Parsons Slough Project, Elkhorn Slough,CA the crane barge into position at the start of the p

description

Parsons Slough Project, Elkhorn Slough,CA. Moving the crane barge into position at the start of the project . Preparation on the RR tie-in at the southern end of the sill. Completion of the RR tie-in at the southern end of the sill. - PowerPoint PPT Presentation

Transcript of Parsons Slough Project, Elkhorn Slough,CA

Page 1: Parsons Slough Project,  Elkhorn  Slough,CA

Parsons Slough Project, Elkhorn Slough,CA

Moving the crane barge into position at the start of the project

Page 2: Parsons Slough Project,  Elkhorn  Slough,CA

Preparation on the RR tie-in at the southern end of the sill

Page 3: Parsons Slough Project,  Elkhorn  Slough,CA

Completion of the RR tie-in at the southern end of the sill

Page 4: Parsons Slough Project,  Elkhorn  Slough,CA

Work on the RR tie-in at the northern end of the sill, includinginstallation of sheet pile with the vibratory hammer

Page 5: Parsons Slough Project,  Elkhorn  Slough,CA

Installation of sheet pile across Parsons channel with the vibratory hammer

Page 6: Parsons Slough Project,  Elkhorn  Slough,CA

Surveying the sill across the channel before dropping the sheets to grade

Page 7: Parsons Slough Project,  Elkhorn  Slough,CA

Installation of the H pileswith the impact hammer

Page 8: Parsons Slough Project,  Elkhorn  Slough,CA

Placing the rock ramp

Page 9: Parsons Slough Project,  Elkhorn  Slough,CA

The marine mammal monitoring post on the west side of the sill