    Methods for Development of Project plan objectives:

    A clear understanding of the plan objectives is a requirement for the plans success.

    Ensure that the objectives are achievable, measurable, simple to understand and consistentwith the resources levels fixed (as per the assumptions made in DPR estimates.

    Planning aims at achieving the project completion making the most effective use of time andresources.

    What?

    Describe the project objectives and its end results in detail and define the scope of work to beaccomplished. This will help on understand the plan better, in regard to the work and theproject specific problems.

    Why?

    State the purpose of the project and why it is important to the national economy, to thesociety, to the stakeholders, to you and to the project team. The project purpose andrationale will guide the plans preparation and make the total task easy.

    How?

    State the strategy and approach or method proposed to be adopted in the projectsexecution. Define the managements practices, construction technology, controlling andadministrative procedures, information systems etc. and whether execution is proposed to be

    done through turnkey contracts, other forms of procurement and contracting ordepartmentally. Describe documentation and coding and accounting procedures. Specify thefinancial power.

    Where?

    Geographic area or place of work is relevant if the project enterprise has several offices orplaces of work or operating stations. Define the area or location where different activities willbe carried out. In a multilevel or multi divisional organisation, the organizational level ordivision or team to which different tasks are assigned shall be defined.

    When?

    Fix at time frame to the total project, with a schedule or major milestones, in line with thecommitment made in the DPR and then, within the overall time frame, fix time duration forevery major project activity. Distribute the entire work over the project duration. Determinesequence and priorities in an acceptable manner, suiting the overall plan.

  • 7/28/2019 Organizing Sysytems and Procedures of Project Implementations

    2/5

    How much?

    State the quantities of the major activities. These are taken from the DPR estimates andsubjected to refinement made possible by subsequent improvement in design and projectspecifications. State the level of resources requirements against various tasks, based onDPR estimates and subsequent firming up.

    Who?

    Design the project organisation and assign responsibility to teams and individuals with dueconsideration for competence. Specify the type and size of organisation, hierarchy and levels,qualifications and experience for each position etc and job specifications of every position.

    Programming:

    Program is the fore-runner of schedule.It is form a program of action that the schedule is prepared.

    Listing of work:List the tasks and the activities under each task, showing main work elements of the totalproject by functions/discipline/skills/crafts.These lists will form the foundation of the subsequent step of amore detailed definition ofwork. The list can be simple, phase wise, tabular statement with columns for TASKCODE/TASK DESCRIPTIONS/DURATIONS/ESTIMATED MANDAYS (CATEGORYWISE).

    Definition of Work:

    Here define the listed work elements in greater detail for clearer understanding. This

    definition should remove uncertainties, if any, contained in DPR.

    Work Breakdown Structure:WBS is prepared by studying the design and engineering characteristics and requirements ofthe project, and breaking down the project into smaller elements, in different levels thus:Level 1: the total projectLevel 2: major segments of the projectLevel 3: Tasks in every segmentLevel 4: Activities in every taskLevel 5: Elements in every activity

    The Project engineering department normally prepares a WBS manual which describes everyelement in detail.

    Codification:

    Codification of tasks and related project accounts facilitate effective management and control.It is usual practice in all large projects to use structured codes for identification, reference,accounting, integration and computerization of drawings and technical documentations, WBScontents, costs , purchase orders, budget commitments, equipments and material,

  • 7/28/2019 Organizing Sysytems and Procedures of Project Implementations

    3/5

    schedules, off-site and infrastructural facilities, manpower and other inputs, contracts, bills,progress reports, performance evaluation, income and expenditure, assets and liabilities etc.

    The numbering structure should be logical, interrelated and level-related as suggested below.

    Project number XWork package XX

    Task XXXActivity XXXXWork element XXXXXOrganizational Element AAEquipment/materials/services BBType of Work CCCost/Financial Account Head DDType of Document MMThe structure of codification would depend on the type, size and accounting needs of theproject and enterprise.

    Coding can be done either numerically or alphabetically or combined alpha-numerically.Alpha-numeric codes are short as one alphabet can replace two or more numerals.

    Modeling the Work:

    Make graphic models of the main segments and important elements of the work. Thesemodels will help you understand the variables you have to handle in translating the plan intoreality.

    Fixation of Sequence and Priority:

    A project is an integrated whole unit into which hundreds of tasks and thousands of workelements are integrated.So, work programming has to be done with the interrelationship of work in mind.Interfacing of the models will establish the interrelationship. It must be possible to carry outmany work elements independently upto their assembly stage, but in a project with a fewhundred thousand identifiable work elements, one cannot afford to leave half of themexecuted out of sequence and wait for mass finishing, assembly, connections and towardsthe end of the project.

    That would cause a lot of confusion, wastage; lock up of money and in most casesremobilization and even some rework.

    Moreover, in a large project, different work packages may have different phase outcommissioning dates for technical and financial reasons, necessitating a correspondinglyphased out completion of work.

    Besides, for economic or technical reasons, some segments may have to be accomplishedon priority over others.

    For these reasons, sequence and priority have to be given due considerations while duringprogramming.

  • 7/28/2019 Organizing Sysytems and Procedures of Project Implementations

    4/5

    Fixation of Activity Duration:

    Every activity shall be allocated realistically estimated time duration so that the sum total ofall such durations minus the net overlapping would be equal to the project duration.It is usual to fix a shorter than permitted duration, keeping a few days buffer time for anypossible slippage. This provision is called contingency time.Scheduled completion time plus contingency time is the target time.

    Scheduling:Scheduling is a substantial improvement on programming.Scheduling is principally the exercise of laying out and integrating time, resources and themain work elements of engineering, procurement and construction in the most efficientmanner to achieve the project execution.

    Forward and Backward Scheduling:Forward and backward scheduling is a strategy used for keeping down the level of resourcesdeployment and making the optimum use of them by taking advantage of floats.For doing this, time estimates have to be made for all individual work elements.

    Forward schedule starts as soon as working front clearance available for an activity and itoften finishes before the required due date. The philosophy here is finishing every activity asearly as possible.

    Backward schedule starts backwards from the required due date of finishing the activity andarrives at a required starting date. The starting date so arrived at will be the latest startingdate. The guiding philosophy here is finish economically when required.

    Resource Assessment and Matching SchedulingEvery projects owner resources have some limitations for reasons of economy and previouscommitments. So what is usually done in scheduling is as follows:

    Take stock of the total available resources that can be mobilized during the activity

    time, after previous commitments if any.

    Assess the most economic quantity of resources requirements for finishing the activity

    within the time duration.

    If the resources required is more than available resources, try to revise the activity

    duration using forward and backward scheduling technique and adjust the volume ofactivities to suit the available resources, taking advantage of floats , but with dueconsideration to dependencies of activities and overall project completion target and

    then calculate the. Make provision for procurement of the difference between reassessed requirements of

    resources and available resources

    Manpower schedules:Master manpower planning is required for:

    1. Project Management for the project duration2. Construction till the completion of construction3. Operation and maintenance4. Management and Control

  • 7/28/2019 Organizing Sysytems and Procedures of Project Implementations

    5/5

    You must ensure availability of the required number of the right type of staff and workmen forproject management suiting the overall project schedule. This must be related to themanpower estimated given in DPR.

    Ordering and Delivery Schedule:For all equipment and materials including bulk materials that go into the project, separateexhaustive lists should be prepared first for guidance in scheduling their ordering and receipt

    at site.The total procurement time plus any possible slippage time should be kept in mind whileordering the equipment and materials to suit the project.

    Schedule of Maintenance Spare Parts:The project planner usually plans also for the procurement of initial plant and machinerymaintenance spares. In consultation with the engineering, operations and maintenancedepartments, the planner makes out a list of spares, collects the relevant drawings andspecifications , ascertains the sources of supplies, obtain quotations and depending upon thelead time and level of stock required to be maintained, raises time phased purchaserequisition for about one to two years requirement.

    Other Supporting schedules:A large project shall have several supporting schedules of resources and infrastructureactivities. These are made with the objective of managing and controlling projectImplementation in the best possible manner. There shall also be supporting schedulesprepared factor wise as per requirements.

    Integration of schedules:All supporting schedules must be dovetailed appropriately into the master schedule.

    Principles of Schedule:Schedules must be sufficiently detailed, easy to understand, comprehensive, realistic andfeasible and must form quantitative baseline for monitoring and control. They should correlateobjectives, resources, cost and time and aim at speedy execution of the project, using theleast possible amounts of resources, making optimum use of them.

    ConclusionPlanning, organisation and control are the main components of project management after thestudies, clearances and financing phases.

    As per the management expert Luther Gulicks there is a term PODSCORB which stands forthe following:Planning: establishing broadly what needs to be done and how to achieve itOrganizing: creating formal management structuresDirecting: carrying out the role of leader-making decisions, giving orders and making surethey are carried out.Staffing: recruiting, selecting and training people to do the work.Coordinating: pulling together disparate elements of the work, so that they all support thesame overall objectivesReporting: through record, measurement and monitoring, keeping track of progress andproviding relevant feedback to himself, his superiors and subordinatesBudgeting: the process of control, particularly financial control.