or t h o- r a t i e l o r Stret a d Second Avenue Subway...

3
Second Avenue Subway Phase 2 Fact Sheet Federal Transit Administration The Second Avenue Subway is Coming to East Harlem ! ( ! ( ! ( ! ( ! ? ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ? ! ( Central Park Marcus Garvey Park Metro-North Railroad 6 125th Street Station 116th Street Station 106th Street Station 116th St 110th St 106th St 125th St Third Avenue Madison Avenue Fredericj Douglass Blvd Fifth Avenue Malcolm X Blvd 108th St 112th St 115th St 118th St 120th St 124th St Second A Park Avenue Lexington Avenue ! ( Station Entrance ! ? Alternative Entrance ! ( Ancillary Facility ! ? Alternative Ancillary Facility Proposed Station Platforms With the recent opening of Phase 1 of the Second Avenue Subway, the Metropolitan Transportation Authority (MTA) is now advancing Phase 2. Phase 1 extended Q subway service from 63rd Street to 96th Street along Manhattan’s East Side, with new stations at 72nd, 86th, and 96th Streets, providing one-seat service from the Upper East Side to Times Square and on to Coney Island via the Broadway line. Phase 2 will extend into East Harlem to 125th Street and include three new stations at 106th, 116th, and 125th Streets. Phase 2 will provide direct passenger connections to the Lexington Avenue (4/5/6) subway line at 125th Street and an entrance at Park Avenue to allow convenient transfers to Metro-North Railroad. 4 5 6 Phase 2 Stations: Like the new stations in Phase 1, the stations in Phase 2 at 106th Street, 116th Street, and 125th Street will be bright and modern. The stations will be air tempered (cooled) and will have entrances with elevators and escalators. All stations will be accessible consistent with the Americans with Disabilities Act. Each station will have above-ground ancillary buildings that house ventilation, mechanical, and electrical equipment. These will include space for possible ground-floor retail. What’s Happening Now? MTA is currently advancing the design for Phase 2, including: • Station layouts – locations of platforms, entrances, and ancillary buildings • Need for property acquisition • Field investigation – geotechnical borings drilled through the street and sidewalk to provide information on soil and rock layers; investigation of existing utilities MTA is also conducting environmental review to evaluate the impacts of the new subway on the community and environment. As part of this process, MTA has incorporated and will continue to seek measures to reduce impacts as part of Phase 2 of the subway wherever possible.

Transcript of or t h o- r a t i e l o r Stret a d Second Avenue Subway...

Page 1: or t h o- r a t i e l o r Stret a d Second Avenue Subway ...web.mta.info/capital/sas_docs/ea_phase2/SAS_Factsheet_7_6_18.pdfConstruction work will include: • Modification and use

Second Avenue Subway Phase 2Fact Sheet

Federal Transit Administration

The Second Avenue Subway is Coming to East Harlem

!(

!(

!(

!(

!? !(!(

!(

!(

!(

!(

!(

!(!( !(

!?!(

Central Park

MarcusGarvey Park

Met

ro-N

orth

Rai

lroad

103rd St

6

5

4

125th Street Station

116th Street Station

106thStreetStation

127th St

116th St

110th St

106th St

125th St

Third

Ave

nue

First

Aven

ue

Mad

ison A

venu

e

Fred

ericj

Doug

lass B

lvd

Fifth

Aven

ue

Malc

olm X

Blvd

104th St

108th St

112th St

115th St

118th St

120th St

124th St

Seco

nd A

venu

e

Park

Aven

ue

Lexin

gton A

venu

e

127th St

!( Station Entrance

!? Alternative Entrance

!( Ancillary Facility

!? Alternative Ancillary Facility

Proposed Station Platforms

!(

!(

!(

!(

!? !(!(

!(

!(

!(

!(

!(

!(!( !(

!?!(

Central Park

MarcusGarvey Park

Met

ro-N

orth

Rai

lroad

103rd St

6

5

4

125th Street Station

116th Street Station

106thStreetStation

127th St

116th St

110th St

106th St

125th St

Third

Ave

nue

Firs

t Ave

nue

Mad

ison

Aven

ue

Fred

ericj

Dou

glas

s Blvd

Fifth

Ave

nue

Malc

olm

X B

lvd

104th St

108th St

112th St

115th St

118th St

120th St

124th St

Seco

nd A

venu

e

Park

Ave

nue

Lexin

gton

Ave

nue

127th St

!( Station Entrance

!? Alternative Entrance

!( Ancillary Facility

!? Alternative Ancillary Facility

Proposed Station Platforms

With the recent opening of Phase 1 of the Second Avenue Subway, the Metropolitan Transportation Authority (MTA) is now advancing Phase 2. Phase 1 extended Q subway service from 63rd Street to 96th Street along Manhattan’s East Side, with new stations at 72nd, 86th, and 96th Streets, providing one-seat service from the Upper East Side to Times Square and on to Coney Island via the Broadway line. Phase 2 will extend into East Harlem to 125th Street and include three new stations at 106th, 116th, and 125th Streets. Phase 2 will provide direct passenger connections to the Lexington Avenue (4/5/6) subway line at 125th Street and an entrance at Park Avenue to allow convenient transfers to Metro-North Railroad.

456

Phase 2 Stations:Like the new stations in Phase 1, the stations in Phase 2 at 106th Street, 116th Street, and 125th Street will be bright and modern. The stations will be air tempered (cooled) and will have entrances with elevators and escalators. All stations will be accessible consistent with the Americans with Disabilities Act.Each station will have above-ground ancillary buildings that house ventilation, mechanical, and electrical equipment. These will include space for possible ground-floor retail.

What’s Happening Now?MTA is currently advancing the design for Phase 2, including:

• Station layouts – locations of platforms, entrances, and ancillary buildings

• Need for property acquisition• Field investigation – geotechnical borings drilled

through the street and sidewalk to provide information on soil and rock layers; investigation of existing utilities

MTA is also conducting environmental review to evaluate the impacts of the new subway on the community and environment. As part of this process, MTA has incorporated and will continue to seek measures to reduce impacts as part of Phase 2 of the subway wherever possible.

Page 2: or t h o- r a t i e l o r Stret a d Second Avenue Subway ...web.mta.info/capital/sas_docs/ea_phase2/SAS_Factsheet_7_6_18.pdfConstruction work will include: • Modification and use

Second Avenue Subway Phase 2

Construction Construction of Phase 2 of the Second Avenue Subway will include moving some utilities (water, sewer, electric) currently located under Second Avenue away from the construction zone, excavation for the new tunnel and stations, and construction of the station entrances, ancillary buildings, and connections to the 4/5/6 subway at Lexington Avenue. MTA is seeking to minimize construction impacts on the community as much as possible.

Environmental ReviewThe National Environmental Policy Act (NEPA) requires environmental review for projects that will seek federal funding. As required by NEPA, the Federal Transit Administration (FTA) and MTA evaluated the full proposed Second Avenue Subway between 125th Street and the Financial District in an Environmental Impact Statement (EIS) completed in 2004. Because of the long duration for completion of the new subway, FTA and MTA will prepare an updated supplemental NEPA environmental document for each phase of the subway. Each supplemental NEPA document will evaluate updated conditions and any refinements to the project design from what was presented in the 2004 EIS.FTA and MTA have completed a Supplemental Environmental Assessment (EA) that evaluates the impacts of Phase 2 of the Second Avenue Subway and are now inviting comments from the public on the information presented in the Supplemental EA.

Federal Transit Administration

SUMMARY OF IMPACTS

ConstructionImpacts

• Overall construction for approximately9 years, with construction at somelocations for shorter periods

• Traffic disruption, noise, visualappearance of construction sites,temporary modified access to buildings

PermanentOperational

Impacts

• Beneficial impacts of new subwayservice and enhanced transitaccessibility

• New ancillary buildings 90 to 140 feethigh on Second Avenue, 45 to 75 feethigh on 125th Street; designed to becompatible with neighborhood setting

• New station entrances on both SecondAvenue and 125th Street (see graphicon previous page)

• Need for acquisition of private propertyto accommodate entrances and ancillaryfacilities: possible acquisition of 36 to39 properties and partial acquisitionof 4 to 5 properties. This would resultin an estimated displacement of 170residents and 157 to 505 employees.As with Phase 1 of the Project, MTA willwork with owners and tenants, and willfollow all state and federal regulations forcompensation and displacement, as wellas robust MTA real estate protocols.

E 125 ST

E 116 ST

THIRD AVE

LEXINGTON AVE

PARK AVE

106th StStation

E 110 ST

E 106 ST

116th StStation

125th StStation

Metro-NorthRailroad

Current LexingtonAvenue Station

FIFTH AVE

ExistingTunnels

New Tunnel(Mined Construction) Tail Tracks

(Mined Construction)

MADISON AVE

MALCOLM

X BLVD / LENOX AVE

SECOND AVE

E 109 ST

E 111 ST

E 112 ST

E 115 ST

E 117 ST

E 118 ST

E 119 ST

E 121 ST

E 120 ST

E 122 ST

E 123 ST

E 124 ST

Soil

Cut-and-CoverConstruction

BedrockMined Construction

Ancillary

Entrance

AlternativeOptions

E 122 ST

E 126 ST

SECOND AVE

E 125 ST

E 116 ST

THIRD AVE

LEXINGTON AVE

PARK AVE

106th StStation

E 110 ST

E 106 ST

116th StStation

125th StStation

Metro-NorthRailroad

Current LexingtonAvenue Station

FIFTH AVE

ExistingTunnels

New Tunnel(Mined Construction) Tail Tracks

(Mined Construction)

MADISON AVE

MALCOLM

X BLVD / LENOX AVE

SECOND AVE

E 109 ST

E 111 ST

E 112 ST

E 115 ST

E 117 ST

E 118 ST

E 119 ST

E 121 ST

E 120 ST

E 122 ST

E 123 ST

E 124 ST

Soil

Cut-and-CoverConstruction (Excavation)

BedrockMined Construction

Ancillary

Entrance

AlternativeOptions

E 122 ST

E 126 ST

SECOND AVE

E 125 ST

E 116 ST

THIRD AVE

LEXINGTON AVE

PARK AVE

106th StStation

E 110 ST

E 106 ST

116th StStation

125th StStation

Metro-NorthRailroad

Current LexingtonAvenue Station

FIFTH AVE

ExistingTunnels

New Tunnel(Mined Construction) Tail Tracks

(Mined Construction)

MADISON AVE

MALCOLM

X BLVD / LENOX AVE

SECOND AVE

E 109 ST

E 111 ST

E 112 ST

E 115 ST

E 117 ST

E 118 ST

E 119 ST

E 121 ST

E 120 ST

E 122 ST

E 123 ST

E 124 ST

Soil

Cut-and-CoverConstruction (Excavation)

BedrockMined Construction

Ancillary

Entrance

AlternativeOptions

E 122 ST

E 126 ST

SECOND AVE

E 125 ST

E 116 ST

THIRD AVE

LEXINGTON AVE

PARK AVE

106th StStation

E 110 ST

E 106 ST

116th StStation

125th StStation

Metro-NorthRailroad

Current LexingtonAvenue Station

FIFTH AVE

ExistingTunnels

New Tunnel(Mined Construction) Tail Tracks

(Mined Construction)

MADISON AVE

MALCOLM

X BLVD / LENOX AVE

SECOND AVE

E 109 ST

E 111 ST

E 112 ST

E 115 ST

E 117 ST

E 118 ST

E 119 ST

E 121 ST

E 120 ST

E 122 ST

E 123 ST

E 124 ST

Soil

Cut-and-CoverConstruction (Excavation)

BedrockMined Construction

Ancillary

Entrance

AlternativeOptions

E 122 ST

E 126 ST

SECOND AVE

Construction work will include:• Modification and use of the existing tunnel sections

beneath Second Avenue that were built in the 1970s• Cut-and-cover construction for 106th Street Station

and 116th Street Station to connect to the existingtunnel sections

• Mined tunnel constructed below-ground using aTunnel Boring Machine from Second Avenue at 120thStreet to 125th Street near Lenox Avenue; minedconstruction of 125th Street Station

• Excavation and above-ground construction for allstation entrances and ancillary buildings

Page 3: or t h o- r a t i e l o r Stret a d Second Avenue Subway ...web.mta.info/capital/sas_docs/ea_phase2/SAS_Factsheet_7_6_18.pdfConstruction work will include: • Modification and use

Second Avenue Subway Phase 2

Federal Transit Administration

PLEASE JOIN US FOR A PUBLIC MEETING

The Federal Transit Administration (FTA) and the Metropolitan Transportation Authority (MTA) have completed a Supplemental Environmental Assessment (EA) to the Second Avenue Subway Final Environmental Impact Statement: Phase 2. Phase 2 of the subway will extend service from 96th Street to 125th Street with new stations at 106th Street, 116th Street, and 125th Street. The Supplemental EA has been prepared in accordance with the National Environmental Policy Act (NEPA) for FTA as lead federal agency.

FTA and MTA are holding the public meeting to hear comments related to Phase 2 and the Supplemental EA. Written comments also may be submitted at the public meeting or submitted to MTA or FTA at [email protected] or the addresses below. All submissions received by MTA or FTA by August 13, 2018 will be considered and included in the public record.

Tuesday, July 31, 2018Meeting from 6 PM - 9 PM

6 PM - Open House7 PM - Presentation

7:30 PM - Public Comment Session

Henry J. Carter Specialty Hospital & Nursing FacilityFirst Floor Conference Room

1752 Park Ave, New York, NY 10035(Main Entrance on Park Avenue and East 122nd Street)

For additional information contact:

Hector SantanaSecond Avenue SubwayCommunity Information Center69 East 125th StreetNew York, NY 10034(212) [email protected]

Donald Burns, AICPDirector, Planning and Program DevelopmentFederal Transit Administration, Region IIOne Bowling Green, Room 429New York, NY 10004(212) 668-2170

The Supplemental EA is available for public review at the following locations: • Online at http://web.mta.info/

capital/phase2_docs.html• Second Avenue Subway

Community Information Center, 69 East 125th Street, Manhattan

• Federal Transit Administration, One Bowling Green, Room 429, Manhattan

• Manhattan Community Board 10 Office, 215 West 125th Street, 4th Floor

• Manhattan Community Board 11 Office, 1664 Park Avenue, Ground Floor