PETE DYEThe Ford Plantation’s
DYE AND LIDDY AT 13
MR. DYE REVIEWING THE 8TH GREEN
The rain gets heavy
PETE DYE
The Ford Plantation #13 Golf Hole
Staking the 13th tee
Ground Breaking Event
Ground Breaking Event
Ground Breaking Picnic
60 inch lake pipe connectors arrive
TFP employee transporting soil
#2 GOLF HOLE WAITING DIRECTION FROM MR. DYE
THE BOOM TRUCK ARRIVES TO FORD
STORM WATER PUMP INSTALL
STORM WATER PUMP INSTALLATION
Alan MacCurrach, Tim Liddy, CW Canfield and Mr. Dye at #9
Dye and others at 9 golf hole
Chris Kleinsmith Shaping the 10th
Getting the work done!
TFP EMPLOYEE ARMIN
IRRIGATION WORKMacCurrach Golf Construction Emloyees
Irrigation system
ROTO-TILLING HOLE 16
MacCurrach Golf Company