Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply...

13
Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference January 21st – 23rd 2010 Dipl.-Ing. (FH) Martin Jacob IT10 Rail (2010-01-21) 1

Transcript of Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply...

Page 1: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

Operation and Power Supply (Simulation) forChina Railways

- by experience -

IT10 RAILInternational Railway Conference

January 21st – 23rd 2010

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 1

Page 2: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

Eine Expertenrunde für das Gesamtsystem Bahn

The Expert Team for the Complete Railway System

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 2

Page 3: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

BeiJing – TianJing Dedicated Passenger LineGeneral Overview

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 3

Page 4: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

BeiJing – TianJing Dedicated Passenger LineKey Features

• 25kV 50Hz 2AC Power Supply System,• 2 TSS,• 7 ATS,• Minimum 3 minutes headway,• Operation speed is 350km/h,• Operation speed is 350km/h,• Nonstop travel time is 30min,• Opening day August 1st 2008 (parallel commercial operation was

immediately suspended),• 115km main line length, • 3 intermediate Stations,• ~87% bridge structure,

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 4

Page 5: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

BeiJing – TianJing Dedicated Passenger LineBridge Construction

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 5

Page 6: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

BeiJing – TianJing Dedicated Passenger LineTest & Commissioning Planning

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 6

Page 7: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

BeiJing – TianJing Dedicated Passenger LineOpening day August 1 st 2008

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 7

Page 8: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

WuHan – GuangZhou Passenger Dedicated LineKey Features

• 25kV 50Hz 2AC Power Supply System,• 20 TSS,• 38 ATS / SP,• Minimum 3 minutes headway,• Operation speed is 350km/h,• Operation speed is 350km/h,• Nonstop travel time is 3h,• Opening day December 26th 2009 (parallel commercial operation was

immediately suspended),• 963km main line length,

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 8

Page 9: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

WuHan – GuangZhou Passenger Dedicated LineOperation Simulation by IFB using c

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 9

Page 10: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

Busbar Voltage and Current, Wuhan-GuangzhouSubstation ATS_1457_Hua, Transformer 1457_Hua_AT-01

19000

21000

23000

25000

27000

29000

31000

Vol

tage

[V]

100

200

300

400

500

600

700

800

900

Cur

rent

[A]

WuHan – GuangZhou Passenger Dedicated LinePower Supply Simulation by IFB using c

17000

12:0

0:01

12:0

5:01

12:1

0:01

12:1

5:01

12:2

0:01

12:2

5:01

12:3

0:01

12:3

5:01

12:4

0:01

12:4

5:01

12:5

0:01

12:5

5:01

Time

0

|U|-OCSBB-01-RBB-01 |U|-RBB-01-NFBB-01 |I|-OCS |I|-Rail |I|-NF

44

94

67

88

70

95

69

93

66

93 94

69

93

82

103

115

93 94

89

83

93 93 93 9492 92

95 94

9092

70

92 91

70

91

69

92

69

73

00

20

40

60

80

100

120

App

aren

t Pow

er [M

VA

]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Substation No.

Maximum Substation PowerWGPDL - Operation Program 2028

WU dir.

GUA dir.

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 10

Page 11: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

China Railways High Speed NetworkFuture Planning

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 11

Page 12: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

Operation- and Power Supply- Simulation TrainingChina Railway SIYUAN Survey and Design Group Co. Lt d

• One OpenTrack License for Route & Station Design Department– 11 days intensive training provided by IFB & OpenTrack

Technology

• One OpenPowerNet & OpenTrack License for the Electrification Department– 15 days intensive training provided by IFB– 5 days technical intercommunication to discuss detailed problems

of the electrical power supply provided by IFB

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 12

Page 13: Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply (Simulation) for China Railways - by experience - IT10 RAIL International Railway Conference

Contact:IFB – Institut für Bahntechnik GmbHIFB – Institut für Bahntechnik GmbHDipl.-Ing. (FH) Martin JacobWiener Straße 114-116 D-01219 Dresden

Tel.: +49 (0)351 877 59 42Fax: +49 (0)351 877 59 90E-Mail: [email protected] Internet: www.bahntechnik.de, www.openpowernet.de

Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 13