NOTE: FUTURE PUBLIC TRANSIT STOPS TO BE COORDINATED WITH THE CITY. LIMIT OF WORK ON-STREET PARKING THE BAY PARK PARKING AND KAYAK LAUNCH NEXT RIGHT PARKING, TURN RIGHT DO NOT ENTER (FACING EAST) ADDITIONAL PARKING AT VAN WEZEL, TURN LEFT (FACING WEST) THE BAY PARKING, TURN LEFT AND IF LOT IS FULL PROCEED TO VAN WEZEL PARKING LOT SIGNAGE LEGEND LOW LIMIT OF WORK LOW 4.28.2020 DRAFT 36 33 STANDARD 3 ADA 21 21 STANDARD 24 22 STANDARD 2 ADA OFF-STREET PARKING 51 PARKING SPOTS 1,296 PARKING SPOTS TOTAL: 1,347 PARKING SPOTS BOAT RAMP PARKING LOT CONTINUES OFF MAP 108 21 STANDARD 4 ADA 83 BOAT 8 4 STANDARD 4 ADA 8 8 ADA 15 4 91 87 STANDARD 4 ADA 154 147 STANDARD 7 ADA 878 845 STANDARD 33 ADA PHASE 1 VEHICULAR CIRCULATION + PARKING * * 1 * 4 * 2 * 1 * 2 * 3 * 4 * 3

Transcript of PHASE 1 VEHICULAR BOAT RAMP PARKING LOT CIRCULATION ... · 4/28/2020  · phase 1 pedestrian + bike...

Page 1: PHASE 1 VEHICULAR BOAT RAMP PARKING LOT CIRCULATION ... · 4/28/2020  · phase 1 pedestrian + bike circulation primary pedestrian crossings pedestrian circulation multi-use path

NOTE: FUTURE PUBLIC TRANSIT STOPS TO BE COORDINATED WITH THE CITY.

LIMIT OF WORK

ON-STREET PARKING

THE BAY PARK PARKING AND KAYAK LAUNCH NEXT RIGHT

PARKING, TURN RIGHT

DO NOT ENTER (FACING EAST) ADDITIONAL PARKING AT VAN WEZEL, TURN LEFT (FACING WEST)

THE BAY PARKING, TURN LEFT AND IF LOT IS FULL PROCEED TO VAN WEZEL PARKING LOT

SIGNAGE LEGEND

LOW LIMIT OF WORKLOW

4.28.2020 DRAFT

3633 STANDARD3 ADA

2121 STANDARD

2422 STANDARD2 ADA

OFF-STREET PARKING

51 PARKING SPOTS

1,296 PARKING SPOTS

TOTAL: 1,347 PARKING SPOTS

BOAT RAMP PARKING LOT CONTINUES OFF MAP

10821 STANDARD4 ADA83 BOAT

84 STANDARD

4 ADA

88 ADA

15

4

9187 STANDARD4 ADA

154147 STANDARD7 ADA

878845 STANDARD33 ADA

PHASE 1 VEHICULAR CIRCULATION + PARKING

*

*1

*4

*2

*1

*2

*3

*4

*3

Page 2: PHASE 1 VEHICULAR BOAT RAMP PARKING LOT CIRCULATION ... · 4/28/2020  · phase 1 pedestrian + bike circulation primary pedestrian crossings pedestrian circulation multi-use path

PHASE 1 PEDESTRIAN + BIKE CIRCULATION

PRIMARY PEDESTRIAN CROSSINGS

PEDESTRIAN CIRCULATION

MULTI-USE PATH

BIKE STORAGE + PARKING

MURT

PRIMARY PEDESTRIAN CROSSING

PRIMARY PEDESTRIAN CROSSING

LIMIT OF WORKLOW