PipeControl Installations and Projects Eng a Defensetechs

8
 Pipe-Control ®  Leak Detection System - Installations and Projects - 

Transcript of PipeControl Installations and Projects Eng a Defensetechs

Page 1: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 1/8

 

Pipe-Control® 

Leak Detection System

- Installations and Projects - 

Page 2: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 2/8

Page 3: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 3/8

Installation: Rosneft

Customer: Rosneft (Russia) 

Project: Protection of crude oil upstream network of pipelines. Total length: 300km 

Rosneft - an integrated oil company majority owned by the Government of Russia. It is the leading extraction and

refinement company in Russia. In 2008 Pipe-Control LDS was installed on the crude oil upstream network of 

pipelines in the southern fields of Samara region (the total length of protected pipelines is around 300 km). Rosnefthas plans to expand the use of Pipe-Control LDS for their other upstream pipelines.

Page 4: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 4/8

Installation: Lukoil

Customer: Lukoil (Russia) 

Project: Protection of refined oil products transport pipeline. Total length: 100km 

Lukoil - Russia's largest public oil company In 2008 Pipe-Control LDS was installed on refined oil products

transport pipeline "Perm - Andreevka" (river crossings along the 280 km section). Lukoil has indicated their desire to

expand the use of Pipe-Control LDS technology to their other pipelines.

Page 5: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 5/8

Installations: Transneft 

Customer: Transneft/Transnefteproduct (Russia) 

Project: Protection of refined oil products transport pipeline. Total length: 150 km 

Transneft - Russian state-owned company responsible for the national oil pipelines and which has the monopoly on

transports of the oil and oil products produced in Russia. In 2009 Pipe-Control LDS was installed on the refined oil

products transport pipeline "Nijnekamsk-Almetievsk-Nijni Novgorod" (along two sections of 120 km and 33 km inlength). These projects are the first in a series of planned installations of Pipe-Control LDS for this company.

Page 6: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 6/8

Installations: Pipe-Tech 

Customer: Pipe-Tech Inc (Saudi Arabia) 

Project: Protection of closed loop pipeline testing facility for Saudi Aramco . Total length: ~1,5 km 

Pipe-Tech Inc - solution provider, system integrator, and a researcher in the field of pipeline LDS. In the middle of 2010, Pipe-

Control LDS was installed at closed loop pipeline testing facility in Dammam, Saudi Arabia. At the end of 2010 the system

have successfully passed Site Acceptance Tests for Aramco (Saudi Arabia's the state-owned national oil company) and was

included in the registry of systems recommended for installations in Aramco. There are currently plans to install Pipe-Control

LDS on tens of Aramco's pipeline (totaling hundreds of km and transporting prepared oil and refined products).

Page 7: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 7/8

Installations: Pemex 

Customer: Pemex Refinancion (Mexico) 

Project: Protection of refined oil products transport pipeline. Total length: 600 km 

Pemex - Mexican state-owned petroleum company. In 2009, Group LBI won the bid to supply LDS for Pemex and

currently we have 4 projects (prepared oil and refined products pipelines totaling around 600 km) in the design and

final approval stage. The start of implementation of these projects is scheduled for 2011.

Page 8: PipeControl Installations and Projects Eng a Defensetechs

7/31/2019 PipeControl Installations and Projects Eng a Defensetechs

http://slidepdf.com/reader/full/pipecontrol-installations-and-projects-eng-a-defensetechs 8/8

 

Thank You! 

www.defensetechs.com 

[email protected]