OUTLINE SCHEME REPORT (WATER AND SEWER) 327043
HOLDING 263, WILLOWGLEN AGRICULTURAL HOLDINGS Issue 1
SHELL SUMMIT ROADPROPOSED FILLING STATION ON THE REMAINING EXTENT OF PORTION 123 (APORTION OF PORTION 38) OF THE FARM KNOPJESLAAGTE 385 JR.
OUTLINE SERVICES SCHEME REPORT(WATER AND SEWER)
APRIL 2013
Issue 1
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria2
Issue/Revision Issue 1 Revision 1 Revision 2 Revision 3
Remarks
Date April 2013
Prepared by M.S Mashamba
Signature
Checked by Harm Schreurs Pr Eng
Signature
Authorised by H. Schreurs Pr Eng
Signature
Project number 14900.R
File reference 14900.R / 11
HARM SCHREURSDIVISIONAL DIRECTOR: Pr Eng Reg. No. 960262
E-mail Address: [email protected]
Mobile Number: 082 376 0527
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria3
CONTENTS
1. INTRODUCTION.............................................................................. 4
2. CIVIL ENGINEERING SERVICES ..................................................... 6
2.1 WATER .......................................................................................................................... 6
2.1.1 ESTIMATED WATER CONSUMPTION ........................................................................... 6
2.2 SEWER .......................................................................................................................... 7
2.2.1 ESTIMATED SEWER FLOW .......................................................................................... 7
2.3 EXISTING DISTRIBUTION NETWORKS UPGRADES .................................................... 8
3. CONCLUSIONS ............................................................................... 9
Appendices
Appendix A S.G Diagram
Appendix B Title Deed
Appendix C Technical report stating upgrades required in the distribution networks inthe vicinity of the development, prepared by GLS Consulting.
Appendix D Figure SS_W1
Appendix E Figure SS_S1
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria4
1. INTRODUCTION
Plan Associates approached WSP SA Civil and Structural Engineers (Pty) Ltd to assist in the
establishment township on the Remaining Extent of Portion 123 (A portion of portion 38) of the
farm Knopjeslaagte 385-JR, for the purposes of establishing a filling station (See Appendix A for
the S.G Diagram). The appointment is for the compilation of a services report, (specifically for
water and sewer), for the proposed development. The report investigates whether the proposed
development can be serviced economically with the existing resources and infrastructure.
The site measures xxxxxha in total and is located on the corner of Summit Road and Stirrup
Road, Briddle Park, in the jurisdiction of the City of Johannesburg Metropolitan Municipality area.
Refer to Figure 1 for the locality plan.
Developer: Shell SA Marketing (Pty) LtdThe Campus, Twickenham
57 Sloane Street
Epsom Downs
Bryanston
2021
Private Bag x19
Bryanston
2021
Republic of South Africa
Email: [email protected]
Tel: 011 408 4339
Fax: 011 413 1509
Contact person: Nonceba Ngwenya
(Title Deed – Appendix B)
Consulting Engineers:
WSP Group Africa (Pty) LtdWSP Civil and Structural Engineers Division34 Bouvardia Avenue,
Lynnwood Ridge
Pretoria
0081, South Africa
PostNet Suite 287
Private Bag X025
Lynnwood Ridge
0040
Contact person: Harm Schreurs
Email: [email protected]
Tel: 012 361 4141, Fax: 012 361 4142
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria5
Figure 1 – Site Locality Plan (Not to scale)
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria6
2. CIVIL ENGINEERING SERVICES
2.1 WATERWSP Group Africa (Pty) Ltd/WSP Civil & Structural Engineers Division appointed GLS
Consulting to evaluate the existing infrastructure in the development area and the impact of the
development. Refer to Appendix C for the report.
The proposed development is currently located within the Blue Hills (PRV 1) water sub-district.
It should be noted that a 600mm diameter Rand Water bulk pipeline is also located in Stirrup
Road, which supplies Diepsloot. See Appendix D for the existing water network (GLS Figure
SS_W1).
A connection to the existing 160mm diameter pipe along Stirrup Road in the vicinity of Point A is
proposed to serve the development via a new 160mm diameter pipe to be installed.
The existing system analysis, including the additional peak demand of the proposed
development (4 x AADD = 0.04 l/s), confirms that the peak residual pressure at the proposed
connection point would be approximately 45m. This peak pressure is greater than the minimum
pressure criteria of 24 m (as in accordance with JW’s Modelling Guidelines) confirming that no
upgrading is required to meet the minimum pressure criteria.
The total cost for the connection of the new pipeline(s) from the development to the existing
systems cannot be obtained yet (or discussed) since the SDP is not yet finalised.
2.1.1 ESTIMATED WATER CONSUMPTION
(The estimated water consumption calculations for this report are based on the GLS findings and
recommendations).
To note is that the development is located within the Blue Hills (PRV1) water sub-district. GLS
Consulting compiled a water master plan for the Blue Hills and Diepsloot Water Sub-Districts
(Ref. JWAT-C-0160-01-00-1029) for Johannesburg Water (JW) in October 2009. The report and
the latest hydraulic models (2013-02) formed the bases of the water impact study undertaken
for the proposed development.
The water demand for the proposed development, assuming a unit demand of 0.4 kl/day per
100m² floor area as per the JW Design Guidelines, is estimated to be 0.86 kl/d. The demand
translates into a peak demand of 0.04 l/s assuming a peak factor of 4 to be applicable.
The required fire flow was assumed to be 50 l/s with a minimum pressure of 15 m when
assuming this development falls within the medium risk category. It should be noted that this is
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria7
a deviation of the JW Design Guidelines which requires a total fire flow of 100 l/s for
business/commercial developments, but this is considered stringent. The model confirms that
the fire flow of 50 l/s cannot be supplied through the existing system. Therefore, on-site storage
tanks and other fire protection measures as in accordance with SANS 10252-1:2004 will be
required.
The “Ultimate Scenario” of the existing water services taking into account the proposed
development is that it will be supplied directly from the proposed Pretoriusrand Reservoir
(Estimated TWL to be 1562 masl) in which case the peak pressure at the proposed connection
point will be 26m, only marginally more than the minimum requirement. However, it should be
noted that substantial upgrading is required for the ultimate scenario to achieve the re-zoning as
per above-mentioned master plan.
Therefore, the existing as well as the future systems can accommodate the anticipated peak
demand of the proposed development, with upgrading only required for the ultimate scenario.
2.2 SEWERThe development is also located in the northern Sewer Sub-Basin for which GLS Consulting
compiled a Sewer Network Analysis Report in September 2010 (Ref. JWAT-C-0187-00-01-
0810).
There is currently no sewage reticulation in the vicinity of the proposed development to which it
can connect. There is also no nearby sewer reticulation in the City of Tshwane Metro. JW also
does not have any plans, as far as we know, to construct any sewers in this area as it is located
outside the current urban development boundary.
Therefore it is recommended that a suitable on-site solution such as a septic tank and/or French
drain be considered/investigated to handle all sewage effluent subject to local soil conditions
and municipal guidelines.
Also, the total cost for the connection of the new pipeline from the development to the existing
system will not be discussed since the SDP is not yet finalised.
2.2.1 ESTIMATED SEWER FLOW
The estimated unit sewer flow for the proposed garage is 0.22 kl/100m², as per JW Design
Standard Guidelines. The area to be developed is 215m², thus the estimated sewage flow
contribution is 0.48 kl/d.
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria8
2.3 EXISTING DISTRIBUTION NETWORKS UPGRADES
These are the upgrades as recommended by GLS Consulting’s report (Annexure C)
2.3.1 The following are the adjustments to the master plan as per GLS report in orderto accommodate the proposed development:
2.3.1.1 Water Network
The only upgrading will be required for the ‘Ultimate Scenario’ where the proposed development
will be part of the proposed Pretoriusrand Reservoir (TWL = 1562 masl) in which case the peak
pressure at the proposed connection point will be 26m, only marginally more than the minimum
requirement.
No upgrading for the ‘Current scenario’ is required to meet the minimum pressure criteria.
2.3.1.2 Sewer Network
No upgrades needed since there is no sewage reticulation in the vicinity of the proposed
development.
Cost estimate for the upgrading will be dealt with after the SDP is approved.
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria9
3. CONCLUSIONS
All the required engineering services, in respect of water and sewer can be supplied
economically to the proposed development.
There is spare capacity available in the water system to supply the proposed development with
no upgrading required.
A fire flow of 50 l/s cannot be supplied through the existing system. Therefore, on-site storage
tanks and other fire protection measures as in accordance with SANS 10252-1:2004 will be
required. Alternatively extensive upgrading to the Blue Hills PRV water system will be required.
A 160mm diameter connection to the water system in Stirrup Road Is proposed to supply the
development.
The current bulk distribution system has adequate spare capacity to accommodate the peak
flow of the development.
It is recommended that a suitable on-site sewage solution such as a septic tank and/or French
drain be considered to handle sewage effluent subject to local soil conditions and municipal
guidelines as there is no sewer reticulation in the vicinity of the site and none is planned in the
near future as the site is located outside the current urban development boundary.
The total budget amount for these services as per this document is not included since the SDP
is yet finalised.
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria10
Appendices
Appendix A S.G Diagram
Appendix B Title Deed
Appendix C Technical report stating upgrades required in the distribution networksin the vicinity of the development, prepared by GLS Consulting.
Appendix D Figure SS_W1
Appendix E Figure SS_S1
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria11
Appendix AS.G Diagram
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria12
Appendix BTitle Deed
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria13
Appendix CTechnical report stating upgrades required in the
distribution networks in thevicinity of the development,
prepared by GLS Consulting
4 April 2013 WSP SA CIVIL AND STRUCTURAL ENGINEERS (PTY) LTD 34 Bouvardia Avenue Lynnwood Ridge Pretoria 0081 South Africa Attention: Mr. S Mashamba Dear Sir WATER AND SEWER IMPACT INVESTIGATION FOR PROPOSED SHELL FILLING STATION: SUMMIT ROAD
As requested we have investigated the capacity of the existing water and sewer systems to serve the proposed development and comment as follows:
1. EXTENT OF DEVELOPMENT The location of the proposed Shell filling station and layout of existing water and sewer services in the vicinity of the site is indicated on Figures SS_W1 and SS_S1 respectively. The proposed Shell filling station will have an estimated floor area of 215m2. No car wash is planned.
We confirm that the development is located within the City of Johannesburg municipal boundary (on the edge of this boundary), but located outside the current urban development boundary.
2. BACKGROUND The proposed development is located within the Blue Hills (PRV 1) water sub-district. GLS compiled a water master plan for the Blue Hills and Diepsloot Water Sub-Districts (Ref. JWAT-C-01060-01-00-10209) for Johannesburg Water (JW) in December 2009. This report and the latest hydraulic models (2013-02) formed the basis of the water impact study undertaken for the proposed development.
The development is also located in the Northern Sewer Sub-Basin for which GLS Consulting compiled a Sewer Network Analysis Report in September 2010 (Ref. JWAT-C-0-187-00-01-0810).
3. WATER SYSTEM
3.1 Water Demand
The water demand for the proposed development, assuming a unit demand of 0.4 kl/day per 100 m2 floor area as per the JW Design Guidelines, is estimated to be 0.86 kl/d. This demand translates into a peak demand of 0.04 l/s assuming a peak factor of 4 to be applicable. This peak demand was used in the hydraulic analysis undertaken herewith.
3.2 Existing Water Services, Available Capacity and Proposed Connection Points
Figure SS_W1 has reference. Current Scenario: The proposed development is currently located within the Blue Hills (PRV 1) water sub-district. It should be noted that a 600 mm Ø Rand Water bulk pipelines is also located in Stirrup Road, which supplies Diepsloot. A connection to the existing 160 mm Ø pipe along Stirrup Road in the vicinity of point A is proposed to serve the development via a new 160 mm Ø pipe to be installed. The existing system analysis, including the additional peak demand of the proposed development (4 x AADD = 0.04 l/s), confirms that the peak residual pressure at the proposed connection point would be approximately 45m. This peak pressure is greater than the minimum pressure criteria of 24 m (as in accordance with JW’s Modelling Guidelines) confirming that no upgrading is required to meet the minimum pressure criteria. An alternative option is to apply for a direct RW connection to the 600 mm Ø bulk pipeline, in which case both peak flow and fire flow could be supplied, but this option will most likely not be approved. Ultimate Scenario: Ultimately, the proposed development will be part of the proposed Pretoriusrand Reservoir (TWL = 1562 masl) in which case the peak pressure at the proposed connection point will be 26m, only marginally more than the minimum requirement. However, it should be noted that substantial upgrading is required for the ultimate scenario to achieve the re-zoning as per above-mentioned master plan. Therefore, the existing as well as the future systems can accommodate the anticipated peak demand of the proposed development, with upgrading only required for the ultimate scenario.
3.3 Reservoir Capacity and Bulk Supply
The Blue Hills water sub-district is currently supplied directly from the Rand Water system through the Centurion (Blue Hills) Rand Water connection, thus there currently no reservoir storage provided. However, JW’s long term plan is to build the 20Ml Pretoriusrand Reservoir, which would then provide the required storage.
3.4 Fire Flow Analysis
The required fire flow is assumed to be 50 l/s with a minimum pressure of 15 m when assuming this development falls within the medium risk category. It should be noted that this is a deviation of the JW Design Guidelines which requires a total fire flow of 100 l/s for business / commercial developments, but this is considered too stringent. The model confirms that the fire flow of 50 l/s cannot be supplied through the existing system. Therefore, on-site storage tanks and other fire protection measures as in accordance with SANS 10252-1:2004 will be required.
4. SEWER SYSTEM 4.1 Sewage Flow
The estimated unit sewer flow for the proposed garage is 0.22 kl/100 m2, as per JW Design Standard Guidelines. The area to be developed is 215 m2, thus the estimated sewage flow contribution is 0.48 kl/d.
4.2 Existing Sewer Services, Available Capacity and Proposed Connection Point
Figure SS_S1 has reference. There is currently no sewage reticulation in the vicinity of the proposed development to which it can connect. There is also no nearby sewer reticulation in the City of Tshwane Metro. JW also does not have any plans, as far as we know, to construct any sewers in this area as it is located outside the current urban development boundary. Therefore it is recommended that a suitable on-site solution such as a septic tank and/or french drain be considered/investigated to handle all sewage effluent subject to local soil conditions and municipal guidelines.
5. SUMMARY
In conclusion, we summarise:
1. There is currently spare capacity available in the water system to supply the proposed development with no upgrading required.
2. The model confirms that a fire flow of 50 l/s cannot be supplied through the existing system. Therefore, on-site storage tanks and other fire protection measures as in accordance with SANS 10252-1:2004 will be required. Alternatively extensive upgrading to the Blue Hills PRV water system will be required.
3. A 160 mm Ø connection to the water system in Stirrup Road is proposed to supply the development.
4. The current bulk distribution system has adequate spare capacity to accommodate the peak flow of the development.
5. It is recommended that a suitable on-site sewage solution such as a septic tank and/or French drain be considered to handle sewage effluent subject to local soil conditions and municipal guidelines as there is no sewer reticulation in the vicinity of the site and none is planned in the near future as the site is located outside the current urban development boundary.
We trust you find the above sufficient in terms of your request.
Yours faithfully GLS CONSULTING (PTY) LTD REG. NO.: 2007/003039/07
Per: MR JK COMPION (Director)
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria14
Appendix DExisting water layout (Figure SS_W1)
1450
1455
1435
1440
1440
14801470
1465
1440
1435
1430
1425
1420
1415
1465
1455
1440
1440
1450
1445
1460
1435
1430
1425
1425
1410
1420
1460
1455
1450
1460
1455
1445
1445
1440
1435
1450
1430
1455
1495
1495
15101505
1485
1490
1500
1500
1485
1495
1500
1495
1500
1490
1490
1480
1485
1500
1495
1495
1490
1480
1470
1465
1460
1475
1470
1465
1455
1485
1495
1495
1510
1515
1515
1460
1475
1450
1475
1445
1470
1470
1460
1465
1455
1445
1505
1500
149014
90
1480
1485
1455
1460
1475
1480
1450
1475
1500
1510
1500
1500
1505
1510
1515
1515
1500
1505
1510
1515
1515
1505
1510
1505
1495
TANGANANI
DIEPSLOOT WES
DIEPSLOOT WEST EXT.6
DIEPSLOOT WES EXT.4DIEPSLOOT WES EXT.4
TANGANANI
DIEPSLOOT WES
DIEPSLOOT WEST EXT.6
7254
136/388-JR
7253
69136911 6912
365
244
243
248
249
213
212
245
356 357
246
353 354 355
247
145
370 367 366
146148147
369 368
151150149
211
214
320
319
383
130
61
62276
275
274
31765
66
28168
67
318
379
278
361 378
64
277 63
358 359
279
280
360380 381 382
411 410 409 408362 413 412
364 363
141142143144 140139138137136135134133132131
298
314
313
315
316
397398
399
165
394393
395118
392396
117
119
400402404
390
295
401
391389388387
297
296
403
122123124125120121
7255
384 386385
406 405
126127128
407
129
231
232
47
230
200 261
464543
199
44
233
234
260
259
258
257204
202
201
236
235
237
242
239
205
203
238206
207
208
250
251
252 241
240
256
255
254
210
253
209
415
80 81 82
26326250
4948
267
266
265
76
77
78
79
291
292
293
53
264
52
51
268 54 75
74
73
72
71
56
57
58
59
60
55
271
269
270
272
273
289
290
288
287
286
285
284
283
282
70
69
65806565
6577
6567
6563
65786566
6597
6562
6556
65536554
6606
6607
6583
6601
6582
6603
6581
66026568 6594
6576
6596
6595
65576561
6555
656065846593
6605
6604
658665916574
6585659265596575 6570
6571
6558
6569
6608
6590 6587
6589
65726573
6609
6610
6588
6848
98 99 100 101
92
671267136714
85919089
6716
88
6715
878683 84
329
328
294303
302
304
301
300
299
306
305
308
309
310
311
312
307
327
326
325
324
323
322
321
RE/138/388-JR67266745
6621
6620
6619
138/388-JR
6655
6654
RE/138/388-JR
6637
6636
6638
6639
6746 6725
6724
67276618 6743
6642
6641
6653
66406742 6729
6741 6730
6728
6652
6651
6649
6650
6644
6643
6646
6645
66486647
67326739
67316740
6737 6734
6736 6735
6738 6733
6721 6720671967186717
6616
6617
6613
6614
6615
6612
6611
6744
6600
6761
6754
6756
6755
6757
6759
6758
67776659
67756657
67766658
6656
6795
6774
6772
6773
6771
68056762
6804 67996763
6802
680068036764
6801
6767
6765
6768
6766
6769
6752
6751
6753
67506781
66676666
6783 6748
6749
6668
139/388-JR
6598
6782
6665
6664
66316630
66286627
6629
6779
6662 6780
6663
6778
6632
6660
66616634
6633
663567236747
6722
66256626
6622
66236624
659965796564
65466549 6545
654465486547 6543
6542
65516550
6552
1071
996
972
997
1078
10801081
1079
971
849
10681070
858
848
10641065
10661067
1069
970
973974975976977
1073 1074 1075 1076 1077
108210831084
968
994 995
969
10851086
966
991 992
967
993
850
851
852
853
856
857
860
859
854
855861
862
113110391040
872
873
874
875
876877
1123
1124
1125
1126
1106
1107
1127
1128 1108
1129
1109
1130
1110
1111
1112
1113
11051104
1044
1045
1048
1049
1052
1042
1046
1053
1050
1054
1043
1047
1051
1122 1114
881
882
883
884870
871
1115
11161120
1121
1118
11171119
1055
869
1057
1041
878
879
880
1063
864
1058
865 866
10561059
867
10601061
868
1062
1159863
435
10231024
1025
333
1019 1020 1021 10221162
1026
334 332335336337
434 433
338339
1017 1018
340
1014
341
1015
1089
1016
1090 1091 1094 10951092
1097
999 998
1096
1093
1098109911001101
1000100110021003
1102
1004
124
355
353
415
323
1151324
349350
351352
414
354
418419
416
325
417
425424423
440441442422
389
392393394
395396
397
413
398
356
402
357
403
358
404
359
391
360
399
388
1153
1154
401405
412
400
410411
390
407408409 406 387
432426 427 428 429 430 431 384
385
386
436437438439
369
370 730
366
371
372
373
374
734 735732
728
367
729
733
375
376
365
377
378
381
380
382
10271028
383
1037 10381036
10301031
10321033
1034 1035
1029
117
118
113
142143
114
115
493
494
134
136 495137
135
138
111
139
112
140141
116
119
120132
133
313144
145
315
121
122
314 131311312146
310147
316 130309
125364
126127
361
123
128
362
129
363
308
322
326327
317
320
318319305
306307
321
561562
468
514
469
515 516
470517 518
464465466
471
477
456459
455458
461
509 510
478479
480481482
506 507 508
483484
531533 476
532
486487488489
530
539
527 528 529
485
526540
535537538
463473474
5341155
472475536
490491
492
443
462444
451 452 454
1158
460
446 447
453448 449 450
445
99
556
552
627
9394
95
553 554 555
563564565566567568
548 549 550 551
96
666100
636577
578101
102103
104105
543
106
542628544 545 546 547
573575576541
574
569570571572
503 504 505
499500 501 502
107108
109
497498
496
110
101/388-JR
RE/18/388-JR
20/388-JR
RE/3/388-JR
23/388-JR
RE/117/388-JR
192/388-JR
66/61-JR
116
115
669967056704670367026701
97
67066708
96
670767096710
104
6700
105102 103
959493
6711
345
106
108
107331330
332
333344109
334
335
336
337
338339114
113
112
111
110343
342
341
340
6684
66866843
66836821
6823 66856844
6824
67896814
6813
6811
67916812
6792
67906845 6822
6810 6687
66896840
68266841
68256688
6842
6827
6794
6793
6808
6809
66916838 6692
682868396690
6837
6829
66946836
6696
6831
6830
6834
6693
68326835 6695
6806 6797
67966807
6798
6760
6697
6698
6833
6770
123/388-JR
6679
6680
66786677
6682
6681
6846
6820
6818
6787
6817
6816
6786
6815 6788
6675
66766673 6674
6819
66696672
6784
66716670
6785
6847
895 896
897
1140
1141
894
1132
892
1137
1148
893
1138
1139
1142
1135
1143
114511461149
1150
1133
1134
1136
11441147
885 886 887 888 889 890 891
722
723
724 718
719
720
717
731727
736 737
740741742 721743
738
725726
739
1
772
773
752
753
745 746 747 748 749 750
744
751
754756757758759760761
767768
774
769764 765 766
379
770
771
762
763
755
RE/153/388-JR
37
704
696
50
697
52
701
38
54
48 49
51
53
698
3940
4142
43
47
699
44
559
702
46520
521
522 45
560
519
467
511 512 513
523 700
57166
8 9 10 11 127
368
524457
3
4
525
626
557
638
9192
664665
585586
639640
579581 582 583 584
637667668
632633634
580
629630631
635
9798
650
693
646
648 653654
657
645
647
649
655
658597
618
619591592
593
656
594595
596659
620621
643644
660661662663
587
1157
588 589 590
1156
641 642
622
675676
671 672673
694
674
695
623624
669 670558
625
34
709
27
708
25
26
283132
33
24
710 22
711
23
5758
705706
707
35
5556
36
71521
16
712
1517
18
19
20
713
714
14
2
13
703
7576
601
602603
604605
606 74
77
681682
685
684
683
608609
610611612
613
69
70
71
72
607
73
651
652
599600
614615
598
616617
680 686
5960
687688
6162
689
63
64
65
6667
68
2930
678679
690691
677
692
7879
8081
8283
84858687
8889
90
RE/120/388-JR119/388-JR
450/388-JR
165/388-JR
RE/30/388-JR
202/388-JR
214/388-JR
19/388-JR
29/388-JR
191/388-JR
RE/31/388-JR
213/388-JR
215/388-JR
26/388-JR
27/388-JR
28/388-JR
RE/2/388-JR
353/388-JR409/388-JR
357/388-JR
361/388-JR
RE/118/388-JR
RE/118/388-JR
413/388-JR
414/388-JR
RE/251/385-JR
354/388-JR
RE/396/388-JR
360/388-JR
364/388-JR
168/388-JR
355/388-JR
397/388-JR396/388-JR
169/388-JR
356/388-JR
410/388-JRRE/167/388-JR
193/388-JR
454/388-JR
451/388-JR
452/388-JR
453/388-JR
RE/63/385-JR
243/385-JR
244/385-JR
242/385-JR
247/385-JR
246/385-JR
249/385-JR
164/388-JR
248/385-JR
RE/229/385-JR
250/385-JR
251/385-JR
899/385-JR
RE/251/385-JR
959/385-JR
960/385-JR
363/388-JR
352/388-JR362/388-JR
RE/250/385-JR
358/388-JR
359/388-JR
166/388-JR
204/388-JR
RE/166/388-JR
RE/409/388-JR
R28
R28
600Ï Rand Water Pipeline
A600Ï Rand Water Pipeline
600Ï JHB Water Pipeline
160 Ï
160 Ï160 Ï 160 Ï
160 Ï
600 Ï
160 Ï
600 Ï
200
Ï
200 Ï
200
Ï20
0 Ï
200
Ï20
0 Ï
200 Ï
200
Ï
200
Ï20
0 Ï
200
Ï
200
Ï
200 Ï200 Ï
200 Ï
200 Ï
600 Ï
160 ÏSABELO PHAMA
PA
UL
ND
LOV
U
MAK
HOSO
NKE
XIS
UN
GU
LO
NOKO
ZEP
H M
OTH
OP
EN
G
SOLIDARITY
ITERELENG
AFRICA
TSA
KA
UM
A
NK
ULU
LEK
O
TAKA
LAN
I
AGGREY KLAASTE
JAB
ULA
NI
BIT
DRESSAGE
GYM
KANA
POMMEL
ROAN
STIRRUP
SUMMIT RD
K46.
02
K46.
02
FUNDUDZI
UTHUKELA
DUKUZA
MU
SI
RE
PA
NG
UKHAHLAMBA
KING DINIZULU
UM
HLA
NG
A
BUFFALO
REPANG
R.M. MAKHADO
AMANZ'AMTOTI
KIN
G M
AM
PU
RU
FUNWABO
NOBUHLE
RIV
ER
S O
F B
AB
YLO
N
MG
AB
AB
A
PITS
I
OWL
TLOU
NONGOMA
MGIBE
Impact Investigation for Proposed Shell Filling Station :Summit Road
April 2013
Existing Water System andProposed Connection Point
Figure SS_W1 (Sheet 1)
Detail 1
SeeDetail 1
1346
_Joh
anne
sbur
g_A
d_H
oc...
.
5m Contours
Existing Water Layout(< 110Ï unless otherwise shown)
Proposed System :
Proposed Connection Point
Legend :
Existing System :
1620
Proposed Pipeline
Hydrants
Proposed Development :
Rand Water Bulk Pipeline
City of JohannesburgUrban Development BoundaryCity Of JohannesburgMunicipal Boundary
PRV (and settings)
Scale 1:10000
0 62.5 125 250 500 meters
243/385-JR
A600Ï Rand Water Pipeline
STIRRUP ROAD
ROAN
160 Ï
600Ï Rand Water Pipeline
110 Ï
1495
1495
15101505
14801485
1475
1485
1500
1510
1500
1550
1500
1520
1500
1530
1525
1525
1530
1500
1510
1515
1520
1505
1495
15001490
1495
1520
1505
1510
1520
1515
1515
1500
1505
1510
1515
1515
1510
1505
1495
1545
15301550
1545
1540
1550
1555
1550
1555
1555
15351540
1550
1530
1555
1535
1555
1555
1550
1540
1545
1550
1555
1555
1555
1550
15451540
1525
1535
1520
1545
15351540
1525
1520
1530
1515
1540
1545
1530
1525
1525
1540
1530
1535
1515
1505
1510
1520
1535
165/388-JR
353/388-JR409/388-JR
357/388-JR
361/388-JR
RE/118/388-JR
RE/118/388-JR
413/388-JR
414/388-JR
RE/251/385-JR
354/388-JR
RE/396/388-JR
360/388-JR
364/388-JR
168/388-JR
355/388-JR
397/388-JR396/388-JR
169/388-JR
356/388-JR
410/388-JRRE/167/388-JR
193/388-JR
283/385-JR
262/385-JR
284/385-JR
285/385-JR
258/385-JR
259/385-JR
261/385-JR
260/385-JR
RE/63/385-JR
RE/282/385-JR
849/385-JR
893/385-JR
872/385-JR
264/385-JR
265/385-JR
RE/279/385-JR
917/385-JR
279/385-JR
918/385-JR
RE/2/385-JR
280/385-JR
253/385-JR
243/385-JR
244/385-JR
301/385-JR
245/385-JR 252/385-JR
928/385-JR
242/385-JR
254/385-JR
255/385-JR
277/385-JR
926/385-JR
927/385-JR
247/385-JR
246/385-JR
249/385-JR
164/388-JR
248/385-JR
RE/229/385-JR
278/385-JR
256/385-JR
257/385-JR
250/385-JR
251/385-JR
899/385-JR
RE/251/385-JR
959/385-JR
960/385-JR
363/388-JR
352/388-JR362/388-JR
RE/250/385-JR
358/388-JR
359/388-JR
166/388-JR
204/388-JR
RE/166/388-JR
RE/409/388-JR
600Ï Rand Water Pipeline
A600Ï Rand Water Pipeline
600 Ï
160 Ï160 Ï 160 Ï
250 Ï
350
Ï
350 Ï
160 Ï
350 Ï
160 Ï
350 Ï
160 Ï
BIT
CHAMPION
DRESSAGE
GYM
KANA
POMMEL
ROAN STIRRUP
STIR
RUP
LINK
STIRRUP
SUMMIT RD
DiepslootTown(RW5590)
CenturionConnection(Blue Hills)
PRV (45m)
Impact Investigation for Proposed Shell Filling Station :Summit Road
April 2013
Existing Water System andProposed Connection Point
Figure SS_W1 (Sheet 2)
1346
_Joh
anne
sbur
g_A
d_H
oc...
.
5m Contours
Existing Water Layout(< 110Ï unless otherwise shown)
Proposed System :
Proposed Connection Point
Legend :
Existing System :
1620
Proposed Pipeline
Hydrants
Proposed Development :
Rand Water Bulk Pipeline
City of JohannesburgUrban Development BoundaryCity Of JohannesburgMunicipal Boundary
PRV (and settings)
Scale 1:10000
0 62.5 125 250 500 meters
OUTLINE SCHEME REPORT (WATER AND SEWER) 14900.R
PROPOSED FILLING STATION ON REMAINING EXTENT OF PTN 123 OF THE FARM KNOPJESLAAGTE 385 JR Issue 1
WSP SA Civil and Structural Engineers (Pty) Ltd.
Pretoria15
Appendix EExisting sewer layout (Figure SS_S1)
1445
1460
1455
1450
1465
1440
1445
1435
1430
1425
1420
1435
1440
1495
1500
1490
1470
1465
1475
1480
1480
1450
1455
1460
1485
1475
1470
1460
1465
1470
1455
1410
1435
1450
1460
1455
1460
1445
14401470
1465
1440
1450
1425
1430
1440
1455
1420
1460
1445
1440
1435
1425
1430
1455
1455
145014
15
1495
1500
1490
1480
1495
1475
1485
1500
1500
1495
1490
1485
1475
1470
1465
1460
1455
1480
1445 14
50
1465
15051515
1515
1510
15101505
1500
1490
14751480
1485
1495
1495
1505
1500
1510
1495
1505
1490
1500
1500
1485
1490
1510
1495
1515
1515
DIEPSLOOT WES EXT.4
TANGANANI
DIEPSLOOT WES
DIEPSLOOT WEST EXT.6
250 Ï
250 Ï250 Ï
250 Ï
250 Ï
AFRICA
TSA
KA
UM
A
NK
ULU
LEK
O
TAKA
LAN
I
AGGREY KLAASTE
JAB
ULA
NI
FUNWABO
NOBUHLE
RIV
ER
S O
F B
AB
YLO
N
MG
AB
AB
A
PITS
I
OWL
TLOU
NONGOMA
SABELO PHAMA
PA
UL
ND
LOV
U
MAK
HOSO
NKE
MGIBE
XIS
UN
GU
LO
NOKO
ZEP
H M
OTH
OP
EN
G
SOLIDARITY
ITERELENG
K46.
02
K46.
02
FUNDUDZI
UTHUKELA
DUKUZA
MU
SI
RE
PA
NG
UKHAHLAMBA
KING DINIZULU
UM
HLA
NG
A
BUFFALO
REPANG
R.M. MAKHADO
AMANZ'AMTOTI
KIN
G M
AM
PU
RU
SUMMIT RD
BIT
DRESSAGE
GYM
KANA
POMMEL
ROAN
STIRRUP
Impact Investigation for Proposed Shell Filling Station :Summit Road
April 2013
Proposed Shell Filling Stationand Existing Sewer System
Figure SS_S1
1346
_Joh
anne
sbur
g_A
d_H
oc...
.
Manholes
5m Contours
Rising Main
Legend :
Existing System :
1620
Proposed Development :
City of JohannesburgUrban Development BoundaryCity Of JohannesburgMunicipal Boundary
Existing Sewer System (< 160Ï unless otherwise shown)
Scale 1:10000
0 62.5 125 250 500 meters