Capacity Market
Registration & Prequalification webinar – Aug 2016
Webinar Etiquette
Questions via chat function
2 MM
Todays Webinar
End to end process
including 2016 Rule
and Regulation
changes;
Common reasons for
Application rejection
from last year; and
What the team will be
doing during
Prequalification.
3 MM
The Process
Key aspects of Registration and Prequalification
4
Register a company Set up users Add details to a
company and set up a CMU
Create and save an application
Submit an application
Results
1 2 3
4 5 6
MM
Prequalification Overview
Prequalification required to “verify” that potential
sources of capacity are genuine physical resources
Three key considerations for an Application:
1. Applicant must be either the Legal Owner of the asset
or its Despatch Controller (with agreement from the
Legal Owner)
2. Accompanied by declarations signed by two directors
or officers of the Applicant
3. Submitted by the end of the Prequalification Window
(via the EMR portal) by 17:00 on Friday 26 August
5
Prequalification Process
Prequalification
process is user
driven
System is designed
to guide parties
through the process
We can answer
queries about the
prequalification portal
We can’t give
“advice” about how a
project should be
presented into
prequalification
No contact with us
during the
assessment window
6 6 MM…TS
Register a Company
Via the portal and
click on “Capacity
Market”
Scroll to the
Registration link and
click it
Follow the on-screen
instructions to
complete the
Registration form
Subscribing to the portal does not mean you have registered!
Quick Link: EMR Company Registration and User Management
user guide 7 TS
Register a company
High Level Principles
All Companies will need to
register
Other “company users” may be
added to the portal
Companies previously
registered will not need to re-
register
A single Registration allows
applications for all three
auctions
Audit Trail – anything that
happens is traceable
NG cross-checks company
details against public record
Each Company needs to
nominate at minimum;
Company Secretary/Director
(Authorised Person) –
somebody recognisable in
the public domain
Proposed “Main Administrator”
– somebody who will fill in
the application
Copy of registration form must
be printed on company letter
head and signed by a director
or company secretary
All log-ins are password and
PIN protected - important that
email and mobile numbers are
accurate to issue passwords
and PINs
8 TS
Set up users
The Main Administrator can register additional users to log-in to their
Company's area of the Admin System and carry out specific roles
Each of these users must be given "privileges" to carry out specific roles
for the Main Company or any Sub-Company.
Quick Link: EMR Company Registration and User Management user guide
9 TS
Adding details to a company
Basic company information created through a company registration
process
Upload the following where it is required
A copy of the company’s Certificate of Incorporation
Prequalification Certificate
Certificate of Conduct
If the Applicant is part of a Group – the name of its direct Holding
Company – this is not provided in the system – PLEASE DETAIL
THIS ON THE PREQUALIFICATION CERTIFICATE IF
APPLICABLE
Where applicable, confirmation of an interconnection licence
Legal Opinion & Bank Account details – these items were removed in
2015 but are still present in the system, they do not need to be filled in
10 2016 Rule change TS
Set up CMU
Type & Classification
If CMRS CMU
Existing Generating CMU
Existing Interconnector CMU
New Build Generating CMU
New Build Interconnector CMU
Refurbishing Generating CMU
Refurbishing Interconnector CMU
If Non- CMRS
Existing Generating CMU
New Build Generating CMU
Refurbishing Generating CMU
Proven DSR CMU
Unproven DSR CMU
CMU Type is defined in
the Regulations and the
Rules (Rule 3.2)
You must select the
correct CMU Type as
you will be assessed as
the type you select & this
cannot be changed
This drives the rest of the
application
11 TS
CMU Data Requirements
CMU Data
All
Connection Capacity & Tech. Class
Contact Details for Secondary Trading
Metering Information (now optional for 2016
applications
Nomination relating to the CMU and CMU
Component
Primary Fuel Type
Existing
Generating
Connection Agreements
Transmission Connected:
Distribution Connected For Private Network
connections
New Build
Generating
Connection Agreement
Construction Plan
Credit Support
Planning Consents
Refurbishing
Generating
Additional Information to cover both possible states
of the CMU or submit an “Opt-Out Declaration for the
“Pre-Refurbishment CMU” if it is a “Mandatory CMU”: 12 2016 Rule change TS
CMU Data Requirements
CMU Data
Proven DSR
Business Model
DSR Test Certificate
Permitted On-Site Gen Units
Unproven DSR
Business Plan
Credit Support
DSR Test Certificate
Metering Assessment
Existing
Interconnector
Connection Agreements
Interconnector Licence
Technical Data
New Build
Interconnector
Connection Agreement
Construction Plan
Credit Support
Planning Consents
Technical Data
Application / Opt-
Out
Bulk of all data required is set up against a CMU and,
when completing the Application / Opt-out
Notification,
The system will copy all of the appropriate CMU and
company data into the Application / Opt-out.
13 2016 Rule change TS
All CMUs Data Requirements
14
Information Details Comment
Nomination
relating to the
CMU Component
Description of and location of the CMU
component
MPAN numbers and other relevant meter
numbers
BMU ID or Balancing Services ID (if
applicable)
Data to be entered
in Prequalification
System
Connection
Capacity & Tech.
Class
Connection Capacity or DSR Capacity of
a component
Technology Class of a component
(The system
aggregates these
to give CMU
Connection
Capacity)
Nomination
relating to the
CMU
Name of CMU
Type of CMU – which sets the Additional
Information Required
System generated
Drop-Down Box
TS
All CMUs Data Requirements
15
Contact Details for Secondary Trading
Information Details Comment
Email Address
& Telephone
No.
Email Address and Telephone Number that can
be used by a person wishing to discuss
secondary trading in relation to the CMU
This is not provided
in the system –
DETAILS FOR HOW
TO FOLLOW
Metering Information (now optional for 2016 Applications)
Information Details Comment
Metering
Assessment
Questions to establish if the Settlement Body will need to carry
out a further detailed check of metering arrangements
Metering Info Line Diagrams and other data on the CMU’s metering set-up
Metering Config. Confirmation of CMU’s Approved Metering Configuration
Information Details Comment
Primary Fuel
Type
For Generating CMUS only, the Primary Fuel Type
intended for the CMU at the time the Application
is made
OCGT & reciprocating engines – gas, diesel, & other
Please choose from
the drop down menu
in the CM Type
2016 Rule change(s) TS
Existing Generating CMU
16
Regulation 4 – An Existing Generating Unit (or combination of two of more units) which provides
electricity, is capable of being controlled independently from any other generating unit, net output is
measured by half-hourly meters and has a connection capacity not less than the minimum capacity
threshold (2MW).
Information Details Comment
Connection
Agreements
Transmission Connected:
Copy of one or more Grid Connection Agreement for
at least the De-rated capacity for the relevant Delivery
Year
Distribution Connected – one of:
Copy of one or more Distribution Connection
Agreement for at least the de-rated capacity for the
relevant Delivery Year
Copy of one or more Distribution Connection Offer for
at least the de-rated capacity for the relevant Delivery
Year
For Private Network connections – a letter from the
owner of that private network confirming the full output
that CMU is able to export to the network and that the
owner of the Private Network has a Distribution
Connection Agreement or Offer.
This must be
uploaded in
electronic copy
TS
New Build Generating CMU
17
Regulation 4 – a Prospective Generating Unit (or combination of 2 or more units) which, when
commissioned, will be capable of being controlled independently from any other generating unit, net
output is measured by half-hourly meters and has a connection capacity not less than the minimum
capacity threshold (2MW). A Prospective Generating Unit means a generating unit or proposed
generating unit that has not been commissioned.
Information Details Comment
Planning
Consents
Legal right to use the land and all Relevant
Planning Consents obtained (or able to
defer declaration to 22 Days before auction)
Documentary evidence of Planning
Consents
Additional Planning Consent requirements:
• If Planning Consent “time limited” evidence
that the end date of the consent is after the
expiry of any future Capacity Agreement
• If the MW capacity granted by the planning
consent is less than the connection
capacity of the CMU evidence justifying the
difference
Declaration, evidence of
Consents, and confirmation of
right of use of land.
2016 Rule changes TS
New Build Generating CMU
18
Information Details Comment
Construction
Plan
Brief description of the works
Schedule identifying :
Signing of EPC/equivalent Major Contract
Start of construction works
Main Foundations Complete
Gas/Steam Turbine Delivery
Back-feed Milestone
First Firing
Substantial Completion Milestone
Amount of Capital Expenditure proper to be
incurred within 77 months of the commencement
of the Delivery Year.
That the expected Capital Expenditure exceeds 3
or 15 year thresholds (£130/kw and £255/kw)
Capital Expenditure not previously considered in
respect of any CMU which has a Capacity
Agreement
Extended Years Criteria
Data to be entered
directly in
Prequalification
System
2016 Rule changes TS
New Build Generating
19 2016 Rule changes
Information Details Comment
Connection
Agreement
Transmission Connected:
Copy of one or more Grid Connection Agreement for at least the
De-rated capacity for the relevant Delivery Year(s)
Distribution Connected – one of:
Copy of one or more Distribution Connection Agreement for
at least the de-rated capacity for the relevant Delivery Year(s)
Copy of one or more Distribution Connection Offer or at least
the de-rated capacity for the relevant Delivery Year(s)
Declare the CMU will have such a connection offer at least 18
months prior to start of Delivery Year (6 months prior for the
Early Auction)
For private wire connections
Confirmation that the owner of the Private Network will have
an agreement with the relevant DNO at least 18 months prior
to the start of the Delivery Year. (6 months prior for the Early
Auction)
Soft copy to be
uploaded with
application
Credit
Support
Credit support to cover Termination Fee(s) and Draw Downs
Unless Credit Cover remains in place for the same CMU from a
previous auction – this must be declared in the Application using
any of the free text boxes and flagged to the Settlements Body.
Follows after
Prequalificatio
n Results Day
TS
Refurbishing Generating
20
CM Rules and Regulation 4 – an Existing Generating Unit which is the subject of an Application as
a Prospective Generating CMU by virtue of an improvements programme that will be completed
prior to the commencement of the first Delivery Year.
Information Details Comments
Additional Information to
cover both possible
states of the CMU or
submit an “Opt-Out
Declaration for the “Pre-
Refurbishment CMU” if
it is a “Mandatory CMU”:
Exceptions
Planning Consents
declaration not needed if
no further consents
required – please state if
this is the case
Construction Plan need
not specify a “Back-
Feed Milestone”
Capital Expenditure
allowed is that spent
from Auction Results
Day to start of Delivery
Year
Must also make additional statement in
Prequalification Certificate if multi-year
agreement is needed to undertake the
refurbishment
TS…TG
Proven DSR
21
Regulation 5 - A DSR CMU for which a DSR test has been carried out. The DSR provider must, in
relation to each component, be the DSR customer, own the DSR customer or have contractual
control over the DSR Customer.
Information Details Comment
DSR Test
Certificate
DSR Test or Joint DSR Test required to be completed
prior to the commencement of the Prequalification
Window – successful completion of which will see a
DSR Test Certificate being issued
Upload of scanned
document
Permitted On-
Site Gen Units
Details of all such generating units and their electrical
connections to the site where DSR Capacity is being
provided
Data to be entered
directly in
Prequalification System
Business
Model
Data to be entered
directly in
Prequalification System
Please note the new
declarations
Print and Fill 2016 Rule changes
TG
Unproven DSR
22
Regulation 5 - A DSR CMU for which a DSR test has not been carried out. The DSR provider must,
in relation to each component, be the DSR customer, own the DSR customer or have contractual
control over the DSR Customer.
Information Details
Business
Plan
Print and Fill
TG
Unproven DSR
23
Information Details Comment
DSR Test
Certificate
Confirmation that the a DSR Test will be completed prior
to the start of the relevant Delivery Year
Metering
Assessment
Confirmation the a Metering Assessment will be
completed and if necessary a Metering Test will be
completed in each case prior to the start of the relevant
Delivery Year
Credit Support
Credit support to cover Bid Bond
To be provided to Settlement Body
Unless Credit Cover remains in place for the same
CMU from a previous Auction – this must be
declared in the Application using one of the free text
boxes
2016 Rule changes TG
Existing (Opt In) Interconnector
24
Regulation 5A – An Interconnector that has been commissioned, has a connection capacity greater
than 2MW and the net output is measured by one or more half hourly meters.
Information Details Comment
Interconnector
Licence
Declare whether the Applicant holds an
Interconnector Licence at time of applying.
Connection
Agreements
Provide copy of Connection Agreement (Grid
Connection Agreement(s) or Distribution Connection
Agreement(s) or letter from DNO) confirming that
they permit the Generating Unit in the CMU in
aggregate to export at least the Anticipated De-rated
Capacity of the CMU
This must be
uploaded in
electronic copy
Technical Data
- Technical specifications of the Interconnector
- Country interconnector connects to GB
- Forecast technical reliability for the relevant
Delivery Year
Data to be entered
directly in
Prequalification
System
TG
New Build Interconnector
25
Regulation 5A – an electricity interconnector or prospective interconnector which is not yet
commissioned and, when commissioned, will have a connection capacity greater than 2MW and the
net output is measured by one or more half hourly meters.
Information Details Comment
Planning
Consents
Legal right to use the land and all Relevant
Planning Consents obtained (or able to defer
declaration in 2015 to 22 days before auction)
Documentary evidence of Planning Consents
Additional Planning Consent requirements:
• If Planning Consent “time limited”
evidence that the end date of the
consent is after the expiry of any future
Capacity Agreement
• If the MW capacity granted by the
planning consent is less than the
connection capacity of the CMU
evidence justifying the difference
Declaration, evidence of
Consents, and confirmation of
right of use of land.
Technical
Data
- Technical specifications of the
Interconnector
- Country interconnector connects to GB
- Forecast technical reliability for the relevant
Delivery Year
Data to be entered directly in
Prequalification System
2016 Rule changes TG
New Build Interconnector
26
Information Details Comment
Construction
Plan
Brief description of the works
Schedule identifying :
a) Signing of EPC/equivalent Major Contract
b) Start of construction works
c) Main Foundations Complete
d) Commencement of Cable Laying*
e) Back-feed Milestone
f) First Test Connection Date*
g) Substantial Completion Milestone
The Total Project Spend for the construction of the New
Build Interconnector CMU. Capital Expenditure not
previously considered in respect of any CMU which
has a Capacity Agreement
Data to be entered
directly in
Prequalification
System
* - These items are
worded as per the
generation
equivalents in the
Portal
Connection
Agreement
A copy of one or more Grid Connection Agreements with
sufficient Transmission Entry Capacity for at least the
De-Rated capacity secured by the start of the Delivery
Year
Soft Copy to be
uploaded into
Auction System
Credit Support
Credit support to cover Non-Completion Fee @
£5,000/MW
To be provided to Settlement Body
Unless Credit Cover remains in place for the same
CMU from a previous auction – this must be declared
in the Application using one of the free text boxes &
flagged to the Settlements Body.
Follows after
Prequalification
Results Day
2016 Rule changes TG
Application / Opt-Out
Bulk of all data required is set up against a CMU and,
when completing the Application / Opt-out Notification,
the system will copy all of the appropriate CMU and
company data into the Application / Opt-out.
This data once set-up can be reused each year if it has
not changed.
If some data changes then the new data can be
updated without having to upload all of the unchanged
data again.
27 TG…TS
Create and Save an Application
28
Information Details Comment
If the Application is from a
company acting as the
Despatch Controller or
Joint Owner for the CMU
then an Applicant
Declaration signed by
Directors of both the Legal
Owner and the Despatch
Controller / Joint Owners
is required
Previous Performance
(Existing Generating
CMUs, Existing
Interconnector CMUs or
pre-refurbishing element
of Refurbishing CMUs
only)
Identify 3 Settlement Periods of highest metered output in two most
recent calendar years of operation (up to 1 month before the start of
the Prequalification Window) when de-rated capacity was delivered
Confirmation of output and optional line loss factor methodology
applied for non-CMRS generating CMUs in letter from Supplier, or
evidence that output provided via balancing service
If a plant has been
mothballed, then this
could be in the last two
years of operation, but it
is key that the dates are
identified for National
Grid.
STOR Declaration
Applicant must also declare that either:
a) It is not the subject of a Relevant STOR Contract or
b) It is the subject of a Relevant STOR Contract but irrevocably
undertakes to withdraw from the contract should it be awarded a
Capacity Agreement
Tick Box Declarations in
Application
Low Carbon Exclusions - Declarations relating to Low Carbon Exclusions and Low Carbon
Grants
Tick Box Declarations in
Application
2016 Rule change TS
Create an Opt-Out Notification
29
Information Details Comment
Status Details
Must declare whether and provide
reason for:
Will be permanently non-operational
by the start of the Delivery Year
Will be temporarily non-operational
for all the Winter of the Delivery Year
Will remain operational for the
Delivery Year
Data to be
entered directly
in
Prequalification
system
For an Opt-Out Declaration a CMU must be created and CMU Component
data submitted (as if for an Existing CMU) before its Opt-Out Status is
confirmed
TS
Submit an application
Applicants who wish to enter the same CMU in multiple Auctions
will need to submit one application per auction
You can withdraw a submitted application, make changes and
submit again till 5 p.m. on 26/08/2016. You will not be able to
withdraw your application after this deadline.
Click the ‘Submit’ button only once else it will generate multiple
applications
The Delivery Body will assess only the latest application if more
than one applications are submitted for the same CMU for the
same Auction
30
Finally a set of declarations must be completed within the
application
This is the last step!
TS…TG
Results
National Grid will provide
a notification to each
party that submitted an
Application informing
them if they have
prequalified, conditionally
prequalified or rejected
The Capacity Market
Register will also be
published containing the
information specified in
chapter 7 of the Capacity
Market Rules 31
Notice of Prequalification success
Prequalification Decision Prequalified or Conditionally Prequalified
Applicant Applicant xxxa
Identity of CMU CMU xx1
Type of CMU CMU Type
De-rated Capacity XMW
Whether the unit is currently prequalified as a Price-Maker or Price-Taker
Price-Maker/ Taker
If successful at Auction is the CMU subject to a Metering Test
Metering test required/not required
Whether Prequalification is conditional on providing credit support pursuant to Rule4.5.1 (b) (ii) or 4.5.1 (b) (iii) or 4.5.1 (b) (iv)
Conditional – Please provide [the required amount of collateral] to the Settlement Body.
Whether Prequalification is conditional on providing Planning Consents requirement of Rule 4.7
Conditional - Planning consent declaration required
The Maximum Obligation Period of the Capacity Agreement it may bid for
Agreement duration x years
Additional Information Any other pertinent information.
Notice of Prequalification Rejection
Prequalification Decision
Rejected
Applicant Applicant xxxa
Identity of CMU CMUxx1
Type of CMU CMU Type
De-rated Capacity XMW
Additional Information The reasons for rejection
TG
Common reasons for rejection
Application Declarations
Company Address
Company Documents (e.g. PQ
Cert, Cert of Conduct etc)
Connection Agreement
Construction Plan Declaration
Credit Cover Elexon Receipt
Details of Total Project Spend
Historic Output Data
Extended Years Criteria
Metering Documents
Method used to calculate the
Connection Capacity
Planning Consents -
declaration/documents
Price Maker / Taker Status
Provide OS Grid reference
Sign and date certificates for the
company
STOR Declaration
Supplier/DNO Letter - make sure
the Supplier letter breaks down the
CMU output into the individual
component outputs
Three highest historic outputs
not each in excess of the de-
rated capacity
32 TG…MM
Prequalification Key Dates
33
Aug Sept Oct Nov Dec Jan Feb Mar
01/08/2016 - Pre-qualification Submission Window Opens 09:00
26/08/2016 Pre-qualification Submission Window Closes 17:00
30/08/2016 Pre-qualification Assessment Window Opens
23/09/2016 Pre-qualification Assessment Window Closes / Results Day
26/09/2016 Tier 1 Disputes Window Opens
30/09/2016 Tier 1 Disputes Window Closes
14/10/2016 Pre-qualification Results Register Update 17:00
06/12/2016
T-4 Auction Starts
31/01/2017
Early Auction Starts
22/03/2017
Transitional Auction Starts
Only Applicants
informed of their results
in 2016
2016 Rule change MM
What is the team is doing …
Administering the process Logging common queries
Continuing Agreement
Management Handling customer queries
Developing subject matter
experts
Building knowledge of rules
and regulations
Follow us on Twitter @EMRDeliveryBody
34 MM
The CM team
35
Capacity Mechanism Manager
Matthew Magill
EMR Delivery Manager
Laura Brock
EMR Delivery Manager
Ian Nicholas
Senior EMR Analyst Neil Morgans
Auction Analyst Vikas Garg
Auction Analyst Tim Dart
Customer Team Leader
David Williams
Senior EMR Analyst Richard Griffiths
Customer Team Leader
Faye Purchase
Senior EMR Analyst Angela Hodgson
Capacity Market Account Manager
Tushar Singh
Capacity Market
Customer Lead
Emily Hirst
EMR Analyst Tim Gregory
EMR
Pre-Qualification
Team
Customer Team
Rules & Regulations Team
AuctionTeam
Reminder: Capacity Market Notices
System Operator responsible for communicating CMNs
CMNs are not an operational dispatch tool
Operational messages will continue to appear on BMRS
2016/17 Transition Period is an opportunity to learn
Particular interest in 4hr and 500MW (threshold) constants
System Stress Event confirmation follows SO analysis
Subscribable website launched for CMNs, Stress Events mid-Sept
MM
Key Messages from today…
Understand the process for your company and CMU type
Read the related rules and regulations and guidance information
Think about what this means for you
We are here to support you and Good Luck!
Next Steps
Slides available later today
Telephone / 121s on 10, 11, 17 and 18 August booked by emailing
Please include your CMU type / short description of query in the
subject heading
Your thoughts about todays webinar using the poll
37 MM
APPENDIX
38 MM
Useful resources
39
Ref. CMU Classification
40
CMRS CMUs Non CMRS CMUs
Transmission CMU
A Generating or Interconnector
CMU, each Unit of which Exports
to the Transmission Network. The
Metering System for the
corresponding BMU is registered
in the Central Meter Registration
Service in accordance with the
BSC.
Or
CMRS Distribution CMU
A Generating or Interconnector
CMU, each Unit of which Exports
to a Distribution Network. The
Metering System for the
corresponding BMU is registered
in the Central Meter Registration
Service in accordance with the
BSC.
Non-CMRS Distribution CMU
A Generating Unit, each
Generating Unit of which supplies
Electricity to a Distribution
Network. The Metering System is
not registered with the Central
Meter Registration Service.
Proven DSR CMU
A DSR CMU for which a DSR test
has been carried out.
Unproven DSR CMU
A DSR CMU for which a DSR test
has not been carried out.