PEDESTRIAN BRIDGE DECK TO LENGTHENED WITH FOOTPATH … · wmwm wm wm wm wm wm wm wm wmwm wm wm wm...
Transcript of PEDESTRIAN BRIDGE DECK TO LENGTHENED WITH FOOTPATH … · wmwm wm wm wm wm wm wm wm wmwm wm wm wm...
C
P
-
0
6
KE
PP
OC
H R
OA
D
G
A
S
GASGAS
GAS
G
A
S
G
A
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
A
S
GA
SG
AS
G
A
S
GA
S
GA
S
G
A
S
F
S
F
S
F
S
F
S
F
S
F
S
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
WM
WM
WMWM
WMWM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
W
M
W
M
WM WM WM WM WM WMWM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
FS
FS
FS
FS
FS
FS
FS
FS
WM
WM
WM
WM
WM
WM
WM
W
M
WM
WM
WM
WM
SW
SW
SW
SW
SW
SW
SW
SW
SW
WM
WM
WM
WM
WM
FS
FS
FS
EC
U
EC
U
EC
U
EC
U
ECU
EC
U
EC
U
E
C
U
ECUECU
EC
U
E
C
U
EC
UE
CU
EC
U
EC
U
EC
U
EC
UE
CU
EC
U
EC
U
ECU
ECU
E
C
U
E
C
U
ECU
EC
U
EC
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
EC
U
EC
U
E
C
U
E
C
U
ECU
E
C
U
EC
UE
CU
EC
U
EC
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
EC
U
E
C
U
E
C
U
EC
U
E
C
U
EC
U
E
C
U
E
C
U
EC
U
EC
U
E
C
U
E
C
U
E
C
U
EC
U
EC
U
EC
U
E
C
U
ECU
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
ECU EC
U
EC
U
E
C
U
E
C
U
ECU
ECUECU
ECU
E
C
U
E
C
U
E
C
U
E
C
U
ECU
E
C
U
EC
U
EC
U
E
C
U
WMWM
WMWM
WM
FS
FS
FS
FS
FSFS
FSFS
FSFS
FS
FS
FS
W
M
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
WM
WM
W
M
W
M
W
M
W
M
W
M
W
M
W
M
PITCH No.1
C
P
-
0
4
CP
-03
8-8
3
-
3
3
-
3
2
-
2
2
-
2
1-1
1-1
5-5
7-7
8-8
5-5
6-6
CP-01
6-6
20.38
7-7
CP
-05
20.38
4
-
4
4
-
4
C
P
-
0
5
5m WIDE OR THEREBY ACCESS
TRACK ON CREST FOR
MAINTENANCE VEHICLES
NEW VEHICULAR ACCESS
FROM CULLODEN PARK ROAD
WITH LOCKABLE GATE
CREST LEVEL 25.52m OR THEREBY
REALIGNED CHANNEL
FOOTPATH ACCESS
WATER MAIN TO BE PROTECTED
DURING WORKS
ACCESS TRACK ON CREST FOR
MAINTENANCE VEHICLES
GAS PIPE TO BE PROTECTED
DURING THE WORKS
ABANDONED EXISTING CHANNEL
TO BE REINSTATED AS A SHALLOW SWALE
WITH EROSION PROTECTION TO
EMBANKMENT TOE AS REQUIRED
EXISTING CHANNEL REALIGNED
THROUGH FLOOD STORAGE BASIN
60m LONG OR THEREBY NEW
CONCRETE FLOOD WALL
WITH CREAM HARLING FINISH
EXISTING PEDESTRIAN ACCESS PATH
TO BE REINSTATED
NEW BRIDGE SUITABLE FOR
MAINTENANCE VEHICLES
NEW OUTLET CHANNEL TO CONVEY FLOWS
BACK INTO EXISTING CHANNEL.
EROSION PROTECTION TO BE PROVIDED
SEPARATION FENCE
APPROX 1.8m HIGH
EXISTING KEPPOCH
ROAD CULVERT
56m OR THEREBY
LONG SPILLWAY
ON EMBANKMENT
EXISTING PLAYPARK
TO BE RETAINED
FLOOD STORAGE BASIN FLOOR MAY BE
USED FOR AMENITY AND WILDLIFE
PROVIDED FLOOD PROTECTION FUNCTION
IS NOT COMPROMISED
25m OR THEREBY LENGTH OF WALL
TO BE USED AS SPILLWAY
PARK SPACE
C
P
-
0
2
NEW PEDESTRIAN ENTRANCE
ACCESS TRACK TO SCREEN
SEE NOTE 9
ACCESS STEPS
SEE NOTE 7
PARK SPACE
Sa
Sa
Sar
Sa
Bp
Bp
Bp
Sa
Bp
Sa
Bp
Sar
Sa
Sar
Bp
Bp
Sa
Cm
Bp
Ai
Sa
Bp
Cm
Sa
Sa
Pp
Pp
Bp
Pp
Sa
Sa
Bp
Sa
Sal
Cm
Bp
Bp
Pp
Pp
Pp
Pn
Ca
Bp
Bp
Sa
Sa
Bp
Bp
Sa
Pn
Sa
CmBp
Bp
Bp
Bp
Cm
Pn
Sa
Sxi
Bp
Sa
Sa
Bp
Bp
Bp
Bp
25.52
100x60 PITCH WITH 3m BORDER
CONSTRUCTED
TO SPORTS SCOTLAND SPECIFICATION
PITCH No.2
100x60 PITCH WITH 3m BORDER
CONSTRUCTED
TO SPORTS SCOTLAND SPECIFICATION
BA
SSE ELECTRICITY
CABLE TO BE
PROTECTED OR
DIVERTED
DURING WORKS
PEDESTRIAN BRIDGE DECK TOBE RAISED AND/ORLENGTHENED WITH FOOTPATHON BOTH SIDES TO BEREALIGNED TO SUIT.
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
FSFSFSFSFS
FS
FS
FS
FS
FS
FS
FS
FS
WM
W
M
WM
WM
WM
WM
WM
WM
SW
SW
SW
SW
SW
E
C
U
E
C
U
ECU
ECU
ECU
E
C
U
E
C
U
E
C
U
E
C
U
EC
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
E
C
U
ECU
E
C
U
E
C
U
E
C
U
EC
U
E
C
U
E
C
U
E
C
U
EC
U
ECU EC
U
EC
U
E
C
U
E
C
U
ECU
ECU
E
C
U
CP-01
Tag= 327
EXISTING PEDESTRIAN ACCESS PATH
TO BE REINSTATED
25.52
CP-07
BA
1
0
-1
0
1
0
-1
0
9
-9
9-9
1
1
-1
1
1
1
-1
1
80m LONG OR THEREBY
NEW CONCRETE FLOOD WALL
WITH CREAM HARLING FINISH AND
GALVANISED STEEL HANDRAIL
SSE ELECTRICITY
CABLE TO BE
PROTECTED OR
DIVERTED
DURING WORKS
PEDESTRIAN BRIDGE DECK TOBE RAISED AND/ORLENGTHENED WITH FOOTPATHON BOTH SIDES TO BEREALIGNED TO SUIT.
EXISTING FENCE TO BE
REMOVED AND REPLACED BY
FLOODWALL WITH HANDRAIL
EXISTING FOOTPATH
TO BE REINSTATED
AND REALIGNED TO
TIE-INTO RAISED
BRIDGE DECK
The property of this drawing and design vested in Jeremy Benn Associates Ltd. It shall not be reproduced in whole or in part,
nor disclosed to a third party, without the prior written consent of Jeremy Benn Associates Ltd.
Port Neuk
1 Longcraig Road
South Queensferry
EDINBURGH
EH30 9TD
United Kingdom
www.jbaconsulting.com
t +44 (0)131 3192940
+44 (0)845 8627772
f
e
ApprovedCheckedDesignedDrawnDate
Offices at Atherstone, Doncaster, Edinburgh, Haywards Heath, Limerick, Newcastle upon Tyne, Newport, Saltaire,
Skipton, Tadcaster, Thirsk, Wallingford and Warrington
Project
Title
Client
for
Purpose of Issue Status
Scale
Drawing Number Revision
Project Number:
Drawn:
Designed:
Checked:
Approved:
Client Approval
Rev.:
A - Approved
B - Approved with Revisions
C - Do Not Use
Comments
Revision
Rev.:
Comments
ApprovedCheckedDesignedDrawnDate
Rev.:
Comments
ApprovedCheckedDesignedDrawnDate
Rev.:
Comments
ApprovedCheckedDesignedDrawnDate
Rev.:
Comments
ApprovedCheckedDesignedDrawnDate
SC-JBA-03-07-DR-C-0101
Smithton & Culloden Flood Protection Scheme
2013s7134
Flood Protection Scheme Drawings
Zone 3 Culloden Park Plan
Sheet 2 of 2
P4.0
1:500 @ A1
J. Redpath 25/08/15
S. Thomson 25/08/15
S. Cooney 25/08/15
R. Dobson 25/08/15
For Consultation S4
P1.1
Hatching and legend updated. Annotation added, embankment toe protection added, separation fence
added.
21/09/15 JR ST SC
P1.2
Note 5 added, Hatching, Boxes, annotation and Legend updated.
07/10/15 SO ST SC
P1.3
Title and revision number updated.
16/10/15 LA ST SC
P2.0
Proposed planting areas and existing trees to be removed added.Wetland added,additional annotation
legend updated.
11/01/16 JR SC RD DB
P3.0
For Consultation
08/04/16 AC SC RDSC
P4.0
For Consultation
20/04/16 JR SC SC RD
This map is reproduced from Ordnance Survey material with the permission of the Ordnance Survey on behalf of the
controller of Her Majesty's Stationery Office. (c) Crown Copyright. Unauthorized reproduction infringes Crown Copyright
and may lead to prosecution or civil proceedings. Highland Council 100023369
This is the plan marked SC-JBA-03-07-DR-C-0101
referred to in the Smithton & Culloden Flood Protection
Scheme 2016 made by The Highland Council.
LEGEND
OPEN CHANNEL WATERCOURSE
EROSION PROTECTION
NEW BRIDGE
FLOOD EMBANKMENT
SEE NOTES
EXISTING SERVICES
CS
SURFACE WATER SEWER
COMBINED SEWER
FOUL SEWER
BT OVERHEAD
BT UNDERGROUND
GAS
ELECTRICITY UNDERGROUND
SW
FS
BTO
BTU
GAS
ECU
WATER MAIN
WM
ELECTRICITY OVERHEAD
ECO
FLOOD STORAGE BASIN
EMBANKMENT TOE PROTECTION
AND SWALE PROTECTION
RETAINING WALL
GRAVEL VEHICLE ACCESS TRACK
TO FPS STRUCTURES FOR
MAINTENANCE
CONCRETE STRUCTURE
GRAVEL FOOTPATH
5m HINGED LIGHTING COLUMN
TREES TO BE REMOVED (ALL
OTHER TREES TO BE RETAINED)
XX SECTION MARKER
LIMITS OF LAND AFFECTED BY
OPERATIONS AND OF LAND UPON
WHICH ENTRY IS REQUIRED FOR
THE PURPOSES OF CARRYING
OUT THE OPERATIONS
REPROFILED GROUND
PROPOSED AREAS OF NEW TREE
PLANTING SEE NOTES
EXISTING TREES (TO BE
RETAINED)
GRASSCRETE SURFACE
Notes
1. These plans are in accordance with the requirements of Section 60 and Schedule 2
of the Flood Risk Management (Scotland) Act 2009.
2. Information received from statutory undertakers has been used to identify
approximate locations of services, exact locations of these services will be
determined during detailed design.
3. Drawing to be read in conjunction with :
SC-JBA-00-00-DR-C-0100
SC-JBA-03-07-DR-C-0100
SC-JBA-03-07-DR-C-0102
SC-JBA-03-07-DR-C-0103
SC-JBA-03-07-DR-C-0104
SC-JBA-00-00-RP-Z-0006_FPS Document
4. The location, horizontal and vertical extents of the operations may vary by those limits
(where applied) as noted in the Description of the Flood Protection Scheme.
5. Diversion of any statutory undertaker apparatus will be carried out by or on behalf of
the statutory undertaker under its own statutory powers.
6. Where existing fencing is removed to facilitate works it will be replaced with
equivalent fencing.
7. Steps to have timber risers with gravel filled goings and be provided with timber
stringers and timber handrails.
8. Warning signage and depth boards to be placed around park.
9. Surface of access track to screen to be permeable grass crete paving.
10. Flood embankment side slopes vary from 1:3 max to approx 1:6.
11. New gravel footpath with Hoggin finish constructed in line with Highland Council Road
and Transport Guidelines section 7.
12. Flood Embankment to be sown with wildflower mix (to be specified). The Flood
Embankment adjacent to the open channel watercourse to be seeded with wildflower
to suit semi-dry/wet conditions (to be specified).
13. Proposed areas of new tree planting. May vary in size subject to the constraints of the
final design.
14. Proposed wetland areas to be sown with a wetland wildflower mix to suit permanently
wet areas.
PROPOSED WETLAND AREA
Sal WHITE WILLOW
COMPENSATORY PLANTING KEY
Ai GREY ALDER
Cm HAWTHORNS
Sa ROWAN
Sar WHITEBEAM
Bp
BIRCH
Pp
BIRD CHERRY
Sxi S. WHITEBEAM
OPERATION
DESCRIPTION
CP-01
THE EXISTING CULLODEN BURN WEST CHANNEL WILL BE DIVERTEDINTO THE FLOOD STORAGE AREA USING A CONCRETE FLOOD WALL.
CP-02
NEW BRIDGE OF 14m SPAN, OR THEREBY, CROSSING THE DIVERTEDWATERCOURSE TO ALLOW ACCESS FOR MAINTENANCE VEHICLES ANDPEDESTRIANS.
CP-03
WORKS WILL BE UNDERTAKEN TO CONSTRUCT AN ONLINE FLOODSTORAGE BASIN TO CONSIST OF EARTH EMBANKMENTS KEYED INTOEXISTING GROUND WITH A SUITABLE CUT-OFF AND A VEHICULARACCESS TRACK ON THE CREST. THE CHANNEL WILL BE REALIGNED.
CP-05
A LENGTH OF 25m OR THEREBY OF THE WALL FROM THE DOWNSTREAMEND WILL BE USED AS A SPILLWAY ALONG WITH 56m OR THEREBYLENGTH OF EMBANKMENT. EXISTING ABANDONED CHANNEL TO BEREINSTATED AS A SHALLOW SWALE WITH EROSION PROTECTION TO THEEMBANKMENT TOE WHERE REQUIRED.
CP-07
NEW 80m LONG OR THEREBY FLOOD WALL TO PREVENT HIGH FLOWSFROM LEAVING THE CHANNEL. PEDESTRIAN BRIDGE DECK TO BE RAISEDAND/OR LENGTHENED WITH FOOTPATH ON BOTH SIDES TO BEREALIGNED TO SUIT.
CP-06
CONSTRUCTION OF A NEW OUTFALL CHANNEL, 28m IN LENGTH ORTHEREBY, WITH TIE-IN TO THE EXISTING CHANNEL DOWNSTREAM FROMTHE FLOOD STORAGE AREA.
CP-04
NEW OUTFLOW STRUCTURE TO INCLUDE FLOW CONTROLHYDROBRAKES, AN OUTFALL CULVERT BARREL, AN OVERFLOWARRANGEMENT AND A TRASH SCREEN ON THE UPSTREAM SIDE AND ASECURITY SCREEN ON THE DOWNSTREAM HEADWALL.
UPSTREAM FLOOD WALL
This map is reproduced from Ordnance Survey material with the permission of the Ordnance Survey on behalf of the
controller of Her Majesty's Stationery Office. (c) Crown Copyright. Unauthorized reproduction infringes Crown Copyright
and may lead to prosecution or civil proceedings. Highland Council 100023369
Rev.:
Comments
ApprovedCheckedDesignedDrawnDate