Page 1 of Page 1 of 30 - United States Environmental ... · Page 9 of 30 Mandatory Linking • Add...
Transcript of Page 1 of Page 1 of 30 - United States Environmental ... · Page 9 of 30 Mandatory Linking • Add...
Page 1 of 30
Page 1 of __
Page 2 of 30
Permit SeriesPermit Series
• “Series Only” data entry no longer needed -- large facilities accommodated in V4.
• Series Name now 40 characters (was 12 characters)
• Deleted Fields: EPA Staff Attorney and related fields
• State and EPA Responsible Person fields combined into 1 Responsible Person field-- will be populated from existing EPA / State Responsible Person fields based on Permit Series IOR.
Page 3 of 30
Permit EventsPermit Events
• Deletion of many HQ Permit Event Codes:
• Appendix A-2: Permit Event Codes Deactivated In V4
• Appendix A-4: Permit Event Codes Added For V4
• Appendix A-5: Active Permit Event Codes For V4
• States / Regions can now “not display” specific event codes for permitting and corrective action events.
Page 4 of 30
Permit EventsPermit Events
• Category field added to the Permit Event Lookup Table (Appendix A-5). Category lookup values are:
CLC Closure/Post Closure -- ClosureCLP Closure/Post Closure -- Post Closure PlanEPG Emergency Permit -- GeneralOPG Operating Permit -- GeneralOPC Operating Permit -- CombustionOPW Operating Permit -- Waivers/WithdrawalsOPM Operating Permit -- ModificationsPCG Post Closure -- GeneralPCW Post Closure -- Waivers/WithdrawalsPCM Post Closure -- ModificationsPCA Post Closure -- Alternative AuthorityRDG RD&D Permits -- GeneralRDW RD&D Permits -- WithdrawalsRDM RD&D Permits -- ModificationsIDG Implementer -- Defined General
Page 5 of 30
Permit EventsPermit Events
• IDG => default category for implementer-defined codes during conversion. Users can change this category after implementation.
• Permit Event Code resides in only one category. To find an event, all events can be viewed.
Page 6 of 30
Event CodesEvent Codes
• MO/MP codes converted to OP/PC codes
• PC300-414 added post-closure track.
• PCA-PAA proposed event codes, US-OP020RN and HQ-PC300, implemented in V3 for immediate use.
• No more permutations of HQ-defined codes. e.g. an implementer cannot create an OP200 with any other status.
• Appendix A-3: Permit Event Codes V4 Conversion Crosswalk
Page 7 of 30
Event CodesEvent Codes• Data Entry for Multiple Events:
• streamlined, redesigned data entry screens
• Enter multiple events related to same series, units and unit detail info.
• Pre-Populating Unit Detail Links:
• add event(s) to existing series,
• unit detail links pre-populated with same linked units as most recent event. Save or modify links.
• Permit Units Name: increased to 40 characters.
Page 8 of 30
PERMIT UNIT DETAILS
• Mandatory Commercial Status field in PUNIT_DETAIL table.
– Default value = 0 (Does not accept waste from offsite generators).
– Values 1, 2, and 3 as currently defined.
• Add a new unit with Legal Status IS, comment required to justify IS designation.
Page 9 of 30
Mandatory Linking
• Add Unit/Unit Details through series/event --no longer through Unit/Unit Detail menu
• Link each unit detail to 1 or more events --editing orphan unit or detail record requires linking to event.
• Maintain unit detail history -- must enter NEW unit detail record to change LE/OP status.
• New audit table -- capture deleted unit detail info: handler id, unit sequence, unit detail sequence, LE/OP status, user id, deletion date, and reason for deletion.
Page 10 of 30
Legal/Operating Status Code Lookup Table Maintenance
• Deactivated LE/OP status code combinations.
• Existing unit detail records with combinations not affected -- new unit details with combinations not allowed.
• Matrix shows deactivated LE/OP status code combinations.
Page 11 of 30
DEACTIVATION CODE MATIX
Operating Status Codes OP CN UC BC IN CC CP CO DC CV CR AB SF PF CA PI √ √ PC √ √ √ √ √ √ √ PT √ PR √ √ √ √ √ √ √ √ √ IS √ LI √ IT √ TA √ √ √ √ √ PM √ LP √ NN √ √ √ RQ √ √ √ √ √ √ √ √ √ √ √ NR √ √ √ √ √ √ √ √ √ √ √ DL √ √ √ √ √ √ √ RD √ √ √ RU EM √ √ √ √
Legal Status Codes
SR
Page 12 of 30
Deactivated LE/OP Status Codes
• Report: Current Unit Detail Records with Legal/Operating Status Codes that will be Deactivated under News Alerts and General Information > RCRAInfo Documentation > Version 4 > Appendix A-7.pdf.
• PC/CC (in report) now listed Strange-But-True.
• Strange-But-True combinations in lookup-table. Selection of Strange-But-True combination generates warning message, user comments required to document valid usage.
Page 13 of 30
e-Permitting / Standardized Permit
• e-Permitting initiative (standardized permits) implemented
• draft Standardized Permit available under News Alerts and General Information > RCRAInfo Documentation > Version 4 > RCRA Model Standardized Permit-Draft.
• Standardized Permits identified as flag in Unit Detail record.
Page 14 of 30
Waste Codes -- Part A Form
• V4 accommodates capture of waste codes associated with Permit Unit Details.
• Determine approval of waste codes from Legal/Operating Status in Permit Unit Detail.
• Determine Estimated Quantity and Unit of Measure data from Capacity and Process Code UOM fields.
• Copy waste code info from previous Unit Detail when add new Permit Unit Detail (determined using the effective date).
Page 15 of 30
Permit Schedule Event Trigger Report: lists initial permit event along side future schedule event & notes where expected future schedule event has not been entered.
Report Name /Description
Future Schedule Triggers implemented through a data quality report which identifies data meeting the trigger requirements.
Method of Implementation
To specify a timeline for next anticipated submittal or permitting event; activated following entry of an event reflecting approval of a submittal.
Purpose
Future Schedule Trigger
Page 16 of 30
Permit Progress and Data Gaps Report, shows progress of individual facilities by indicating the presence or absence of nationally required operating / closure / post-closure track events based on the permit progress universe
Report Name /Description
Data Gap Triggers implemented through data quality report which identifies data meeting the trigger requirements.
Method of Implementation
Applies to nationally required event codes & assists the user in identifying potential gaps in data.
Purpose
Data Gap Triggers
Page 17 of 30
Event - Legal & Operating Status Report shows units with legal-operating status codes which do not agree with linked trigger events.
Legal and Operating Status - Event Report identifies process units where the current legal/operating status may not be supported by a related permit event linked to the unit.
Report Name /Description
Status Triggers implemented with a data quality report; a second report evaluates LE/OP status codes which may signify a change in event.
Method of Implementation
Activated by specific event which may signify change in the legal status and/or operating status for the regulated unit.
Purpose
Status Triggers
Page 18 of 30
General Triggers – Permittinganyone used these?
prompts user to change operating status to SF for a regulated unit with a linked CA210SF event code.
update unit capacity to “permitted capacity”when the facility/unit is permitted, as indicated by OP200 or PI legal status code.
Purpose
Pop-up window appears reminding the user to create a new unit detail with SF Operating Status.
SF
. Pop-up window reminds user -- capacity type should be “Permitted Capacity” if the capacity specified is not “Permitted” or blank.
Capacity
Method of Implementation
GeneralTrigger
Page 19 of 30
UNIVERSE CALCULATIONS
Closure Workload Universe in V4• Excludes Solid Waste Management Units
(SWMUs) with zero capacity and LE/OP status PICA (Permitted / Referred to Corrective Action for Closure).
• Captures any facility with closing units; included up to verification of closure certification. Does not include facilities which completed and verified closure or post-closure facilities.
Page 20 of 30
UNIVERSE CALCULATIONS
Post-closure Workload Universe In V4
• Excludes Solid Waste Management Units (SWM) with zero capacity and LE/OP status PICA (Permitted / Referred to Corrective Action for Closure).
• Captures facilities with closing land disposal units and storage units closing as landfills.
Page 21 of 30
Tracking Permit Commitments and Initiatives
• V3 introduced tracking of CM&E commitments and initiatives.
• V4 allows tracking commitments and initiatives in new permitting table: LN_EVENT_COMMITMENT3, facilitates linking commitments and initiatives to accomplishments (permit events).
Page 22 of 30
MODIFICATIONS TO EXISTING REPORTS
V4 COMPREHENSIVE PERMITTING REPORT
• Now 3 sorts/formats.
– Series, Unit, and Events (existing national report)
– Series, Event, and
– Unit Detail By Unit, Unit Detail, Events
• Selection criteria allows selection of standardized report criteria and specific data fields, for example:
– current unit detail or all unit detail,
– inclusion of unit waste codes, and
– inclusion of notes or not.
Page 23 of 30
MODIFICATIONS TO EXISTING REPORTS
PROCESS REPORT in V4
• Expanded to display process info with unit commercial status and associated waste codes.
• Users can: 1) select multiple process codes, 2) select legal/operating status codes, 3) select pre-defined unit grouping for land-based units,
combustion, BIFs, storage, and treatment units,4) select current unit detail records only, and 5) print waste codes
Page 24 of 30
New Report: Event - Legal & Operating Status Report
• Data Quality Report
• Current unit detail information inconsistent with events linked to the unit -- LE/OP status codes which do not agree with linked trigger events,
• For example, tracked trigger events with expected LE/OP status codes:
ITOP, ITIN, ITCC, or ITCP PIBC or PIOP
OP200PD OP200 (not PD) or OP205
Expected Legal/Operating Status Trigger Event
Page 25 of 30
New Report: Legal & Operating Status - Event Report
• Data Quality Report
• Process units with current LE/OP status not supported by linked permit event.
• For example, tracked trigger LE/OP status codes with expected events:
OP200PD ITIN, ITCC, ITCP Trigger Event(s) Legal / Operating Status
Page 26 of 30
New Report: Permit Progress and Data Gaps Report
• Data Quality Report
• Implements PCA PAA data gap trigger recommendations
• Individual facility progress indicated by occurrence / non-occurrence of nationally required events based on permit progress universe.
Page 27 of 30
New Report: Permit Schedule Event Trigger Report
• Data Quality Report
• Reviews projected events for unit groups when linked events indicate specific track like permit issuance, clean closure, or post-closure.
• Lists initial event and associated future schedule event, notes absence of expected future schedule event.
Page 28 of 30
New Report: Interim Status Verification Report
• Data quality report for Interim Status facilities.
• Displays permit units meeting one of listed criteria.
• Each unit listed with criteria it meets.
• If unit meets > 1, only the first criteria is shown.
1. Interim status units with effective dates prior to November 1980,
2. Units where interim status not earliest legal status, or
3. Units where current legal status is interim status.
Page 29 of 30
New Report: WASTE CODE MANAGEMENT REPORT
• Reports facility units (in permit workload or operating TSDF universes) managing specified waste codes.
• Selection criteria allow standardized report selection criteria and specific criteria, like: location zip code, legal status, and operating status.
Page 30 of 30
PC260 PC270PTCO
PC200 (excluding PD status) or PC205 PCCP
OP260 or OP270 PTCC
OP200 (excluding PD status) or OP205 PIBC, PIOP
OP200PD ITIN, ITCC, ITCP EP200PI EMOP, EMCC Trigger Event(s)
Legal / Operating Status
Legal and Operating Status - Event Report
OP200PD ITIN, ITCC, ITCP