PETER HUGHES MOBILE +44 (0) 7766 916 541 EMAIL [email protected] ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE +44 (0) 20 7251 9784 WWW.ARC1.CO.UK MEASURING OP RISK EXPOSURE MEASURING OP RISK EXPOSURE THE KEY TO A COMPLETE OP RISK MANAGEMENT PROGRAMME THE KEY TO A COMPLETE OP RISK MANAGEMENT PROGRAMME

description

February 22, 2006Operational Risk Management - The Right Way3 THE FINITE OP RISK ENVIRONMENT THE EFFECTIVENESS OF OP RISK MANAGEMENT IS LIMITED IF THERE IS NOT A FINITE RISK ENVIRONMENT A FINITE ENVIRONMENT FOR OP RISK IS WHERE: –THE TOTAL POPULATION OF OP RISK EXPOSURES IS QUANTIFIED AND A FINITE FRAMEWORK OF RISK CONTROL TOTALS IS ESTABLISHED –OP RISKS ARE REPORTED WITHIN A UNIFIED FRAMEWORK OF STANDARDISED CORPORATE RISK METRICS THAT CAN BE AGGREGATED AND CONSOLIDATED THIS IS WHAT ARC1 DOES!

Transcript of PETER HUGHES MOBILE +44 (0) 7766 916 541 ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y...

Page 1: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

PETER HUGHESMOBILE +44 (0) 7766 916 541EMAIL [email protected] BEST PRACTICES LIMITED2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOMTELEPHONE +44 (0) 20 7251 9784 WWW.ARC1.CO.UK

MEASURING OP RISK EXPOSUREMEASURING OP RISK EXPOSURE

THE KEY TO A COMPLETE OP RISK MANAGEMENT PROGRAMMETHE KEY TO A COMPLETE OP RISK MANAGEMENT PROGRAMME

Page 2: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 2

TODAY’S AGENDATODAY’S AGENDA

• THE FINITE OP RISK ENVIRONMENT

• THE BASIC CONCEPTS

• THE ARC1 WORKFLOW

• THE OP RISK MEASUREMENTS

• ARC1 SAMPLE SCREENSHOTS

• ARC1 SAMPLE DASHBOARDS

• ABOUT ARC1

Page 3: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 3

THE FINITE OP RISK ENVIRONMENTTHE FINITE OP RISK ENVIRONMENT• THE EFFECTIVENESS OF OP RISK MANAGEMENT IS LIMITED

IF THERE IS NOT A FINITE RISK ENVIRONMENT

• A FINITE ENVIRONMENT FOR OP RISK IS WHERE:

– THE TOTAL POPULATION OF OP RISK EXPOSURES IS QUANTIFIED AND A FINITE FRAMEWORK OF RISK CONTROL TOTALS IS ESTABLISHED

– OP RISKS ARE REPORTED WITHIN A UNIFIED FRAMEWORK OF STANDARDISED CORPORATE RISK METRICS THAT CAN BE AGGREGATED AND CONSOLIDATED

THIS IS WHAT THIS IS WHAT ARC1 ARC1 DOES!DOES!

Page 4: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 4

THE BASIC CONCEPTSTHE BASIC CONCEPTS• END-TO-END TRANSACTION PROCESSING CYCLES ARE

DECONSTRUCTED AND REDUCED TO ‘PROCESSES’

• EACH PROCESS HAS THREE MEASURABLE PROPERTIES:– ACTIVITY– VOLUME– RISK SCORE

• BENCHMARK DATA COLLECTED IN 3 STANDARD TABLES WITH RISK QUOTIENTS / WEIGHTINGS ATTACHED:

RISK DRIVER TABLES

OPERATIONAL ACTIVITY

DAILY VOLUMES

CAUSES OF OPERATIONAL FAILURE

34 ACTIVITY QUOTIENTS

8 VOLUME BAND WEIGHTINGS

9 CATEGORY/30 SUB-CATEGORY SCORING TEMPLATES

Page 5: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 5

Infinity

CONSTRUCT PROCESS HIERARCHIES

MAP CURRENT / TARGET STATUS TO ARC1 TABLES:1. ACTIVITY (34 ACTIVITY TYPES / RISK QUOTIENTS)2. VOLUME (8 VOLUME BAND WEIGHTINGS)3. RISK SCORING (9 CATEGORIES / 30 SUB-CATEGORIES)

INPUT ACTION ITEMS

RUN ARC1

THE ARC1 WORKFLOWTHE ARC1 WORKFLOW

Page 6: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 6

THE OP RISK MEASUREMENTSTHE OP RISK MEASUREMENTS

• ARC1 USES THREE BASIC MEASUREMENTS TO MONITOR AND TRACK OP RISK: – RISK CONCENTRATION

• OPERATIONAL SIZE – RISK WEIGHTED TRANSACTIONS• COMBINATION OF ACTIVITY RISK QUOTIENT AND VOLUME BAND

WEIGHTING• EXPRESSED IN OPERATIONAL RISK UNITS (ORUs)

– RISK MITIGATION INDICATOR - RMI• REPRESENTS EFFECTIVENESS OF RISK COUNTERMEASURES• EXPRESSED ON A SCALE OF ZERO TO 100

– VALUE-AT-RISK• REPRESENTS POTENTIAL IMPACT OF OPERATIONAL FAILURE• COMBINATION OF RISK CONCENTRATION AND RMI• EXPRESSED IN OPERATIONAL RISK UNITS (ORUs)

Page 7: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 7

Page 8: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 8

Select peak daily value supported by

the Process

MAPPING PROCESS TO VOLUME BANDMAPPING PROCESS TO VOLUME BAND

Page 9: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 9

Page 10: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 10

GENERATE RISK MEASUREMENTSGENERATE RISK MEASUREMENTS

Generate risk measurements

Page 11: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 11

GENERATE RISK REDUCTION PLANGENERATE RISK REDUCTION PLAN

Construct risk reduction plans

Page 12: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 12

SAMPLE LOSS EVENT CAPTURESAMPLE LOSS EVENT CAPTURE

Page 13: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 13

OP RISK OVERVIEW DASHBOARDOP RISK OVERVIEW DASHBOARD

Page 14: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 14

DEPARTMENTAL ANALYSISDEPARTMENTAL ANALYSIS

Page 15: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 15

KEY RISK INDICATORSKEY RISK INDICATORS

Page 16: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 16

DEPARTMENTAL PROFILEDEPARTMENTAL PROFILE

Page 17: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 17

ABOUT ARC1ABOUT ARC1• PLUG-AND-PLAY / INTERNET, INTRANET OR STANDALONE PC / SQL

DATABASE / SUPPORTS UNLIMITED USERS

• FULLY RESEARCHED OP RISK BENCHMARKS COMPILED OVER 6 YEARS OF CONTINUOUS APPLICATION

• AUDITABLE - STANDARDISED OP RISK MEASUREMENT TABLES

• LOSS EVENT CAPTURE AND REPORTING MODULE – ATTACHES OP RISK CONTEXT TO LOSS EVENTS

• COMPREHENSIVE REPORTING CAPABILITY:

– SCORECARDS

– RISK REDUCTION PLANS

– MANAGEMENT DASHBOARDS – OP RISK MEASUREMENTS ACROSS THE COMPANY DRILLING TO INDIVIDUAL DEPARTMENT PROFILES

• THE ULTIMATE RISK PROFILING TOOL FOR BASEL II / PILLAR 2

• RISK MANAGEMENT BECOMES A LEARNING EXPERIENCE

Page 18: PETER HUGHES MOBILE +44 (0) 7766 916 541  ARC BEST PRACTICES LIMITED 2 SYCAMORE STREET LONDON EC1Y 0SF UNITED KINGDOM TELEPHONE.

February 22, 2006 Operational Risk Management - The Right Way 18