ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 1 OF 34 OPERATIONS MONTHLY REPORT December 2004 Kent Saathoff, Director ERCOT System Operations Joel Mickey, Manager Market Operations Support

Transcript of Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34...

Page 1: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 1 OF 34

OPERATIONS MONTHLY REPORT

December 2004

Kent Saathoff, Director ERCOT System Operations

Joel Mickey, Manager Market Operations Support

Page 2: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 2 OF 34

Acronyms............................................................................................................................................................................3

Grid Operation ...................................................................................................................................................................4 Daily Peak Demand ........................................................................................................................................................................................5 13 Month Review of Peak Demand ...............................................................................................................................................................5 Trend of Temperature in Five Congestion Management Zones...................................................................................................................6 Relative Activity Capacity Purchases – OOMC & RMR.............................................................................................................................6 Total Number of Days of Local Congestion Management...........................................................................................................................7 Instances of CSC Congestion .........................................................................................................................................................................8 Notable Events.................................................................................................................................................................................................9

Market Operation ............................................................................................................................................................11 Ancillary Services .....................................................................................................................................................................11

Average Hourly Procurement by Ancillary Service....................................................................................................................................12 13 Month Review of Average Hourly Procurement by Ancillary Service ................................................................................................12 Average MCPC by Ancillary Service..........................................................................................................................................................13 13 Month Review of Average MCPC by Ancillary Service.......................................................................................................................13 Average Deployment by Ancillary Service .................................................................................................................................................14 13 Month Review of Average Deployment by Ancillary Service..............................................................................................................14

Balancing Energy......................................................................................................................................................................15 Average Balancing Energy Deployed ................................................................................................................................15

Average UBES Deployment in Five Zones.................................................................................................................................................16 Average DBES Deployment in Five Zones.................................................................................................................................................16 13 Month Review of UBES Deployment ....................................................................................................................................................17 13 Month Review of DBES Deployment ....................................................................................................................................................17

% of Total ERCOT Energy Requirement ...........................................................................................................................18 Average BES Deployed: as A Percentage of Total Energy Requirement..................................................................................................19 13 Month Review of Average BES Deployed: as A Percentage of Total Energy Requirement ..............................................................19

Average MCPE ...........................................................................................................................................................................20 Average MCPE in Five Zones......................................................................................................................................................................21 Average MCPE at Each Interval for Five Zones.........................................................................................................................................21 13 Month Review of MCPE.........................................................................................................................................................................22 Trend of Average Fuel Index........................................................................................................................................................................22

Average Shadow Price ............................................................................................................................................................23 Average Shadow Price..................................................................................................................................................................................24 13 Month Review of Average Shadow Price...............................................................................................................................................24

Cost Summary.................................................................................................................................................................25 Ancillary Service Capacity Cost...................................................................................................................................................................26 13 Month Review of Ancillary Service Capacity Cost ...............................................................................................................................26 Ancillary Service Deployment Cost.............................................................................................................................................................27 13 Month Review of Ancillary Service Deployment Cost .........................................................................................................................27 OOMC Cost At Final....................................................................................................................................................................................28 13 Month Review of OOMC Cost At Final Settlement and True Up........................................................................................................28 RMR Cost (Initial Settlement)......................................................................................................................................................................29 RMR Net Cost (Initial Settlement)...............................................................................................................................................................29 Verified Actual RMR Cost* .........................................................................................................................................................................30 Total Local Congestion Costs by Area.........................................................................................................................................................31 Total Local Congestion Costs by Instruction Type (in Million $)..............................................................................................................31 Local Congestion Cost for Energy ...............................................................................................................................................................32 Cost Summary...............................................................................................................................................................................................33 13 Month Review of Cost Summary............................................................................................................................................................33

Page 3: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 3 OF 34

Acronyms

AS Ancillary Service

BES Balancing Energy Service

DBES Down Balancing Energy Service

DRS Down Regulation Service

LBE Local Balancing Energy

MCPC Market Clearing Price for Capacity

MCPE Market Clearing Price for Energy

NSRS Non-Spinning Reserve Service

OOMC Out of Merit Capacity

OOME Out of Merit Energy

QSE Qualified Scheduling Entity

RMR Reliability Must Run

RPRS Replacement Reserve Service

RRS Responsive Reserve Service

UBES Up Balancing Energy Service

URS Up Regulation Service

Page 4: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 4 OF 34

Grid Operation

Page 5: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 5 OF 34

Daily Peak Demand

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

MW

Peak Demand for the Month: 12/23/04 8:45 44007

13 Month Review of Peak Demand

0

10000

20000

30000

40000

50000

60000

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

Note: Peak Demand is Peak Interval Demand

Page 6: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 6 OF 34

Trend of Temperature in Five Congestion Management Zones

20.0

30.0

40.0

50.0

60.0

70.0

80.0

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Houston North South West NorthEast

Relative Activity Capacity Purchases – OOMC & RMR

3

8

11

17

14

1

39

44 43

31

6

15

10

0

5

10

15

20

25

30

35

40

45

50

Wes

t Rio

Gra

nde

Eas

t Rio

Gra

nde

Lare

do A

rea

Cor

pus

Chr

isti

Are

a

DFW

Bry

an A

rea

Abi

lene

Are

a

Wes

tern

Are

a

San

Ant

onio

San

Ang

elo

Are

a

Nor

thea

st

Uni

t-Day

s*

OOMC RMR

Note: 1 Unit-Day = 1 unit procured during any time period within one trade day.

Page 7: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

Total Number of Days of Local Congestion Management

15

12

7 7 7

54

3 3 3 3 32 2 2 2 2 2 2 2 2 2 2 2 2

0

2

4

6

8

10

12

14

16

Hei

ghts

- PH

Rob

inso

n

Ash

erto

n - W

est C

onoc

o

Aus

trop

Tr

Ara

nsas

Pas

s - N

aval

bas

e

Ode

ssa

- Sw

Mos

s

Phar

r MVE

C -

Polk

Rio

Hon

do -

La P

alm

a

Five

Poi

nts

- Wes

t Sid

e

Cic

o - C

omfo

rt

Gill

es -

Wol

f Cre

ek

Mili

tary

Hig

hway

T2

Boo

nevi

lle -

Sutto

n

Bat

es T

r

Ced

ar H

ill -

Wat

erm

ill

Uva

lde

- Asp

halt

Min

es

Win

ches

ter -

Fay

ette

ville

Wat

erm

ill -

Ced

ar H

ill S

witc

h

Hol

t Sw

T1

Mid

way

Lan

e - O

zona

Big

foot

Tr

Com

fort

- C

ico

Flyn

n - F

airm

ont

Gen

eral

Tire

- R

exal

l

Hai

ne D

r - L

a Pa

lma

Port

Ara

nsas

- M

usta

ng Is

land

Day

s

Contingency Congestion Element Number of Days Heights Sub - Freeway Park Heights - PH Robinson 15

Uvalde - Hamilton Asherton - West Conoco 12 Celanese Bishop - Barney Davis Aransas Pass - Naval base 7

Austrop - Sandow Austrop Tr 7 Midland East - Odessa Odessa - Sw Moss 7

N Edinburg - Bates Pharr MVEC - Polk 5 Rio Hondo Tr Rio Hondo - La Palma 4

Calaveras- Skyline/Walzem Rd Five Points - West Side 3 Cico - Helotes Gilles - Wolf Creek 3

Military Highway T1 Military Highway T2 3 Dilley Switch - San Miguel Bigfoot Tr 2

Hearne Tr Booneville - Sutton 2 Sargent - Watermill Cedar Hill - Watermill 2

Clear Springs - Marion/Zorn Cico - Comfort 2 Zorn - Hayes Comfort - Cico 2

Forney Elkton - Tricorner Flynn - Fairmont 2 Morgan Creek - Odessa General Tire - Rexall 2 La Palma - Rio Hondo Haine Dr - La Palma 2

Holt Switch - Andrews North Holt Sw T1 2 Big Lake - Friend Ranch Midway Lane - Ozona 2 Asherton - Eagle Pass Uvalde - Asphalt Mines 2

Big Brown - Venus Switch Watermill - Cedar Hill Switch 2 Austrop - Lost Pines Winchester - Fayetteville 2

Note: 1 day= units procured during any time period within one trade day. Total numbers of 1 day or less of local congestion management arenot shown in the graph. Occurrences of 1 day or less are not listed in table but are totaled in graph.

PAGE 7 OF 34

Page 8: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 8 OF 34

Instances of CSC Congestion

0

10

20

30

40

50

60

7012

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

EN SN NH SH WN

Num

ber o

f int

erva

ls

Page 9: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 9 OF 34

Notable Events

New Procedures/ Forms/ Operations Bulletins

12/06/04 Ercot Power Operations Bulletin 121 Verbal Dispatch Exception

12/06/04 Ercot Power Operations Bulletin 122 Verbal Dispatch Exception

12/09/04 Ercot Power Operations Bulletin 123 Procedures when DC Tie is over scheduled

12/09/04 Ercot Power Operations Bulletin 124 Failure to clear Day Ahead A/S Market

12/09/04 Ercot Power Operations Bulletin 125 Update of QSE list

12/09/04 Ercot Power Operations Bulletin 126 Update of QSE list

12/09/04 Ercot Power Operations Bulletin 127 Managing Maintenance Level 2 and 3 outages TCN#176

12/09/04 Ercot Power Operations Bulletin 128 Extending TCN#138 TCN#178

12/09/04 Ercot Power Operations Bulletin 129 Monitoring West Texas Generation TCN#183

12/09/04 Ercot Power Operations Bulletin 130 Granting VDE’s TCN#178

12/09/04 Ercot Power Operations Bulletin 131 Managing Maintenance Level 2 and 3 outages TCN#172

12/09/04 Ercot Power Operations Bulletin 132 Verification of Dynamic Ratings TCN#183

12/20/04 Ercot Market Operations Bulletin 20 SPD Price Administration Process

12/21/04 Ercot Power Operations Bulletin 133 OOME for CT’s

12/21/04 Ercot Market Operations Bulletin 21 Shadow Price Calculations for 5 Zone, 6 CSC model for 2005

Security Alert Stage/ Threatcon/ Related issues

None/Yellow

EECP Occurrence

None

Major Weather Related Power System Problems

None Major system Voltage problems

None Significant Communication Problems

12/1/04 01:45-02:00 Held interval. OC1 inadvertently activated

12/3/04 02:15-03:30 Held interval. One QSE experienced a Portal failure and scheduling issues. Major Computer System Problems/Fixes

None Load Shed incidences

None New SPS & RAP’s

None

Page 10: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 10 OF 34

OCN, Advisory, Alert, Emergency Notice and Major Disturbances

12/1/04 02:00-04:30 OCN issued. Capacity shortage 08:00 - 10:00

12/1/04 04:00-04:30 Alert issued. Capacity shortage 08:00 - 10:00

12/2/04 13:30-15:20 Transmission Alert. Loss of Holt Switch-Permian Basin loads Moss Switch-Amoco North Cowden Tap.

12/7/04 18:45-19:25 Transmission Alert. Centerville Road - Garland Road exceeding first contingency limit.

12/9/04 09:20 -11:20 OCN issued. Capacity shortage 18:00 – 20:00

12/9/04 14:40 -20:00 OCN issued. Capacity shortage 19:00 – 20:00

12/21/04 07:30-24:00 OCN issued. Cold temperatures and freezing precipitation forecasted.

12/21/04 10:00-17:00 Transmission Alert. Loss of Holt Sw – N Andrews loads Holt Tr.

12/22/04 00:00-24:00 OCN issued. Cold temperatures and freezing precipitation forecasted.

12/23/04 19:00 – 22:45 Transmission Alert. Loss of Barney Davis – Celanese Bishop results in islanding in South Corpus Christie area.

12/24/04 06:00 – 14:30 Transmission Alert. Loss of Uvalde – Hamilton loads Asherton – W Monaco.

12/24/04 08:15 – 12/25 15:00 Transmission Alert. Loss of Barney Davis U2 loads Port Aransas – Mustang Island.

12/24/04 11:30 Transmission Alert. Loss of Menard T1 loads Ft. Mason – Mason.

12/24/04 00:00 – 12/25 15:00 Advisory issued for low temperatures and strong winds.

12/25/04 05:30 – 12:00 Transmission Alert. Loss of Uvalde Hamilton loads Asherton – W Conoco.

12/25/04 08:15 Transmission Alert. Loss of Barney Davis U2 loads Port Aransas – Mustang Island.

12/26/04 06:45 – 12:30 Transmission Alert. Loss of Bates U1 loads Bates T1.

12/27/04 03:15 – 05:00 OCN issued for 08:00 capacity shortage.

12/30/04 14:30 – 16:00 OCN issued for 19:00 capacity shortage.

12/31/04 16:30 OCN issued for 1/1/05. Insufficient Down Reg for HE 06,23, & 24.

Update on New Generation

None

Max / Min Temperature

Max: 84.6˚F S Min: 13˚F N

Page 11: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 11 OF 34

Market Operation Ancillary Services

Page 12: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 12 OF 34

Average Hourly Procurement by Ancillary Service

0

200

400

600

800

1000

120012

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

DRS URS RRS NSRS

M W

13 Month Review of Average Hourly Procurement by Ancillary Service

0

200

400

600

800

1000

1200

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DRS URS RRS NSRS

M W

Page 13: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 13 OF 34

Average MCPC by Ancillary Service

$0

$5

$10

$15

$20

$25

$30

$35

$4012

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

DRS URS RRS NSRS

$/M

W

13 Month Review of Average MCPC by Ancillary Service

$0

$4

$8

$12

$16

$20

$24

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DRS URS RRS NSRS

$/M

W

≈ 62.28

Page 14: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 14 OF 34

Average Deployment by Ancillary Service

0

50

100

150

200

250

300

35012

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

DRS URS RRS NSRS

M W

13 Month Review of Average Deployment by Ancillary Service

0

20

40

60

80

100

120

140

160

180

200

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DRS URS RRS NSRS

M W

Page 15: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 15 OF 34

Balancing Energy Average Balancing Energy Deployed

Page 16: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 16 OF 34

Average UBES Deployment in Five Zones

0

100

200

300

400

500

600

700

800

900

1000

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

UBES_H UBES_N UBES_SUBES_W UBES_NE

M W

Average DBES Deployment in Five Zones

0

100

200

300

400

500

600

700

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

DBES_H DBES_N DBES_SDBES_W DBES_NE

MW

Page 17: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 17 OF 34

13 Month Review of UBES Deployment

0

100

200

300

400

500

600

700

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

UBES_H UBES_N UBES_SUBES_W UBES_NE

MW

13 Month Review of DBES Deployment

0

100

200

300

400

500

600

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DBES_H DBES_N DBES_SDBES_W DBES_NE

MW

Page 18: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 18 OF 34

Balancing Energy % of Total ERCOT Energy Requirement

Page 19: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 19 OF 34

Average BES Deployed: as A Percentage of Total Energy Requirement

0%

1%

2%

3%

4%

5%

6%

7%12

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

UBES % DBES %

13 Month Review of Average BES Deployed: as A Percentage of Total Energy Requirement

0%

1%

2%

3%

4%

5%

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

UBES DBES

Page 20: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 20 OF 34

Balancing Energy Average MCPE

Page 21: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 21 OF 34

Average MCPE in Five Zones

(5)

10

25

40

55

70

8512

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

MCPE_H MCPE_N MCPE_SMCPE_W MCPE_NE

$/M

W

Average MCPE at Each Interval for Five Zones

(40)

(20)

0

20

40

60

80

100

120

140

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96

MCPE_H MCPE_N MCPE_SMCPE_W MCPE_NE

Interval

$/M

W

Page 22: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 22 OF 34

13 Month Review of MCPE

0

10

20

30

40

50

60

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MCPE_H MCPE_N MCPE_SMCPE_W MCPE_NE

$/M

W

Trend of Average Fuel Index

0.000

1.000

2.000

3.000

4.000

5.000

6.000

7.000

Dec Jan Feb Mar Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec

Page 23: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 23 OF 34

Balancing Energy Average Shadow Price

Page 24: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 24 OF 34

Average Shadow Price

0

20

40

60

80

100

120

140

16012

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

EN NH SH SN WN

$/M

W

13 Month Review of Average Shadow Price

0

1

2

3

4

5

6

7

8

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

EN NH SH SN WN

$/M

W

Page 25: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 25 OF 34

Cost Summary

Page 26: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 26 OF 34

Ancillary Service Capacity Cost

$-

$0.5

$1.0

$1.5

$2.0

$2.5

$3.0

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Total: $52.50 Million

Mill

ions

$

DRS URS RRS NSRS

13 Month Review of Ancillary Service Capacity Cost

$-

$10.0

$20.0

$30.0

$40.0

$50.0

$60.0

Dec Jan

Feb

Mar

Apr

May

Jun

Jul

Aug Sep

Oct

Nov

Dec

Mill

ions

$

DRS URS RRS NSRS

Note: There is not a price for self-arranged Ancillary Services. MCPC is used to calculate the cost for self-arrangement.

Page 27: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 27 OF 34

Ancillary Service Deployment Cost

$(0.4)

$(0.3)

$(0.2)

$(0.1)

$-

$0.1

$0.2

$0.3

$0.4

$0.5

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Total w DRS: $ 1.47 Million Total w/o DRS: $5.76 Million

Mill

ion

$

DRS URS RRS NSRS

13 Month Review of Ancillary Service Deployment Cost

$(8.0)

$(6.0)

$(4.0)

$(2.0)

$-

$2.0

$4.0

$6.0

$8.0

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep

Oct

Nov

Dec

Mill

ions

$

DRS URS RRS NSRS

Page 28: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 28 OF 34

OOMC Cost At Final

0.0

0.2

0.4

0.612

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Start-Up Payment (Total: $.49 Million)

Total OOMC Payment (Total: $3.82 Million)

Mill

ion

$

13 Month Review of OOMC Cost At Final Settlement and True Up

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Aug

Sep

Oct

Nov

Dec

Total OOMC Payment (Total: $91.82 Million)

Mill

ion

$

Up to date as of 1/1/2005

Page 29: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 29 OF 34

RMR Cost (Initial Settlement)

-1.0

-0.5

0.0

0.5

1.0

1.512

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Energy Stand By Start Up BENA Credit

Mill

ion

$

RMR Net Cost (Initial Settlement)

Total Net Cost $9.69 Million

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Mill

ions

$

Page 30: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 30 OF 34

Verified Actual RMR Cost*

-30

-20

-10

0

10

20

30

40

50Ja

n-04

Feb-

04

Mar

-04

Apr

-04

May

-04

Jun-

04

Jul-0

4

Aug

-04

Sep-

04

Oct

-04

Nov

-04

Dec

-04

Mill

ion

$

RMR Payments BENA Credit RMR Net Costs

RMR Net Cost: $119.53

*Note: 1. Trade dates 1/1/04 thru 11/21/04 complete with Final Resettlement data, using verifiable actual cost data provided by

the RMR Unit owner. 2. Trade date 11/22/04 thru 12/31/04 complete with Initial Resettlement data, using estimated eligible costs.

Page 31: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 31 OF 34

Total Local Congestion Costs by Area

Austin $0.20

Corpus $0.80

Houston $0.31 San Antonio

$0.18

South $1.10

Valley $0.80

West $2.70

Wind $0.00

DFW $0.77

North $0.72

Total: $7.56 Million

Mill

ion

$

Total Local Congestion Costs by Instruction Type (in Million $)

$0.93

$0.54

$0.83

$3.82

$0.00

$1.43

LBE-operate at or below a level

LBE-operate at or above a level

LBE-hold at a level

Manual OOME DN

Manual OOME UP

OOMC

Page 32: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 32 OF 34

Local Congestion Cost for Energy

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.812

/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Total $3.7 Million

Mill

ion

$

DN Payment for Aggregated Units for Both Manual and LBE Deployment

UP Payment for Aggregated Units for Both Manual and LBE Deployment DN Payment for LBE Deployment without Market Solution

UP Payment for LBE Deployment without Market Solution

DN Payment for Manual OOME Deployment

UP Payment for Manual OOME Deployment

DN Payment for LBE Deployment with Market Solution UP Payment for LBE Deployment with Market Solution

Page 33: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 33 OF 34

Cost Summary (Total w DBES: $109.24 Total w/0 DBES: $122.30)

-1

0

1

2

3

4

5

6

7

12/1

12/2

12/3

12/4

12/5

12/6

12/7

12/8

12/9

12/1

0

12/1

1

12/1

2

12/1

3

12/1

4

12/1

5

12/1

6

12/1

7

12/1

8

12/1

9

12/2

0

12/2

1

12/2

2

12/2

3

12/2

4

12/2

5

12/2

6

12/2

7

12/2

8

12/2

9

12/3

0

12/3

1

Mill

ions

$

DBES UBES LBES/OOMEOOMC RMR A/S

13 Month Review of Cost Summary

0

20

40

60

80

100

120

140

Dec Jan

Feb

Mar

Apr

May Jun

Jul

Aug Sep

Oct

Nov

Dec

Mill

ions

$

Total with DBES (Total: $964.47 Million)

Total Without DBES (Total: $1,211.04 Million)

Page 34: Operations Monthly Report 12 2004 · ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004 PAGE 5 OF 34 Daily Peak Demand 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

ERCOT OPERATIONS MONTHLY REPORT – DECEMBER 2004

PAGE 34 OF 34

Note: 1. DBES cost is a credit to system costs and therefore is shown as a negative number here to differentiate it from the other types of Reliability Costs. 2. BES deployment costs include two parts: the cost for Power Balance and the cost for CSC Congestion. Due to Relaxed Balanced Schedule, the cost paid for Power Balance covers both the difference between ERCOT load forecast and QSE's schedule and the difference between QSE's Relaxed scheduled load and the load it would schedule should RBS were not allowed. The cost for Power Balance is not further divided accordingly because currently we do not have a way to differentiate these two types of Power Balance costs.

Please contact Shuye Teng at 512-248-3998 or email at [email protected] should you have any questions.