PH electronics “Headquarters”
description
Transcript of PH electronics “Headquarters”
![Page 1: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/1.jpg)
PH electronics “Headquarters”
![Page 2: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/2.jpg)
Remindero Reasons for relocation (and making one group)
o Get people closer together to enable good daily exchange of experience/expertise/ideas in the electronics domain related to all the different projects we are doing in a large variety of domains (micro-electronics to standard instrumentation)
o Assure appropriate lab infrastructure for all our different activates: Clean room – IC testing - opto – general labs – mini mechanical workshop – storage – etc..
o But also keep in mind:o Maintain close/regular contacts with our clients/project
partners (experiments)
ESE group meeting slide 2
![Page 3: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/3.jpg)
Officeso General principle
o Long term staff gets individual office to the extent possible. o Large rooms used for multiple students/visitors/fellows/etc.
o Air-conditioningo CERN does not any more “allow” to have air-conditioning of
individual offices unless for specific reasons.o Exceptions in ESE:
o Top floor that can get very hot in summero 5th floor installed before new “CERN rule” on this.o Offices on south corner getting exceedingly hot in summer because of bad
general thermal insulation of our old building.o Comment: Air-conditioning in labs not intended to cool offices via
corridor keeping all doors open.o All offices have been painted and should be in good
shape.o Remaining:
o New lightningo Radiator thermostatso ?
ESE group meeting slide 3
![Page 4: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/4.jpg)
Labs/workshopso All new labs have been refurbished with appropriate flexible
electrical installations (power rails at ceiling) and air-conditioning (some not yet connected to global cooling system).
o Each lab is run by a lab responsible that takes care of general state of lab. All other users of labs must agree with this “lab master” on how and when to use the lab.o To prevent complete anarchy seen in some labs in the past.o Same principle applies to all our major instruments:
https://ph-dep-ese.web.cern.ch/ph-dep-ese/group_internal/instruments/ESE_Inventory.htm
o Electronic keys (not yet on all labs in 5/6th. floor)o Default: People in section have accesso Additional access can easily be added (Evelyne)o Electronic keys keeps a log of who have had access when
(big brother watching you, that we will hopefully never use)o Unexpected “feature”: Cards must be refreshed once per month via
dedicated terminal in building entrance (or on terminal in Evelyne’s office)o Some labs will have particular access restrictions for
safety reasons:o Radioactive sources, X-ray machines, Laser labs, Mechanical workshop.
ESE group meeting slide 4
![Page 5: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/5.jpg)
Some of our labs
slide 5
Pool lab Pool/HV lab Pool lab
LVPS lab Opto lab1 Opto lab2
![Page 6: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/6.jpg)
More Labs
ESE group meeting slide 6ESE group meeting
SMD lab1 with ESD floor and ventilation FE/Power lab FE lab
FE pixel-laser lab ME prober/X-ray lab Medipix X-ray lab
![Page 7: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/7.jpg)
Even more labs
ESE group meeting slide 7
IC tester lab ME lab Old IC tester lab
Clean room/wafer prober Mini mechanical workshop Pool reception
![Page 8: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/8.jpg)
Storage
ESE group meeting slide 8
Group/section storage SS-14 Group/section storage SS-14 Experiment spare Components Storage inSS-13 under finalization
Pool storage SS-14
![Page 9: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/9.jpg)
Meeting/training/terminal
o 14-4-010: Small meeting room
o Booking via Indico (by group members)
o Projector, Computer, Camera, Microphone, Phone: Equipped for EVO and phone conference.
o Will soon get electronic key
o 14-5-22: Training/Termial/Meeting/ME library , , room
o Booking via Indico (by group members)
o Projectoro Electronic key
ESE group meeting slide 9
![Page 10: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/10.jpg)
Common facilitiesLarge meeting room: 13-2-005
o Old and worn outo Seats keeps people awakeo Refurbishment in planning.
o Painting, projectoro Air-conditioning, heating, seats ?
o Public meeting room with booking via Indico
Coffee Paradise
o Central point for many informal discussions.
o Only kept alive if certain turnaround(should be OK now)
ESE group meeting slide 10
![Page 11: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/11.jpg)
Planned work (2011)o Finalize refurbishment of cellar of 13:
o Component storageo Nitrogen protected storage
(bare dies, wafers and delicate components)o 1 -2 labs with infrequently used equipment
(Egun, climatic chambers, etc.)o Renovation of sanitary installationso Refurbishment of building entranceo Additional parking places when removing old
barrackso “Controlled” car access to back yardo Refurbishment of global chilled water
distribution in building. New cooling plant and connection of remaining cooling units in our labs.
o New ceilings and painting of corridors in 14.o Painting of stair caseso Other:
o Renovate small elevator (just replace “wooden” panels)o Noisy escape stairso ?
ESE group meeting slide 11
![Page 12: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/12.jpg)
Entrance refurbishmento Entrance very visible from CERN main roado General refreshment strongly neededo Should be more welcoming.o Get rid of bicycle mess in fronto Allow smokers to have a decent place outside with
appropriate ash trays.o Allow appropriate use of coffee automates with minimal
mess generated from this.o Use available space to have small permanent exposition
of electronics/detectors for HEP.o Easy to maintain and keep cleano An initial study has been done by an architect.
o Asbestos removal in floor glue: 16k (CERN policy to do this now)o Internal refurbishment: 60k (of which~ 10k for vitrine)o External + bicyles + stair case + water fountain + information panel: ?
o WHO PAYS: GS, PH, ESE, ?
ESE group meeting slide 12
![Page 13: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/13.jpg)
Outline
ESE group meeting slide 13
![Page 14: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/14.jpg)
“3D”
ESE group meeting slide 14
![Page 15: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/15.jpg)
ESE group meeting slide 15
![Page 16: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/16.jpg)
Cost estimate
ESE group meeting slide 16
![Page 17: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/17.jpg)
Conclusionso I think we are now very well installed and have all required
infrastructure available.o There will still be major work to do this year:
o Entrance, Sanitary, Chilled water, Corridors, Stair case, Meeting room, Cellar of bat 13.
o I hope financial constraints (or asbestos problems) will not delay this work.o Thanks to you all to have made this possible
o PH and GS management (funding and support)o PH-SMI: Jean-Loup, Marie-Noelle, Jacques, Sebastian.o GS: Christophe Martel, Barthelemy Gossuino ESE: Patrick Petito All of you who have made this relocation smoothly and efficiently.
o When all finalized, I can propose that we organize an open day for visits by our colleagues and collaborators at CERN.
o Please let me know of ideas/requests for further improvements.
o I think we are now very well installed, even though some of you may have been dreaming about this:
ESE group meeting slide 17
![Page 18: PH electronics “Headquarters”](https://reader034.fdocuments.in/reader034/viewer/2022050802/56815f2d550346895dcdf88d/html5/thumbnails/18.jpg)
Google office
ESE group meeting slide 18