Technical Specification 5.6.8 Am Palo Verde Nuclear Generating Station Thomas N. Weber Department Leader Regulatory Affairs Tel. 623-393-5764 Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06565-TNW/RASICJS August 7, 2012 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Subject: Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Docket No. STN 50-530 Renewed Operating License No. NPF-74 Steam Generator Tube Inspection Report Attached please find the PVNGS Unit 3 Steam Generator Tube Inspection Report prepared and submitted by Arizona Public Service Company (APS) pursuant to Technical Specification (TS) Reporting Requirement 5.6.8. This report describes steam generator tube inspection and plugging results from the Unit 3 sixteenth refueling outage. By copy of this letter, this submittal is being provided to the NRC Region IV Regional Administrator and the PVNGS Senior Resident Inspector. No commitments are being made to the NRC by this letter. Should you have questions regarding this submittal, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111. Sincerely, TNW/RAS/CJS/hsc Attachment cc: (with attachment) E. E. Collins Jr. L. K. Gibson M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway * Comanche Peak * Diablo Canyon * Palo Verde 0 San Onofre 0 South Texas 0 Wolf Creek 4Aoo

Transcript of Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and...

Page 1: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

Technical Specification 5.6.8

AmPalo Verde NuclearGenerating Station

Thomas N. WeberDepartment LeaderRegulatory Affairs

Tel. 623-393-5764Fax 623-393-5442

Mail Station 7636PO Box 52034Phoenix, Arizona 85072-2034

102-06565-TNW/RASICJSAugust 7, 2012

ATTN: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001

Subject: Palo Verde Nuclear Generating Station (PVNGS) Unit 3Docket No. STN 50-530Renewed Operating License No. NPF-74Steam Generator Tube Inspection Report

Attached please find the PVNGS Unit 3 Steam Generator Tube Inspection Report preparedand submitted by Arizona Public Service Company (APS) pursuant to TechnicalSpecification (TS) Reporting Requirement 5.6.8. This report describes steam generator tubeinspection and plugging results from the Unit 3 sixteenth refueling outage.

By copy of this letter, this submittal is being provided to the NRC Region IV RegionalAdministrator and the PVNGS Senior Resident Inspector. No commitments are being madeto the NRC by this letter.

Should you have questions regarding this submittal, please contact Russell A. Stroud,Licensing Section Leader, at (623) 393-5111.

Sincerely,

TNW/RAS/CJS/hsc

Attachment

cc: (with attachment)E. E. Collins Jr.L. K. GibsonM. A. Brown

NRC Region IV Regional AdministratorNRC NRR Project Manager for PVNGSNRC Senior Resident Inspector for PVNGS

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance

Callaway * Comanche Peak * Diablo Canyon * Palo Verde 0 San Onofre 0 South Texas 0 Wolf Creek

4Aoo

Page 2: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

Attachment

Unit 3- 1 6 th Refueling OutageSteam Generator Tube Inspection Report

Page 3: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

I

Palo Vemde Nuclear Generating Slation

UNIT3U3R16

ARIZONA PUBLIC SERVICEP. 0. BOX 52034PHOENIX, AZ 85072

Prepared by:

Reviewed by:

Approved by:

Hansen, Douglas50z)y .30)DKl -nHansen, Douglas 91741530)B(Z41 30) . .... the author of this document

B(Z4530)Date:2 22.073010,0:25:59 -07"l00'

Digitally signed by 1-aten.n Warne

Leaverton, L L,Warren L(V59783) D

.Date212,07.1013:180207 W

Oigitaillysigned by Radspinner, MarkRadspin ner, A,,,Rad pin er, DN: cnRadOnner, Mark AGE76778)

) Wson: System Engineering Acting

Mark A(Z76778) DepartmenteaderDatý 2012.071 01:13 -07W'

Commercial Service Date: 1-8-88

Page 4: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

Table of Contents

1.0 SUMMARY

2.0 SCOPE OF EXAMINATIONS PERFORMED

3.0 ACTIVE DEGRADATION MECHANISMS

4.0 NDE TECHNIQUES UTILIZED

5.0 INDICATION SUMMARY

6.0 TUBES PLUGGED

7.0 PLUG HISTORY

8.0 CONDITION MONITORING

APPENDIX A - TUBE SUPPORT DIAGRAM, LEGEND, and ANALYSIS CODES

APPENDIX B - SG 31 SUMMARY DATA SHEETS

APPENDIX C - SG 32 SUMMARY DATA SHEETS

APPENDIX D - PLI and PLP DATA SHEETS

'APPENDIX E - PLUG MAPS

Page 5: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

UNIT 3

STEAM GENERATOR EDDY CURRENT

U3 R16 Refueling Outage

1.0 Summary

This report is intended to satisfy the requirements of PVNGS Technical Specifications 5.6.8 for thesubmittal of a Steam Generator Tube Inspection Report. The steam generator (SG) eddy currentexamination for the 16th refueling outage in Unit 3 (U3R16) was conducted during March andApril 2012. Mode 4 entry of Unit 3 Cycle 16 was entered on April 11, 2012. The initial examinationplan for both steam generators is listed in Table 1. This table summarizes the examinationsperformed for each of the various categories, examination types, extents, and the number of tubes ortube locations completed. This examination was a 100% full length tubing inspection.

The examinations resulted in a total of 6 tubes being plugged in SG 31, and 6 tubes being pluggedin SG 32. A description of the previous plugging history for these replacement steam generators iscontained in Appendix E.

2.0 Scope of Examinations Performed

The original examination plan was developed based on the "PVNGS U3R16 Steam Generator'Degradation Assessment" (Westinghouse document SG-SGMP-12-02, dated March 2012)developed per PVNGS Procedure 81DP-9RC01 as required by NEI 97-06. In addition, possibledamage mechanisms were reviewed along with the specific requirements set forth in Procedure73TI-9RC01 and the PVNGS Technical Specifications.

This original plan, along with the examinations performed as a result of bobbin indications noted, issummarized in Table l of this report.

3.0 Active Degradation Mechanisms

The only degradation noted during the examinations was determined to be wear, Section 8.0contains further discussions relating to this mechanism. Table 2 summarizes the results intocategories and sections B and C itemizes all indications reported.

Page 6: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

4.0 NDE Techniques Utilized

The following table documents the site qualified techniques utilized during this outage:

ECs,YOUU'. I

Rev. 134-2010

QUALIFIED

Wear Loose Part 27091.2 1 SITE NA Y N Volt DIFF NoneRev. 0 QUALIFIED8-20071

d I I i i

The eddy current examinations were performed by Westinghouse Electric Company using the CoreStar OMNI 200 eddy current instrument. Westinghouse Anser software was utilized to acquire thedata along with the Pegasys robotic manipulator. This robot was configured with a dual guide tubein each of the hot and cold legs.

The tubing was examined with Zetec manufactured bobbin coil probes and Zetec rotating coil (RC)style probes. Probe diameters were 0.590" to 0.610". Plus Point RC probes were used for thecharacterization of non-quantifiable or distorted bobbin indications.

Fiber optic cable was used from containment to the data acquisition room located at the PVNGSNorth Annex. Primary and secondary analysis was all performed on site. The Primary andSecondary Resolution Analysts, Independent Review Analysts, and data management were alsolocated at PVNGS in the North Annex. Westinghouse provided the data acquisition and primarydata analysis. Anatec International, Inc. provided the secondary data analysis.

Each individual from Westinghouse and Anatec International, Inc. who performed data analysis wasrequired to complete and pass a PVNGS site specific Eddy Current Data Analysis Course as well asan associated performance and written examination. All individuals performing data analysis werealso required to have Qualified Data Analyst (QDA) certification. Per 73TI-9RCO 1, all certificationrecords are maintained in the Nuclear Information Records Management System.

Page 7: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

5.0 Indication Summary

A detailed listing of the location and mheasured' sizes of all service induced indications recorded isincluded in Appendix B and C. A summary of these indication results is located in Table 2. Inaddition, Appendix A contains a reference drawing of steam generator support locations and reportlegend.

Appendix D contains a listing of the possible loose part (PLP) indications that were confirmed withrotating coil examinations. Note Section 8.0 for further discussion on the PLPs.

There were no indications that were identified as linear during this outage.

6.0 'Tubes Plugged

A summary of the tubes plugged is located in Table 2. Appendix E' contains a map that details theplugged tube location'along with the previously plugged tubes.

7.0 Plug History

A summary of the number and percentage of tubes plugged is also located in Table 2.

8.0 Condition Monitoring

Per the Steam Generator Program, as defined in PVNGS Procedure 81DP-9RCO1, a conditionmonitoring evaluation was conducted by PVNGS Engineering. The results of the eddy current.examinations are provided in Section 5.0. An engineering evaluation of the as-found condition ofinservice tubes did not reveal any degradation exceeding the threshold values for structural andleakage integrity. As such, all steam generator performance criteria were satisfied for Unit 3 Cycle.,16. No tube pulls or insitu pressure testing were required based on the results of the examinations.

Forei2n Object Search and Retrieval (FOSAR)

Tubesheet Annulus and Blowdown Lane FOSAR was conducted using a power cart mounted with aremotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of theEPRI Steam Generator Integrity Assessment Guidelines Section 10.5, Secondary Side Visual'Inspections, were applied for the FOSAR inspections....

'The only loose parts observed in SG31 during U3R16 were sludge rocks. Four sludge rocks wereidentified in the cold leg during FOSAR. Two were in the blowdown lane adjacent to the staycylinder. An attempt was made to retrieve them, but .due to the nature of the RSG design wasunsuccessful. One sludge rock was found in bundle between tubes R163C78 and R164C77. It was'resting approximately 0.5" above the tube sheet wedged between the tubes. No attempt was made toremove it. The last sludge rock was observed between tubes R124C33 & R125C34 at the tube sheet:'An attempt was made to retrieve it, but was unsuccessful due to its. orientation.. No wear wasdetected in the vicinity of any of the sludge rocks.

The only loose parts observed in SG32 during U3R16 were sludge rocks. Two sludge rocks wereidentified in the cold leg blowdown lane during FOSAR. Due to the nature of the RSG design, noattempt was made to retrieve them. One sludge rock was found in the cold leg in bundle betweentubes R19C202 and R21C202. Itwas resting approximately 1.5" above the tube sheet wedged'

Page 8: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

between the tubes. A sludge flake was observed in the hot leg between tubes R8C203 and R10C203at the tube sheet. It disintegrated when an attempt was made .to retrieve it. No wear was detected inthe vicinity of any of the sludge rocks.

Also included in the scope of the FOSAR effort was an inspection of the blowdown patch platewelds that were found to be cracked in Unit 3 during U3R1 5. The condition was first identified inUnit 2 during U2R15. The inspections confirmed that the weld material in the vicinity of thecracked weld on all 4 patch plates (2 per SG) is intact, and a loose parts concern is not beingcreated. A previous evaluation concluded that, with the presence of the cracked welds, the patchplates in the Unit 2 SGs will continue to perform their design function and that the probability ofloose parts being formed is remote. Thus, there is a very low risk that the cracked welds will affectthe structural or leakage integrity of tubes in these steam generators.

Potential Loose Parts (PLPs)

As noted in Appendix D, there were no new PLP locations identified in Steam Generator 31 or 32.PVNGS has historically taken the position that if a loose part is detected by ECT or FOSARwithout the presence of wear, it is reasonable to conclude that the required conditions to promotewear do not exist. Per the PVNGS SG Program, trending of these locations will continue in futureoutages.

Finally, PVNGS Procedure 81DP-9RCO1 requires, per the EPRI PWR Steam GeneratorExamination Guidelines, that a visual inspection of the previously installed steam generator plugsbe performed to assess plug integrity. Additionally, the Examination Guidelines Section 6.9.1 states- "Verify the location and presence of existing in-service plugs." The conduct of the plug locationand integrity verification was performed in U3R16 per procedure 81CP-9RC40. A review of theinspection results indicated that all plugs were accounted for and no evidence of potential plugleakage was identified.

Page 9: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

COLD LEG

BOBBIN

TEC-VS3

TEC-BW1

12234

278

12242

278

HOT LEG TEH-VS3 12242 12234

BOBBIN TEH-BWI 278 278

** HOT STRAIGHT VARIOUS 8 29

RC

** HOT U & SQUARE BEND VARIOUS 50 65

RC

** COLD STRAIGHT VARIOUS 37 24

RC

** COLD U & SQUARE BEND VARIOUS 16 40

RC

4 4 4

Page 10: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

WEAR0%- 19%

20%-29%30%-39%

> 40%PLUGGED

2301250

(6)

2332320

(6)

Possible Loose Parts (RC)PLI 0 0PLP 0 3

PLUGGED (0) (0)

Volumetric IndicationsSVI/MVI 0 0

PLUGGED (0) (0)

PREVENTATIVE (0) (0)

t t

I I

I I

I I

I I

I I

PLUGGED (6) (6)

TOTAL PLUGGED / %(66 / 0.5%) (74 / 0.5%)

Page 11: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

APPENDIX A

TUBE SUPPORT DIAGRAM,

LEGEND, and ANALYSIS CODES

Page 12: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

PUNSS Stem GeneratorREPLACEMENTS

Center of OSH to 08CRow I - 17.415Row 2 - 19.736Row 3 - 22.056Row 4- 24.377Row 5 - 26.698Row 6 - 29.019

I

Page 13: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

LEGEND

ROW:COL:

VOLTS:DEG:IND:

PER or PCT:CHN:

LOCN:

Indicates the row number of a given tube.Indicates the column number of a given tube.Indicates the peak-to-peak voltage of a given indication response.The measured phase angle of a given indication response.Indicates the analysis code or PCT for percentThe percent through the tube wall of a given indicationIndicates the channel used to make the callGives indication location at INCH 1 to INCH2 relative toknown landmarks such as supports, vertical straps, andbatwings. Typical location codes are as follows:

#1 Vertical Strap .......................... VS1#1 Batwing .................................. BW l#1 Support Plate in Hot Leg ...... 01H#7 Support Plate in Cold Leg ............. 07CTop Tube Sheet Cold Leg .................. TSCTube End Hot Leg ............ TEHTube End Cold Leg ............................ TEC

CRLEN:CRWID:

CEG:BEGT and ENDT:

PDIA:PTYPE:

CAL:L:

COM:

Indicates the flaw length, used to identify the length of a wear indicationIndicates the flaw width, typically used for cracks onlyIndicates the flaw length, typically used for cracks onlyIndicates the beginning and of the test; together they documentthe examination extentDocuments the probe diameterDocuments the probe typeIndicates calibration numberIndicates the leg the examination was conducted fromThis comment field is utilized to document comments

Page 14: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

Analysis CODES:

A bsolute D rift .................................................................... A D IBulge ........................................ BLGDented Buff Mark .............................................................. DBMD ep osit ............................................................................... D E PD en t .................................................................................... D N TData Quality Acceptance ...................... DQADistorted Support Signal With Indication .......................... DSIDistorted Top of Tubesheet With Indication ..................... DTIGeometric Indication .......................................................... GEOID C hatter ........................................................................... ID CIndication Not Found ..................................................... INFIndication Not Reportable .................................................. INRMultiple Axial Indication ...................................... * ............ MAIManufacturer Burnishing Mark .......................................... MBMMixed Mode Indication ................ ....................... .... MMIMultiple Circumferential Indication ................................... MCIMultiple Volumetric Indication .......................................... MVINo Detectable Defect ......................................................... NDDNo Discontinuity Found ....................... NDFNon-Quantifiable Indication .............................................. NQINo Tube Sheet Expansion .................................................. NTEO bstructed .......................................................................... O B SOver Expanded ............................................................... OXPPrevious Bobbin Call ......................................................... PBCPossible D eposit ................................................................. PD PPositive Identification ................................................... PIDPositive Identification Verified .......................................... PIVPossible Loose Part with Indication .............................. PLIPossible Loose Part ............................................................ PLPPrevious RC Call ........................... PRCPossible Support Anomaly ................................................. PSAPossible Support Indication ............................................... PSIPermeability Variation Noise ............................................. PVNR etest B ad D ata .................................................................. R B DRetest Identification Check ................................................ RICRetest with Magnetic Bias RC Probe ................................. RMBSingle Axial Indication................................................. SAISingle Circumferential Indication ...................................... SCISingle Vo!umetric Indication ............................................. SVISenior (Lead) Analysis Review ..................................... SRS lu dge ................................................................................ S L GTo B e Plugged .................................................................... T B PVolumetric Indication ........................................................ VOL

Page 15: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

APPENDIX B

STEAM GENERATOR 31

SUMMARY DATA SHEETS

Page 16: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

+ .... ÷ .... --- -- ---- .. ÷.. ------------ -.--... +... ----+---..---+- .. +........---- +-- -..---+ -.... +-.....+--+-+....... 4 -- ÷

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL IL UTIL1 UTIL21+ .... +-----------. ... +---+----..+ ----...... +..---+-. .+----+÷...+... .... +...-----.....--- .. +-........+

I 80 19 .29 161 PCT 10 P2 VS2 .57 VS3 TEH .610 NBAZ1 30 H

93 20 .13 125 NOI P1 08H 32.53 VS3 TEH .610 NBAZ1 30 H

86 23 .09 64 NOI 3 TSC 4.67 VS3 TEC .610 NBAZ3 20' C

87 24 .41 152 PCT 13 P2 VS2 -. 79 VS3 TEH .610 NBAZI 30 H

89 24 .81 123 PCT 21 P2 VS2 -. 79 VS3 TEH .610 NBAZ1 30 H89 24 1.07 101 PCT 20 P3 VS2 -. 88 .45 VS2 VS2 .580 ZPUFZ 69 H

1 109 24 .78 104 PCT 22 P2 VS3 -. 53 VS3 TEC .610 NBAZ3 39 C109 24 1.24 98 PCT 22 P3 VS3 -1.04 .23 VS3 VS3 .580 ZPUFZ 69 H

81 26 .32 114 PCT 10 P2 VS4 -. 90 VS3 TEC .610 NBAZ3 20 C

82 27 .42 157 PCT 13 P2 VS2 .69 VS3 TEH .610 NBAZI 30 H

85 28 .27 160 PCT 10 P2 VS3 .42 VS3 TEH .610 NBAZ1 30 H

89 28 .34 46 PCT 12 P2 VS4 .90 VS3 TEC .610 NBAZ3 19 C

85 30 .74 67 PCT 21 P2 VS2 -1.08 VS3 TEH .610 NBAZI 31 H85 30 1.36 100 PCT 23 P3 VS2 -1.11 .54 VS2 VS2 .580 ZPUFZ 69 H DOA

87 30 .33 114 PCT 10 P2 VS4 .88 VS3 TEC .610 NBAZ3 20 C

120 33 .75 78 PCT 19 P2 VS4 .76 VS3 TEC .610 NBAZ3 40 C120 33 1.06 105 PCT 18 P3 VS4 .86 .27 VS4 VS4 .580 ZPUFZ 74 C

100 35 .27 60 PCT 11 P2 VS4 .28 VS3 TEC .610 NBAZ3 39 C

128 37 .23 120 PCT 8 P2 VS3 -. 68 VS3 TEH .610 NBAZ1 38 H

132 39 .21 116 PCT 9 P2 11C -. 47 VS3 TEC .610 NBAZ3 39 C

134 39 .19 141 DSI P1 05H -. 17 VS3 TEH .610 NBAZ1 38 H

76 43 .28 141 PCT 10 P2 09H .71 VS3 TEH .610 NBAZ1 30 H

124 43 .57 93 PCT 18 P2 VS4 -. 76 VS3 TEC .610 NBAZ3 39 C124 43 1.14 95 PCT 19 P3 VS4 -. 78 .54 VS4 VS4 .580 ZPUFZ 74 C

1.127 44 .18 68 PCT 8 P2 VS4 -. 23 VS3 TEC .610 NBAZ3 39 C

90 45 .26 135 PCT 10 P2 VS3 .91 VS3 TEC .610 NBAZ3 23 C

116 45 .44 100 PCT 13 P2 VS3 .82 VS3 TEC .610 NBAZ3 40 C

121 46 .34 118 PCT 11 P2 VS3 -. 59 VS3 TEC .610 NBAZ3 40 C

115 48 .17 76 PCT 8 P2 VS3 -. 46 VS3 TEC .610 NBAZ3 39 C

90 - 49 .17 106 PCT 7 P2 IOC -1.56 VS3 TEC .610 NBAZ3 23 C

132 49 .87 137 PCT 21 P2 VS2 -. 55 VS3 TEH .610 NBAZ1 42 H132 49 .97 112 PCT 22 P2 VS4 .85 VS3 TEC .610 NBAZ3 44 C132 49 1.76 101 PCT 28 P3 VS2 -. 72 .52 VS2 VS2 .580 ZPUFZ 69 H-'132 49 1.84 97 PCT 27 P3 VS4 .71 .45_ VS4 VS4 .580 ZPUFZ 74 C DQAI

126 51 .42 84. PCT 15 P2 VS3 -. 40 VS3 TEC .610 NBAZ3 39 C126 51 2.17 99 PCT 35 P2 VS3 1.08 VS3 TEC .610 NBAZ3 39 C126 51 1.10 99 PCT 20 P3 VS3 -. 65 .20 VS3 VS3 .580 ZPUFZ 69 H OOA126 51 1.94 90 PCT 30 P3 VS3 1.27 .29 VS3 VS3 .580 ZPUFZ .69 H

126 53 .68 103 PCT 18 P2 VS3 -. 36 VS3 TEC .610 NBAZ3 40 -C126 53 1.22 107 PCT 26 P2 VS3 1.05 VS3 TEC .610 NBAZ3 40 C126 53 1.32 101 PCT 23 P3 VS3 -. 61 .29 VS3 *VS3 .580 ZPUFZ 69 H126 53 2.05 96 PCT 31 P3 VS3 1.19 .37 VS3 VS3 .580 ZPUFZ 69 H

121 54 .33 109 PCT 11 P2 VS2 -. 68 VS3 TEH .610 NBAZ1- 43 H

125 54 .31 83 PCT 10 P2 VS3 -. 64 VS3 TEC .610 NBAZ3 40 C

56 55 .32 64 PCT 10 P2 BW1 -1.63 VS3 TEH .610 NBAZI 34 H

126 55 .51 116 PCT 17 P2 VS3 .92 VS3 TEC .610 NBAZ3 39 C126 55 .42 116 PCT 15 P2 VS4 -. 78 VS3 TEC .610 NBAZ3 39 C126 55 .85 90 PCT 17 P3 VS3 .93 .14 VS3 VS3 .580 ZPUFZ 69 H126 55 1.09 87 PCT 19 P3 VS4 -. 93 .30 VS4 VS4 .580 ZPUFZ 74 C

47 56 .30 86 PCT 11 P2 VS3 -. 69 VS3 TEH .610 NBAZI 21 H

66 59 .27 124 PCT 9 P2 VS2 -. 99 VS3 TEH .610 NBAZ1 34 H+ .. +...+..... .. .. .. ..------------+..-- . .....------- + ..---. +-+.........----+-- --. .--- ... +-... +--+- ........ + - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ . .÷. . . . .. .+. . . .+.. .+. . . .+-----------+.....--- ...+ ... ... ... .. +. .. .. . ... .. .----- -.- +.....-- + -....... + ....-- -. +

I ST Max

Page 17: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

.. .- . ..-- .. . ..- +.. .- . .. +.. . . .. ÷ .----------+-.÷ . ....+-.. ..- ÷...--...-+-... .---- - - +- .. ... +...- .. +--+- ...... . ..- - --.....

ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+.---... + .... + ........ + ... +---+-... +-...-+....--...... -- ...... - ....-- .... + ..... - ... .....---........--........---- +

126 59 .28 95 PCT 11 P2 VS4 -. 73 VS3 TEC .610 NBAZ3 39 C

145 60 .31 96. PCT 10 P2 VS3 .32 VS3 TEH .610 NBAZ1 58 H

56 61 .43 120 PCT 14 P2 BW1 -1.52 VS3 TEH .610 NBAZ1 35 H

88 61 .51 102 PCT 16 P2 VS2 .80 VS3 TEH .610 NBAZ1 35 H88 61 1.08 104 PCT 20 P3 VS2 .62 .57 VS2 VS2 .580 ZPUFZ 69 H

122 61 .30 95 PCT 9 P2 VS3 .96 VS3 TEC .610 NBAZ3 40 C

126 61 .30 102 PCT 11 P2 VS1 .39 VS3 TEH .610 NBAZ1 47 H

121 62 .43 110 PCT 13 P2 VS3 .79 VS3 TEC .610 NBAZ3 40 C121 62 .60 114 PCT 17 P2 VS2 .81 VS3 TEH .610 NBAZ1 47 H121 62 1.15 106 PCT 21 P3 VS2 .75 .60 VS2 VS2 .580 ZPUFZ 69 H

138 63 .23 148 PCT 8 P2 VS1 .70 VS3 TEH .610 NBAZ1 58 H

109 64 .28 82 PCT 9 P2 VS2 -. 83 VS3 TEH .610 NBAZ1 46 H126 65 .31 106 PCT 10 P2 VS3 -. 47 VS3 TEC .610 NBAZ3 40 C126 65 .52 103 PCT 15 P2 VS4 -. 85 VS3 TEC .610 NBAZ3 40 C

126 65 .31 119 PCT 11 P2 VS1 .28 VS3 TEH .610 NBAZ1 47 H126 65 1.22 91 PCT 20 P3 VS4 -. 89 .25 VS4 VS4 .580 ZPUFZ 74 C DQAI

46 67 .23 127 PCT 8 P2 VS3 .81 VS3 TEC .610 NBAZ3 2 C

118 67 .34 126 PCT 12 P2 VS3 -. 29 VS3 TEC .610 NBAZ3 41 C118 67 .21 146 PCT 8 P2 VS2 1.01 VS3 TEH .610 NBAZ1 46 H

126 67 .23 104 PCT 9 P2 VS3 -. 28 VS3 TEC .610 NBAZ3 41 C126 67 .34 125 PCT 12. P2 VS4 -. 76 VS3 TEC .610 NBAZ3 41 C126 67 .23 147 PCT 8 P2 VS1 .53 VS3 TEH .610 NBAZ1 46 H

128 67 .30 95 PCT 11 P2 VS3 -. 52 VS3 TEC .610 NBAZ3 41 C128 67 .38 142 PCT 12 P2 VS2 .72 VS3 TEH .610 NBAZ1 46 H

130 67 .52 96 PCT 16 P2 VS4 -. 64 VS3 TEC .610 NBAZ3 41 C130 67 1.32 91 PCT 22 P3 VS4 -. 68 .43 VS4 VS4 .580 ZPUFZ 74 C DOAI

122 69 .31 90 PCT 10 P2 VS1 .50 VS3 TEH .610 NBAZ1 47 H

113 70 .31 73 PCT 11 P2 VS2 -. 65 VS3 TEH .610 NBAZ1 47 H

54 71 .14 143 PCT 7 P2 09H -. 76 VS3 TEH .610 NBAZ1 4 H

121 72 .33 130 PCT 11 P2 VS2 -1.02 VS3 TEH .610 NBAZ1 46 H

130 73 .28 66 PCT 10 P2 VS3 -. 57 VS3 TEH .610 NBAZ1 47 H

164 75 .55 130 PCT 15 P2 BW2 .75 VS3 TEC .610 NBAZ3 44 C164 75 .91 107 PCT' 16 P3 BW2 .96 .15 10C VS5 .580 ZPUFZ 74 *C

1 35 76 .27 114 PCT. 10 P2 04H .80 VS3 TEH .610 NBAZI 3 "H

165 76 .43 *92 PCT 13 P2 BW2 .65 VS3 TEC .610 NBAZ3 44 C

108 77 .22 104 PCT 7 P2 VS3 .17 VS3 TEC .610 NBAZ3 42 C

116 77 .30 69 PCT .11 P2 VS2 .83 VS3 TEH .610 NBAZ1 47 H

128 77 .43 75 PCT 13 P2 VS3 -. 45 VS3 TEC .610 NBAZ3 42 C

31 78 .17 119 DSI P1 08H .63 VS3 TEH .610 NBAZ1 4 H

89 78 .31 106 PCT 11 P2 09H .70 VS3 TEH .610 NBAZ1 35 H

42 79 .20 113 DSI P1 08H -. 05 VS3 TEH .610 NBAZ1 4 H42 79 .75 93 PCT 15 P3 08H .18 .24 07H VS3 .580 ZPUFZ 69 H

103 80 .36 87 PCT 13 P2 VS3 -. 69 VS3 TEC .610 NBAZ3 41 C

44 81 .35 59 .PCT 12 P2 VS3 .66 VS3 TEC .610 NBAZ3 i C!

50 83 .48 107 PCT 17 P2 09H -. 10 VS3 TEH .610 NBAZ1 4 H50 83 1.49 101 PCT 25 . P3 09H -. 17 .24 08H VS3 .580 ZPUFZ 69 H50 83 .92 83 PCT 18 P3 VS3 1.17 .38 08H VS3 .580 ZPUFZ 69 H.

1 118 83 .50 199 PCT 16 P2 VS3 -. 15 VS3 TEC .610 NBAZ3 41 C1 118 83 1.30 94 PCT 23 P3 VS3 -. 41 .31 VS3 VS3 .580 ZPUFZ 69 H

1 41 84 .21 51 PCT 8 P2 08H -1.07 VS3 TEH .610 NBAZ1 3 H+.. ..--- +...- ... ... + ... + ..----------+. + ......... +" INCH----+- - - +- - - ++. ---- + -- ..--- + -.. +-. +--+- ........ + .....-... +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ .. .. +......+...+ .. .. ..---------- ....-----+...---+-- -+- - -+.. .. ..----+---- ...--- - +--...+--+- ........ + .....-... +

2 ST Max

Page 18: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

S... - -- _÷.....-+.. .. .. .. ..----------..------ + ....... + ....... .....---------- +....+.....---- .-+--+- ....... +...-.....+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21------------------------------------+----+----+------+-----*-----+---+---4. ----- +---** - 4. - 4.- ++ - + - +

1 47 84 .22 119 PCT 8 P2 08H -. 09 VS3 TEH .610 NBAZ1 3 H

49 84 .31 127 PCT 11 P2 08H .87 VS3 TEH .610 NBAZI 3 H

40 85 .23 79 PCT 8 P2 08H -. 05 VS3 TEH .610 NBAZ1 3 H

48 85 .36 67 PCT 12 P2 VS3 -. 66 VS3 TEC .610 NBAZ3 1 C

122 85 .30 74 PCT 10 P2 VS2 .84 VS3 TEH .610 NBAZ1 47 H

63 86 .32 51 PCT 12 P2 VS3 .79 VS3 TEC .610 NBAZ3 27 C

65 86 .37 135 PCT 12 P2 09H .99 VS3 TEH .610 NBAZ1 35 H

115 86 .46 93 PCT 13 P2 VS4 -. 78 VS3 TEC .610 NBAZ3 42 C

118 87 .58 91 PCT 17 P2 VS3 .74 VS3 TEC .610 NBAZ3 41 C118 87 1.29 96 PCT 23 P3 VS3 .77 .49 VS3 VS3 .580 ZPUFZ 69 H

53 88 .26 69 PCT 10 P2 VS3 -. 71 VS3 TEC .610 NBAZ3 1 C

103 88 .29 147 PCT 10 P2 VS2 -. 78 VS3 TEH .610 NBAZ1 46 HI4

44 89 1.55 182 PCT 30 P2 VS3 -. 65 VS3 TEC .610 NBAZ3 1 CI44 89 .51 92 PCT 16 P2 BW2 -. 69 VS3 TEC .618 NBAZ3 1 C

1 44 89 1.87 99 *PCT 28 P3 VS3 -. 71 .56 07C VS3 .580 ZPUFZ 74 C DQAI1 44 89 .68 133 PCT 13 P3 BW2 -. 98 .22 07C VS3 .580 ZPUFZ 74 C

1 48 89 .30 113 PCT 10 P2 09H -1.07 VS3 TEH .610 NBAZ1 3 H

64 89 .36 147 PCT 12 P2 09H .80 VS3" TEH .610 NBAZ1 35 H

130 89 .28 86 PCT 10 P2 VS1 .65 VS3 TEH .610 NBAZ1 47 H

51 90 28 76 PCT 9 P2 VS3 .61 VS3 TEC .610 NBAZ3 2 C

75 90 .21 111 PCT 8 P2 09H .76 VS3 TEH .610 NBAZ1 39 H

89 90 .46 99 PCT 14 P2 VS2 -. 82 VS3 TEH .610 NBAZ1 39 H

i111 90 .20 83 PCT 7 P2 VS3 -. 42 VS3 TEC .610 NBAZ3 42 C

44 91 .34 120 PCT 11 P2 VS3 -. 55 VS3 TEC .610 NBAZ3 2 C44 91 .60 105 PCT 16 P2 BW2 -. 74 VS3 TEC .610 NBAZ3 2 C44 91 .22 123 PCT 10 P2 BW1 .94 VS3 TEH .610 NBAZ1 4 H44 91 .86 104 PCT 16 P3 VS3 -. 67 .37 07C VS3 .580 ZPUFZ 74 C44 91 .75 117 PCT 14 P3 BW2 -. 86 .29 07C VS3 .580 ZPUFZ 74 C

45 92 .22 82 PCT 8 P2 08H -. 94 VS3 TEH .610 NBAZ1 3 H45 92 .41 129 PCT 13 P2 BW1 -1.15 VS3 TEH .610 NBAZI 3 H

49 92 .30 143 PCT 10 P2 BW1 .79 VS3 TEH .610 NBAZ1 3 H

53 92 .29 35 PCT 11 P2 VS3 .77 VS3 TEC .610 NBAZ3 1 C

48 93 .54 115 PCT 17 P2 BW2 .96 VS3 TEC .610 NBAZ3 1 C48 93 .71 111 PCT 13 P3 VS3 -. 78 .30 08C VS3 .580 ZPUFZ 74 C48 93 .76 101 PCT 14 P3 BW2 .79 .29 08C VS3 .580 ZPUFZ 74 C

60 93 .38 136 PCT 11 P2 VS4 -. 84 VS3 TEC .610 NBAZ3 32 C

90 93 .38 93 PCT 12 P2 10H -1.24 VS3 TEH .610 NBAZ1 39 H

111 94 .34 98 PCT 10 P2 VS3 .97 VS3 TEC .610 NBAZ3 42 C

48 95 .48 95 PCT 14 P2 VS3 .92 VS3 TEC .610 NBAZ3 2 C48 95 .40 67 PCT 12 P2 BW2 .95 VS3 TEC .610 NBAZ3 2 C

56 95 .19 98 PCT 7 P2 07H .02 VS3 TEH .610 NBAZ1 38 H

70 95 .28 84 PCT 10 P2 08H -. 10 VS3 TEH .610 NBAZ1 38 H

99 96 .20 92 PCT 8 P2 VS3 -. 73 VS3 TEC .610 NBAZ3 41 C

1 111 96 .40 141 PCT 12 P2 VS2 -. 75 VS3 TEH .610 NBAZ1 50 H

48 97 .44 68 PCT 14 P2 VS3 .67 VS3 TEC .610 NBAZ3 1 C

54 97 .20 96 PCT 7 P2 VS3 -. 52 VS3 TEH .610 NBAZ1 3 H

90 97 .33 98 PCT 11 P2 10H -1.25 VS3 TEH .610 NBAZ1 39 H

1 130 97 .30 98 PCT 11 P2 VS3 -. 63 VS3 TEH .610 NBAZ1 51 H- .... - .... - .... -- ... --... - -... --.. -7 - - - .....-. - -. - .-. --------------- --- +- -+ -. + . .-- + - + -... +--- - +- -.. . -

I ROW COL VOLTS DEG. IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ . .. .. . + ... ... . ÷ ... ÷ .. + ... + . .. .. . + ... .. .---. ..- .. . ÷ ... ... . + ... ..---------+ ...... ---- -........- ÷-........+ -

3 ST Max

Page 19: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

..- .- . ..------------ -- + .-- +----- ----- - - - --+----------------------------------------------------- -- +---- 4-.-+-- + .. .-- - --- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21---------------------------------------------------------+----+----*----+---+---4-+~------4 ----- --

1 89 98 .64 106 PCT 19 P2 VS4 .87 VS3 TEC .610 NBAZ3 31 C1 89 98 1.29 99 PCT 21 P3 VS4 .81 .26 VS4 VS4 .580 ZPUFZ 74 C DOAI

50 99 .40 110 PCT 12 P2 BW2 -. 75 VS3 TEC .610 NBAZ3 2 C I

126 99 .26 73 PCT 10 P2 VS3 -.42 VS3 TEC .610 NBAZ3 41 C I

54 101 .27 74 PCT 10 P2 VS3 -.52 VS3 TEC .610 NBAZ3 1 C54 101 .18 139 PCT 7 P2 BW1 -1.07 VS3 TEH .610 NBAZ1 3 H

74 101 .28 121 PCT 10 P2 09H -. 28 VS3 TEH .610 NBAZ1 39 H74 101 .29 127 PCT 10 P2 09H .72 VS3 TEH .610 NBAZ1 39 H

76 101 .69 111 PCT 18 P2 09H .75 VS3 TEH .610 NBAZ1 39 H76 101 .78 96 PCT 16 P3 09H .61 .21 08H VS2 .580 ZPUFZ 69 H

84 101 .28 140 PCT 9 P2 09H .68 VS3 TEH .610 NBAZ1 39 H

92 101 .24 329 PCT 8 P2 10H -1.04 VS3 TEH .610 NBAZ1 39 H

I 118 101 .33 120 PCT 10 P2 VS3 .75 VS3 TEC .610 NBAZ3 42 C

1 49 102 .26 117 PCT 8 P2 BW2 -. 96 VS3 TEC .610 NBAZ3 6 C

1 53 102 .32 60 PCT 10 P2 VS3 -. 83 VS3 TEC .610 NBAZ3 6 C

111 102 .15 99 PCT 6 P2 VS2 -1.10 VS3 TEH .610 NBAZ1 51 H

165 102 .18 46 PCT 7 P2 11H .32 VS3 TEH .610 NBAZ1 51 H

48 103 .14 70 PCT 7 P2 09H -1.42 VS3 TEH .610 NBAZ1 4 H48 103 2.40 103 PCT 38 P2 .VS3 .62 VS3 TEC .610 NBAZ3 6 C48 103 .48 82 PCT 14 P2 BW2 .71 VS3 TEC .610 NBAZ3 6 C48 103 2.24 100 PCT 32 P3 VS3 .95 .23 VS3 VS3 .580 ZPUFZ 69 H

72 103 .18 123 PCT 7 P2 09H -. 22 VS3 TEH .610 NBAZI 32 H

90 103 .41 130 PCT 13 P2 10C -. 74 VS3 TEC .610 NBAZ1 26 C

1 102 103 .31 139 PCT 11 P2 VS2 .20 VS3 TEH .610 NBAZ1 32 H

1 54 105 .81 116 PCT 23 P2 VS3 .61 VS3 TEC .610 NBAZ3 5 C1 54 105 1.64 103 PCT 27 P3 VS3 .79 .23 VS3 VS3 .580 ZPUFZ 69 H

76 105 .32 145 PCT 13 P2 09H . .65 VS3 TEH .610 NBAZ1 33 H

116 105 .26 89 PCT 12 P2 VS2 .89 VS3 TEH .610 NBAZ1 33 H

164 105 .11 93 NOI 3 IOC 24.71 VS3 TEC '.610 NBAZ3 47 C

95 106 .21 123 PCT 10 P2 BW1 -. 84 VS3 TEH .610 NBAZ1 33 H

109 106 .21 80 PCT 10 P2 VS3 -. 80 ýVS3 TEH .610 NBAZ1 33 H

92 107 .18 120 PCT 9 P2 BW1 -. 99 VS3 TEH .610 NBAZ1 33 H

94 107 .16 130 PCT 8 P2 BW1 -. 90 VS3 TEH .610 NBAZ1 33 H

98 107 .15 145 PCT 6 P2 BW1 .77 VS3 TEH .610 NBAZ1 32 H

I 105 108 .44 98 PCT 14 P2 VS2 .66 VS3 TEH .610 NBAZ1 32 HI 10 108 .65 119 PCT 19 P2 .VS3 -. 67 VS3 TEH .610 NBAZ1 32 HI 105 108 .36 117 PCT 12 P2 VS3 .65 VS3 TEH .610 NBAZ1 32 H1 105 108 .19 84 PCT 7 P2 VS4 -. 87 VS3 TEC .610 NBAZ1 56 C1 105 108 1.61 86 PCT 24 P3 VS3 -1.13 .71 VS3 VS3 .580 "ZPUFZ 70 H

105 108 1.04 74 PCT 18 P3 VS3 1.04 .28 VS3 VS3 .580 ZPUFZ 70 H DQAI

107 108 .36 91 PCT 11 P2 VS4 -. 72 VS3 TEC .610 NBAZ1 56 C

48 109 2.55 101 PCT 38 P2 VS3 .73 VS3 TEC .610 NBAZ3 5 C48 109 2.51 91 PCT 35 P3 VS3 .81 .32 VS3 VS3 .580 ZPUFZ 69 H

50 109 .21 28 PCT 10 P2 VS3 .68 VS3 TEC .610 NBAZ3 5 C

58 109 .26 100 PCT 9 P2 VS3 .72 VS3 TEC .610 NbAZ1 18 C

82 109 .27 158 PCT 12 P2 09H .67 VS3 TEH .610 NBAZ1 33 H

92 109 .31 132 PCT 10 P2 VS3 -. 45 VS3 TEC .610 NBAZ1 21 C

118 109 .15 118 PCT 7 P2 VS4 .10 VS3 TEC .610 NBAZI 51 C

130 109 .23 122 PCT 11 P2 VS3 .66 VS3 TEH .610 NBAZ1 33 H.. +.+.---------+--------------------+ --- --- +--------......--+ - + - + --- ----.. . . . .. +-. .+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ . .+ . .+ . . . . . . . .-. .+ . .+ . .+--------- .....--- ...+ ... ... ... .. .. . ... ....-- -.-- - +...... ..+..- . + . .-- - .+- ......- +

4 ST Max

Page 20: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

+ . . .. . . .. . +. .. +.. .+ . . .. ... .. . .. . .----------+-. ...--... ..--. ..--...-+ -. ..---+- +- + -. . .. +-.... +--+--..... .÷. - .+

ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21..... --.... ----- z -. . ---- +----.----.-------- ---- ------ ---------- ---- - ---.---- ----- --+ - --+-- +--- --------- - ..-. .. - --- +

1 132 109 .26 90 PCT 11 P2 VS3 .71 VS3 TEH. .610 NBAZ1 37 H

83 110 .27 146 PCT 10 P2 08H .64 VS3 TEH .610 NBAZ1 32 H

87 110 .34 141 PCT 12 P2 09H .70 VS3 TEH .610 NBAZ1 32 H

95 110 .24 122 PCT 11 P2 10H .74 VS3 TEH .610 NBAZ1 33 H

103 110 .29 146 PCT 12 P2 VS2 -. 92 VS3 TEH .610 NBAZ1 33 H

109 110 .17 103 PCT 8 P2 VS3 .22 VS3 TEH .610 NBAZ1 33 H

98 111 .23 90 PCT 9 P2 BWi .94 VS3 TEH .610 NBAZ1 32 H

102 111 .22 100 PCT 8 P2 VS2 .74 VS3 TEH .610 NBAZ1 36 H

95 112. .22 106 PCT 9 P2 10H -. 23 VS3 TEH .610 NBAZ1 32 H

103 112 .27 132 PCT 10 P2 10H .75 VS3 TEH .610 NBAZI 36 H103 112 .15 47 PCT 6 P2 BW1 -. 82 VS3 TEH .610 NBAZI 36 H

44 113 .94 128 PCT 26 P2 BWi -. 80 VS3 TEH .610 NBAZ1 6 H44 113 2.01 105 .PCT 30 P3 BW1 -.77 .54 07H VS3 .580 ZPUFZ 69 H

48 113 .34 107 PCT 10 P2 VS3 .80 VS3 TEC .610 NBAZ3 6 C

93 114 .16 118 PCT 8 P2 BWl -1.07 VS3 TEH .610 NBAZ1 29 H

99 114 .34 138 PCT 12 P2 10H .72 VS3 TEH .610 NBAZ1 24 H

117 114 .22 '64 PCT 10 P2 VS2 -1.19 VS3 TEH .610 NBAZI 37 H

42 115 .76 97 PCT 22 P2 VS3 .87 VS3 TEC .610 NBAZ3 5 C42 115 1.25 111 PCT 22 P3 VS3 .86 .26 VS3 VS3 .580 ZPUFZ 69 H

44 115 .32 98 PCT 13 P2 VS3 .68 VS3 TEC .610 NBAZ3 5 C

42 117 .25 127 PCT 8 P2 08C -. 28 VS3 TEC .610 NBAZ3 6 C

44 117 .32 119 PCT 13 P2 BWl -1.11 VS3 TEH .610 NBAZi 6 H

124 117 .29 108 PCT 10 P2 VS1 -.78 VS3 TEH .610 NBAZ1 24 H

41 118 .21 118 PCT 9 P2 08H .70 VS3 TEH .610 NBAZ1 5 H

38 119 .36 107 PCT 15 P2 VS3 .75 VS3 TEC .610 NBAZ3 5 C38 119 1.11 85 PCT 20 P3 VS3 .82 .21 VS3 VS3 .580 ZPUFZ 69 H

40 119 .20 125 DSI P1 08C -. 25 VS3 TEC .610 NBAZ3 5 C40 119 .58 107, PCT 11 P3 .08C -. 15 .22 07C VS3 .580 ZPUFZ 74 C

42 119 .21 100 PCT 9 P2 BWl -. 95 VS3 TEH .610 NBAZ1 5 H

44 119 .27 54 'PCT 10 P2 6Wl -1.25 VS3 TEH .610 NBAZI 5 H44 119 .12 105 PCT 7 P2 VS3 -. 80 VS3 TEC .610 NBAZ3 5 C

90 119 .17 42 DSI P1 10H .00 VS3 TEH .610 NBAZi 29 H

90 119 .48 97 PCT 9 P3 10H -. 35 .15 09H VS2 .580 ZPUFZ 70 H DOAI

43 120 .50 116 PCT 14 P2 8W2 -1.02 VS3 TEC .610 NBAZ3 6 C

91 120 .24 125 PCT 9 P2 BWl -. 86 VS3 TEH .610 NBAZi 28 H

64 121 .20 150 PCT 8 P2 09H .84 VS3 TEH .610 NBAZi 28 H

168 121 .22 125 PCT 8 P2 10H .90 VS3 TEH .610 NBAZI 24 H

39 122 .41 137 PCT 14 P2 08H .77 VS3 TEH .610 NBAZI 5 H39 122 .26 94 PCT 12 P2 BW2 -1.19 VS3 TEC .610 NBAZ3 5 C

41 122 .20 39 PCT 10 P2 BW2 -1.24 VS3 TEC .610 NBAZ3 5 C

71 122 .28 134 PCT 12 P2 VS2 -. 62 VS3 TEH .610 NBAZi 29 H

52 123 .12 47" PCT 6 P2 VS3 -. 63 VS3 TEC .610 NBAZ3 5 C

126 123 .62 116 PCT 20 P2 VS3 -. 50 VS3 TEH .610 NBAZ1 25 H126 123 1.23 90 PCT 20 P3 VS3 -. 66 .51 VS3 VS3 .580 ZPUFZ 70 H DQAl

31 124 .43 118 PCT 13 P2 BW2 -. 82 VS3 TEC .610 NBAZ3 6 C

124 125 .27 116. PCT 10 P2 VS1 .72 VS3 TEH .610 NBAZi 24 H+ . .. + .. +.. .. .. +.. . ''- + ... + .. . + ... +..... ... ----------+- --- +...- ...--.. ...+-... ..--- "-....-- +'++.......+ +....-. 4...

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INOH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21. .. - - - .- .. .. .÷...+.. .. .. ..----------+ - + ---- +- --........ +......-- ---+ - +----+---- ++-- .. .... _- +....... ....-- -+- -- .+-+.......

5 ST Max

Page 21: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

+ . .+ . .+.. . . .. . . . .+ . .+ . .+.. .+.------------.......+- - - - - - +-+---- +-.. . .---.- ...... + -...... + ......- +-........- . .. .-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21----------------------------------------------+-------+----+------+ - - - --+- - -------------------+---- ------------- --...- +- .....

52 127

54 127

90 127

126 129

128 129

133 130

74 131

43 132

98 133

65 134

89 134

97 134

102 135

124 135

37 138

107 138

103 140103 140

64 141

120 143

65 144

94 14594 145

132 145

105 146

94 147

105 148105 148

108 149

114 149114 149

148 149148 149

111 150

143 150

82 151

60 153

107 154

56 157

91 158

82 15982 159

100 159100 159

112- 159112 159

.19 97 PCT

.25 105 PCT

.30 90 PCT

.33 121 PCT

.29 127 PCT

.26 127 PCT

.13 134 PCT

.21 145 PCT

.24 62 PCT

'.14 147 PCT

.17 98 PCT

.21 143 PCT

.18 139 DSI

.22 139 PCT

.13 111 DSI

.21 131 PCT

.28 142 DSI,

.47 98 PCT

.10 104 DSI

.29 143 PCT

.28 134 PCT

.59 100 PCT1.57 98 PCT

.31 133 PCT

.36 105 PCT

.27 81 PCT

1.08 131 PCT1.77 80 PCT

.29 141 PCT

.53 110 PCT-1.30 102 PCT

.46 142 DS1

.69 101 PCT

.23 114 PCT

.27 117 PCT

.23 126 PCT

.32 138 PCT

.33 136 PCT

.37 154 PCT

.25 78 PCT

.37 133 PCT1.18 102 PCT

.48 114 PCT1.03 91 PCT

.71 120 PCT1.64 100 PCT

8 P2 09H

10 P2 09H

11 P2 10C

11 P2 VS3

10 P2 VS1

9 P2 VS1

7 P2 08H

10 P2 08H

10 P2 VS3

7 P2 09H

8 P2 VS2

10 P2 10H

P1 10H

10 P2 VS1

P1 08H

8 P2 09H

P1 10H9 P3 10H

P1 09H

12- P2 VS2

10 P2 09H

18 P2 VS224 P3 VS2

11 P2 VS1

12 P2 VS2

10 P2 VS4

24 P2 VS326 P3 VS3

10 P2 10H

16 P2 VS221 P3 VS2

P1 11H13 P3 11H

9 P2 10H

10 P2 11H

10 P2 09H

10 P2 VS3

11 P2 10H

12 P2 VS3

11 P2 VS2

15 P2 VS219 P3 VS2

17 P2 VS317 P3 VS3

22 P2 VS325 P3 VS3

.62

.35

-1.71

- .56

.79

- .67

.70

.73

- .59

.90

-1.24

.89

.69

.69

- .24

.49

.75

.68

.64

- .73

1.14

.57

.70

.82

1.03

.84

-. 64- .65

.69

.72

.79

.72

.40

.88

.69

.84

.63

.07

.46

.24

.68

.83

- .37- .50

- .78- .92

.18

.54

.46

.41

.15

.36

.31

.36

VS3 TEH .610 NBAZ1 5 H

VS3 TEH .610 NBAZI 5 H

VS3 TEC .610 NBAZ1 22 C

VS3 TEH .610 NBAZi 24 H

VS3 TEH .610 NBAZI 24 H

VS3 TEH .610 NBAZI 22 H

VS3 TEH .610 NBAZ1 29 H

VS3 TEH .610 NBAZ1 6 H

VS3 TEC .610 NBAZI 55 C

VS3 TEN .610 NBAZi 29 H

VS3 TEH .610 NBAZ1 29 H

VS3 TEH .610 NBAZi 29 H

VS3 TEH .610 NBAZ1 23 H

VS3 TEH .610 NBAZi 23 H

VS3 TEH .610 NBAZ1 7* H

VS3 TEH .610 NBAZI 22 H

VS3 TEH .610 NBAZI 23 H09H VS2 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 19 H

VS3 TEH .610 NBAZi 23 H

VS3 TEH .610 NBAZ1 19 H

VS3 TEH .610 NBAZi 15 HVS2 VS2 .580 ZPUFZ 70 H

VS3. TEH .610 NBAZI 22 H

VS3 TEH .610 NBAZi 22 H

VS3 TEC .610 NBAZi 16 C

VS3 TEC .610 NBAZI 15" CVS3 VS3 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 22 H

VS3 TEH .610 NBAZI 22 HVS2 VS2 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 23 H10H VS1 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 22 H

VS3 TEH .610 NBAZ1 22 H

VS3 TEH .610 NBAZ1 16 H

VS3 TEC .610 NBAZ1 15 C .

VS3 TEH .610 NBAZ1 22 H

VS3 TEC .610 NBAZ1 15 C

VS3' TEH .610 NBAZ1 16 H

VS3 TEH .610 NBAZ1 16 HVS2 VS2 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 16 HVS3 VS3 .580 ZPUFZ 70 H

VS3 TEH .610 NBAZ1 18 HVS3 VS3 .580 ZPUFZ 70 H I

---- -..- + .. .. + .....-. + .....-. +--+ -. -+-. . .. . . .

BEGT ENDT PDIA PTYPE CAL L* UTILl UTIL21--- + .. 4 .... + .....-. + .....-. +--+---......4.-. .+

- -- - - +- - . .--- + ---- + ---- + ---- + ---- + - - - ---- -I ROW COL VOLTS DEG IND PER CHN LOCN INCHI4. - - - -- - - - -..- - - - -- - - - -.- - - - -.- - - - -. + - . . .-+ . .. .- - - - --- -. . . . .. . . .--

INCH2 CRLEN B. . .-- - ---. -. . . --

6 ST Max

Page 22: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

..... ----. ----..... .. ... !- -- ----- ---------- -------------------- -------- -----------------------------4 - -- + -.--- --- --+- - - -------- -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21.. ..- . .-- . .. . .. + .. - - -+.. .+ .. . .. + . .. .. ÷. .. .. . .. .. ----------... ...- -.....-..---- -.. + ..- .. . .+-- ... ...-- - .+- ........ +

1 116 159 1.01 102 PCT 27 P2 VS3 -. 73 VS3 TEH .610 NBAZI 18 H116 159 2.27 89 PCT 31 P3 VS3 -. 94 .46 VS3 VS3 .580 ZPUFZ 70 H

118 159 .21 144 PCT 10 P2 VS3 -. 73 VS3 TEH .610 NBAZ1 18 H

128 159 .17. 151 PCT 8 P2 VS1 .73 VS3 TEH .610 NBAZ1 18 H

99 160 .47 87 PCT 15 P2 VS3 - -1.22 VS3 TEH .610 NBAZ1 15 H99 160 .98 87 PCT 17 P3 VS3 -1.09 .23 VS3 VS3 .580 ZPUFZ 70 H

101 160 .27 114 PCT 12 P2 VS3 -. 84 VS3 TEH .610 NBAZ1 18 H

100 161 .27 145 PCT 10 P2 09H .35 VS3 TEH .610 NBAZ1 15 H

124 161 .32 88 PCT 11 P2 VS3 -. 56 VS3 TEH .610 NBAZ1 19 H

128 161 .27 142 PCT 10 P2 VS1 .78 VS3 TEH .610 NBAZ1 19 H

69 162 .12 141 PCT 6 P2 VS2 . -. 83 VS3 TEH .610 NBAZ1 16 H

79 162 .22 150 ,PCT 10 P2 09H .72 VS3 TEH .610 NBAZ1 16 H

95 162 .21 141 PCT 10 P2 09H .80 VS3 TEH .610 NBAZ1 16 H

96 163 .24 139 PCT 10 P2 VS2 .65 VS3 TEH .610 NBAZI 16 H96 163 .30 122 PCT 10 P2 VS4 -. 73 VS3 TEC .610 NBAZ1 58 C

98 163 .53 116 PCT 18 P2 VS3 -. 64 VS3 TEH .610 NBAZ1 16 H98 163 1.57 104 PCT 24 P3 VS3 -. 76 .53 VS3 VS3 .580 ZPUFZ 70 H

130 165 .22 127 PCT 8 P2 BW1 -. 13 VS3 TEH .610 NBAZ1 19 H

97 166 .11 85 OSI P1 10H -. 36 VS3 TEH .610 NBAZ1 16 H

23 168 .19 129 PCT 9 P2 08H -. 22 VS3 TEH .610 NBAZ1 12 H

66 169 .24 49 PCT 9 P2 VS2 -. 57 VS3 TEH .610 NBAZ1 15 H

1128 169 .31 103 PCT 11 P2 VS3 -. 76 VS3 TEH .610 NBAZ1 19 H

121 170 .22 139 PCT 10 P2 10H .67 VS3 -TEH .610 NBAZI 18 H;

90 171 .17 142 PCT 8 P2 09H .45 VS3 TEH .610 NBAZ1 14 -H

15. 172 .19 131 DSI P1 08H -. 40 VS3 TEH .610 NBAZ1 45 H15 172 .66 95 PCT 12 P3 08H , -. 16 .13 07H VS3 .580 ZPUFZ 70 H

93 172 .27 129 PCT 10 P2 10H .69 VS3 TEH .610 NBAZ1 13 H

99 172 .51 123 PCT 16 P2 VS2 -. 98 VS3 TEH .610 NBAZ1 13 H99 172 1.77 109 PCT 33 P2 VS3 -. 90 VS3 TEH .610 NBAZ1 13 H99 172 1.23 94 PCT 20 P3 VS2 -1.04 .36 VS2 VS2 .580 ZPUFZ 70 H99 172 2.52 94 PCT 33 P3 VS3 -1.11 .46 VS3 VS3 .580 ZPUFZ 70 H

56 173 .24 129 PCT 11 P2 BW1 -1.46 VS3 TEH .610 NBAZI 12 H

96 173 .44 123 PCT 15 P2 VS3 .50 VS3 TEH .610 NBAZ1 13 HI96 173 .82 296 PCT 16 P3 VS3 .53 .29 VS3 VS3 .580 ZPUFZ 68 H

63 174 .25 137 PCT 9 P2 VS3 .83 VS3 TEC .610 NBAZ1 11 C

99 174 .19 86 PCT 9 P2 VS3 -1.10 VS3 TEH .610 NBAZ1 14 H

115 174 .19 61 PCT 7 P2 VS1 .82 VS3 TEH .610 NBAZ1 19 H

82 175 .35 135 PCT 14 P2 VS2 .74 VS3 TEH .610 NBAZ1 14 H

92 175 .21 149 PCT 10 P2 VS2 .69 VS3 TEH .610 NBAZI 14 H

i100 175 .22 130 PCT 10 P2 VS3 .39 VS3 TEH .610 NBAZ1 14 H

I 106 175 .27 145 PCT 12 P2 10H .64 VS3 TEH .610 NBAZI 18 H

I 79 176 .33 111 PCT 12 P2 VS4 -. 85 VS3 TEC .610 NBAZ1 12 C

87 176 .39 116 PCT 13 P2 VS2 .91 VS3 TEH .610 NBAZ1 13 H

77 178 .31 106 PCT 10 P2 VS3 -. 65 VS3 TEC .610 NBAZ1 11 C

103 180 .25 138 PCT 11 P2 VS3 -1.08 VS3 TEH .610 NBAZ1 18 H

105 180 .30 122 PCT 13 P2 VS3 -1.04 VS3 TEH .610 NBAZ1 18 H

107 180 .30 94 PCT 13 P2 VS3 -. 99 VS3 TEH .610 NBAZ1 18 H+.. . .... ÷..----------..---.----.----+----.----+-.-... .+--- - + ........---- +....-- -- +------+--- . ...-- +-- ........ +.--+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ .. ÷.. . ... .+.. .. + .. +.. ..----------+----+ ..... .. .. . .... ÷...----- -.- + ----+ -- . ..--- + -. +-.. +--+- ........ + .....-... +

7 ST Max

Page 23: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG '- 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:27:33

+ . . . . .. . . . .. .. . . . .----------+-. .. +-.. .. ..--.. .. ..----- - +- . . .+..----+ +--- '+ ...... + ...... + ...--..- ++ ' -- - + -- +

i ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ .. +.. - ....-- ..- .. +.. .. +..--------------..+- + -- + --- + .------- +--.+-. +----+..---- +- ... +.-+. .... ......------ +- ....... +

98 181 .51 117 PCT 16 P2 VS3 -. 78 VS3 TEH .610 NBAZ1 13 H98 181 .80 89 PCT 16 P3 VS3 -. 75 .55 VS3 VS3 .580 ZPUFZ 68 H DOAI

100 181 .33 130 PCT 12 P2 VS3 -. 97 VS3 TEH .610 NBAZ1 13 H

106 181 .33 116 PCT 8 P2 VS3 -. 98 VS3 TEH .610 NBAZI 19 H

49 184 .22 109 PCT 8 P2 BW2 -. 98 VS3 TEC .610 NBAZ1 7 C

99 184 .34 121 PCT 12 P2 VS3 -1.90 VS3 TEH .610 NBAZ1 13 H

77 186 .23 73 PCT 11. P2 "VS3 -. 68 VS3 TEH .610 NBAZ1 14 H

81 186 .69 108 PCT 18 P2 VS4 -. 64 VS3 TEC .610 NBAZI 11 C81 186 1.27 92 PCT 21 P3 VS4 -. 78 .47 VS4 VS4 '.580 ZPUFZ 74 C

79 188 .28 107 PCT 10 P2 VS3 -1.12 VS3 TEC .610 NBAZ1 8 C

81 188 .10 93 DSI P1 09C -. 30 VS3 TEC .610 NBAZ1 8 C81 188 .26 110 PCT 10 P2 VS2 -1.98 VS3 TEH .610 NBAZ1 13 H

58 189 .26 158 PCT 9 P2 VS3 -. 44 VS3 TEC .610 NBAZ1 7 C-----.---- ....-------------+..+----.----+----------------- -- --• ------ +------+----+------- .+ .------ +------ +--+---------+-...---- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ .. .. ..... .. .. .. .. ----------... +---........+__............----------+ ..----- -+-..+-...+--+- ....... + ...---. +

Tubes: 262 Records: 3508 ST Max

Page 24: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

APPENDIX C

STEAM GENERATOR 32

SUMMARY DATA SHEETS

Page 25: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG -32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

+---- ..----------- +----+-----+-- -+-----+-------+----.....-+------+-----+---++ -. + - --------- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I÷ . .+. . . .. . .+. . . .÷ . .+. . . .-----------...---- .....+- ... ... . +... ... +. .. .. . ... ..----- -...- . .+- ... ..-- +- .... ...-- +.. ... .

1 41 10 .26 140 PCT 10 P2 VS3 -. 53 VS3 TEC .610 NBAZ4 25 C

52 11 .29 138 PCT 10 P2 VS3 -. 45 VS3 TEC .610 NBAZ4 26 C

75 12 .48 131 PCT 15 P2 VS3 -. 61 VS3 TEC .610 NBAZ4 29 C75 12 .31 125 PCT 11 P2 VS3 .67 VS3 TEC .610 NBAZ4 29 C75 12 .63 98 PCT 12 P3 VS3 -. 81 .21 VS3 VS3 .580 ZPUFZ 56 H

72 13 .20 146 NOI 3 08H 4.95 VS3 TEH .610 NBAZ1 28 H

76 15 .31 135 PCT 10 P2 VS4 -. 48 VS3 TEC .610 NBAZ4 30 C

1 82 15 .32 125 PCT 11 P2 VS3 .78 VS3 TEC .610 NBAZ4 30 C

69 18 .35 81 PCT 11 P2 VS3 -. 69 VS3 TEC .610 NBAZ4 30 C

86 21 .33 139 PCT 11 P2 VS3 .61 VS3 TEC .610 NBAZ4 29 C

100 21 .27 128 PCT 9 P2 VS3 -. 40 VS3 TEC .610 NBAZI 45 C

102 21 .47 132 PCT 15 P2 VS3 -. 78 VS3 TEC .610 NBAZ1 44 C102 21 .98 89 PCT 17 P3 VS3 -. 67 .16 VS3 VS3 .580 ZPUFZ 56 H

100 23 .37 110 PCT 10 P2 VS3 -. 44 VS3 TEH .610 NBAZ1 27 H

72 25 .23 108 PCT 9 P2 07C .30 VS3 TEC .610 NBAZ4 29 C

84 25 .28 76 PCT 10 P2 VS4 -. 62. VS3 TEC .610 NBAZ4 29 C

113 26 .29 140 PCT 10 P2 VS3 .27 VS3 TEC .610 NBAZ1 44 C

111 28 .34 128 PCT 12 P2 VS3 .33 VS3 TEC .610 NBAZ1 40 C

113 28 .26 108 PCT 10 P2 VS3 .36 VS3 TEC .610 NBAZ1 40 C

111 32 .29 96 PCT 10 P2 VS3 .42 VS3 TEC .610 NBAZ1- 41 C

117 32 .29 124 PCT 10 P2 VS3 -1.42 VS3 TEH .610 NBAZ1 31 H

123 32 .29 111 PCT 11 P2 VS3 .32 VS3 TEC .610 NBAZ1 40 C

114 33 .20 140 PCT 7 P2 1OH -. 10 VS3 TEH .610 NBAZ1 31 H

23 34 .28 136 PCT 9 P2 08H .88- VS3 TEH .610 NBAZ1 29 H

99 34 .26 118 PCT 9 P2 VS3 -. 87 VS3 TEC .610 NBAZ1 45 C

102 35 .71 97 PCT 19 P2 VS4 .54 VS3 TEC .610 NBAZ1 44 C102 35 1.13 100 PCT 20 P3 VS4 .57 .62 VS4 VS4 .580 ZPUFZ 70 C

1 113 38 .27 97 PCT 9 P2 VS3 -. 72 VS3 TEC .610 NBAZ1 45 C

127 38 .22 138 DSI P1 10H .73 VS3 TEH .610 NBAZ1 32 H

125 42 .44 103 PCT 14 P2 VS4 .91 VS3 TEC .610 NBAZ1 40 C

48 43 .31 115 PCT 11 P2 VS3 -. 43 VS3 TEC .610 NBAZ4 21 C

122 43 .31 148 PCT 10 P2 VS3 .65 VS3 TEH .610 NBAZ1 31 H

99 44 .37 137 PCT 12 P2 VS3 -. 89 VS3 TEC .610 NBAZ1 44 C

63 46 .24 44 PCT 7 P2 BW1 -. 93 VS3 TEH .610 NBAZI 25 H

121 46 .68 109 PCT 17 P2 VS2 -. 73 VS3 TEH .610 NBAZ1 38 H121 46 1.60 94 PCT 25 P3 VS2 -. 72 .31 "VS2 VS2 .580 ZPUFZ 56 H DOAI

51 48 .26 47 PCT 9 P2 09H .92 VS3 TEH .610 NBAZ1 29 H

132. 49 .70 124 PCT 18 P2 VS3 .82 VS3 TEC .610 NBAZ1 53 C132 49 1.36 82 PCT 22 P3 VS3 .77 .36 VS3 VS3 .580 ZPUFZ 56 H

140 49 .25 110 PCT 8 P2 11H -. 37 VS3 TEH .610 NBAZ1 38 H

112 51 .33 119 PCT 10 P2 BW1 1.51 VS3 TEH .610 NBAZ1 31 H

105 52 .28 118 PCT 10 P2 VS4 -. 67 VS3 TEC .610 NBAZ1 44 C

135 52 .23 107 PCT 8 P2 VS3 .52 VS3 TEH .610 NBAZ1 38 H

68 53 .30 128 PCT 9 P2 09H .79 VS3 TEH .610 NBAZ1 26 H

118 53 .29 119 PCT 9 P2 VS2 -. 98 VS3 TEH .610 NBAZ1 38 H

+ .. +. .. + .. . .. ÷. .. + .. . .. + . . . . +.. .. . . . .----------- -......-- + ... ... +.. . ... . ... .... ...-- --+- + -.- + -+-..+- - - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21÷ . .+ . .-- . . ...-- . .- . .-- . . . . . . . . ..--------- - + - - - +. . .. . . .. ÷ ..-- - .. +----... ,+ ... .... ... . ... .-----....-- .- ... +- ... .+

1 ST Max

Page 26: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

+ .. +.. ..... +.. ÷.. .. + .. +.. ----------...............--- ..-+-.. ---- +----........+ ........... +..-....+........--.-.+-. .+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ .. +.. ..... +.. - .. + .. +.. ..----------+-......--.....-+....+------ - - - + ....---- +-- .--- +-...+-. +--+- ........ + .....-... +

1 120 53 .47 122 PCT 13 P2 VS2 -. 79 VS3 TEH .610 .NBAZ1 38 H

1 125 54 .99 106 PCT 22 P2 VS1 -. 79 VS3 TEH .610 NBAZ1 37 H1 125 54 .50 131 PCT 14 P2 VS3 -. 77 VS3 TEC .610 NBAZ1 45 C1 125 54 1.41 95 PCT 23 P3 VS1 -. 76 .52 VS1 VS1 .580 ZPUFZ 56 H

1 118 55 .29 71 PCT 9 P2 VS2 -. 73 VS3 TEH .610 NBAZ1 37 H

1 128 55 1.82 105 PCT 30 P2 VS2 1.07 VS3 TEH .610 NBAZI 38 H1 128 55 1.57 113 PCT 30 P2 VS3 .82 VS3 TEC .610 NBAZI 44 C1 128 55 1.79 86 PCT 27 P3 VS2 .89 .49 VS2 VS2 .580 ZPUFZ 56 H1 128 55 1.64 84 PCT 25 P3 VS3 .82 .29 VS3 VS3 .580 ZPUFZ 56 H DOAI

1 138 55 .34 100 PCT 11 P2 VS1 .90 VS3 TEH .610 NBAZ1 38 H

1 140 55 .36 123 PCT 11' P2 VS1 .81 VS3 TEH .610 NBAZ1 38 H

1 43 56 .43 22 PCT 13 P2 VS3 .91 VS3 TEH .610 NBAZ1 31 H

103 56 .34 110 PCT 12 P2 VS3 .81 VS3 TEC .610 NBAZ1 44 C

1 120 57 .32 130 PCT 10 P2 VS2 -. 85 VS3 TEH .610 *NBAZ1 37 H

1 128 59 .33 122 PCT 11 P2 VS3 .76 VS3 TEC .610 NBAZ1 44 C

1 12 61 .36 85 PCT 11 P2 06H .69 VS3 TEH .610 NBAZ1 43 H

1 106 61 .26 98 PCT 9 P2 VS3 .65 VS3 TEC .610 NBAZ1 45 C

1 112 61 .33 124 PCT 10 P2 VS2 -. 89 VS3 TEH .610 NBAZ1 38 H

1 118 61 .33 87 PCT 11 P2 VS3 -. 62 VS3 TEH .610 NBAZ1 32 H

1 142 63 .29 82 PCT 10 P2 VS3 .48 VS3 TEH .610 NBAZ1 37 H

1 129 64 .39 109 PCT 12 P2 VS1 -1.09 VS3 TEH .610 NBAZ1 38 H1 129 64 .52 104 PCT 14 P2 VS2 -. 99 VS3 TEH .610 NBAZ1 38 H1 129 64 .49 116 PCT 15 P2 VS3 .77 VS3 TEC .610 NBAZ1 44 C1 129 64 1.10 108 PCT 25 P2 VS4 -. 73 VS3 TEC .610 NBAZ1 44 C1 129 64 .96 95 PCT 17 P3 VS2 -. 86 .39 VS2 VS2 .580 ZPUFZ 56 H1 129 64 1.02 86 PCT 18 P3 VS3 .69 .42 VS3 VS3 .580 ZPUFZ 56 H DQAI1 129 64 1.97 96 PCT 29 P3 VS4 -. 62 '68 VS4 VS4 .580 ZPUFZ 70 C DOAI

1 156 65 .,24 119 PCT 8 P2 11H -. 25 VS3 TEH .610 NBAZ1 38 H

1 37 66 .30 96 PCT 10 P2 VS3 -. 64 VS3 TEC .610 NBAZ4 17 *C

1 83 66 .32 127 PCT 10 P2 09H .78 VS3 TEH .610, NBAZ1 21 H

1 100 67 .29 108 PCT 9 P2 10H .57 VS3 TEH .610 NBAZ1 21 H

1 117 68 .38 130 PCT 11 P2 VS2 -1.24 VS3 TEH .610 NBAZ1 38 H

1 138 69 .29 119 PCT 9 P2 VS1 -. 39 VS3 TEH .610 NBAZ1 37 H

1 111 70 .32 124 PCT 10 P2 VS2 -. 86 VS3 TEH .610 NBAZ1 41 H111 70 .31 133 PCT 10 P2 VS3 .63 VS3 TEC .610 NBAZI 51 C

84 71 .33 130 PCT 10 P2 09H .77 VS3 TEH .610 NBAZI 21 H

118 71 .56 129 PCT 15 P2 VS2 .89 VS3 TEH .610 NBAZ1 41 H118 71 1.13 109 PCT 26 P2 VS4 .45 VS3 TEC .610 NBAZ1 50 C118 71 .88 88 PCT 16 P3 VS2 .75 .42 VS2 VS2 .580 ZPUFZ 56 H118 71 1.99 102 PCT 29 P3 VS4 .45 .62 VS4 VS4 .580 .ZPUFZ 70 C DQAI

120 71 .29 72 PCT 10 P2 VS3 1.07 VS3 TEC .610 NBAZ1 50 C

45 72 .85 122 PCT 20 P2 08H .60 VS3 TEH .610 NBAZ1 1 H45 72 1.01 84 PCT 18 P3 08H .60 .34 07H VS3 .580 ZPUFZ 56 H

124 73 .22 84 PCT 8 P2 VS3' .73 VS3 TEC .610 NBAZ1 51 C

164 73 .20 124 PCT 7 P2 10H .77 VS3 TEH .610 NBAZI 42 H

147 74 .26 82 PCT 9 P2 VS3 .44 VS3 TEC .610 NBAZ1 59 C

157 74 .29 141 PCT 9 P2 VS1 .71 VS3 TEH .610 NBAZI 41 H157 74 .34 97 PCT 11 P2 VS3 .42 VS3 TEC .610 NBAZ1 59 C

120 75 .78 123 PCT- 19 P2 VS2 -. 90 VS3 TEH .610 NBAZ1 23 H120 75 1.41 90 PCT 23 P3 VS2 -. 85 .39 VS2 VS2 .580 ZPUFZ 56 H .1

164 75 .27 140 PCT 9 P2 10H .82 VS3 TEH .610 NBAZ1 41 H

----------------- -- ----------------------------------------------+---------------- --- +-----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ .. .. +......+ .. .. +...+...---------- . .... ......... +- -------- +----..+----+-.....+-......+......- ...------------.. +

2 ST Max

Page 27: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

+ .... +-- - -- --- +..+ .. + .. ..+-------------.----+ " NCH---+- --1"'+- ....... + .... ............----....- + +-. .--.. +' ---" +- ........ +

I ROW COL VOLTS DEG IND PER CHN LOCN INCHi INCN2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21------------------------------------- ---+--+ + -+ . . .-----+- - --- - - -------- --------- _-+- _.+- . .+ ..-. +- - -+----------+-------- +

105

117

121

165

82

88

112

118118118118

51

149149

118

158

85

. 167

50

114114

102

116

61

65

118

120120120

126

158

41

76 .37 133 PCT 11

76 .38 138 PCT 11

76 .28 119 PCT 10

76 .42 133 PCT 12

77 .30 132 PCT 9

77 .34 90 PCT 12

77 .23 100 -PCT 8

77 .24 79 PCT 877 1.41 117 PCT 2677 .81 90 PCT 1577 2.05 87 PCT 29

78 .40 137 PCT 12

78 .44 95 PCT 1378 .83 99 PCT 15

79 .29 111 PCT 11

79 .27 104 PCT 9

80 .36 127 PCT 12

80 .26 132 PCT 8

81 .25 99 PCT 8

81 1.08 114 PCT 2381 2.12 90 PCT 30

83 .34 123 PCT 10

83 .43 62 PCT 12

84 .29 29 PCT 11

84 .32 123 PCT 10

85 .43 102 PCT 13

85 .59 121 PCT 1685 .30 122 PCT 1085 1.24 95 PCT 21

85 .12 45 PCT. 5

85 .37 113 PCT 11

86 .51 136 PCT 14

P2 VS3

P2 VS3

P2 VS3

P2 10H

P2 09H

P2 VS3

P2 VS3

P2 VS3P2 VS3P3 VS3P3 VS3

P2 08H

P2 VS3P3* VS3

P2 VS3

P2 VS1

P2 VS3

P2 VS3

P2 08H

P2 VS3P3 VS3

P2 VS3

P2 VS3

P2 VS3

P2 09H

P2 VS2

P2 VS2P2 VS4P3 VS2

P2 VS1

P2 VS1

P2 VS3

.49

-1.10

- .71

.74

.67

.60

.76

-. 23.80

- .21.80

.60

.39

.50

- .15

.84

- .83

.73

-. 48

- .50- .61

.65

.78

-. 52

.64

- .42

.92

.54

.84

- .72

.77

.55

VS3 TEH .610 NBAZ1 22 H

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEHVS3 TEH

.20 VS3 VS3

.49 VS3 VS3

VS3 TEH

VS3 TEH.29 VS3 VS3

VS3 TEC

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEH

VS3 TEH.42 VS3 VS3

VS3 TEH

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEH

VS3 TEHVS3 TEC

.50 VS2 VS2

VS3 TEH

VS3 TEH

VS3 TEH

.610 NBAZ1

.610 NBAZ1

.610. NBAZ1

.610 NBAZI

.610 NBAZ4

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.610 NBAZ1

.610 NBAZI

.610 NBAZ4

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.610 NBAZ1

.610 .NBAZ1

.610 NBAZ1

23 H

50 C

23 H

22 H

37 C

24 H

24 H24 H56 H56 H

2 H

24 H56 H

50 C

23 H

37 C

23 H

1 H

24 H56 H

21 H

23 H

40 C

22 H

24 H

24 H51 C56 H

24 H

24 H

2 H

DOA

I.

I.

46 87. 1.10 114 PCT 23 P2 VS3 -. 82 VS3 TEH .610 NBAZ1 2 H46 87 1.28 91 PCT 21 P3 VS3 -. 82 .23 VS3 VS3 .580 ZPUFZ 56 H

52 87 .34 114 PCT 11 P2 08H -. 28 VS3 TEH .610 NBAZ1 2 H

118 87 .77 106 PCT 18 P2 VS2 -. 61 VS3 TEH .610 NBAZ1 23 H118 87 1.15 102 PCT 23 P2 VS3 .77 VS3 TEH .610 NBAZ1 23 H118 87 1.06 106 PCT 25 P2 VS4 .83 VS3 TEC .610 NBAZ1 50 C118 87 1.00 91 PCT 18 P3 VS2 -. 30 .52 VS2 VS2 .580 ZPUFZ 56 H118 87 1.72 - 86 PCT 26 P3 VS3 .69 .47 VS3 VS3 .580 ZPUFZ 56 H DQAI118 87 2.02 96 PCT 30 P3 VS4 .82 .62 VS4 VS4 .580 ZPUFZ 70 C I

19120 87 .37 66 PCT 11 P2 VS3 .95 VS3 TEH .610 NBAZ1 23 H

I124 87 .32 41 POT 10 P2 VS3 .93 VS3 TEN .61O N8AZ1 23 HN

89 88 .29 107 PCT 11 P2 VS3 -. 73 VS3 TEC .610 NBAZ1 40 C

42 89 .53 143 PCT 15 P2 BW1 .82 VS3 TEH .610 NBAZ1 1 H42 89 .78 118 PCT 14 P3 BW1 .82 .26 07H VS3 .580 ZPUFZ 56 H

88 89 .44 128 PCT 13" P2 09H .88 VS3 TEH .610 NBAZ1 22 H

120 89 .39 97 PCT 12 P2 VS3 .74 VS3 TEH .610 NBAZ1 24 H

45 90 .44 53 PCT 14 P2 BW2 .87 VS3 TEC .610 NBAZ4 14 C

: .i i i i .... -- .... - .... - .... - .... - .... - .... - .-- --- -- - - -- :-1111-1: - - .. + 7 - - -- - ..... :11:---. -.-_-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I

3 ST Max

Page 28: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

.. .+.. .+ . .. . . .. .+. .. +. .. +. . + . .----------. ... .. + ... .. .+..------ -...- + . ..---- + + . . .. +.----- - .... +- ..... +--+-- ... .... + ....-....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT' PDIA PTYPE CAL L UTIL1 UTIL2I.. .+. .. +. . .. . . . . .+ . .+.. .+..----------+......... .....----..- -. .-- - - .. +....+----+ -- -..---- +-. . +-.. . +--+- ........ +...- ..... +

1 113 90 .30 102 PCT 10 P2 VS4 .99 VS3 TEC .610 NBAZ1 51 C

157 90 .34 131 PCT 11 P2 VS1 .76 VS3 TEH .610 NBAZ1 24 H

48 91 .39 153 PCT 12 P2 VS3 .60 VS3 TEH .610 NBAZ1 2 H

102 91 .32 92 PCT 10 P2 VS3 .81 VS3 TEH .610 NBAZ1 19, H

110 91 .40 63 PCT 12 P2 VS3 .92 VS3 TEH .610 NBAZ1 20 H

118 91 .33 123 PCT 12 P2 VS4 -. 69 VS3 TEC .610 NBAZ1 50 C

134 91 .52 105 PCT 14 P2 11H 1.00 VS3 TEH .610 NBAZ1 20 H134 91 .63 80 PCT 13 P3 11H 1.31 .24 10H VS1 .580 ZPUFZ 53 H

45 92 1.35 126 PCT 26 P2 BW1 -. 85 VS3 TEH .610 NBAZ1 1 H45 92 1.52 98 PCT 24 P3 BW1 -. 85 .34 07H VS3 .580 ZPUFZ 56 H DOAI

49 92 .97 125 PCT 21 P2 BW1 -. 98 VS3 TEH .610 NBAZ1 1 H49 92 .85 110 PCT 15 P3 BW1 -. 90 .21 08H VS3 .580 ZPUFZ 56 H DOAI

103 92 .40 103 PCT 12 P2 VS3 .50 VS3 TEH .610 NBAZ1 20 H

105 92 .31 '58 PCT 10 P2 VS3 -. 53 VS3 TEH .610 NBAZ1 20 H

48 93 .31 137 PCT 10 P2 VS3 -. 88 VS3 TEH .610 NBAZ1 1 H

52 93 .33 99 PCT 11 P2 VS3 -. 69 VS3 TEH .610 NBAZ1 1 H

96 93 .33 135 PCT 10 P2 09H .65 VS3 TEH .610 NBAZ1 20 H

102 93 .33 55 PCT 10 P2 VS3 .68 VS3 TEH .610 NBAZ1 20 H

118 93 .35 58 PCT 11 P2 VS2 .50 VS3 TEH .610 NBAZ1 19 H

47 94 .52 137 PCT 15 P2 BW2 .80 VS3 TEC .610 NBAZ4 14 C47 94 .85 113 PCT. 16 P3 BW2 .90 .32 07C VS3 .580 ZPUFZ 70 C

91 94 .13 21 PCT 5 P2 BW1 .75 VS3 TEH .610 NBAZ1 19 H

46 95 .35 146 PCT 11 P2 08H 1.15 VS3 TEH .610 NBAZ1 4 H"46 95 .33 115 PCT 11 P2 BW1 -. 77 VS3 TEH .610 NBAZ1 4 H

94 95 .27 85 PCT 9 P2 10H .89 VS3 TEH .610 NBAZ1 19 H

I 118 95 .46 110 PCT 15 P2 VS4 -. 77 VS3 TEC .610 NBAZ1 50 C1 118 95 1.07 90 PCT 19 P3 VS4 -. 77 .44 VS4 VS4 .580 ZPUFZ 70 C DOAI

120 95 .73 106 PCT 17 P2 VS3 -. 78 VS3 TEH .610 NBAZ1 18 H120 95 .98 111 PCT 21 P2 VS3 .77 VS3 TEH .610 NBAZ1 18 H120 95 1.81 94 PCT 27 P3 VS3 -. 78 .47 VS3 VS3 .580 ZPUFZ 56 H120 95 1.65 83 PCT 25 P3 VS3 .87 .52 VS3 VS3 .580 ZPUFZ 56 H DOAI

134 95 .39 124 PCT 11 P2 1IH 1.00 VS3 TEH .610 NBAZ1 18 H

47 96 .34 119 PCT 11 P2 VS3 .51 VS3 TEH .610 NBAZ1 3 H I

49 96 .53 97 PCT 15 P2 BW1 -1.00 VS3 TEH .610 NBAZ1 1 H49 96 .36 50 PCT 13 P2 BW2 -. 84 VS3 TEC .610 NBAZ4 13 C49 96 1.13 95 PCT 19 P3 BW1 -. 93 .29 08H VS3 .580 ZPUFZ 56 H

48 97 .41 123 PCT 12 P2 VS3 -. 62 VS3 TEH .610 NBAZ1 3 H

78 97 .28 63 PCT 9 P2 VS2 -. 93 VS3 TEH .610 NBAZ1 20 H

1 92 97 .43 117 PCT 12 P2 10H .66 VS3 TEH .610 NBAZ1 20 H

49 98 .28 50 PCT 10 P2 BW1 .79 VS3 TEH .610 NBAZI 4 H49 98 1.36 111 PCT 26 P2 VS3 .68 VS3 TEH .610 NBAZ1 4 H

1 49 98 1.20 74 PCT 20 P3 VS3 .69 .26 VS3 VS3 .580 ZPUFZ 56 H DOAI

89 98 .23 75 PCT 8 P2 VS4 98 VS3 TEC .610 NBAZ1 41 C

103 98 .47 93 PCT 13 P2 VS3 .51 VS3 TEH .610 NBAZ1 19 H

94 99 .26 59 PCT 8 P2 VS2 -. 89 VS3 TEH .610 NBAZ1 19 H

98 99 .33 59 PCT 10 P2 VS2 -1.08 VS3 TEH .610 NBAZ1 19 H

87 100 .25 145 DSI P1 09H .76 VS3 TEH .610 NBAZ1 5 H

103 100 .26 108 PCT 8 P2 BW1 -. 84 VS3 TEH .610 NBAZ1 20- H

171 100 .29 134 PCT 9 P2 11H .73 VS3 TEH .610 NBAZI 18 H.. +..+.----------...... + ----+....+..+- -+- -+- --..----.. + ----..+ -. +-. .- +---+---....+-.....+

ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ . .+. . . . . . . .+. . . .+. . .----------. .....------ .... +. .... .. ... ... +.. .+.... . ...----- - + - + + + - +- .. . .+..- .. --.+. - - -... + -. . . .+

4 ST Max

Page 29: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

..-.-. .---------- -----+----+----+---- +----.. +- ----------- - ----+---------+ . .-----+ - -------+- -+ - -+- +--+---------- +---- - ------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21.. . - . .+. . ...-- . .+. . . . . .+. .------------.. .......----- - - + . .-- - + -....... +.... .....----.....-- +- ... - -+- ... .... +...- ..... +

52 101

144 101

49 10249 102

69 10269 102

79 10279 102

93 10293 102

159 102159 102

48 10348 10348 10348 103

98 103

102 103

170 103

47 10447 10447 10447 10447 104

49 10449 10449 104

55 10455 10455 10455 104

81 10481 10481 104

58 105

75 106

87 10687 106

89 106

103 106

119 106

54 107

96 107

170 107

47 10847 10847 10847 108

.49 92 PCT

.41 94 PCT

1.06 98 PCT1.92 95 PCT

1.04 100 PCT1.81 93 PCT

.79 129 PCT.89 86 PCT

.58 49 PCT1.24 84 PCT

.12 119 DSI

.56 81 PCT

.53 145 PCT1.10 103 PCT1.03 83 PCT2.25 85 PCT

.27 70 PCT

.42 101 PCT

.25 113 PCT

.39 126 PCT

.59 94 PCT

.46 96 PCT1.11 107 PCT

.74 108 PCT

1.24 105 PCT.54 88 PCT

1.95 89 PCT

.75 114 PCT

.45 85 PCT-.97 101 PCT.80 81 PCT

.85 .129 PCT

.82 82 PCT

.92 75 PCT

.33 99 PCT

.37 141 PCT

.27 135 DSI

.,74 81 PCT

.25 148 PCT

.25 105 PCT

.25 120 PCT

.28 144 PCT

.33 36 DSI

.31 98 PCT

1.98 111 PCT.66 92 PCT.31. 135 PCT

2.78 96 PCT

P2 VS3

P2 VS1

P2 BW1P3 BW1

P2 VS3P3 VS3

P2 09HP3 09H

P2 VS2P3 VS2

P1 11HP3 11H

P2 BO1P2 VS3P3 BW1P3 VS3

P2 VS3

P2 VS3

P2 11H

P2 BW1P2 VS3P2 BW2P3 VS3P3 BW2

P2 BW1P3 BW1P3 BW1

P2 BWIP2 Vs3P3 BW1P3 VS3

P2 09HP3 09HP3 09H

P2 BW1

P2 VS2

P1 09HP3 09H

P2 VS3

P2 VS3

P2 VS4

P2 VS3

P1 10H

P2 VS4

P2 BW1P2 BW1P2 VS3P3 BW1

- .46

-. 98

- .89- .64

-i.00- .80

.53

.76

.72

.59

.43

.46

.96-. 79

.95-. 68

.81

.79

.68

- .41- .77

.79- .77

.89

- .99- .82- .67

1.56.77

*1.81.94

.69

.73

.73

.71

.35

.85

.77

- .60

.56

- .58

- .57

.98

.64

- .87- .28

.62- .50

VS3 TEH

VS3 TEH

VS3 TEH.31 08H VS3

VS3 TEH.55 VS3 VS3

VS3 TEH.26 08H VS2

VS3 TEH.32 VS2 VS2

VS3 TEH.13 10H VS1

VS3 TEHVS3 TEH

.31 08H VS3

.42 08H VS3

VS3 TEC

VS3 TEC

VS3 TEH

V53 TEHVS3 TEHVS3 TEC

.59 07C VS3

.21 07C VS3

V53 TEH.21 08H VS3.34 08H VS3

VS3 TEHVS3 TEH

.24 08H VS3

.32 08H VS3

VS3 TEH.29 08H VS2.24 08H VS2

VS3 TEH

VS3 TEH

VS3 TEH.29 08H VS2

VS3 TEC

VS3 TEC

VS3 TEC

VS3 TEC

VS3 TEH

VS3 TEC

VS3 TEHVS3 TEHVS3 TEH

.50 07H VS3

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

..580 ZPUFZ

.610 NBAZ1

.580 ZPUFZ

.610 NBAZI

.580 ZPUFZ

.610 NBAZI

.580 ZPUFZ

.610 NBAZI

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZI1

.610 NBAZI

.610 NBAZ4

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.610 NBAZI

.610 NBAZ1

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ4

.610 NBAZI

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

"3 H

17 H

4 H53 H

19 H53 H

19 H53 H

20 H53 H

17 H53 H

4 H4 H

53 H53 H

19 C

19 C

18 H

3 H3 H

13 C70 C70 C

3 H53 H53 H

3 H3 H

53 N53 H

19 H53 H53 H

19 H

20 H

20 H53 H

20 C

20 C

31 C

14 C

20 N

39 C

3 H3 H3 H

53 H

DOAI

DAI

DQAI

I.

10

31171037

47 108 .92 107 PCT 18 P3 BW1 .05 .29 07H VS3 .580 ZPUFZ 53 H47 108 .98 *87 PCT 19 P3 VS3 .48 .50 07H VS3 .580 ZPUFZ 53 H

51 108 1.01 107 PCT 22 P2 BW1 -. 81 VS3 TEH .610 NBAZ1 3 H51 108 1.30 97 PCT 23 P3 BW1 -. 55 .37 08H VS3 .580 ZPUFZ 53' H DQAI

81 108 .66 131 PCT 17 P2 09H .88 VS3 TEH .610 NBAZI 19 H

97 108 .24 119 PCT 8 P2 09H .69 VS3 TEH .610 NBAZ1 19 H

47 110 .91 102 PCT 21 P2 VS3 .25 VS3 TEH .610 NBAZ1 3 H+ . .+ _'+. . .. . . .+. . ÷. . . .+.----------+.--. .. ...+-. .. ..--. .------ - - - -.. +..---- + . .- . .. . . .. ÷.. ..----- + - ++ --+.- - -.. +-... .... +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL2I+ . .+. . . . . . . .+. . . .+. . .----------..--.... .... ... ..-- -..- -.-- + .. . ... ...----.-- - ...---.- +- .... +--+.......--- -+--... .... +

5 ST Max

Page 30: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

÷ . . . .- .. . ..-- ..- ..-- . .- . . +. . ÷. .. . . +..-----------. ... +-. .. ..--.. . +.. . ... ..- -.----....- +- .... +--,-4-. ... .. ... - 4....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL2I÷ . . .. - . . ...- ÷..- +. .. ÷.. .÷- . .--. .--.. . .. . . .. . . . .. . . ÷. ..÷.----------------.. . .. ..- -... .. +.-- -......--.-- - .- + ... ....

1 47 110 1.87 91 PCT 29 P3 VS3 .52 .60 VS3 VS3 .580 ZPUFZ 53 H DQAII49 110 .35 96 PCT 11 P2 BW2 -. 86 VS3 TEC .610 NBAZ4 10 C

49 110 .47 105 PCT 14 P2 BW2 .68 VS3 TEC .610 NBAZ4 10 C

95 110 .38 101 PCT 12 P2 VS3 -. 47 VS3 TEC .610 NBAZ1 20 C

129 110 .48 75 PCT 13 P2 VS1 .79 VS3 TEH .610 NBAZ1 17 H

131 110 .15 110 NOI 3 VS3 14.97 VS3 TEC .610 NBAZ1 31 C131 110 .14 117 NQI 3 VS3 15.27 VS3 TEC .610 NBAZi 31 C131 110 .11 114 NOI 3 10C 24.60 VS3 TEC .610 NBAZ1 31 C131 110 .16 60 NOI 3 10C 24.78 VS3 TEC .610 NBAZ1 31 C

46 111 .58 104 PCT 15 P2 BW1 -. 80 VS3 TEH .610 NBAZ1 3 H46 111 1.05 101 PCT 20 P3 BW1 -. 53 .60 07H VS3 .580 ZPUFZ 53 H

56 111 .28 73 PCT 9 P2 VS3 -. 70 VS3 TEC .610 NBAZ1 16 C

90 111 .35 123 PCT 10 P2 09H .75 VS3 TEH .610 NBAZI 20 H

95 112 .26 47 PCT 10 P2 VS3 -. 47 VS3 TEC .610 NBAZ1 19 C

44 113 .25 92 PCT 9 P2 08H .20 VS3 TEH .610 NBAZ1 4 H44 113 .50 141 PCT 14 P2 BWl -. 91 VS3 TEH .610 NBAZ1 4 H

96 113 .42 53 PCT 12 P2 VS2 -. 85 VS3 TEH .610 NBAZ1 19 H

43 114 1.35 115 PCT 26 P2 BW1 -. 95 VS3 TEH .610 NBAZ1 3 H43 114 1.64 94 PCT 27 P3 BWl -. 64 .42 07H VS3 .580 ZPUFZ 53 H43 114 .50 82 PCT 11 P3 VS3 .62 .55 07H VS3 .580 ZPUFZ 53 H

47 114 .32 88 PCT 10 P2 VS3 .56 VS3 TEH .610 NBAZ1 3 H

67 114 .41 115 PCT 12 P2 09H .86 VS3 TEH .610 NBAZ1 20 H

1 113 114 .26 131 PCT 8 P2 VS2 .82 VS3 TEH .610 NBAZ1 17 H

131 114 .22 76 NOI 3 VS3 10.14 VS3 TEC .610 NBAZ1 31 C131 114 .18 74 NOI 3 10C 29.26 VS3 TEC .610 NBAZ1 31 C

42 115 .33 66 PCT 10 P2 BWl -. 77 VS3 TEH .610 NBAZ1 3 H

47 116 1.39 121 PCT 27 P2 BWl -1.07 VS3 TEH .610 NBAZI 4 H47 116 1.41 95 PCT 24 P3 BW1 -. 77 .47 07H VS3 .580 ZPUFZ 53 H

131 116 .07 74 NOI 3 VS3 14.63 VS3 TEC .610 NBAZI 32 C131 116 .12 87 NOI 3 VS3 18.48 VS3 TEC .610 NBAZI 32 C131 116 .15 59 NOI 3 IOC 22.79 VS3 TEC .610 NBAZI 32 C

155 116 .89 110 PCT 20 P2 VS1 -. 84 VS3 TEH .610 NBAZi 18 H155 116 1.83 91 PCT 29 P3 VS1 -. 72 .50 VS1 VS1 .580 ZPUFZ 53 H

167 116 .26 132 PCT 11 P2 BW2 -1.01 VS3 TEC .610 NBAZ1 38 C

40 117 .39 92 PCT 12 P2 BWl -. 88 VS3 TEH .610 NBAZI 4 H

44 117 .35 119 PCT 11 P2 BWl -. 90 VS3 TEH .610 NBAZ1 4 H

74 117 .24 53 PCT 10 P2 VS3 .67 VS3 TEC .610 'NBAZ1 15 C

96 117 .29 55 PCT 9 P2 09H .77 VS3 TEH .610 NBAZ1 19 H

166 117 .25 134 PCT 10 P2 BW2 -1.20 VS3 TEC .610 NBAZi 35 C

41 118 .40 132 PCT 12 P2 08H .81 VS3 TEH .610 NBAZ1 3 H

131 118 .16 68 NOI 3 10C 21.05 VS3 TEC .610 NBAZ1 31 C

96 119 .31 70 PCT 10 P2 10H 1.05 VS3 TEH .610 NBAZ1 14 H

45 120 .64 124 PCT 17 P2 BWl -1.08 VS3 TEH .610 NBAZl 4 H45 120 1.52 99 PCT 25 P3 BWl .-. 70 .29 07H VS3 .580 ZPUFZ 53 H

51 120 .24 86 PCT 8 P2 09H -1.05 VS3 TEH .610 NBAZl 4 H

36 121 .55 110 PCT 15 P2 BWl -. 91 VS3 TEH .610 NBAZ1 4 H36 121 1.29 102 PCT 23 P3 BWl -. 60 .58 07H VS3 .580 ZPUFZ 53 H

58 121 .25 62 PCT 10 P2 VS3 -. 58 VS3 TEC .610 NBAZl 15 C

66 121 .45 87 PCT 13 P2 09H .05 VS3 TEH .610 NBAZi 13 H

100 121 .58 110 PCT 16 P2 VS2 .71 VS3 TEH .610 NBAZ1 13 H+ . .. + ... + .. ... . . .. . .. + . .. + ... + .. +... .. .. +.. •. . ... + .. .. +... .. + ..-----------..-- - - - - + -...... 4- 4 - +-- +.. ...- - +- .. +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILl UTIL21+ . .+. . +. . . . .+.. .+. .-.. -. .+.----------+. ÷.. .. .. ÷.. .. . . . .. .. + .. +.---+- - - + -.------ . .---... +- ... --- .......-- - . +- ........

6 ST Max

Page 31: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

÷ . .+.. .+. . .. . . . . .÷.. .+. . +. . _• . . .----------.....-- - - - .- +-- . .. . .. +.. . ...---+ - +-+.. .- +---_- _ _-- ÷.. ...--- . +-... .... +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ . .. + ... + .. .. .. . .. + ... ÷ .. +... +.. .-----. . .. .-. .. .. + .. +.. . .----------+...--+ -.... +- -. ...--- ....-..-- - .+- ........ +

I 100 121 1.37 90 PCT 24 -P3 VS2 .79 .39 VS2 VS2 .580 ZPUFZ 53 H

I 35 122 .34 322 PCT 11 P2 05H .86 VS3 TEH .610 NBAZ1 3 HI 35 122 .45 104 PCT 13 P2 BW1 -. 97 VS3 TEH .610 NBAZ1 3 H

I 34 123 .31 80 PCT 10 P2 07H -. 96 VS3 TEH .610 NBAZI 3 H

168 123 .37 84 PCT 11 P2 VS1 .50 VS3 TEH .610 NBAZ1 15 H168 123 .59 121 PCT 18 +P2 BW2 -. 40 VS3 TEC .610 NBAZI 35 C168 123 1.06 104 PCT 18 P3 BW2 -. 62 .37 10C VS5 .580 ZPUFZ 71 C

69 124 .32 103 PCT 10 P2 VS3 -. 47 VS3 TEC .610 NBAZ1 16 C

38 125 .26 114 PCT 10 P2 VS3 -. 58 VS3 TEC .610 NBAZ4 9 C

48 125 .28 89 PCT 11 P2 VS3 -. 75 VS3 TEC .610 NBAZ4 9 C

90 125 .36 121 PCT 11 P2 09H .88 VS3 TEH .610 NBAZ1 13 H

120 125 .34 53 PCT 10 P2 VS2 .53 VS3 TEH .610 NBAZ1 15 H

31 126 .43 100 PCT 14 P2 DM2 .82 VS3 TEC .610 NBAZ4 9 C

69 126 *.42 129 PCT 12 P2 VS3 -. 43 VS3 TEC .610 NBAZI 16 C

24 127 1.18 101 PCT 24 P2 BW1 .98 VS3 TEH .610 NBAZ1 3 H24 127 1.61 96 PCT 26 P3 BW1 .99 .42 07H VS3 .580 ZPUFZ 53 H

1 163 128 .34 63 PCT 11 P2 BW2 -. 80 VS3 TEC .610 NBAZ1 36 C

165 128 .74 81 PCT 19 P2 BW2 .39 VS3 TEC .610 NBAZ1 36 C165 128 1.24 104 PCT 20 P3 BW2 .96 .39 10C VS5 .580 ZPUFZ 71 C

50 129 .35 121 PCT 11 P2 VS3 -. 66 VS3 TEH .610 NBAZ1 4 H

45 132 .44 126 PCT 13 P2" 08H .50 VS3 TEH .610 NBAZ1 4 H

65 132 .36' 123 PCT 11 P2 09H .83 VS3 TEH .610 NBAZ1 11 H

50 133 .76 118 PCT 19 P2 09H 1.00 VS3 TEH .610 NBAZ1 4 H50 133 .77 74 PCT '16 P3 09H 1.60 .26 08H VS3 .580 ZPUFZ 53 H

76 133 .31 137 PCT 10 P2 VS2 .74 VS3 TEH .610 NBAZI 11 H

1 107 134 .27 110 PCT 7 P2 09H .90 VS3 TEH .610 NBAZ1 12 H

50 135 .76 116 PCT 18 P2 09H 1.24 VS3 TEH .610 .NBAZ1 3 H50 135 .73 87 PCT 15 P3 09H 1.18 .26 08H VS3 .580 ZPUFZ 53 H DOAI

100 135 .26 34 PCT 7 P2 iCH .92 VS3 TEH .610 ,NBAZ1 12 H

117 136 " .43 124 PCT 12 P2 VS2 -. 50 VS3 TEH .610 NBAZ1 16 H

156 137 .17 137 DSI PI 08H .74 VS3 TEH .610 NBAZ1 15 H

67 138 ;25 63 PCT 7 P2 09H .60 VS3 TEH .610 NBAZ1 12 H

97 138 28.99 100 DTI P5 TSC -1.79 VS3 TEC .610 NBAZ1 20 C

111 138 .36 108 PCT 11 P2 1OH .67 VS3 TEH .610 NBAZ1 15 H

89 144 .30 130 PCT 10 P2 BW1 .87 VS3 TEH .610 NBAZ1 11 H

68 145 .52 137 PCT 14 P2 09H .67 VS3 TEH .610 NBAZI 11 H

103 146 .33 113 PCT 10 P2 10H .74 VS3 TEH .610 NBAZ1 12 H

107 146 .27 55 PCT 7 P2 VS2 -. 79 VS3 TEH .610 NBAZ1 12 H

134 147 .12 130 NQI- 3 VS3 11.16 VS3 TEC .610 NBAZ1 31 C134 147 .24 134 NOI 3 VS3 11.65 VS3 TEC .610 NBAZ1 31 C

152 147 .25 92 PCT 10 P2 03C .00 VS3 TEC .610 NBAZI 31 C

81 148 .21 144 PCT 7 P2. VS3 -1.29 VS3 TEH .610 NBAZ1. 11 H

134 149 .19 107 NOI 3 VS3 7.43 VS3 TEH .610 NBAZI 13 H

95 152 .29 36 PCT 9 P2 10H .67 VS3 TEH .610 NBAZ1 11 H

80 153 .32 116 PCT 10 P2 VS2 -. 63 VS3 TEH .610 NBAZ1 11 H

100 153 .24 127 PCT 8 P2 09H .84 VS3 TEH .610 NBAZ1 11 H

+ .. +. -----... + ......---- +....+--...+....+....+- ----- - - - - - +----...+. .. - --- + - .+-.. ... +--+-........+...- .. .+I ROW COL, VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ . . . . .. . . . . . .. .. .. . . . ..---------.. -.. ... ..-...-.-..----- -.-.---- + -- . .+.--- - .+- .. . +-- +.......-- - .+- ........ +

7 ST Max

Page 32: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:29:54

+ .. . . +.. . .. .+ .. ..- + ..-- . .- +.. .+ . .. .. . . .. .. +.. . ..+-----------.... ....-----+-- ...--.- + -...... +- ...... +- - - - -+ - --.. .. +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE , CAL L UTIL1 UTIL21------------------------------ -----------------------------------------+-+--+ - - + - .+ -----+ ----- - -+ - -+ - +--+---------- +-- ..... .+

102 153

110 153

89 154

78 155

71 156

87 156

142 157

117 160

118 161

93 164

84 165

S89 16689 166

I 89 16689 166

189 166

57 170

87 178

t. 189 172

56 17556 175

86 175

114 175

67 176

113 178113 178.

76 179

96 179

69 18069 180

81 180

.24 126 PCT

.37 129 PCT

.25 36 PCT

.24 127 PCT

.24 118 PCT

.22 141 PCT

.34 142. PCT

.29 141 PCT

.20 140 PCT

.39 142 PCT

.38 130 PCT

.59 113 PCT

.30 135 PCT1.17 90 PCT.51 82 PCT

.41 72 PCT

.34 121 PCT

.29 76 PCT

.47 109 PCT

.55 129 PCT1.24 99 PCT

.09 116 NOI

.35 127 PCT

.26 121 PCT

.41 133 PCT

.14 156 NQI

.26 124 PCT

.29 120 PCT

.89 110 PCT1.42 90 PCT

.14 138 DSI

8 P2 VS2 .83 VS3 TEH .610 NBAZ1 11 H

P2 06H

P2 VS3

P2 VS2

P2 VS2

P2 VS3

P2 11H

P2 VS3

P2 1OH

P2 VS2

P2 VS2

P2 VS3P2 VS3P3 VS3P3 VS3

P2 VS3

P2 09H

P2 VS3

P2 VS3

P2 BW1P3 BW1

3 VS3

P2 VS4

P2 VS3

P2, VS33 09C

P2 VS2

P2 VS2

P2 VS3P3 VS3

P1 09H

.79

-. 69

.70

.91

-. 76

.77

-. 73

1.04

.64

.54

-. 78.45

-. 87.71

-. 81

.94

-. 46

-. 67

-1.81-1.24

3.72

-. 61

-. 55

-. 5514.65

.60

.91

-. 65-. 83

.87

VS3 TEH

VS3 TEH

VS3 TEH

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEC

VS3 TEH

VS3 TEH

VS3 TEH

VS3 TEHVS3 TEH

.31 VS3 VS3

.29 VS3 VS3

VS3 TEH

VS3 TEH

VS3 TEC

VS3 TEC

VS3 TEH.37 08H VS3

VS3 TEC

VS3 TEC

VS3 TEC

VS3 TECVS3 TEC

VS3 TEH

VS3 TEH

VS3 TEC.31 VS3 VS3

VS3 TEH

.610 NBAZI

.610 NBAZI

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZI

.610 NBAZ1

.610 NBAZI

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.580 ZPUFZ

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.610 NBAZI

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.610 NBAZI

.610 NBAZ1

.610 NBAZ1

.610 NBAZ1

.580 ZPUFZ

.610 NBAZ1

13 H

12 H

10 H

11 H

11 C

13 H

24 C

13 H

9 H

9 H

10 H10 H53 H53 H

13 H

10 H

7 C

8 C

10 H53 H

8 C

7 C

8 C

7 C7 C

10 H

10 H

4 C53 H

9 H

DOA

DOA

8

9,

2024

97 180 .35 84 PCT 11 P2 VS3. -. 60 VS3 TEC .610 NBAZ1 4 C

72 181 .24 135 PCT 9 P2 VS3 .85 VS3 TEC .610 NBAZ1 3 C

84 183 .26 112 PCT 8 P2 VS3 .51 VS3 TEC .610 NBAZ1 4 C

102 183 .41 101 PCT 14 P2 VS3 -. 60 VS3 TEC .610 NBAZI 3 C

86 187 .33 100 PCT 11 P2 VS4 .58 VS3 TEC .610 NBAZ1 2 C

55 188 .12 118 DSI P1 09H .85 VS3 TEH .610 NBAZ1 7 H

81 188 .24 137 DSI P1 09H .21 VS3 TEH .610 NBAZ1 7 H

78 189 .28 119 PCT 11 P2 VS3 -. 32 VS3 TEC .610 NBAZ1 1 C

50 191 .19 37 NOI 3 05C 22.81 VS3 TEC .610 NBAZ1 2 C+ . .+.. .+. . .. . . . . .+ . .+. .. ÷. .-----------.....--- ...+ ... .. . +... ... + ... +. .. . ... ..-- - - --- _+- ...... +_ .....-- .- .. +- ...... .+

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21+ . .+. . . . . . . .÷. . . .+. . .----------. . .. ... ..----..----- - -. .-- - +- .. +... ... .. ... ..----...--..-.-.--. -+ ..... --- +-+........

Tubes: 277 Records: 385ST Max8

Page 33: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

APPENDIX D

PLI & PLP

DATA SHEETS

Page 34: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:41:20

-----------------------------------+-----+-----+-----+------+---+---+ ----- +-----+- + - + - +--+ --- +--+---

I ROW COL VOLTS DEG IND PER CHN LOCN INCHi INCH2 CRIEN BEGT ENOT POXA PTYPE CAL L UTILl UTIL2I---------------------------+--------+-----+-----+-----+------+---+---+ ----- +-----+- + - + - + ---- +-+----

--------------------------- +----+-----+-----+-----+-----+----+---+ ----- +-----+- + - + - +--+ --- +-+----

I ROW COL VOLTS. DEG IND PER CHN LOCN INCHi INCH2 CRLEN BEOT ENOT POTA PTYPE CAL L UTILl UTIL2I----------------------------+---------+----+-----+-----+-----+----+---+ ----- +-----+ - - --+ ---- +-+----

Tubes: 0 Records: 01 ST Mas

Page 35: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:39:31

-----------------------------------+-----+-----+-----+-----+----+---+ ----- +-----+- + - + - +--+ --- +-+----

I RaW COL VOLTS DEG IND PER CHN LOCN INCHi INCH2 CRLEN BEGT ENOT P.IA PTYPE CAL L UTIL. UTIL21153 64 1. 84PLP8FDP 1.0FDPFDP .60 PA----------H 69-C-- ---------- --- -

I 153 64 10.55 84 PIP 8 FOP 1.20 FOP FOP .600 ZPAHZ 69 C HRI

I 154 65 14.97 89 PLP 8 FDP .99 FOP FOP .600 ZPAHZ 69 C HRjI I.I 156 65 15.48 84 PLP 8 FOP .99 FOP FOP .600 ZPAHZ 69 C HRI

----- ----- ----- ----------------+--------+-----+------+---+---+---------+-----+* - + - + - +-- ---. 4-+----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21÷ . . . .. .. . . . _ _L .. .. . . ÷..----------+---...--.. ..--+.. ...---..-- -..-- +..----+ -- . ..--- +-. .. +- .. +--+ ... ...--- +-- .. .. .+

1Tubes: 3 Records: 3

ST Max

Page 36: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

APPENDIX E

PLUG MAPS and LISTS

Page 37: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 Tubes Plugged in U3R16

PaloVerde U3R16 PVNGS33RSG* 53 Stay Rod

* 60 Plugged Tube

* 6 Tube Plugged in U3R16

5 16 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 138 135 140 145 158 155 168 165 170 175 180 185 198 195 200170

165

160

155

150

145

140

135

130

125

120

115

110

105

18

95

90

85

80

75

78

65

60

55

50

45

40

35

30

25

20

15

1A

5

10 15 26 25 39 35 40 45 59 55 60 65 70 75 80 85 90 95 109 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 290... .... .... ....-- --- -L I I I -- t- ý 1- -- I t - * I I -ý- , I I - - - I -ý- I -.-T T............I ................... .... .... .... .... .... ...... -- ----- -

. . . . . . . . . . . . . . . . . ---- --------- -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

.... .... .... .... . .... . . .. .... .... .... .. .. .... . . ..... .....T -- -----------.... ... ... ....... .... .. .... ............... ........ .. .... ........... ........... .... .... ........................ .... ...... .... ..... ................ .. ................. ...... ......... .... .... ......... .... .... .... .... .... .... .................. .................. . .................. .. ........................ .... ...............

................ ............ .................. ................ ............. .. ....e-- ....... ... .. ............... ......... ...... .............................................. ............ ............................... .. ........................ ........ ......... .... .............. ...........

......... ......... ... .....-4%.*.....'............' ' , . -: .......... .. .... ...........: :. . . . . . . . . . . . . . . . . . . . .

- -+ -t . . . . . . . . . . . .

T

:4i-

... .. .... .... .. ..... ............... ...... ... .... .... .... .... .... .... ........................ ................... .......... ............................................. . ...... ....................................... ................... .................. ... ...... ........... .... .... .... .... .... .... .... .... .... .... .... .... .... ....... ..............I ............ ........ .................. ....... ............................................... .. ......... .... .... .....

170

165

160

155

150

145

140

135

130

125

120

115

118

185

180

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

18

5

5 19 15 28 25 30 35 40 45 50 55 60 65 70 75 85 90 95 100 1905 118 115 120 125 130 135 149 145 150 155 169 165 170 175 180 185 190 195 200

W..Ibngtvo..s E~dnc Com~pany LLC - ST Max~ 04102r2012 10:10:09

Page 38: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 31 ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:49:23

+.. .. +.... ... ÷..+.. .. +--------------...---+---.....+.....+.......+..----------+ .----- +- +-+..÷. .-- +- ....... + ...---. +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT" PDIA PTYPE CAL L UTILI UTIL21+.. .. +.....÷..+.. ... +.. -------------...................------.----.......... +----+.....-.+.....-.+.....-.+--+-... .+..---. +

1 126 51 .42 84 PCT 15. P2 VS3 -. 40 VS3 TEC .610 NBAZ3 39 C1 126 51 2.17 99 PCT 35 P2 VS3 1.08 VS3 TEC .610 NBAZ3 39 C

126 51 PBC VS3 TEH .610 NBAZ1 43 H126 51 TBP VS3 TEH .610 NBAZ1 64 H126 51 PID P2 VS3 1.08 VS3 TEH .610 NBAZ1 64 ýH126 51 1.10 99 PCT 20 P3 VS3 -. 65 .20 VS3 VS3 .580 ZPUFZ 69 H DOQA126 51 1.94 90 PCT 30 P3 VS3 1.27 .29 VS3 VS3 .580 ZPUFZ 69 H

44 89 1.55 102 PCT 30 P2 VS3 -. 65 VS3 TEC .610 NBAZ3 1 C44 89 .51 92 PCT 16 P2 BW2 -. 69 VS3 TEC .610 NBAZ3 1 C44 89 PBC VS3 TEH .610 NBAZ1 3 H44 89 TBP VS3 TEH .610 NBAZ1 64 H44 89 PID P2 VS3 -. 65 VS3 TEH .610 NBAZI 64 H44 89 1.87 99 PCT 28 P3 VS3 -. 71 .56 07C VS3 .580 ZPUFZ 74 C DQAl44 89 .68 133 PCT 13 P3 BW2 -. 98 .22 07C VS3 .580 ZPUFZ 74 C

48 103 PBC VS3 TEH .610 NBAZI 4 H48 103 .14 70 PCT 7 P2 09H -1.42 VS3 TEH .610 NBAZ1 4 H48 103 2.40 103 PCT 38 P2 VS3 .62 VS3 TEC .610 NBAZ3 6 C48 103 .48 82 PCT 14 P2 BW2 .71 VS3 TEC .610 NBAZ3 6 C48 103. TBP VS3 TEH .610 NBAZI 66 H48 103' PID P2 VS3 .62 VS3 TEH .610 NBAZ1 66 H48 10.3 2.24 100 PCT 32 P3 VS3 .95 .23 VS3 VS3 -.580 ZPUFZ 69 H

48 109 PBC VS3 TEH .610 NBAZi" 3 H48 109 2.55 101 PCT 38 P2 VS3 .73 VS3 TEC .610 NBAZ3 5 C48 109 TBP VS3 TEH .610 NBAZ1 66 H48 109 PID P2 VS3 .73 VS3 TEH .610 NBAZ1 66 H48 109 2.51 91 PCT 35 P3 VS3 .81 .32 VS3 VS3 .580 ZPUFZ 69 H

44 113 NDD VS3 TEC .610 NBAZ3 5 C44 113 .94 128 PCT 26 P2 BW1 -. 80 VS3 TEH .610 NBAZ1 6 H44 113 TBP VS3 TEH .610 NBAZ1 66 H44 113 PID P2 BWl -. 80 VS3 TEH .610 NBAZI 66 H44 113 2.01 105 PCT 30 P3 BWl -. 77 .54 07H VS3 .580 ZPUFZ 69 H

99 172 .51 123 PCT 16 P2 VS2 -. 98 VS3 TEH .610 NBAZ1 13 H99 172 1.77 109 PCT 33 P2 VS3 -. 90 VS3 TEH .610 NBAZI 13 H99 172 PBC VS3 TEC .610 NBAZ1 55 C99 172 TBP VS3 TEH .610 NBAZ1 66 H99 172 PID P2 VS3 -. 90 * VS3 TEH .610 NBAZi 66 H99 172 RBD P3 VS2 .87 VS2 VS2 .580 ZPUFZ 68 H QETI99 172 RBD P3 VS3 .00 VS3 VS3 .580 ZPUFZ 68 H OETI99 172 1.23 94 PCT 20 P3 VS2 -1.04 .36 VS2 VS2 .580 ZPUFZ 70 H99 172 2.52 94 PCT 33 P3 VS3 -1.11 .46 VS3 VS3 .580 ZPUFZ 70 H

÷.. .. ..... ÷..÷.. .------------- ...-..----.----+-.+- --- ...... + ..... +_+---+...÷------......+- ...... + ----.--.---..--.I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 CRLENBEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL21

+ .... ÷-------------+...+...+....+.. ----++--........+ ---. + - ----.----....... +-......+...-----+ -. +----...+

Tubes: 6 Records: 40ST Max

Page 39: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

SG - 32 Tubes Plugged in U3R16

Palo Verde U3R16 PVNGS3 3RSG* 53 Stay Rod

a 68 Plugged Tube

0 6 Tube Plugged in U3R16

5170

165

160

155

150

145

140

135

130

125

120

115

110

105

lee

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200

4 ._ ... .. ..1. ... .. ~

...................................... .... .... . .... ........• .. . ., . . . . . . . . . . . . . o , . , • . ° . . .. .• , . ., . . . ., . . . .. . .•

!:. ... .{ : .....t. ...

• .,. . , . .,. . o. . . . . . o o o . , . . ,. . .,. . .. o , . .,. . ., o . ., . . , . ., . .., . ., • , . .,.:. :. .. .:. . .- .! . .:.. .. .:. .: . .. ..: .:. :. .. .:.. .! ..: ..: :.: .. ... .! .-- - - - .-- ! .: :- -. :. . : . :. .. .: :-. .- - - -.- :--. ...: . ....i .i 1 . o .. • • . i. . . . . . . . . . . . .. . .. . .1 . . . .o . . . . . . . ... • . . . . . . . . .. . . . . .° . . . .° . . . .- .

. .. .. . . .. .. . .° . .. ., . . . . . . . .. .. . ., . . . . . . . .. .. . ° . . .. o . . . . . . . . . . . . .. .. . ,. . . . .,. . .,

• '.t " ' " ".1. ."l' . ". " •° . . 1" .I ".' ' " t " 1, " ' . ."1" " .. 1 1". •. ." '• ". ." 1" .1. '. .. . ... I". 1' .. .I *-1". . ' " " " I. . * "1" ." . I. " " " ." .I. '." -" ."

: :. .:. I: : : :I : t . I ~ . . I .t. . I . 1- "t l . ' ':' ~ t " I ~ " I: t" " t • I " ! . ...1 i 1.'. . .. . . I. '. t. '. '. ...

.'.'. '' ' ''' '<.' ' ' ."

1' T

170

165

160

155

150

145

140

135

130

125

120

115

110

105

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

9 .- , i , .- -I -- 4 -s- -i-~ + + -i + - + - - f. -

. . . . . . | - -i- - T - .i- . r : -i- - l -I 7 -

j ~sj LY I +i+4i-t+ I ~4+d5; I H

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200

Wesbnghouse Electjic Company LLC - ST Max 04/0212012 10:24:49

Page 40: Palo Verde, Unit 3 - Steam Generator Tube Inspection Report. · remotely operated camera and retrieval tooling. The applicable requirements of Revision 3 of the EPRI Steam Generator

,WG - 3e- ST Max

Palo Verde 3 U3R16 PVNGS3 20120301 04/08/2012 08:50:13

---------------------------------+----------+-----+-----+----+---+---+ ----- +-----+- + - + - --- ,--+-----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTILI UTIL21÷ .. +.. .... .. +.. .. ÷..-------------+--...-.....- ..... -.... +------ -.- -..-.----.-.--.-. +-....+..-+--+-+....... --- +

1 128 55 PBC VS3 TEH .610 NBAZ1 38 H128 55 1.82 105 PCT 30 P2 VS2 1.07 VS3 TEH .610 NBAZ1 *38 H128 55ý 1.57 113 PCT 30 P2 VS3 .82 VS3 TEC .610 NBAZ1 44 C128 55 TBP VS3 TEH .610 NBAZ1 49 H128 55 PID P2 VS3 .82 VS3 TEH .610 NBAZ1 49 H128 55 1.79 86 PCT 27 P3 VS2 .89 .49 VS2 VS2 .580 ZPUFZ 56 H128 55 1.64 84 PCT 25 P3 VS3 .82 .29 VS3 VS3 .580 ZPUFZ 56 H . DOA

45 92 1.35 126 PCT 26 P2 BW1 -. 85 VS3 TEH .610 NBAZ1 1 H45 92 NDD VS3 TEC .610 NBAZ4 13 C45 92 TBP VS3 TEH .610 NBAZ1 49 H45 92 PID P2 BW1 -. 86 VS3 TEH .610 NBAZ1 49 H45 92 1.52 98 PCT 24 P3 BW1 -. 85 .34 07H VS3 .580 ZPUFZ 56 H DQAI

49 98 .28 50 PCT 10 P2 BW1 .79 VS3 TEH .610 NBAZ1 4 H49 98 1.36 111 PCT 26 P2 VS3 .68 VS3 TEH .610 NBAZ1 4 H49 98 PBC VS3 TEC .610 NBAZ4 14 C49 98 TBP VS3 TEH .610 NBAZ1 49 H49 98 PID P2 VS3 .68 VS3 TEH .610 NBAZ1 .49 H49 98 1.20 74 PCT 20 P3 VS3 .69 .26 VS3 V53 .580 ZPUFZ 56 H DQAI

47 108 1.98 111 PCT 31 P2 BW1 -. 87 VS3 TEH .610 NBAZ1 3 H47 108 .66 92 PCT 17 P2 BW1 -. 28 VS3 TEH .610 NBAZ1 3 H47 108 .31 135 PCT 10 P2 VS3 .62 VS3 TEH .610 NBAZ1 3 H47 108 NOD VS3 TEC .610 NBAZ4 14 C47 108 TBP VS3 TEH .610 NBAZ1 49 H47 108 PID P2 aW1 -. 87 VS3 TEH .610 NBAZI 49 H47 108 2.78 96 PCT 37 P3 BW1 -. 50 .50 07H VS3 .580 ZPUFZ 53 H47 108 .92 107 PCT 18 P3 BW1 .05 .29 07H VS3 .580 ZPUFZ 53 H47 108 .98 87 PCT 19 P3 VS3 .48 .50 07H VS3 .580 ZPUFZ 53 H

43 114 1.35 115 PCT 26 P2 aWl -. 95 VS3 TEH .610 NBAZ1 3 H43 114 NOD VS3 TEC .610 NBAZ4 10 C43 114 TBP VS3 TEH .610 NBAZ1 49 H43 114 PID P2 BW1 -. 95 VS3 TEH .610 NBAZ1 49 H43 114 1.64 94 PCT 27 P3 BWl -. 64 .42 07H VS3 .580 ZPUFZ 53 H

1 43 114 .50 82 PCT 11 P3 VS3 .62 .55 07H VS3 .580 ZPUFZ 53 H

1 47 116 1.39 121 PCT 27 P2 BWl -1.07 VS3 TEH .610 NBAZ1 4 H47 116 NOD VS3 TEC .610 NBAZ4 10 C47 116 TBP VS3 TEH .610 NBAZ1 49 H47 116 PID P2 BW1 -1.07 V53 TEH .610 NBAZ1 49 H47 116 1.41 95 PCT 24 P3 BW1 -. 77 .47 07H VS3 .580 ZPUFZ 53 H

S. .. +_- __- .. . ..--. .-. . . . . . .----------.--..... ...-+....------ -.... + -. . -----. + .. . .. . ----. .. .+-. .+.-+--+- ........ + ..... __+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 CRLEN BEGT ENDT PDIA PTYPE CAL L UTIL1 UTIL2I+.. .. .... . .. .. ..-------------....-....----+---- ..--- +......+.....+.. ...........-------- +-......+--+-...... -+........+

Tubes: 6 Records: 38ST Max