Pimentón A new Cu-Au porphyry deposit in Farellones · 2015. 4. 8. · 15 pimentón project...

23
1 Pimentón Project –June 6, 2006 Pimentón A new Cu-Au porphyry deposit in Farellones This report by Rio Tinto dated June 6, 2006 was prepared as an Executive Summary and is not compliant with National Instrument 43-101

Transcript of Pimentón A new Cu-Au porphyry deposit in Farellones · 2015. 4. 8. · 15 pimentón project...

  • 1 Pimentón Project –June 6, 2006

    PimentónA new Cu-Au porphyry deposit in Farellones

    This report by Rio Tinto dated June 6, 2006 was prepared as an Executive Summary

    and is not compliant with National Instrument 43-101

  • 2 Andean District - Chile Exploration June 6, 2006

    Summary

    •Exploration was carried out under an LOU between SAGCand Rio Tinto, signed in March 2005

    • 8 holes were drilled totalling 3891m of diamond drilling

    • A very well mineralised copper-gold porphyry system wasdiscovered

    • Best results include 279m 0.4% Cu - 0.43g/T Au and 70m0.46% Cu - 0.49g/T Au

    • Results of exploration programme conducted by Rio Tintohave added a significant value to the Pimentón project

  • 3 Pimentón Project –June 6, 2006

    Pimentón

    0 m 500

    N

    3

    14

    Camp

    Plant

    86m @ 0.15% Cu &0.06g/t Au, from 11m

    136m @ 0.17% Cu &0.04g/t Au, from 627m

    34m @ 0.13% Cu &0.14g/t Au, from 188m

    2

    56

    8

    7

    8

    Phyllic

    LegendLithology

    Tuffs

    PotassicAlteration

    Propylitic

    Tourmaline breccia

    Proposed drill holes

    Diorite porphyry

    Auriferous quartz veins

    Volcaniclastics

    RT diamond drill holes

    Other diamond drill holes

  • 4 Pimentón Project –June 6, 2006

    0 m 500

    N

    Volcaniclastics

    Moraine

    Pimentón Valley Valle Hondo

    Intermineral

    porphyry

    Early porphyry

    Tourmalinebreccia

    Late porphyry

    Lithology

    Other diamonddrill holes

    RT diamonddrill holes

    6 42

    Faul

    t

    626m

    685m

    465m

    70m @ 0.46% Cu &0.49g/t Au, from 100m

    279m @ 0.4% Cu &0.43g/t Au, from 312m

    34m @ 0.13% Cu &0.14g/t Au, from 188m

    PimentónSchematic Cross Section

  • 5 Pimentón Project –June 6, 2006

    Intermineral diorite porphyry

    Late diorite porphyry

  • 6 Pimentón Project –June 6, 2006

    Pimentón – Hole 4 330mCu & Au mineralisationin potassically alteredearly diorite porhyry0.53% Cu – 0.56 g/t Au

  • 7 Pimentón Project –June 6, 2006

    Pimentón Hole 6 128mEarly diorite porphyrywith A-veinlets andchalcopyrite – bornitemineralisation

  • 8 Pimentón Project –June 6, 2006

    Intermineraldioriteporphyry

    Early diorite porphyry

  • 9 Pimentón Project –June 6, 2006

    Early diorite porphyryIntermineral Dioriteporphyry

  • 10 Pimentón Project –June 6, 2006

    Early diorite porphyryIntermineral dioriteporphyry

  • 11 Pimentón Project –June 6, 2006

    Volcaniclastics

    Moraine

    M 5000

    Valle Pimentón Valle Hondo

    Intermineraldiorite porphyry

    Early dioriteporphyry

    Tourmalinebreccia

    Late dioriteporphyry

    Lithology

    Other diamonddrill holes

    RT diamonddrill holes

    6 42

    Faul

    t

    626m

    685m

    465m

    70m @ 0.46% Cu & 0.49g/t Au, from 100m (0.8% Cu equivalent)

    279m @ 0.4% Cu & 0.43g/t Au, from 312m (0.7% Cu equivalent)

    34m @ 0.13% Cu & 0.14g/t Au, from 188m

    Volcaniclastics

    Moraine

    M 5000

    Valle Pimentón Valle Hondo

    Intermineraldiorite porphyry

    Early dioriteporphyry

    Tourmalinebreccia

    Late dioriteporphyry

    Lithology

    Other diamonddrill holes

    RT diamonddrill holes

    6 42

    Faul

    t

    626m

    685m

    465m

    70m @ 0.46% Cu & 0.49g/t Au, from 100m (0.8% Cu equivalent)

    279m @ 0.4% Cu & 0.43g/t Au, from 312m (0.7% Cu equivalent)

    34m @ 0.13% Cu & 0.14g/t Au, from 188m

    MODELO GEOLOGICOPREDICTIVO

    MODELO GEOLOGICO CONINFORMACION DE NUEVOSSONDAJES

  • 12 Pimentón Project –June 6, 2006

    Mesotermal

    Pórfido Cu

    Epitermal

    Argilica-Seric

    A

    Hm

    B

    Jr

    C

    Sericita

    Sericita verde

    Leached

    Cp(+)

    Argilica I

    Biotita-FK-mgt

    Biotita

    Cp-Bn

    BxTermal

    Vetas QzAu

    Cc/PyE.Sec.

    Vetillas D (Py)

    Vetas AuEsp-Cp

    Calc-EpBr act-Qz-Ep-Esp-mgt

    Vetilla B (Mo)

    StockworkVetilla A

    Mesotermal

    Pórfido Cu

    Epitermal

    Argilica-Seric

    A

    Hm

    B

    Jr

    C

    Sericita

    Sericita verde

    Leached

    Cp(+)

    Argilica I

    Biotita-FK-mgt

    Biotita

    Cp-Bn

    BxTermal

    Vetas QzAu

    Cc/PyE.Sec.

    Vetillas D (Py)

    Vetas AuEsp-Cp

    Calc-EpBr act-Qz-Ep-Esp-mgt

    Vetilla B (Mo)

    StockworkVetilla A

    Argilica-Seric

    A

    Hm

    B

    Jr

    C

    Sericita

    Sericita verde

    Leached

    Cp(+)

    Argilica I

    Biotita-FK-mgt

    Biotita

    Cp-Bn

    BxTermal

    Vetas QzAu

    Cc/PyE.Sec.

    Vetillas D (Py)

    Vetas AuEsp-Cp

    Calc-EpBr act-Qz-Ep-Esp-mgt

    Vetilla B (Mo)

    StockworkVetilla A

    Pórfido DioríticoIntermineral

    Pórfido DioríticoTemprano

    Vt qz A truncada

    Pórfido DioríticoIntermineral

    Pórfido DioríticoTemprano

    Vt qz A truncada

    Pórfido DioríticoTemprano

    Vt qz A – cp

    Pórfido DioríticoTemprano

    Vt qz A – cp

    Pórfido DioríticoIntermineral

    Pórfido DioríticoTardío - sin vt qz

    Pórfido DioríticoIntermineral

    Pórfido DioríticoTardío - sin vt qz

  • 13 Pimentón Project –June 6, 2006

    FARELLONES

    Unidad LitologíaColumna

    Fm.A

    C

    BToba cristalina-lítica

    Andesita porfídica, aglomerados, areniscas tobáceas y andesita grano fino

    Toba soldada

    Andesita porfídica gruesas y afaníticacon intercalaciones brechas volcánicas

    FARELLONES

    Unidad LitologíaColumna

    Fm.A

    C

    BToba cristalina-lítica

    Andesita porfídica, aglomerados, areniscas tobáceas y andesita grano fino

    Toba soldada

    Andesita porfídica gruesas y afaníticacon intercalaciones brechas volcánicas

    B

    C

    A

    B

    C

    A

  • 14 Pimentón Project –June 6, 2006

    3

    14

    Camp

    Plant

    M 5000

    2

    56

    8

    7

    3

    14

    Camp

    Plant

    M 5000

    2

    56

    8

    7

    SONDAJES PIMENTON

    2005: 3 POZOS DDH – 1.822,9 m

    2006: 5 POZOS DDH – 2.068,2 m

    TOTAL 3.891,1 m

    RIO TINTO

    PIMENTON

  • 15 Pimentón Project –June 6, 2006

    CONTROL DE CALIDAD DE STANDARD ALTAR 1PM-DD-004 PROYECTO PIMENTON 2006

    80009000

    1000011000

    1 3 5 7 9 11

    BATCH

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 10007 P P M)RANGO INFERIOR (VALOR 9237 P P M)STANDARD

    CONTROL DE CALIDAD DE STANDARD ALTAR 2 PM-DD-004 PROYECTO PIMENTON 2006

    4000

    5000

    6000

    2 4 6 8 10 12

    BATCH

    Cu P

    PM

    RANGO SUP ERIOR (VALOR 5282 P P M)RANGO INFERIOR (VALOR 4779 P P M)STANDARD

    CONTROL DE DUPLICADO PM-DD-004 PROYECTO PIMENTON

    0

    5000

    10000

    1 2 3 4 5 6 7 8 9 10 11 12

    BATCH

    Cu

    PPM

    DUPLICADO PADRE

    DUPLICADO HIJO

    CONTROL DE CALIDAD DE STANDARD ALTAR 1 PM-DD-006 PROYECTO PIMENTON

    8 0 0 0

    9 0 0 0

    10 0 0 0

    110 0 0

    1 3 4 6

    B A TC H

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 10007 P P M)RANGO INFERIOR (VALOR 9237P P M)STANDARD

    CONTROL DE CALIDAD DE STANDARD ALTAR 2 PM-DD-006 PROYECTO PIMEMTON

    4000

    5000

    6000

    2 5 7B A TC H

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 5282 P P M)

    RANGO INFERIOR (VALOR 4779 P P M)

    STANDARD

    CONTROL DE CALIDAD DUPLICADO PM-DD-006 PROYECTO PIMENTON

    02000400060008000

    10000

    1 2 3 4 5 6 7

    BATCH

    Cu

    PPM

    DUP LICADO P ADRE

    DUP LICADO HIJ O

    CONTROL DE CALIDAD DE STANDARD ALTAR 1PM-DD-004 PROYECTO PIMENTON 2006

    80009000

    1000011000

    1 3 5 7 9 11

    BATCH

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 10007 P P M)RANGO INFERIOR (VALOR 9237 P P M)STANDARD

    CONTROL DE CALIDAD DE STANDARD ALTAR 2 PM-DD-004 PROYECTO PIMENTON 2006

    4000

    5000

    6000

    2 4 6 8 10 12

    BATCH

    Cu P

    PM

    RANGO SUP ERIOR (VALOR 5282 P P M)RANGO INFERIOR (VALOR 4779 P P M)STANDARD

    CONTROL DE DUPLICADO PM-DD-004 PROYECTO PIMENTON

    0

    5000

    10000

    1 2 3 4 5 6 7 8 9 10 11 12

    BATCH

    Cu

    PPM

    DUPLICADO PADRE

    DUPLICADO HIJO

    CONTROL DE CALIDAD DE STANDARD ALTAR 1 PM-DD-006 PROYECTO PIMENTON

    8 0 0 0

    9 0 0 0

    10 0 0 0

    110 0 0

    1 3 4 6

    B A TC H

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 10007 P P M)RANGO INFERIOR (VALOR 9237P P M)STANDARD

    CONTROL DE CALIDAD DE STANDARD ALTAR 2 PM-DD-006 PROYECTO PIMEMTON

    4000

    5000

    6000

    2 5 7B A TC H

    Cu

    PPM

    RANGO SUP ERIOR (VALOR 5282 P P M)

    RANGO INFERIOR (VALOR 4779 P P M)

    STANDARD

    CONTROL DE CALIDAD DUPLICADO PM-DD-006 PROYECTO PIMENTON

    02000400060008000

    10000

    1 2 3 4 5 6 7

    BATCH

    Cu

    PPM

    DUP LICADO P ADRE

    DUP LICADO HIJ O

    CONTROL DE CALIDAD

  • 16 Pimentón Project –June 6, 2006

    Volcaniclastics

    Moraine

    M 5000

    Valle Pimentón Valle Hondo

    Intermineraldiorite porphyry

    Early dioriteporphyry

    Tourmalinebreccia

    Late dioriteporphyry

    Lithology

    Other diamonddrill holes

    RT diamonddrill holes

    6 42

    Faul

    t

    626m

    685m

    465m

    70m @ 0.46% Cu & 0.49g/t Au, from 100m (0.8% Cu equivalent)

    279m @ 0.4% Cu & 0.43g/t Au, from 312m (0.7% Cu equivalent)

    34m @ 0.13% Cu & 0.14g/t Au, from 188m

    SECCION LITOLOGIA-ESTRUCTURA

  • 17 Pimentón Project –June 6, 2006

    Cp - Py (~0.2% Cu)

    Py (> Bn(> 0.7% Cu)

    Cp > Py - Bn(~0.5% Cu)

    Mineralisation

    6 42

    626m685m

    465m

    Other diamonddrill holes

    RT diamonddrill holes

    70m @ 0.46% Cu & 0.49g/t Au, from 100m (0.8% Cu equivalent)

    279m @ 0.4% Cu & 0.43g/t Au, from 312m (0.7% Cu equivalent)

    34m @ 0.13% Cu & 0.14g/t Au, from 188m

    SECCION ZONA MINERAL

  • 18 Pimentón Project –June 6, 2006

    B

    C

    A

    K

    S

    P

    S-C

    Ca-Na

    C

    ZONA DE ALTERACION

  • 19 Pimentón Project –June 6, 2006

    HOLE HOLE PM-DD-004 PM-DD-005

    FROM TO LARGE m Cu% Au gr/tn FROM TO LARGE m Cu% Au gr/tn83.7 681.15 597.45 0.28 0.32 69 332 263 0.12 0.10

    INCLUYE INCLUYEFROM LARGE m Cu% Au gr/tn FROM LARGE m Cu% Au gr/tn148.5 56 0.30 0.31 69 44 0.20 0.22259 49 0.22 0.22 151 20 0.32 0.15312 279 0.40 0.43

    (312) 385 121 0.44 0.46(312) 553 35 0.44 0.46

    591 37 0.22 0.25600 26 0.23 0.25

    HOLE PM-DD-006

    FROM TO LARGE m Cu% Au gr/tn95.5 464 368.5 0.23 0.26

    INCLUYEFROM LARGE m Cu% Au gr/tn

    100 72 0.46 0.48(100) 106 58 0.50 0.52

    224 34 0.21 0.21280 20 0.23 0.27388 48 0.33 0.43

    GRADE AVERAGE

    GRADE AVERAGE

    GRADE AVERAGE

    3

    14

    Camp

    Plant

    M 5000

    2

    56

    8

    7

    3

    14

    Camp

    Plant

    M 5000

    2

    56

    8

    7

    RESULTADOS DE LEYES Cu - Au

  • 20 Pimentón Project –June 6, 2006

    Abundancia relativa % Leyes Metraje (m) magnetita calcopirita bornita % Cu gr/tn Au

    vetillas Qz

    197 4 2 a 3 0.27 0.38 B 330 2 a 3 0.31 0.38 B 357 3 a 3,5 1,5 a 2 traza 0.33 0.31 A y B 419 3 a 4 2,5 a 3 0.30 0.40 EB-B-D575 4 a 5 1,5 traza 0.40 0.47 EB-A-B

    Cp - Py (~0.2% Cu)

    Py (> Bn(> 0.7% Cu)

    Cp > Py - Bn(~0.5% Cu)

    Mineralisation

    6 42

    626m685m

    465m

    Other diamonddrill holes

    RT diamonddrill holes

    70m @ 0.46% Cu & 0.49g/t Au, from 100m (0.8% Cu equivalent)

    279m @ 0.4% Cu & 0.43g/t Au, from 312m (0.7% Cu equivalent)

    34m @ 0.13% Cu & 0.14g/t Au, from 188m

    PM-DD-004

  • 21 Pimentón Project –June 6, 2006

    22 20 18 16 14 12 10 8 6 4 2 0 Ma

    Volcanics and plutons 22-12 MaLate porphyries >6 Ma

    BrecciasK-alteration10-6.9 Ma

    Los Pelambres

    Los Bronces- Rio Blanco

    Volcanics 21-14 Ma

    Plutons 20-7.6 Ma Breccias 7.3-4.2 Ma

    K-alteration>5.4 Ma

    Late porphyries 5.2-3.9 Ma

    El TenienteVolcanics 14-5.6 Ma

    Plutons 8-7 Ma

    Alteration>4.4 Ma

    Late dykes 3.8-1.8 Ma

    Braden BrecciaTeniente Porphyry4.6-4 Ma

    Pimentón

    Sericite10.37 +/- 0.19 Ma

    Secondary Biotite9.94 +/- 0.14 Ma

    22 20 18 16 14 12 10 8 6 4 2 0 Ma22 20 18 16 14 12 10 8 6 4 2 0 Ma

    Volcanics and plutons 22-12 MaLate porphyries >6 Ma

    BrecciasK-alteration10-6.9 Ma

    Los Pelambres

    Los Bronces- Rio Blanco

    Volcanics 21-14 Ma

    Plutons 20-7.6 Ma Breccias 7.3-4.2 Ma

    K-alteration>5.4 Ma

    Late porphyries 5.2-3.9 Ma

    El TenienteVolcanics 14-5.6 Ma

    Plutons 8-7 Ma

    Alteration>4.4 Ma

    Late dykes 3.8-1.8 Ma

    Braden BrecciaTeniente Porphyry4.6-4 Ma

    Pimentón

    Sericite10.37 +/- 0.19 Ma

    Secondary Biotite9.94 +/- 0.14 Ma

    PimentónPimentón

    DisputadaDisputadaDisputada

    PelambresPelambresPelambres

    Teniente

    Lowest extraction level 1983 mts

    Mineralisation drilled to at least 1200 mts TenienteTeniente

    Lowest extraction level 1983 mts

    Mineralisation drilled to at least 1200 mts

    3000 m.a.s.l

    4000 m.a.s.l

    3500 m.a.s.l

    2500 m.a.s.l

    2000 m.a.s.l

    1500 m.a.s.l

    3000 m.a.s.l

    4000 m.a.s.l

    3500 m.a.s.l

    2500 m.a.s.l

    2000 m.a.s.l

    1500 m.a.s.l

  • 22 Andean District - Chile Exploration June 6, 2006

    Conclusions and recommendations

    • A large Cu-Au porphyry deposit was identified in thePimentón valley under relatively shallow moraine

    • This new Cu-Au deposit is one of the most significantdiscoveries in the Farellones belt in the last years

    • Although the Cu and Au grades can be consideredsubeconomic at this stage, there is potential for a highgrade core in depth

  • 23 Andean District - Chile Exploration June 6, 2006

    Conclusions and recommendations (cont.)

    • It is recommend to drill a few deep holes in the mainvalley to evaluate the vertical extension of mineralisation

    • Potential resources of several hundreds million tonnesis thought to be a realistic scenario

    • Results of exploration programme done by Rio Tintohave added a significant value to the Pimentón projectand subsequently to their stakeholders