Development Project - Onshore Plant Services Oil Gas, Petrochemicals Asia Kazakhstan 2006-06-01 2007-02-01
16 Kashagan Oil Field Development Project, Offshore Civil Construction Works Oil Gas, Petrochemicals Asia Kazakhstan 2005-04-01 2012-10-01
17 Senimdi Kurlyls TCO Asset Development Projects (SGI -SGP Frame Agreement 1671) Oil Gas, Petrochemicals Asia Kazakhstan 2004-02-01 2008-12-01
18 Sakhalin II Onshore Processing Facility (OPF) Project Oil Gas, Petrochemicals Eurasia Russian Federation 2003-06-01 2009-07-01
19 Oued Athmania Water Treatment Plant Infrastructure Africa Algeria 2002-08-01 2007-03-01
20 İZMİR BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station Project Power Plant Eurasia Turkey 2001-05-15 2002-03-21
21 Kashagan Oil Field Exploration Project, Offshore Civil Works (Contract 2000-278) Oil Gas, Petrochemicals Asia Kazakhstan 2001-03-01 2004-05-01
22 Senimdi Kurlyls Infrastructure Works Engineering Construction (Contract OM 202) Oil Gas, Petrochemicals Asia Kazakhstan 2001-02-01 2009-06-01
23 Gebze - Adapazarı BOO CCPP Fuel Gas Pipeline and Pressure Reducing, Metering Station Project Power Plant Eurasia Turkey 2001-01-13 2001-10-31
24 CS-1 Kırklareli Compressor Station, Unit K4 Supply and Construction Project Oil Gas, Petrochemicals Eurasia Turkey 2000-03-30 2002-11-07
25 Tengiz Crude Oil Export Project Oil Gas, Petrochemicals Asia Kazakhstan 2000-03-01 2000-10-01
26 CS-1 Kırklareli Compressor Station, Unit K3 Upgrade and Revamping Project Oil Gas, Petrochemicals Eurasia Turkey 1999-08-06 2002-03-19
27 CS-1 Kırklareli Compressor Station, K1 K2 Units Upgrade Project Oil Gas, Petrochemicals Eurasia Turkey 1997-05-22 1998-09-30
28 Supply and Construction of CS-3 Compressor Station Project Oil Gas, Petrochemicals Eurasia Turkey 1996-07-18 1998-07-31
29 Gas Pipeline Construction Oil Gas, Petrochemicals Africa Algeria 1995-01-01 1995-10-01
30 Tengiz Oil Fields Development Off Plot (Contract OM 133) Oil Gas, Petrochemicals Asia Kazakhstan 1993-07-16 2001-03-01
31 Derna Al-Bumba Water Project Infrastructure Africa Libya 1986-12-01 1996-03-01
6 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
No Project Title Business Line Country Location Start Date Finish Date
32 600 MW Trakya Natural Gas Combined Cycle Power Plant Extension I Power Plant Eurasia Turkey 1986-11-01 1989-08-01
33 USSR - Turkey Natural Gas Pipeline Project Oil Gas, Petrochemicals Eurasia Turkey 1986-09-01 1988-09-01
34 Russian Natural Gas Pipeline, BOTAŞ Ankara River Pass Infrastructure Eurasia Turkey 1986-09-01 1988-08-31
35 Istanbul Sewerage Project (1st Stage) Civil Works for Yenikapı Pretreatment Plant Pumping Stations Infrastructure Eurasia Turkey 1985-06-01 1988-06-01
36 Water Lines in Fanateer, Defii and Mutrafiah, Contract No. 570-C11 Infrastructure Asia Saudi Arabia 1985-02-01 1986-09-01
37 Istanbul Sewerage Project (1st Stage) Mechanical and Electrical Works for Yenikapı Pre-treatment Plant Pumping Stations Infrastructure Eurasia Turkey 1984-09-01 1988-08-01
38 Nahrawan Industrial Estate Water Supply Scheme - EPC Civil Asia Iraq 1984-08-01 1986-03-01
39 New Battaliyah Water Stormwater Facilities Infrastructure Asia Saudi Arabia 1984-07-01 1985-05-01
40 Amman Service Reservoirs - Contract 2 Infrastructure Asia Jordan 1983-10-01 1986-04-01
41 Amman Service Reservoirs - Contract 3 Infrastructure Asia Jordan 1983-10-01 1986-04-01
42 Iraq-Turkey Crude Oil Pipeline Expansion Project (Turkish Part) Oil Gas, Petrochemicals Eurasia Turkey 1983-03-01 1984-10-01
43 Crude Oil Export Project Oil Gas, Petrochemicals Asia Iraq 1983-03-01 1984-10-01
44 Al Khafji Phase 2 Desalination Plant Infrastructure Asia Saudi Arabia 1982-10-01 1986-02-01
45 Diyarbakır Province Drinking Water Supply System Infrastructure Eurasia Turkey 1982-05-01 1986-05-01
46 Kerbela Water Pipeline and Pumping Station - EPCC Infrastructure Asia Iraq 1982-05-01 1983-11-01
47 Tasluja Water Pipeline and Pumping Station - EPCC Infrastructure Asia Iraq 1982-03-01 1983-12-01
48 Riyadh Water Transmission System, Pump Stations 5 and 6 Infrastructure Asia Saudi Arabia 1981-03-01 1983-07-01
49 Riyadh Additional Water Supply Contract No. 3 Treatment Works Infrastructure Asia Saudi Arabia 1979-10-01 1982-05-01
50 Middle Anatolian Refinery Housing Compound Part 2 Civil Eurasia Turkey 1977-08-01 1980-10-01
51 Makkah Water Pipeline Infrastructure Asia Saudi Arabia 1977-07-01 1977-11-01
52 Elazığ - Uluova Irrigation Project Infrastructure Eurasia Turkey 1977-05-01 1979-10-01
53 İskenderun Iron and Steel Factories, Raw Materials Preparation Facilities Civil Eurasia Turkey 1972-01-01 1975-05-01
Pıpelıne, Pump & Compressor Statıons
7 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Oil Field Development of Caspian Sea - Kazakhstan
Offshore Civil Works
1998 EPC construction of Bautino supply base
1998-1999 Supply of graded rock for appraisal berms
1999-2000 Expansion of OKIOC Bautino supply base
2001-2004 Infrastructure upgrade works in Bautino
2005 Construction of Cuttings Pits in Koshken
2006 Supply of High Density Rock (HDR), EPC loading & berthing facility in Saritash
2008 Supply of sheet pile materials
2015-2017 Logistic Support activities for offshore
2015-2017 Pre fabrication works for offshore installations
2001-2004 OKIOC Contract 2000-278: Offshore Civil Works 2005-2012 Contract 2004-1372 Offshore Civil Works
D Complex ConstructionA Island Construction3 ea. EPC Islands6 ea. Berms10 ea. IPS (Ice Protection Structures)4 ea. IRG (Ice Rubble Generators)3 ea. DC Islands for Full Field Development
2015-2016 Pipeline Replacement ProjectD Complex Civil Modification WorksA Island Civil Modification WorksOnshore & Trench Dredging activities
2016-2017 EPC-3 Topside WorksEarly Works, Site Preparation, Load-in, Installation, Hook-up, Mechanical Completion, Pre-commissioning and Commissioning
Main Work Item Quantity Unit Procurement Transport & Logistic Fabrication Construction
Earthworks 14,809,000 m² N/AHaulage 12,513,000 ton N/AExcavation 1,944,302 m² N/A N/ASheetpile 90,337 ton N/AStructural Steel 7,850 tonIn-Situ Concrete 72,639 m³Precast Concrete Elements 362,420 tonGeomembrane/ Geotextile 618,800 m² N/AU/G Piping 32,170 m N/ANot by ENKA
Partially by ENKAFully by ENKA
Location : Kashagan, Kazakhstan Client: : Agip Kazakhstan North
Caspian Operating Company N.V. Construction Period : 1998 - 2017 Project Value : US$ 2 Billion
Onshore Civil Works
8 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Kashagan Oil Field Development - Caspian Sea, Kazakhstan
The Kashagan field is located in the Kazakhstan sector of the Caspian Sea and extendsover a surface area of approximately 75 kilometers by 45 kilometers. The reservoir liessome 4,200 meters below the shallow waters of the northern part of the Caspian Sea.The use of conventional drilling and production technologies, such as concretestructures or jacket platforms that rest on the seabed - is not possible due to the shallowwater and cold winter climate of the northern part of the Caspian Sea. To ensure theirprotection from harsh winter conditions and pack ice movement, offshore facilities arebeing installed on artificial islands.
There are two main types of island – small unmanned ‘drilling islands’ and largermanned ‘hub islands’. Hydrocarbons will travel from the drilling islands to hub islands viapipeline. The hub islands will contain processing facilities to separate recovered liquid(oil and water) from the raw gas, as well as gas injection and power generation systems.During Phase I, around half of the gas produced will be re-injected back into thereservoir. Separated liquid and raw gas will be taken by pipeline to the Bolashakonshore processing plant in Atyrau oblast, where export quality oil will be produced.Some of the processed gas will be sent back offshore for use in power generation whilesome will be used to generate power at the process plant itself.
9 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Sakhalin Projects - Russia
10 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Main Work Item Quantity Unit FEED Engi-neering
Procu-rement
Transport& Logistic
Fabri-cation
Construc-tion
Earth Works 1,750,000 m3 N/AConcrete 95,000 m3
Structural Steel 9,000 tonA/G Piping 6,000 tonCabling 2,800,000 lm N/AMech. Equipment 7,000 tonInsulation & Paint 160,000 m2
Buildings 13,000 m2
Not by ENKAPartially by ENKAFully by ENKA
Location: Sakhalin - Russia Client: Sakhalin Energy Investment Co. Construction Period: May 2003 - July 2009 Project Value: US$ 1.1 Billion Project Description:The Sakhalin II Onshore Processing Facility, located in the Noglikidistrict, 7 km inland in the north-east of Sakhalin Island, is the first combined oil & gas processing facility built in Russia and the largest of its kind globally. It is the key element of the Sakhalin II integrated oil and gas field development project, producing oil and gas from two major offshore fields located on the northeastern shelf of Sakhalin Island in the Okhotsk Sea. The scope of work included the design and construction of buildings, multi-discipline fabrication, construction and erection works and provision of commissioning and start-up assistance for the whole facility; and also procurement of bulk materials; material management; transportation and logistics of all process equipment and materials sourced worldwide and free-issued by the client.
July 2003
Nov 2006 (Phase 1 completed)
First combined O&G Processing in Russia - Largest of its kind in the world
Sakhalin II Onshore Processing Facility (OPF) - Russia
11 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Gallery of Sakhalin II (OPF) - RussiaTransportation & Erection of Heavy Equipment
12 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Sakhalin I Chayvo Onshore Oil Processing Facility-Russıa
Location: Chayvo, Sakhalin Island - Russia Client: Exxon Neftegas Ltd. Construction Period: June 2005 - Oct 2006 Project Value: US$ 94 Million Project Description:In May 2005, ENKA was awarded the contract for the installation of the mechanical and piping systems for the Onshore Processing Facility by Fluor Daniel Eurasia Inc. the EPCM Contractor, on behalf of Exxon Neftegas Limited.ENKA scope comprised the erection and installation of various static and rotating process equipment including compressors, generators, heat exchangers, boilers and pumps; field erection of 40,000 tons of prefabricated modules weighing between 900 and 2,500 tons and field erection of 4,100 tons of steel as well as 40,000 m of field piping, including fitting, welding, pressure tests, painting and insulation. ENKA also performed all scaffolding and winterization works for all disciplines at the Onshore Processing Facility Site & Orlan Platform during the project and provided commissioning and start-up support to the client.ENKA not only performed the hook up of these prefabricated modules, but also a substantial amount of stick built site erection work during very harsh two winters, including required field modifications to prefabricated modules and erection of their loose delivered parts, erection of freestanding equipment, various stick built pipe racks and all interconnecting piping works. ENKA also provided plant commissioning and startup assistance to the client.
Main Work Item Quantity Unit Engi-neering
Procu-rement
Transport&
Logistic
Fabri-cation
Construc-tion
Field Erected Piping 45,000 lmHeavy Haul Eqpmt. & Module Installation 100,000 m³
Erection of Structural Steel 4,100 ton
Not by ENKAPartially by ENKAFully by ENKA
13 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: North Rumaila - Iraq Client: South Oil Company (SOC) of Ministry of Oil Construction Period: Dec 2013 – Apr 2016 Project Value: US$ 59 Million Project Description : ENKA has been awarded the EPC contract for the Crude Oil Turbo Pump Station by South Oil Company. ENKA provided full detail engineering, procurement, construction, commissioning scope for the new station detailed of two 13 MW Turbo Pump Units, Fuel Gas Booster Compressing and Regulation Station, Compressed Air System, Crude Oil Drain Tank, Waste Water Tank, low voltage power distribution and control system, a Station shelter complete with overhead cranes for maintenance. The project has been designed to a high level of operational intelligence and reliability due to being a critical facility for oil exports from a giant oil field. Plant is designed under strict oil and gas standards and specifications (API) with appropriate design margins and redundancy requirements.
Main Work Item Quantity Unit Engi-neering
Procu-rement
Transport& Logistic
Construc-tion
Reinforced Concrete
6,393 m3
Structural Steel 440 ton
Piping 1,088 tonMain Equipment Erection
478 ton
Cabling 75,563 mWelding 11,245 Dia
Inch
Not by ENKAPartially by ENKAFully by ENKA
PS-1 Crude Oil Turbo Pump Station - Iraq
14 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: Basra - Iraq Client: ExxonMobil Iraq Limited Construction Period: Dec 2019 – Apr 2022 Project Value: US$ 69.9 Million Project Description:On October 31, 2019, ENKA signed an agreement withExxonMobil Iraq Limited to construct a ProducedWaterTreatment Facility with a capacity of 210,000 barrels ofwater per day, located within the West Qurna-1 oil field nearthe city of Basra in Iraq.The project includes the detailed engineering, procurement, construction, and commissioning of three water treatmenttrains, one produced water tank, one local equipment room, transfer pumps and all associated systems.The treated produced water will be sent to the WaterInjection Storage Tank that feeds the High Pressure WaterInjection Pump System for injection wells.The Produced Water 2 Treatment Facility project isscheduled to begin operation in April 2022.
Not by ENKAPartially by ENKAFully by ENKA
Produced Water Treatment Facility- Iraq
Main Work Item Design,Engineering Procurement Construction Comm&
Start upCivil WorksArchitectural WorksStructural Steel WorksPiping and 3D ModelingElectrical WorksMechanical WorksInstrumentation & Controls
15 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: Georgia Client: South Caucasus Pipeline Company Ltd. Consortium
between BP (Technical Operator), SOCAR, TPAO, Petronas, Lukoil and NICO)
Construction Period: Feb 2014 – Oct 2019 Project Value: US$ 878 Million Project Description:A joint venture between Bechtel and ENKA was awarded the SCPX Early Works and Facilities contract and responsible for the construction of two Compressor Stations (CSG-1 and CSG-2) and a Pressure Reduction and Metering Station (AREA 81) at three different locations within Georgia, and for all related early civil works and facilities. The early works stage for Compressor Station 2 (CSG-2) includes the construction of a 15 km access road between the existing Millennium Highway and the compressor station. The Bechtel-ENKA Joint Venture’s scope of works also includes the supply and fabrication of all structural steel and fabrication of all piping including the pipeline connection sections to the South Caucasus Pipeline.SCPX – Area 81 Project was awarded with the Merit prize by British Safety Council in “International Safety Awards 2018”
SCPX Early Works and Facilities Project - Georgia
Not by ENKAPartially by ENKAFully by ENKA
Main Work Item Quantity Unit FEED Engineering Procurement Transport & Logistic Fabrication Construction
Process Buildings 20,900 m²Non-process Buildings 2,700 m²
Concrete works 74,000 m³
Steel works 14,500 ton
Pipe works 7,400 ton
16 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Trans Anatolian Natural Gas Pipeline Project - Turkey
Currently the world’s largest pipeline project
Location: Turkey Client: TANAP (SOCAR 58% + BOTAŞ/TPAO 30% + BP
12%) Construction Period: May 2013 – Aug 2014 Project Value: US$ 54 Million Project Description:Front End Engineering Design for the portion in Turkish territory. The work was executed in collaboration with Bechtel Inc. Key figures:
1,800 km 56” pipeline 6 compressor stations 2 metering stations Dardanelles Strait crossing
ENKA provided a strategic contribution to the project as a local partner of the engineering contractor and played a key role in the completion of FEED for the pipeline project with its local resources.
17 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Tengiz Projects - Kazakhstan
World’s largest single-train sourcrude processing facility
SGP – Second Generation Project
Contract Signed : 2003 First Oil : 2007 Final Turnover : 2008 Project Value : 588 Million USD
Newly introduced re-injectiontechnology (depth 7 km)
SGI – Sour Gas Injection Project
Additions to Tengiz Oil Processing Facilities
Train 5 Project
Contract Signed : 2003 Mechanical Completion : 2007 Project Value : 77 Million USD
Contract Signed : 1997 Mechanical Completion : 2000 Project Value : 562 Million USD
Additions to Tengiz Oil Processing Facilities
CSC New Tank Farm Project
Contract Signed : 2014 Mechanical Completion : 2019 Project Value : 436 Million USD
18 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Main Work Item Quantity Unit FEED Design,Engineering Procurement Transport
& Logistic Fabrication Construction
Earth Works 1,700,000 m3 N/A
Concrete 125,000 m3
Structural Steel 35,000 ton
A/G Piping 15,000 ton
Cabling 3,100,000 lm N/A
Mechanical Equipment 1,750 ea
Instrument 60,600 ea N/A
Not by ENKAPartially by ENKAFully by ENKA
Tengiz SGP & SGI Projects - Kazakhstan
19 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
1,600 MW Gebze & 820 MW Adapazarı
In 2011, ENKA’s Adapazarı Power Plant was selectedas the Power Plant of the Year with an availabilityof 99.8 % by the Power Magazine
Location: Adapazari - Turkey Client: Gebze Elektrik Üretim Ltd. Şti. & Adapazarı
Elektrik Üretim Ltd. Şti. Construction Period: Apr 2000 – Oct 2002 Project Description:Following a build-own-operate (BOO) tender in 1997, the InterGen-ENKA partnership was awarded the right to build, own and operate the Gebze Power Plant with a nominal capacity of 1,600 MW, the Adapazarı Power Plant with a nominal capacity of 820 MW, respectively. An ENKA and Bechtel joint venture was the turnkey EPC contractor for all three plants. Each power island in these natural gas-fired combined cycle power plants consists of two combustion turbines / generators, two-heat recovery steam generators and one steam turbine/generator. In the Gebze and Adapazarı power plants, natural draft dry cooling towers serve each power island.ENKA is the sole owner of the Gebze, Adapazarı and İzmir Natural Gas Fired CCPPs since December 2005.Collective annual generation capacity of 32 billionkilowatt-hours are capable of meeting 11% ofTurkey's aggregate energy consumption.
1,600 MW Gebze & 820 MW Adapazari CCPPs – TurkeyNatural Gas Fired CCPPs Built, Owned, Operated (BOO) by ENKA
20 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
1,580 Izmir Natural Gas Fired CCPP - TurkeyNatural Gas Fired CCPP Built, Owned, Operated (BOO) by ENKA
1,580 MW Izmir Aliaga
Factory Mutual (FM) Global awarded allthree power plants the status of “HighlyProtected Risk” in recognition of ENKA’scommitment to the reduction of potentiallosses through a stringent program of riskmitigation and prevention.
Location: Izmir - Turkey Client: İzmir Electricity Generation Company Construction Period: Aug 2000 – Mar 2003 Project Description:Following a build-own-operate (BOO) tender in 1997, the InterGen – ENKA partnership was awarded the right to build, own and operate the Izmir Power Plant with a nominal capacity of 1,580 MW. ENKA and Bechtel joint venture was the turnkey EPC contractor for all three plants.Each power island in these natural gas-fired combined cycle power plants consisted of two combustion turbines/generators, two-heat recovery steam generators and one steam turbine/generator. In the İzmir plant, low-profile forced draft wet cooling towers were built, using seawater as a cooling medium.The combustion turbine generators were supplied by General Electric (USA), the steam turbine generators by Alstom Power (Germany), the closed cooling system by EGI (Hungary), the heat-recovery steam generators by CMI (Belgium), the switchyards by Siemens (Turkey-Germany), the main and auxiliary transformers by Alstom (Turkey), the water treatment plant by Aquatech – ENKA Teknik (USA-Turkey), the gas RMS systems by ENKA Teknik (Turkey) and the DCS control systems by ABB-Bailey (USA).ENKA is the sole owner of the Gebze, Adapazarı and İzmirNatural Gas Fired CCPPs since December 2005.Collective annual generation capacity of 32 billion kilowatt-hours are capable of meeting 11% of Turkey's aggregateenergy consumption.
21 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
411 mw Yajvinskaja CCPP - Russia
Awarded the “Best Project in the Power/Industrial category” in 2013 Global Best Projects Competition of ENR (Engineering News-Record).
Location: Perm Region - Russia Client: OGK-4 (EON) Construction Period: July 2008 – Aug 2011 Project Value: US$ 460 Million Project Description:The Yajva Combined Cycle Natural Gas Power PlantProject consisted of a single shaft Siemens 1xSCC5-4000F-1S Power Train comprising a Gas Turbine,Steam Turbine, Generator and Condenser, a verticalnatural circulation type unfired boiler manufacturedby CMI as well as all auxiliary equipment such assteam / water cycle, a water treatment plant, controlssystems, electrical systems, instrumentation, gascompressors, an administration building, a naturaldraft cooling tower and a 220 kV switchyard.ENKA’s scope as the EPC contractor of the YajvaCombined Cycle Power Plant Project covered all theworks including permitting, engineering,procurement, construction, startup, testing andcommissioning of the plant
Main Work Item Quantity Unit Design,Eng.
Procu-rement
Fabri-cation
Construc-tion
Comm. & Start-Up
Earth Works 50,000 m3 N/A N/AConcrete 11,427 m3 N/AStructural Steel 3,074 tonA/G Piping 959 tonCabling 385,337 lm N/AMech. Equipment 6,155 tonInsulation & Paint 6,000 m2 N/A
Buildings 8,328 m2
Not by ENKAPartially by ENKAFully by ENKA
22 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: Mila – Algeria Commencement: August 2002 Completion: March 2007Client: Ministry of Water Resources National Agency of Dams – ANBTThe dam has a height of 44 m, a length of 630 m, and a reservoir capacity of 33.6 million m3. It has a combined concrete tunnel and 313 m long, derivation gallery. The derivation gallery is able to drain the water with a maximum flow rate of 60 m3 /second. The pipeline capacity is 4 m3 /second for the drinking water and 2.5 m3 /second for the irrigation water. The contract included civil engineering works as well as the design, supply, erection, and start-up of the hydraulic, electric and control equipment.
Oued Atmania Dam - Algeria
23 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
Location: From Bulgarian Turkish border to Ankara (Turkey)Construction Period: March 1986 – September 1988Client: BOTAS Transportation by Pipelines Inc. TurkeyThe 842 km, 36-24 inch natural gas pipeline extends from the Bulgarian border of Turkey to Ankara, including a total of 118 km of offshore pipeline between Ambarli – Pendik and Dil Iskelesi-Hersek in the Marmara Sea at a maximum depth of 90 m. Other principal works in the contract included a 20 MW compressor station, 11 reducing and metering stations, 9 pig stations, 32 line valves, a dispatching center, 3 maintenance center, and telecommunication and telecontrol systems. The pipeline has an annual capacity to deliver 14bcm of natural gas, under 70 barg pressure, into Turkey through the Ukraine. This is equivalent to 75% of Turkey’s current consumption. The project was financed though a number of export credit agencies, such as US Exim, JEXIM, Coface and ECGD.
Former U.S.S.R. – Turkey Natural Gas Pipeline
24 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
The project included :
Design and construction of expansion project
to increase the capacity of existing 40", 1000
km crude oil line from 35 million tons/year to
50 million tons/year. Construction of 80 km
of pipeline loop with 30” and 40” diameters.
Replacement of pumps and motors at
existing stations
Modification of dispatching center
Extension of the metering stations and
addition of the 4th metering station
Construction of five new pump stations
complete with high voltage substation.
Tie-in of new stations to existing pipelineLocation: Turkey and IraqConstruction Period: March 1983 – October 1984Client: BOTAS Transportation by Pipelines Inc., Turkey State Organization for Oil Projects - SCOP, Iraq
Iraq - Turkey Crude Oil Pipeline Expansion
25 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
The project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. Scope: EPC Commencement: August 2006 Completion: August 2010 Location: Derna - Libya Client : General Electricity Company of Libya
Main Work Item Unit Quantity
Concrete m3 14,200Structural Steel ton 650Cabling km 170Mech. Equipment ton 4,800
Engineering Hours hrs 81,000
Document Qty. pcs 1,296
Derna Desalination Plant - LIBYA
26 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
The project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. Scope: EPC Commencement: August 2006 Completion: August 2010 Location: Soussa - Libya Client : General Electricity Company of Libya
Main Work Item Unit Quantity
Concrete m3 11,500Structural Steel ton 460Cabling km 147Mech. Equipment ton 4,000
Engineering Hours hrs 65,000
Document Qty. pcs 1,144 CO
NT
RA
CT
ING
Soussa Desalination Plant - LIBYA
27 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
The project consisted of engineering, procurement, construction, commissioning and start-up of a 4 x 20.000 m3/day Water Production Plant with three type of fuel, Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. NG is planned to be used as main fuel for MED Desalination Plant operation whereas; heavy fuel oil (HFO) are used as back-up fuels. Scope: EPC Commencement: July 2006 Completion: February 2012 Location: Zawia - Libya Client : General Electricity Company of Libya
Main Work Item Unit Quantity
Concrete m3 8,098Structural Steel ton 486Cabling km 340Mech. Equipment ton 7,900
Engineering Hours hrs 48,900
Document Qty. pcs 1,123
Zawia Desalination Plant - Libya
28 of 29Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]
Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349
The project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20.000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO), and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. HFO is planned to be used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. Scope: EPC Commencement: March 2007 Completion: November 2010 Location: Zuara - Libya Client : General Electricity Company of Libya
Main Work Item Unit Quantity
Concrete m3 4,764Structural Steel ton 341Cabling km 185Mech. Equipment ton 4,800
Engineering Hours hrs 28,300
Document Qty. pcs 720
Zuara Desalination Plant - Libya
İNŞAAT VE SANAYİ A.Ş.Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349
Beşiktaş / İstanbul
Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69E-mail: [email protected] web: https://www.enka.com