Peloton Review Fall 2009

4
Page 1 THE INTEGRATED WELL LIFECYCLE SOLUTION FALL 2009 Enhanced Analysis New schematic options are available, including directional wellbore and 3D wellbore selector (drawn from actual survey data). Easy to use Excel templates in multi well reports allow you to quickly access Excel features, such as pivot tables and graphs. In the new Time Tracks tab, you can correlate any date and time based data in the WellView database. WellView 9.0 is Released! Peloton is pleased to announce the release of WellView 9.0. Numerous enhancements to analysis, usability, data auditing, and administrative tools are featured in this milestone release. Here are just a few of the highlights: Enhanced Usability You can select multiple items for copying and deleting data. The report builder has an improved user interface. You can add the same table multiple times in a data block and display attached image files in the report template. The multi well report block now includes the same features as the single well blockyou can add child tables. In the schematic, you have more annotation flexibility. You can also plot any data versus depth. (article continued on page 3) Inside Fall 2009 ReView: Page 2SiteView 3.2 Release Page 3Peloton Conferences & Exhibitions Page 4RigView 2.1New Enhancements

Transcript of Peloton Review Fall 2009

Page 1: Peloton Review Fall 2009

Page 1

THE INTEGRATED WELL LIFECYCLE SOLUTION

FALL 2009

Enhanced Analysis

New schematic options are available, including directional wellbore and 3D wellbore selector (drawn from actual

survey data).

Easy to use Excel templates in multi well reports allow you to quickly access Excel features, such as pivot tables

and graphs.

In the new Time Tracks tab, you can correlate any date and time based

data in the WellView database.

WellView 9.0 is Released! Peloton is pleased to announce the release of WellView 9.0. Numerous enhancements to analysis, usability, data auditing, and

administrative tools are featured in this milestone release. Here are just a few of the highlights:

Enhanced Usability

You can select multiple items for copying and deleting data.

The report builder has an improved user interface. You can add the same table multiple times in a data block and display

attached image files in the report template.

The multi well report block now includes the same features as

the single well block—you can add child tables.

In the schematic, you have more annotation flexibility. You can

also plot any data versus depth.

(article continued on page 3)

Inside Fall 2009 ReView: Page 2—SiteView 3.2 Release

Page 3—Peloton Conferences & Exhibitions

Page 4—RigView 2.1—New Enhancements

Page 2: Peloton Review Fall 2009

Page 2

New SiteView 3.2 Release! SiteView version 3.2 has recently been released with enhancements to the data model to allow the tracking and management of tubular inventory. Traditionally, SiteView has complemented WellView by focusing on surface orientated information, including construction, environmental, facility and pipeline operations. SiteView now expands this workflow of data to include yard and site inventory for tracking tubulars such as casing, tubing, line pipe,

and flow line.

Both the quantity of length and joints can be tracked, as well as the inventory value. As shipments are received or sent out, the current cost at the time of action can be tracked. This cost can also include the invoiced cost as received from the vendor for any shipment. The most current cost is used to assign an inventory value for both length and joint count. Costs can also accrue as inventory sits unused in the form of inspections or audits. This accrual can also be

added to the current inventory value.

The Peloton Material Transfer add-in allows the user responsible for reconciling inventory to move inventory from site to site. Both units of measure—lengths and joints— can be tracked as they are sent and received from sites within SiteView. The cost associated to the material transfer is also tracked, and there is the option to credit and debit the appropriate AFE in the respective Job in SiteView. As shipments are received, they can be applied to an AFE. As the

tubulars may get moved off site, any remaining amount can be credited back to the AFE for accurate project management.

By adding the ability to manage tubular inventory, SiteView includes one more user group that can contribute to a common master site file. This data allows you to accurately query on active inventory to optimize the use of stock. You can minimize the additional purchases from vendors and manage the cost of

the inventory into the job, thus improving AFE management results at the project level.

Federal regulations are now mandating a higher level of reporting for emissions. SiteView has functionality to track and report any pollutants or green house

gas emissions. It can be used to report at a facility level or to provide a full emissions inventory for the entire company.

Tubular Inventory Management

In addition to being a complete asset management tracking system for serialized production equipment and bulk inventory such as connectors, gauges, and valves, SiteView can now be used to track oilfield tubulars. Inventory yards can be set up where shipments are received from vendors. This inventory can then be moved from inventory to active operation sites using the Peloton Material Transfer add-in. Once the tubulars are consumed down hole (which can be tracked in WellView), the remaining quantity of pipe can either be sent to another location for consumption or back to a yard and

replaced into inventory.

The new data model allows for the tracking of the following base tubular attributes:

Size

Weight

Grade

Connection end

Material

Condition

Page 3: Peloton Review Fall 2009

Page 3

WellView 9.0 is Released! (continued from page 1) Enhanced Data Auditing

The Auditor allows you to use plug-ins to extend your data audits with custom business rules.

This new release demonstrates Peloton’s ongoing commitment to creating the best software to fit your organization’s needs. For details on what’s new, see

the WellView 9.0 release notes.

Enhanced Administration

Use Alerts to monitor field level changes and keep a history of old

and new values.

New administrator tools allow you to

edit and report on the UDL.

The Data Cleanup Tool allows you

to normalize historical data.

Look for Peloton at the following industry conferences & exhibitions: 2009 SPE Annual Technical Conference & Exhibition—October 4-7, 2009—New Orleans, Louisiana, USA

2010 SPE Drilling Conference—February 2-4 , 2010—New Orleans, Louisiana, USA

2010 Global Petroleum Show—June 8-10, 2010—Calgary, Alberta, Canada

NEFTEGAZ—June 21-25, 2010—Moscow, Russia

2010 SPE Annual Technical Conference & Exhibition—September 20-22, 2010—Florence, Italy

Page 4: Peloton Review Fall 2009

Page 4

Houston 1.713.914.9454 ● Calgary 1.403.263.2915

Aberdeen +44.1224.560.580 ● Moscow +7.495.411.9696

Amsterdam +31.20.788.1276 ● Jakarta +62.21.5797.3380

Dubai +971 (0) 4433.5430 ● Help desk 1.888.PELOTON

[email protected][email protected][email protected]

RigView 2.1—New Enhancements A new maintenance release of RigView 2.1 is now available and includes the following new enhancements:

Multi-Select and Move of Jobs on the Schedule

This new enhancement allows users to select a group of Jobs on a single rig line and move them to another rig with a single drag and drop. The multi-select

and move functionality will maintain any spacing between the jobs and will drop them on a rig line as a single block of jobs.

This feature is excellent if you are laying down a rig and need to move all of the jobs that had been scheduled to that particular rig.

New Job Distance Calcs & Ability to Display Weekends on the Schedule

RigView now has two new fields in rvJob that will calculate your distance to the next job location, as well as distance from the previous job location, based on

Latitude and Longitude data entered for each.

Using the right-click menu on the schedule, users can now choose to display weekends. Weekends will appear grayed out on the Rig Schedule.

Please contact Peloton if you would like to download a new release, or if you require additional information. When we upload

the new release for you, the detailed change report which itemizes all changes will be available as well.

™®ProdView is a trademark, and MasterView, WellView, RigView, SiteView, and ‘well focused’ are registered trademarks of Peloton Computer Enterprises Ltd.