PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed....

5
pe cvd- office hrs Dr ie- non office hrs rie fl- office hrs rie cl- non office hrs sputter 1- office hrs sputter 2 - non office hrs E- be am evptr-office hrs CP D - non office hrs RF-Anelva Sputtering- of fi ce hrs Thermal Evaporator- no n of fice hrs 0 100 200 300 400 500 600 Equipment Utilization Chart- February 2014 Total hrs

Transcript of PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed....

Page 1: PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed. Ordered for new set. – Wafer transport issue – robot.

pecvd- of-fice hrs

pecvd-

non of-fice hrs

Drie- of-fice hrs

Drie-

non of-fice hrs

rie fl- of-fice hrs

rie fl-

non of-fice hrs

rie cl- of-fice hrs

rie cl-

non of-fice hrs

sputter 1- of-fice hrs

sputter 1-

non of-fice hrs

sputter 2- of-fice hrs

sputter 2 -

non of-fice hrs

E-beam

evptr-of-fice hrs

E-beam

evptr-

non-of-fice hrs

CPD - of-fice hrs

CPD -

non of-fice hrs

RF-Anelva

Sputter-ing- of-fice hrs

Equip 1- non of-fice hrs

Thermal Evapo-ra-tor- of-fice hrs

Thermal Evapo-ra-tor- non of-fice hrs

Used

70 2 NaN 32 4 NaN 57 10 NaN 26 2 NaN 180 164 NaN 52 24 NaN 92 40 NaN 31 2 NaN 152 0 NaN 144 8

Not Used

110 358 NaN 146 356 NaN 123 350 NaN 154 358 NaN 0 196 NaN 128 336 NaN 72 308 NaN 114 336 NaN 28 360 NaN 36 352

Down-time

0 0 NaN 2 0 NaN 0 0 NaN 0 0 NaN 0 0 NaN 0 0 NaN 16 12 NaN 35 22 NaN 0 0 NaN 0 0

Un-available

0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180 NaN 0 180

To-tal

180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540 NaN 180 540

50

150

250

350

450

550

Equipment Utilization Chart- February 2014

Tota

l hrs

Page 2: PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed. Ordered for new set. – Wafer transport issue – robot.

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Nov

Dec

Jan

Feb

Used

14

0 76

70

NaN

34

39

27

32

NaN

47

47

37

57

NaN

17

23

32

26

NaN

180

136

176

180

NaN

32

20

52

52

NaN

96

76

104

92

NaN

87

32

18

31

NaN

116

84

120

152

NaN

96

80

104

144

Not Used

82

21

102

110

NaN

144

90

153

146

NaN

132

88

143

123

NaN

162

104

148

154

NaN

0 0 4 0 NaN

140

116

128

128

NaN

84

64

68

72

NaN

93

78

85

114

NaN

64

96

60

28

NaN

84

100

76

36

Downtime

84

114

2 0 NaN

2 6 0 2 NaN

1 0 0 0 NaN

1 8 0 0 NaN

0 4 0 0 NaN

8 4 0 0 NaN

0 0 8 16

NaN

0 25

77

35

NaN

0 0 0 0 NaN

0 0 0 0

Unavailable

0 45

0 0 NaN

0 45

0 0 NaN

0 45

0 0 NaN

0 45

0 0 NaN

0 40

0 0 NaN

0 40

0 0 NaN

0 40

0 0 NaN

0 45

0 0 NaN

0 0 0 0 NaN

0 0 0 0

Total

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

NaN

180

180

180

180

0 180

180

180

180

10

30

50

70

90

110

130

150

170

190

Equipment Utilization Chart- ComparisonT

ota

l h

rs

RIE-Fl RIE-ClE-beam

EvaporatorSputter Coater1

Sputter Coater2 CPD Thermal

Evap.

PECVD DRIE Anelva Sputter

Page 3: PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed. Ordered for new set. – Wafer transport issue – robot.

Dry Etch– Tool status Update Feb 2014 • DRIE

– Load lock O-Ring changed . Ordered for new set. – Wafer transport issue – robot arm aligned.– Process: scallop smoothening trials in progress

• DRIE deep etches with S-Type wafer – scallops• FGA anneals @1000DegC show no effect• Scallop etch in RIE • SEM imaging and process tuning in progress

• RIE – Scallops smoothening

• Combined process with DRIE.• using Anisotropic Si etch (RIE) smoothening scallops.• Result – scallop reduced to 145nm from 1.3 µm.• Trials for deeper etch and scallop size to be done.

– SiO2 plastering

• Trench filling by PECVD SiO2 , followed by RIE SiO2 etch. • Work in progress for better conformal deposition.

SiO2 plastering

Reduced scallop

• PECVD vacuum leak in load lock –VAT valve to arrive tomorrow!

Process is done in manual mode

Page 4: PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed. Ordered for new set. – Wafer transport issue – robot.

Technical Note

Page 5: PECVD DRIE Anelva Sputter Dry Etch– Tool status Update Feb 2014 DRIE – Load lock O-Ring changed. Ordered for new set. – Wafer transport issue – robot.