Outfall Canal Remediation Projects Outfall Canal Remediation Projects US Army Corps of Engineers BUILDING STRONG ®

Transcript of Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt...

Page 1: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Outfall Canal Remediation ProjectsOutfall Canal Remediation Projects

US Army Corps of EngineersBUILDING STRONG®

Page 2: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

AgendaAgenda Erosion Outfall Canal Status

►OFC-03►OFC-04A►OFC-06►OFC-05

Weekly Coordination MeetingsWeekly Coordination Meetings

BUILDING STRONG®228 April 2011

Page 3: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-03 (London Ave Canal) Construction Contract Awarded to Integrated Pro

Services, LLCA d d 7 D 10 Awarded 7 Dec 10

Notice to Proceed issued 22 Dec 10 Construction Complete for original project - 21 May 11 Construction Complete for original project - 21 May 11 Construction Complete for added 2,100 lf - 22 June 11 Type of Work - Sheet pile for seepage and embankment yp p p g

added at crown to reduce stick-up► 7,100 lf of sheet pile 50% Complete► 3 700 lf of concrete embankment increase 25% Complete► 3,700 lf of concrete embankment increase 25% Complete► 2,100 linear ft of soil embankment increase 0% Complete► 1,300 lf of backfill 25% Complete

BUILDING STRONG®28 April 2011 3

Page 4: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-03 (London Ave Canal) Status

Over 3,500 lf of sheet pile has been installed to date.Sh t il b i d th f Mi b th Sheet piles are being pressed south of Mirabeau on the east side of the canal and between Mirabeau and Filmore on the West side of the canal.

Concrete is being poured on the east side of the canal between Filmore and Robert E. Lee.J t ti i 50% l t Jet grouting is 50% complete.

The AFE for additional work between Robert E Lee and Leon C Simon has been providedLeon C Simon has been provided.

Red Zone Meeting scheduled for 3 May 11, 1:00 pm at the Construction Trailer (5701 Pratt Drive)

BUILDING STRONG®28 April 2011 4

Page 5: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-03

BUILDING STRONG®28 April 2011 5

Page 6: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Sheet Pile Press-In Method

BUILDING STRONG®28 April 2011 6

Page 7: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Installed Sheet Pile and Barges in the Canal

BUILDING STRONG®28 April 2011 7

Page 8: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Concrete Embankment on the east side between Mirabeau and Filmore

BUILDING STRONG®28 April 2011 8

Page 9: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-04A (Orleans Ave Canal) Construction Contract Awarded to Integrated Pro Services,

LLCA d d 18 F b 11 Awarded 18 Feb 11

Notice to Proceed issued 28 Feb 11 Construction Complete 28 Jun 11p Type of Work - Sheet pile for seepage, embankment added at

crown to reduce stick-up, stability berms and Deep Soil Mixing for strengthening the canal wallsfor strengthening the canal walls► Approx. 855 linear ft of sheet pile and embankment -2%

completeA 1 400 li ft f D S il Mi i► Approx. 1,400 linear ft of Deep Soil Mixing

► Approx. 2,800 linear ft berm-36% complete

BUILDING STRONG®28 April 2011 9

Page 10: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-04A (Orleans Ave Canal) Status

Clearing and Grubbing is 65% complete Tree removal is 100% complete Soil borings are 100% complete Upcoming work

► Test Piles for Deep Soil Mixing 29 April 20 May► Test Piles for Deep Soil Mixing 29 April-20 May► Stability Berm-between Filmore St and R.E.Lee ongoing (1000 ft north

of Filmore complete)► Trench excavation for sheet pile I-610 on going► Trench excavation for sheet pile I 610 on going► Sheet pile operation by I-610 on going; duration 45 days (15 ft

complete)

Red Zone Meeting-31 MayRed Zone Meeting 31 May

BUILDING STRONG®28 April 2011 10

Page 11: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-04A

BUILDING STRONG®28 April 2011 11

Page 12: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

BUILDING STRONG®28 April 2011 12

Page 13: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

BUILDING STRONG®28 April 2011 13

Page 14: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-06 (Orleans Ave Canal)( )

Construction Contract Awarded to Progressive gConstruction Company, LLC

Awarded 23 Dec 10 Notice to Proceed issued 6 Jan 11 Construction Complete 13 Apr 11p p Type of Work - Stability berm for strengthening

the canal levees. The stability berm is 100% Complete► Approx. 1,000 linear ft of berm

BUILDING STRONG®28 April 2011 14

Page 15: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-06 (Orleans Ave Canal) Status( )

The contractor has demobilized from the site.P Fi l h ld 31 M h 2011 Pre-Final was held 31 March 2011.

Punch list items to be resolved:► Drainage – A modification will be issued to the

Contractor by the end of the week.► Grass – Grass continues to grow► Grass Grass continues to grow► Rivulets – Repairs and adjustments will be done

concurrently with the drainage work.► Cypress Tree – Berm is not within 15’ of the tree

The Final Inspection will be held 25 May 11.

BUILDING STRONG®28 April 2011 15

Page 16: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-06

BUILDING STRONG®28 April 2011 16

Page 17: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Stability Berm for Orleans Avenue Canal Looking South

BUILDING STRONG®28 April 2011 17

Page 18: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Stability Berm for Orleans Avenue Canal Looking North

BUILDING STRONG®28 April 2011 18

Page 19: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-05 (17th Street Canal)

Construction Contract Awarded to Bailey CKY JV Awarded 9 Dec 10 Awarded 9 Dec 10 Notice to Proceed issued 28 Dec 10 Construction Complete 27 May 11Construction Complete 27 May 11 Type of Work – Jet Grouting for strengthening the canal

walls and embankment added at crown to reduce stick-55% C l tup 55% Complete

► Approx. 10,400 LF of jet grouting, 5,700 LF Complete► Approx. 5,900 LF embankment (including 450 LF of rip-rap), the pp , ( g p p),

450 LF of rip-rap is complete.

BUILDING STRONG®28 April 2011 19

Page 20: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-05 (17th Street Canal) Status Based on the test column diameter the center-to-center spacing for the panels is

14.5’. 378 complete panels are installed for 2,700’ on the Orleans Parish side and 3,000’

on the Jefferson Parish sideon the Jefferson Parish side. Jet Grouting continues on both sides of the canal. Jet Grouting work on the west side should be complete by the end of next week. Levee rebuild on the west bank should begin the week of 9 May.Levee rebuild on the west bank should begin the week of 9 May. Red Zone meeting scheduled for Monday, 2 May 2011. Potential Issues

► Utilities• Columns for the east side under the power line crossing are scheduled to

be placed Friday, 29 April.► Obstructions – The obstruction on the west side will be drilled through and

columns placed under and through the obstruction as per the contractcolumns placed under and through the obstruction as per the contract.

BUILDING STRONG®28 April 2011 20

Page 21: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

OFC-05

BUILDING STRONG®28 April 2011 21

Page 22: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

BUILDING STRONG®28 April 2011 22

Page 23: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

BUILDING STRONG®2328 April 2011

Page 24: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Rip Rap on west side of 17th St Canal.

BUILDING STRONG®2428 April 2011

Page 25: Outfall Canal Remediation ProjectsOutfall Canal ...... · Microsoft PowerPoint - 28 Apr 11.ppt [Compatibility Mode] Author: B2HPOCAC Created Date: 4/28/2011 8:19:46 AM ...

Weekly Construction Status MeetingsWeekly Construction Status Meetings

OFC-05 - 17th Street Canal - Weekly status meetings are held at the job trailer located at 6780 Bellaire on Tuesdays at 1000.

OFC-03 - London Avenue Canal - Weekly status meetings are held at the job trailer at 5701 Pratt Drive (directly across from DPS #4) on Tuesdays at 0830.

OFC-04A - Orleans Avenue Canal – Weekly status meetings are held at the job trailer located at Marconi & Filmore on Wednesdays at 0830.

BUILDING STRONG®28 April 2011 25