ACS understands genset manufacturers’ customers have demanding operational requirements. We have developed a wide range of expertise to provide comprehensive testing facilities to simulate customer operating conditions. ACS has completed design and construction for production, development, and research genset test cells. We have managed the design, construction, and commissioning of load banks for genset, locomotive, and aircraft electrical power system testing as well as for reverse power prevention and maintenance of installed gensets for standby power applications. Our experience includes load bank design and installation for facilities designed to test generators up to 5,000kW, including reactive testing. Test programs include multi-voltage and multi-frequency (DC, 50, 60, 400, and 800Hz) solutions using single or multiple outdoor air-cooled load banks. Additionally, ACS has experience with Hopkinson’s back to back systems to conduct fully reactive load tests without the use of traditional load banks. Regenerative load bank simulation has been executed for a 5,250 KW wind turbine generator testing. This program included utility grid fault simulation in addition to leading and lagging power factor loads. ACS has designed systems that can be manually controlled from the HMI test screen or remotely controlled from the test cell control and data acquisition system. Our commissioning process assures that we prove out the client’s acceptance criteria, as identified during the design phase of a project. Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected] ACS Relevant Experience - Load Banks for Genset Testing and Power Applications OVER VIEW GENSET TEST FACILITIES Application Location Power/Capacity Voltage Description Alternator testing Stamford, UK 3000KW 380V – 13.8KV Hopkinson’s Back to Back Reactive Genset testing Seymour, IN 5000KW/6250KVA .80pf 480V – 4160V 380V-3300V Simplex Resistive/Reactive Genset development Waukesha, WI 1500KW 208V – 600V Simplex Resistive/Reactive Genset production test Tianjin, China 3000KW/3750KVA .80pf 190V – 13.8KV Simplex Resistive/Reactive Genset locomotive LaGrange, IL 12000KW (6 units at 2000KW) 208V – 4160V Simplex load bank on a resistive grounding system Aircraft power systems test Rockford, IL 1500KW/1875KVA .80pf 400V 3-phase 400-800Hz Quantum Resistive/Reactive Reverse power prevention Auburn Hills, MI 500KW 480V Simplex Resistive Genset testing Wuhan, China 3250KW/4000KVA .80pf 190V-690V LANGDI Resistive/Reactive

Transcript of OVER VIEW GENSET TEST FACILITIES · PDF fileload bank design and installation for facilities...

Page 1: OVER VIEW GENSET TEST FACILITIES · PDF fileload bank design and installation for facilities designed to test generators up to 5,000kW, including reactive testing. ... GENSET TEST

ACS understands genset manufacturers’ customers have demanding operational requirements. We have developed a wide range of expertise to provide comprehensive testing facilities to simulate customer operating conditions.

ACS has completed design and construction for production, development, and research genset test cells.

We have managed the design, construction, and commissioning of load banks for genset, locomotive, and aircraft electrical power system testing as well as for reverse power prevention and maintenance of installed gensets for standby power applications. Our experience includes load bank design and installation for facilities designed to test generators up to 5,000kW, including reactive testing. Test programs include multi-voltage and multi-frequency (DC, 50, 60, 400, and 800Hz) solutions using single or multiple outdoor air-cooled load banks.

Additionally, ACS has experience with Hopkinson’s back to back systems to conduct fully reactive load tests without the use of traditional load banks. Regenerative load bank simulation has been executed for a 5,250 KW wind turbine generator testing. This program included utility grid fault simulation in addition to leading and lagging power factor loads.

ACS has designed systems that can be manually controlled from the HMI test screen or remotely controlled from the test cell control and data acquisition system. Our commissioning process assures that we prove out the client’s acceptance criteria, as identified during the design phase of a project.

Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected]

ACS Relevant Experience - Load Banks for Genset Testing and Power Applications

O V E R V I E W

G E N S E T T E S T F A C I L I T I E S

Application Location Power/Capacity Voltage Description

Alternator testing Stamford, UK 3000KW 380V – 13.8KV Hopkinson’s Back to Back Reactive

Genset testing Seymour, IN 5000KW/6250KVA.80pf

480V – 4160V380V-3300V

SimplexResistive/Reactive

Genset development Waukesha, WI 1500KW 208V – 600V Simplex Resistive/Reactive

Genset production test Tianjin, China 3000KW/3750KVA.80pf

190V – 13.8KV SimplexResistive/Reactive

Genset locomotive LaGrange, IL 12000KW(6 units at 2000KW)

208V – 4160V Simplex load bank on a resistive grounding system

Aircraft power systems test Rockford, IL 1500KW/1875KVA.80pf

400V 3-phase 400-800Hz

Quantum Resistive/Reactive

Reverse power prevention Auburn Hills, MI 500KW 480V Simplex Resistive

Genset testing Wuhan, China 3250KW/4000KVA.80pf

190V-690V LANGDIResistive/Reactive

Page 2: OVER VIEW GENSET TEST FACILITIES · PDF fileload bank design and installation for facilities designed to test generators up to 5,000kW, including reactive testing. ... GENSET TEST

O V E R V I E W

G E N S E T T E S T F A C I L I T I E S

ACS is a single-source provider of fully integrated

facility and equipment solutions, serving the

international engine- and vehicle-testing

markets. The Company specializes in the

comprehensive design, construction, integration,

and commissioning of development and

production test facilities for engine, vehicle, and

components manufacturers.

ACS Services• Single source integrated delivery

• Facility design

• Construction management

• Systems integration

• Equipment specification, selection &

procurement

• Specialized test equipment design &

fabrication

• Instrumentation and controls

• Facility & equipment commissioning

• Data management

• Preventative maintenance

ACS Integrated DeliveryUsing our integrated delivery model, we work as strategic partners with our clients to

align our team’s expertise with the specific needs of the project from the initial planning

stages through commissioning and close out.

ACS expertise spans the complete test facility process of planning and design,

specification and procurement, construction management, and commissioning of

engine and genset test facilities.

Design and Planning ConsiderationsResistive only and reactive & resistive

Hopkinson’s back to back arrangement

Regenerative load bank simulation

Utility coordination and control

Process water-heating load banks

Sound attenuation

Controls – manual and automated

Metering and protective relays

Site considerations – protection of load bank from physical damage

Safety - protect against dangerous voltage

Heat rejection – protect people and facilities

Heat recovery – recover heat in colder climates, water cooled options

Code-required and maintenance testing of standby power generation – cost

benefit of fixed load or portable

Construction ManagementProcurement

Shipping, rigging, setting

Underground conduit design layout and oversight/management of installation

Structural support, concrete pad, design layout

CommissioningMeasurement and data acquisition

Start-up, commissioning

Owner education and training

Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected]