    PT. PERTAMINA EP

    MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

    TABULATION OF REVISION SHEET

    SHEETREVISION

    REMARKS SHEETREVISION

    REMARKS1 2 3 3A 4 5 1 2 3 3A 4 5

    1 X 37

    2 X 38

    3 X 394 X 40

     ATTACHMENT 41

    1 X 42

    2 X X 43

    3 X 44

    4 X 45

    5 X X 46

    6 X X 477 X 48

    8 49

    9 50

    10 51

    11 52

    12 53

    13 54

    14 5515 56

    16 57

    17 58

    18 59

    19 60

    20 61

    21 62

    22 6323 64

    24 65

    25 66

    26 67

    27 68

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    3/11

     

    PT. PERTAMINA EP

    MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

    REVISION SHEET DESCRIPTION

    NO PAGE SUBJECT DESCRIPTION OF CHANGE REV.

    1 ALL ALL First issue 1

    2 ALL ALL Issued for approval 2

    3 ALL ALL Issued for construction 3

    4 2,5,6 Packing Style Replace wooden support with steel support 3A

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    4/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    5/11

     

    PT. PERTAMINA EP

    MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

    1. GENERALThis procedure covers minimum requirements for packing after finish fabrication, paintingand before transportation from PT. BBI Workshop, Pasuruan, East Java.

    2. APPLICABLE CODE AND STANDARDCustomer’s specs : MTDF-MS-300-SPE-3101 Rev. 3 (Spec. for pressure vessel)

    : MTDF-MS-300-SPE-3110 Rev. 3 (Spec. for high alloy & clad PV)

    Safety manual Doc. No. : OHSM-001-Rev.2 -ed.1.2011 Edition

    3. APPLICABLE ITEM

    NO. ITEM NO. EQUIPMENT

    1. 340-T-1001 ACID GAS ABSORBER

    2.340-D-1003 /340-T-1002

     ACID GAS FLASH DRUM /FLASH GAS ABSORBER

    3. 340-T-1003 AMINE STRIPPER COLUMN

    4. 340-T-1004 H2S ABSORBER

    5. 320-T-1001 WASH TOWER

    4. PREPARATION4.1. Mobile crane / overhead crane capacity as per necessity.4.2. All consumable packing i.e. : Wooden skid, bolt & nut, wire rope, temporary cover,

    wooden bandage & etc.4.3. Column shall be throughly cleaned inside and outside and free of all dirt and foreign

    matter.

    4.4. Place desicant bag in the inside of column according to preservation procedure(MTDF-SAS-MS-0510-C1008-1002)

    4.5. All flange faces shall be sealed with cover plate blinds, machined surface, all threads& all surface not painted shall be coated with a suitable anti corrosive material(grease), an appropriate gasket shall be used between the flange face cover and thecover.

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    6/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    7/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    8/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    9/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    10/11

  • 8/20/2019 Packing Procedure_rev 3A_saddle From Plate

    11/11