Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply...
Transcript of Operation and Power Supply (Simulation) for China Railways · Operation and Power Supply...
Operation and Power Supply (Simulation) forChina Railways
- by experience -
IT10 RAILInternational Railway Conference
January 21st – 23rd 2010
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 1
Eine Expertenrunde für das Gesamtsystem Bahn
The Expert Team for the Complete Railway System
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 2
BeiJing – TianJing Dedicated Passenger LineGeneral Overview
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 3
BeiJing – TianJing Dedicated Passenger LineKey Features
• 25kV 50Hz 2AC Power Supply System,• 2 TSS,• 7 ATS,• Minimum 3 minutes headway,• Operation speed is 350km/h,• Operation speed is 350km/h,• Nonstop travel time is 30min,• Opening day August 1st 2008 (parallel commercial operation was
immediately suspended),• 115km main line length, • 3 intermediate Stations,• ~87% bridge structure,
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 4
BeiJing – TianJing Dedicated Passenger LineBridge Construction
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 5
BeiJing – TianJing Dedicated Passenger LineTest & Commissioning Planning
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 6
BeiJing – TianJing Dedicated Passenger LineOpening day August 1 st 2008
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 7
WuHan – GuangZhou Passenger Dedicated LineKey Features
• 25kV 50Hz 2AC Power Supply System,• 20 TSS,• 38 ATS / SP,• Minimum 3 minutes headway,• Operation speed is 350km/h,• Operation speed is 350km/h,• Nonstop travel time is 3h,• Opening day December 26th 2009 (parallel commercial operation was
immediately suspended),• 963km main line length,
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 8
WuHan – GuangZhou Passenger Dedicated LineOperation Simulation by IFB using c
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 9
Busbar Voltage and Current, Wuhan-GuangzhouSubstation ATS_1457_Hua, Transformer 1457_Hua_AT-01
19000
21000
23000
25000
27000
29000
31000
Vol
tage
[V]
100
200
300
400
500
600
700
800
900
Cur
rent
[A]
WuHan – GuangZhou Passenger Dedicated LinePower Supply Simulation by IFB using c
17000
12:0
0:01
12:0
5:01
12:1
0:01
12:1
5:01
12:2
0:01
12:2
5:01
12:3
0:01
12:3
5:01
12:4
0:01
12:4
5:01
12:5
0:01
12:5
5:01
Time
0
|U|-OCSBB-01-RBB-01 |U|-RBB-01-NFBB-01 |I|-OCS |I|-Rail |I|-NF
44
94
67
88
70
95
69
93
66
93 94
69
93
82
103
115
93 94
89
83
93 93 93 9492 92
95 94
9092
70
92 91
70
91
69
92
69
73
00
20
40
60
80
100
120
App
aren
t Pow
er [M
VA
]
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Substation No.
Maximum Substation PowerWGPDL - Operation Program 2028
WU dir.
GUA dir.
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 10
China Railways High Speed NetworkFuture Planning
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 11
Operation- and Power Supply- Simulation TrainingChina Railway SIYUAN Survey and Design Group Co. Lt d
• One OpenTrack License for Route & Station Design Department– 11 days intensive training provided by IFB & OpenTrack
Technology
• One OpenPowerNet & OpenTrack License for the Electrification Department– 15 days intensive training provided by IFB– 5 days technical intercommunication to discuss detailed problems
of the electrical power supply provided by IFB
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 12
Contact:IFB – Institut für Bahntechnik GmbHIFB – Institut für Bahntechnik GmbHDipl.-Ing. (FH) Martin JacobWiener Straße 114-116 D-01219 Dresden
Tel.: +49 (0)351 877 59 42Fax: +49 (0)351 877 59 90E-Mail: [email protected] Internet: www.bahntechnik.de, www.openpowernet.de
Dipl.-Ing. (FH) Martin JacobIT10 Rail (2010-01-21) 13