PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An...

4
A Plan is Required for: Any construction activity on any site involving 10 or more contiguous acres of disturbed surface area, or any earthmoving activity exceeding a daily volume of 10,000 cubic yards, or relocating more than 2,500 cubic yards per day of bulk materials at least three days per year. Qualifying Criteria (Complete All That Apply) An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control Plan to the APCO prior to the start of any Large Operation as defined in Rule 402 (Fugitive Dust), or if a plan is required by a CEQA document, eg Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report. Project Name and Location Project Description Project Address: Expected Start Date: City: Project Name: End Date: Section: Township: Range: REP- Dust Plan Page 1 6/20/2017 EASTERN KERN AIR POLLUTION CONTROL DISTRICT 2700 “M” STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 • FAX: (661) 862-5251 • www.kernair.org FUGITIVE DUST EMISSION CONTROL PLAN Project commencement shall not begin until APCO has approved or conditionally approved the Plan. $120 Filing/Review fee is required upon submission of all Fugitive Dust Control Plans. Solar Plant Cement Plant Mining Operation Construction Other ___________________ Project Type DATE Validation (for EKAPCD) Filing Fee: $_______________ Receipt No: _______________ Date: _____________________

Transcript of PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An...

Page 1: PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control

A Plan is Required for: Any construction activity on any site involving 10 or more contiguous acres of disturbed surface area, or any earthmoving activity exceeding a daily volume of 10,000 cubic yards, or relocating more than 2,500 cubic yards per day of bulk materials at least three days per year.

Qualifying Criteria (Complete All That Apply)

An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control Plan to the APCO prior to the start of any Large Operation as defined in Rule 402 (Fugitive Dust), or if a plan is required by a CEQA document, eg Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report.

Project Name and Location

Project Description

Project Address:

Expected Start Date:

City:

Project Name:

End Date:

Section: Township: Range:

REP-11 Dust Plan Page 1 6/20/2017

EASTERN KERN AIR POLLUTION CONTROL DISTRICT 2700 “M” STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 • FAX: (661) 862-5251 • www.kernair.org

FUGITIVE DUST EMISSION CONTROL PLAN

Project commencement shall not begin until APCO has approved or conditionally approved the Plan.

$120 Filing/Review fee is required upon submission of all Fugitive Dust Control Plans.

Solar Plant Cement Plant Mining Operation Construction Other ___________________

Project Type

DATE RECEIVED

Validation (for EKAPCD) use

Filing Fee: $_______________ Receipt No: _______________ Date: _____________________

cravensj
Stamp
Page 2: PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control

EASTERN KERN AIR POLLUTION CONTROL DISTRICTFUGITIVE DUST CONTROL PLAN (Rule 402)

Phone:

Phone: Email Address:

City: State: Zip:

Company Name:

Address:

Email Address:

Address:

City: State: Zip:

Phone:

Title:

Company Name:

This Fugitive Dust Control Plan was prepared by:

Name:

Title:

Company Name:

ContactsList all persons responsible for the preparation, submission, and implementation of plan. Complete all applicable

Secondary Contact Name:

Title:

Address:

City: State: Zip:

Who will have the primary responsibility for implementing this Dust ControlPlan?

Primary Contact Name:

REP-11 Dust Plan Page 2 6/20/2017

Email Address:

Page 3: PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control

EASTERN KERN AIR POLLUTION CONTROL DISTRICTFUGITIVE DUST CONTROL PLAN (Rule 402)

Sources of Fugitive Dust and Reasonably Available Control Measures (RACM). You may attach your plan as a separate document.

Description and Location of Fugitive Dust Source List RACM for each SourceATC No. (if applicable)

REP-11 Dust Plan Page 3 6/20/2017

ATC No: ___________________ Filing Fee: $_______________

Equip Dscrpt: _______________ Receipt No: _______________

Equip Code: ________________ Date: ____________________

Please include additional pages, as needed, and example of "If You See Blowing Dust" sign.

Page 4: PHONE: (661) 862-5250 • FAX: (661) 862-5251 • FUGITIVE DUST … · 2017-06-20 · An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control

EASTERN KERN AIR POLLUTION CONTROL DISTRICTFUGITIVE DUST CONTROL PLAN (Rule 402)

Draw or Attach Plot Plan

Plot plan is attached separately.

REP-11 Dust Plan Page 4 6/20/2017