15-11-2015 1:100@A1 01
1
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED
PROJECT No. DATE SCALE DRAWN CHKD APPD REV.
2349 AS MS --
DRAWING NO.
SH.NO.
DRAWING NO.
STRUCT. ENG. ARCHITECT M.E.P. TECH.M. P.M.
CHECKED BY REVIEWED BY
CONTRACTOR
PROJECT
CONSULTANT
CLIENT
REFERENCE DRAWINGS
REVISION DETAILS
DRAWING NO. REV. DRAWING TITLESl.No.
REV. DATE DRAWN CHKD MODIFICATIONS
LEGEND:
NOTES
K E Y P L A N
P.O.BOX 119364DUBAI,UAE.
ENGINEERING & CONTRACTING LLC.
TEL-8867500,FAX-8867800Email: [email protected] site: www.sobha-me.com
DATE
MS VJ
DRAWINGS STATUS
1
2
3
4
SECL/2349/BW/L1/073
FIRST FLOOR
PART-2
ISSUE FOR APPROVAL
15-11-2015 AS MS
A-03 6 FIRST FLOOR PLAN 28-10-2015
BLOCK WORK LAYOUT
A-421 to A-425 2 SCHEDULE OF DOORS & WINDOWS 07-09-2015
A-420 2 SCHEDULE OF DOORS & WINDOWS 28-10-2015
A-423 3 SCHEDULE OF DOORS & WINDOWS 28-10-2015
00
NOTE:-
1. SIZE OF ALL DB BOXES & TEL. BOXES AS PER MEP
REQUIREMENT
2. FHC DETAIL AS PER MEP REQUIREMENT
ISSUE FOR APPROVAL
01 01-12-2015 AS MS
5 3 APARTMENT ( INDIVIDUAL)A-200 to A-254 25-10-2015
1. MEP BUILDERS WORK OPENINGS, REFER TO SAMA
FIRST FLOOR COORDINATION SHOP DRAWINGS
NOTE:-
2. DAMP PROOF COURSE LAID IN THE BOTTOM LAYER
TO THE EXTERNAL PERIPHERY OF WET AREAS,
SERVICE ROOMS & OTS AREAS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT