PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review...

28
Integration and Testing 1 PACS IIDR ESTEC 01/02 March 2001 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing

description

PACS IIDR ESTEC 01/02 March 2001 Integration and Testing3 Test Level: Component Tests at MPE Ge:Ga Detector Module

Transcript of PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review...

Page 1: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 1

PACS IIDR ESTEC 01/02 March 2001

PACS Instrument Intermediate Design Review (IIDR)

Reinhard Katterloher

Integration and Testing

Page 2: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 2

PACS IIDR ESTEC 01/02 March 2001

AIV and Testing• The Test Plan describes the baseline for the

activities required for all tests under MPE responsibility including the test facilities

• Dedicated DV Plans covering all AIV activities incl. test reports are issued and enforced by the manufacturers of items deliverable to MPE

• In the following, Test Sequences combined with AIV/Test Schedules are shown to illustrate those activities, where the main effort is spent and which require most of the available test time

Page 3: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 3

PACS IIDR ESTEC 01/02 March 2001

Test Level: Component Tests at MPE

Ge:Ga Detector Module

Page 4: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 4

PACS IIDR ESTEC 01/02 March 2001QM Detector Module #8 Design Verification

(Environmental Testing)

QM4 moduleassem bly with

EM FEEat ANTEC

therm al cycle test(25 cryo cycles)

integration with FUB

shakerproofcryostat

cryo vibration(qualif. levels)

remove fromFUB cryostat

functional/continuity check

removeEM FEE

shipmentto ANTEC

delivery to MPEfor tests

at LENS/PSI

\m soffice \grafiken \testp lan\designverif.cdr

assem blywith QM FEE

functional/continuity

check

shipmentto MPE

Page 5: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 5

PACS IIDR ESTEC 01/02 March 2001QM Detector Module #8 Design Verification

(Environmental Testing)

Page 6: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 6

PACS IIDR ESTEC 01/02 March 2001QM Detector Module #8 Spectral Calibration

and Glitch Investigation

QM4 module with QM-FEE,

integration with OGSE2

performance checkwith MPE set-up #2

integrationwith OGSE4

spectral calibrationwith TUFIR

integration with

PSI test facility

100 MeVproton irradiation(glitch investig.)

shipmentto MPE

QM arrayassemblyat ANTEC

\m soffice \gra fiken\testp lan\LE NS P SI.cdr

removeQM4 modulefrom cryostat

shipmentto LENS

shipmentto PSI

shipmentto ANTEC

Page 7: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 7

PACS IIDR ESTEC 01/02 March 2001Readout and Control Scheme

for Detector Module Testing

PC

ADC64 BOARD

4 ADC16 Bit / 200 kHz

8 : 1 MUX8 : 1 MUX8 : 1 MUX8 : 1 MUX

DIO

PATTERNGENERATOR

DIGITALCONTROL

DAC BOARD

16 DAC / 16 Bit

GPIB BOARD

CRYOGENICTEST SETUP

BLACK BODYCONTROL

HOUSEKEEPINGDATA

DATA ARCHIVE

RS 232

SIGNALCONDITIONING

SHUTTERCONTROL

CRE

DETECTOR

SUPPLYVOLTAGES

DETECTOR SIGNALS

PC

Page 8: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 8

PACS IIDR ESTEC 01/02 March 2001QM Detector Module #8 Spectral Calibration

and Glitch Investigation

Page 9: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 9

PACS IIDR ESTEC 01/02 March 2001

Test Level: Subsystem Tests at MPE/MPIA

Ge:Ga Detector Modules and Array AIV

Page 10: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 10

PACS IIDR ESTEC 01/02 March 2001

AIV of QM Ge:Ga Detector Arrays

manufacture and assembly of 24 QM 1x16

detector modules at ANTEC

QMDET-Array-T01

warm functional check

QMDET-Array-T02

relative spectralresponse measurements

QMDET-Array-T03

QM FEE delivery from IMECfor performance verification

and check-out of test electronics at MPE / MPIA

QMDET-Array-T04

delivery QM FEEs to ANTEC

assembly ofQM detector modules + FEEs

QMDET-Array-T05

delivery of 24 QM modulesfor verification tests:

12 to MPE, 12 to MPIA

QMDET-Array-T06

integration with cryostats/OGSE1(MPE: 2+1 cool-downs, each with 4 h.s.modules)

measurements at MPE/MPIA,delivery back to ANTEC

QMDET-Array-T07

assembly of arrays(2 QMs à 12 modules)

at ANTEC

delivery to MPEQMDET-Array-T08

assembly of QM arrays with baffles+filters at MPE

delivery to KTQMDET-Array-T09

Page 11: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 11

PACS IIDR ESTEC 01/02 March 2001

AIV of QM Ge:Ga Detector Arrays

Page 12: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 12

PACS IIDR ESTEC 01/02 March 2001

Configuration of CQM Array

11121 2 3 4 5 6 7 8 910

FPU SKY

1 2 3 4 5

6 7 8 9 10

11 12

Page 13: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 13

PACS IIDR ESTEC 01/02 March 2001

AIV of FM Ge:Ga Detector Arrays manufacture and assembly

of 50 FM 1x16 detector modules at ANTEC

FMDET-Array-T01

warm functional check

FMDET-Array-T02

relative spectralresponse measurements

FMDET-Array-T03

FM FEE delivery from IMECfor performance verification

to MPE/MPIAFMDET-Array-T04

delivery FM FEEs to ANTEC

assembly ofFM detector modules + FEEsFMDET-Array-T05

delivery of 50 FM modulesfor verification tests:

25 to MPE, 25 to MPIA

FMDET-Array-T06

integration with cryostats/OGSE1,measurements at MPE/MPIA,

delivery back to ANTECFMDET-Array-T07

assembly of arrays(2 FMs à 25 modules)

at ANTEC

delivery to MPEFMDET-Array-T08

assembly of FM arrays with baffles+filters at MPE

delivery to KTFMDET-Array-T09

Page 14: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 14

PACS IIDR ESTEC 01/02 March 2001

AIV of FM Ge:Ga Detector Arrays

Page 15: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 15

PACS IIDR ESTEC 01/02 March 2001

AIV of FS Ge:Ga Detector Arrays manufacture and assembly

of 26 FS 1x16 detector modules at ANTEC

FSDET-Array-T01

warm functional check

FSDET-Array-T02

relative spectralresponse measurements

FSDET-Array-T03

FM FEE delivery from IMECfor performance verification

to MPE/MPIA

FSDET-Array-T04

delivery FM FEEs to ANTEC,removal of QM FEEs in

24 QM modules,assembly of

50 FS detector modules + FEEsFSDET-Array-T05

delivery of 50 FS modulesfor verification tests:25 to MPE, 25 to MPIA

FSDET-Array-T06

integration with cryostats/OGSE1measurements at MPE/MPIA,

delivery back to ANTECFSDET-Array-T07

assembly of FS arrays(2 FS arrays à 25 modules)

at ANTECdelivery to MPE

FSDET-Array-T08

assembly of FS arrays with baffles+filters at MPE

delivery to KTFSDET-Array-T09

Page 16: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 16

PACS IIDR ESTEC 01/02 March 2001

AIV of FS Ge:Ga Detector Arrays

Page 17: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 17

PACS IIDR ESTEC 01/02 March 2001

Test Level: ILT at MPE

Instrument

Page 18: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 18

PACS IIDR ESTEC 01/02 March 2001

General Instrument AIV Sequence

Instrument Units manufactured byPACS Consortium

PartnersAIV on Unit level

GEN-AIV-T01

Delivery Readiness Review

(acceptance tests passedat manufacturers site)

GEN-AIV-T02

Delivery of Unitsto

MPE GEN-AIV-T03

Integration and Instrument Level Test (ILT-AVM/CQM/PFM/FS)Responsibility of MPE

(cryovibration/functional and performance test/spectral calibration

at TBD / MPE / LENS using special test equipment at different test sites)

GEN-AIV-T04

Deliveryto ESA

GEN-AIV-T05

Page 19: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 19

PACS IIDR ESTEC 01/02 March 2001

Overall Configuration of ILT Set-up

during AVM phase 2

IFSICSL

CEA CEA

MPE

SpacecraftSimulator

DPU SPU DEC/MEC

BOLC(BOLSIM)

BOLABOLG

OBConn. Brack.

CVV16 connectorseach 100 pins

FPUSimulator

MPE

CEA

CSL

CSLCSL

Power Supply 4xSync. 8x

EGSE

MPE

MPETEI TE

AVM phase 1

during CQM

MPE

MPE

MPE

cryoOGSE

FPU

Page 20: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 20

PACS IIDR ESTEC 01/02 March 2001

AVM Instrument Test Sequence

Instrument Units and Simulators

manufactured byPACS Consortium

Partners(AIV on Unit level)

AVM-T01

Delivery Readiness Review

(tests passed acc. to spec. unit test plans at manufacturers site including test reports) AVM-T02

Delivery of Unitsto

MPE

AVM-T03

Integration with EGSE

ILT AVM

AVM-T04

AVM Electronics Units

ready for CQM Test

AVM-T05

Page 21: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 21

PACS IIDR ESTEC 01/02 March 2001

AVM Instrument Test Sequence

Page 22: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 22

PACS IIDR ESTEC 01/02 March 2001EMC: Conducted Susceptibility Test (common

mode) for Signal Lines

AVM Electronics UnitsIntegration with EGSE

EMC-CM-T01

separation of shields onDPU S/C

EMC-CM-T02

2 V groundingdifference between

DPU and S/Ccommon mode test

EMC-CM-T03

check of proper functioning

EMC-CM-T04

0 V grounding diff.between DPU and

S/C,connect shields

for nominal operationEMC-CM-T05

DPU SPUDPU MECSPU MECMEC DECMEC BOLCDEC FPUBOLC FPU

common mode testfor each interface

EMC-CM-T06

check of proper functioningof each interface

EMC-CM-T07

Page 23: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 23

PACS IIDR ESTEC 01/02 March 2001

CQM/AVM Instrument Test Sequence

FPU CQMverified

ILT1, ILT2functional test

perform ance test short spectral cal.

FPUcryovibration

ILT3wavelengthcalibration

IST

FP U shipment

to external facility

Delivery ESAto

PACS+EGSE+OGSEshipment LENS Italyto

FPUdelivery to MPE

EGSE readyOGSE ready

FPU shipmentto MPE

AVM of

BOLC/A

DEC/MEC/DPU/SPU/WIHQM of

cool-down

warm-up

cool-down

warm-up

cool-down

warm -up

cool-down

warm -up

cool-down

warm-up

\M soffice\g ra fiken\tes tp lan\CQ M test.cdr

ILT1, ILT2functional test

perform ance test short spectral cal.

Page 24: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 24

PACS IIDR ESTEC 01/02 March 2001

CQM/AVM Instrument Test Sequence

Page 25: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 25

PACS IIDR ESTEC 01/02 March 2001

PFM Instrument Test Sequence

FPU PFMverified

FPUcryovibration

ILT3wavelength calibration

IST

FPU shipm ent

to external facility

delivery ESAto

PACS+EGSE+OGSEshipmentLENS Italy to

FPUshipment to MPE

EGSE readyOGSE ready

cool-down

warm -up

cool-down

warm-up

cool-down

warm-up

\m soffice \gra fiken\tes tplan\P FM test.cdr

FM ofBOLC/A

DEC/MEC/DPU/SPU/W IH

cool-down

warm-up

Page 26: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 26

PACS IIDR ESTEC 01/02 March 2001

PFM Instrument Test Sequence

Page 27: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 27

PACS IIDR ESTEC 01/02 March 2001

FS Instrument Test Sequence

warm vibrationresonance

search

ILT1, ILT2functional test

performance test short spectral cal.

ILT3wavelengthcalibration

PACS+EGSE+OGSEshipment LENS Italyto

FPUdelivery to MPE

DeliveryESA to

QM ofDEC/MEC/DPU/BOLC/A /WIH/AVM2 of SPU

cool-down cool-down

warm -up

\M soffice\grafiken\testp lan\FS test.cdr

FPUassembly

remove+refurb.QM det. arrays

chopper, grating,filter wheels

of

redelivery ofFPU CQM from ESA

verification ofinternal and

external alignment

warm-up

Page 28: PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.

Integration and Testing 28

PACS IIDR ESTEC 01/02 March 2001

FS Instrument Test Sequence