Bryan W. Welsh, P.E. President Ongoing Commissioning with Building Automation System and Data Loggers Welsh Commissioning Group, Inc.

Transcript of Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope –...

Page 1: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Bryan W. Welsh, P.E.President

Ongoing Commissioning with

Building Automation System

and Data Loggers

Welsh Commissioning Group, Inc.

Page 2: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Learning Objectives

1. General understanding of Ongoing Commissioning (OCx)2. Elements of a complete OCx plan3. How BAS alarms, BAS trending, data logging and BAS automated

testing fit into a cost effective OCx plan4. Key concepts and lessons learned for setting up and utilizing BAS

alarms, BAS trending, data logging and BAS automated testing in an OCx Plan

AIA Quality Assurance

Page 3: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Bryan Welsh – President, WCxG

BS Mechanical Engineering, Licensed PELEED Accredited ProfessionalBCA Certified Commissioning ProfessionalACG Certified Commissioning Authority25 years engineering and facility engineering

experience in commercial, industrial and educational facility environment

10 years as facilities manager receiving new and remodeled facilities

Full-time commissioning provider since 1999, part time provider since 1989

Page 4: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Presentation Overview

Commissioning overview

The case for Ongoing Commissioning

Ongoing Commissioning Defined

Ongoing Commissioning - BAS/Loggers

Real World Examples

Key Concepts and Lessons Learned

Page 5: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Owner says:

“We need an environmentally friendly swing that will accommodate multiple kids”

Commissioning Overview

The Building Delivery Process at Its Worst

Page 6: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Commissioning Overview

The Building Delivery Process at Its Best

Operation and Occupancy Phase

Systems

Manual

O&M

Review

Training

Verify

Seasonal

Test

Post-Occ

Review

OCx

MBCx

Lessons

Learned

Construction Phase

Submittal

Review

Install

Verify

Cx

Plan

Start

Up

Site

Observe

Functional

Test

Cx

Report

Design Phase

SD & DD

Review

Cx

Specs

CD

Review

Pre-Design Phase

OPR

Review

BOD

Review

Page 7: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Case for Ongoing Commissioning

Page 8: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Ongoing Commissioning Savings

Ongoing Commissioning

Savings Potential Over Life of Building

Time

Building

Perform

ance

Optimum Performance

Normal Degradation

Re or Retro Commissioning

Savings

=$

OCx

Page 9: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Typical State of Maintenance

As Noted During Existing Building Commissioning

Page 10: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Maintenance Axiom

• Most people will gravitate toward pleasure and move away from pain

• Maintenance ≠ Fun• Add it up:

Complex Systems Under FundingPoor Equipment AccessPoor Training

+ Poor Documentation= Really Poor Maintenance

Poor Maintenance ≠ Sustainability• Anything we can do to make maintaining equipment

easier will make maintenance and sustainability better

Page 11: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Sustainability Through Maintainability

Reactive

Preventive

Proactive

Predictive

Increased Sophistication &Cost

More OCx Needed

If the Maintenance Department is here, it is generally considered

“Very Good”

Page 12: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Resistive Forces - Selling OCx

Maintenance people get satisfaction out of being the “hero” on reactive calls

“If everything worked all the time, how would people know we were on the job?”

“I can’t stop to sharpen the saw, I’m too busy cutting wood”

OCx must be understood by all stakeholders

Resource shifts must be identified

• $$ Reactive >> $$ Proactive

Page 13: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Ongoing Commissioning Defined

Page 14: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

ASHRAE Guideline 0 - 2005

Ongoing Commissioning Process: A continuation of the Commissioning Process well into the Occupancy and Operations Phase to verify that a project continues to meet current and evolving Owner’s Project Requirements. Ongoing Commissioning Process activities occur throughout the life of the facility; some of these will be close to continuous in implementation, and others will be either scheduled or unscheduled (as needed). Also see Continuous Commissioning Process.

Page 15: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

USGBC LEED EBOM

Energy and Atmosphere Credits

PR 1: Energy Efficiency Best Management Practices –Planning, Documentation and Opportunity Assessment

PR 2: Minimum Energy Efficiency Performance

PR 3: Refrigerant Management – Ozone Protection

Credit 1: Optimize Energy Efficiency Performance

Credit 2: Existing Building Commissioning

Credit 3: Performance Measurement

Credit 4: Renewable Energy

Credit 5: Refrigerant Management

Credit 6: Emissions Reduction Reporting

Page 16: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

LEED EBOM Commissioning

EA Credit 2.1: Existing Building Commissioning: Investigation and Analysis

EA Credit 2.2: Existing Building Commissioning: Implementation

EA Credit 2.3: Existing Building Commissioning: Ongoing Commissioning

Page 17: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

LEED EBOM Performance Verification

EA Credit 3.1: Performance Measurement: Building Automation System

EA Credits 3.2 and 3.3: Performance Measurement: System-Level Metering

Page 18: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

LEED EBOM Ongoing Commissioning

Page 19: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

EA Credit 3.1 Performance Verification

Page 20: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

EA Credit 3.2&3 Performance Verification

Page 21: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

USGBC LEED EBOM

Sample Work Scope – Ongoing Commissioning

EA Credit 2.3: Existing Building Commissioning: Ongoing Commissioning• Conduct an Ongoing Commissioning planning meeting to review

goals, available monitoring equipment and level of support available by maintenance staff.

• Develop an Ongoing Commissioning Plan (OCP) including system testing, performance verification, ongoing measurement, documentation requirements, scheduling, building equipment list,and a plan for corrective action response.

• Provide training of operations and maintenance staff on OCP execution.

• Spot check the execution of the OCP by others. • Update the Building Operation Plan.• Provide summary report.

Page 22: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Elements of an Integrated OCx Plan

• Overview, goals, roles & responsibilities, etc.• List of systems/equipment/parameters to be included & performance

criteria• Detailed procedures for all elements• Action plan for all elements – reporting requirements• A schedule for all elements, tie into CMMS if possible, use Outlook

tasks, etc.• DDC alarm plan, with reporting and response• Trend Logging Plan, with analysis procedures• Data Logging plan, with analysis procedures• Manual (paper) test forms and procedures• Automated test forms and procedures• Utility bill acquisition and analysis procedure• Utility meter download acquisition, with analysis procedures

Page 23: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

OCx Using BAS/Loggers

Page 24: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

OCx Using BAS & Loggers

Most under-utilized and/or abused:

Alarms• Powerful, inexpensive, easy and proactive

• Poorly configured, nuisance and ignored

Trending/Data Logging• Powerful, predictive, a picture = 1000 words

• Requires skills, more expensive, time consuming

Automation• Powerful, easy and proactive

• Untried, intimidating, requires some skills, expensive

Page 25: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Alarms

Belt Degradation – Alarm Could Have Predicted

Page 26: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Alarms

Why Aren’t They Effective?

• Not specified in the first place – left to control contractor to put in what they want

• Poorly specified without limiters• Nuisance alarms

• Cry Wolf, no response by operators

• Overly aggressive – too many alarms• Zone temperature – why? Occupant will let you know

• No one is monitoring alarms

• Did not consult with operators – Get it in the OPR, have a plan

Page 27: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Trending & Data Loggers

BAS Trend Logs

Three are various trending systems and capabilities depending on BAS• Memory capacity at devices• Archiving capability – requires server• Graphing capability – Auto-scale, multi-scale, grouping• Exporting capability

Some systems are easy to define new trends, others more complicated

Put specific requirements for trending in the specifications.• Watch out for “Shall have capability of” – it gets nothing• Define in detail, point by point, pre-grouping, intervals• Do not use change of value or event driven trends• Easier if system is known up front

Page 28: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Trending & Data Loggers

Data Loggers

Use when BAS is not available

Synchronize with trends

Layout in OCx plan

Wireless and networked loggers are available

Page 29: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Trending & Data Loggers

Trending and Data Logging Parameters• Points trended• Interval – always make the same• Sample size• Units• Archiving

Analysis of Trends and Logs• Can be time consuming to combine in Excel• The Pacific Energy Center – Universal Translator• Screen captures are a good alternative for BAS• OCx plan must include detailed instructions on how to acquire

and analyze• OCx plan should include annotated graphs of a pass and fail

condition

Page 30: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Trending/Logger Applications in OCx

Any meters availableBoiler/Chiller parametersAHU parameters for warm-up and optimum startZone temperaturesAny loop controlled parameter – pressure, temperature,

etc.• Zone temp• Hydronic loop temperatures• Hydronic pressure• Etc.

Parameters downstream of coils or dampersOutside air

Page 31: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Automated Testing

Page 32: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

AHU-1 AHU-2 AHU-3 AHU-4 AHU-5

Coil Design Differential Temperature 40 40 40 45 45

Heating Valve Position 0% 0% 0% 0% 0%

Outside Air Damper 0% 0% 0% 0% 0%

Mixed Air Temperature 70 72 69 70 68

Discharge Air Temperature 71 72 71 70 71

Coil Differential Temperature 0 0 0 0 0

Test Status N/A N/A N/A N/A N/A

70 70

72

50

0%0%

0%

Automated Testing Concept

�Heating Valve Leakage

�Heating Coil Capacity

�Cooling Valve Leakage

�Cooling Coil Capacity

�Outside Air Damper Leakage

�Return Air Damper Linkage

AHU-4

Page 33: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

AHU-1 AHU-2 AHU-3 AHU-4 AHU-5

Coil Design Differential Temperature 40 40 40 40 45

Heating Valve Position 0% 0% 0% 0% 0%

Outside Air Damper 100% 100% 100% 100% 100%

Mixed Air Temperature 51 50 50 51 51

Discharge Air Temperature 52 52 52 71 52

Coil Differential Temperature 1 2 2 20 1

Test Status Pass Pass Pass FAIL Pass

51 71

72

50

0%0%

100%

Automated Testing Concept

�Heating Valve Leakage

�Heating Coil Capacity

�Cooling Valve Leakage

�Cooling Coil Capacity

�Outside Air Damper Leakage

�Return Air Damper Linkage

AHU-4

Page 34: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

AHU-1 AHU-2 AHU-3 AHU-4 AHU-5

Coil Design Differential Temperature 40 40 45 40 45

Heating Valve Position 100% 100% 100% 100% 100%

Outside Air Damper 100% 100% 100% 100% 100%

Mixed Air Temperature 51 51 51 51 51

Discharge Air Temperature 95 97 53 95 101

Coil Differential Temperature 44 46 2 44 50

Test Status Pass Pass FAIL Pass Pass

51 53

72

50

0%100%

100%

Automated Testing Concept

�Heating Valve Leakage

�Heating Coil Capacity

�Cooling Valve Leakage

�Cooling Coil Capacity

�Outside Air Damper Leakage

�Return Air Damper Linkage

AHU-3

Page 35: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Choosing Systems for Automated Testing

Systems most likely to fail

• Heating/cooling valve

• Dampers

• Anything with actuator

Most energy consuming

Hidden or difficult to access

Criticality

Page 36: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Real World Examples

Alarms

Page 37: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Alarm - Heating Loop

Original Sequence - Alarm If:

• High Hot Water Supply Temp: If greater than 200°F (adj.).

• Low Hot Water Return Temp: If less than 120°F (adj.).

Review Comment:

Page 38: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Alarm - Chilled Loop

Original Sequence - Alarm If:

• High Chilled Glycol Supply Temp: If the chilled water supply temperature is greater than 65°F (adj.).

• Low Chilled Glycol Supply Temp: If the chilled water supply temperature is less than 38°F (adj.).

Review Comment:

Page 39: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Alarm - Kitchen Exhaust/MAU

Original Sequence - Alarm If:

• MAU-1 Failure to Run

• EF-3 Failure to Run

• MUA-1 Dirty Filter

• Low Discharge Air Temp Review Comment:

Page 40: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Effective Alarms

Any binary failure

Boiler/Chiller/VFD

Loop temperature (valve controlled)

Duct static pressure

Any freeze point or safety

Water flow at night

Page 41: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Real World Examples

Trending/Logging

Page 42: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Morning Warm-Up and Optimum Start

Page 43: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Supply Air Control

Page 44: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Building Static Pressure Control

Building Static Pressure - Before and After Dead Band Adjustement

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

0.18

0.2

2:0

0 A

M

2:2

2 A

M

2:4

4 A

M

3:0

6 A

M

3:2

8 A

M

3:5

0 A

M

4:1

2 A

M

4:3

4 A

M

4:5

6 A

M

5:1

8 A

M

5:4

0 A

M

6:0

2 A

M

6:2

4 A

M

6:4

6 A

M

7:0

8 A

M

7:3

0 A

M

7:5

2 A

M

8:1

4 A

M

8:3

6 A

M

8:5

8 A

M

9:2

0 A

M

9:4

2 A

M

10:0

4 A

M

10:2

6 A

M

10:4

8 A

M

11:1

0 A

M

11:3

2 A

M

11:5

4 A

M

12:1

6 P

M

12:3

8 P

M

1:0

0 P

M

1:2

2 P

M

1:4

4 P

M

2:0

6 P

M

2:2

8 P

M

2:5

0 P

M

3:1

2 P

M

Inc

hes W

.C.

BSP Before (9/30/02) BSP After (11/20/02)

Prior to dead band

change, system short-

cycled

At night, no problem controlling

with one relief fan running, before

or after changes

SP=0.05"

After change,

good control

Page 45: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Stand Alone System – Xantrex GT-View

Page 46: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Data Loggers - Chiller Parameters

Page 47: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Data Loggers - Chiller Parameters

Page 48: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Use of Utility Data – Downloaded Remotely

Page 49: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Use of Utility Data – Downloaded Remotely

Page 50: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Real World Examples

Automated Testing

Page 51: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Automated Testing

Large Office Building – 2003/2004

1 AHU serving 230 FP VAV w/ HW reheat

Legacy Johnson Metasys Controls (N2)

Retro-Commissioning Project

75% of VAVs had problem of some kind

Owner wanted means of staying on top of it

Automated testing for VAVs was specified and integrated

Page 52: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Automated Testing

Seven VAV Tests Defined

1. Air Flow Sensor Zero

2. Heating Valve Leakage

3. Heating Capacity

4. Air Valve Leakage

5. Full Cooling Air Flow

6. Air Mass Balance (fan on?)

7. Full Heating Air Flow

Page 53: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Interface

Page 54: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Mixed Results

Legacy JCI system was over-taxed

Resulted in skipped processes – solution was to repeat commands three times

Automated testing worked well in finding issues

BAS operators later removed it because too much traffic on campus wide system

Last checked, they were considering reactivating after a system upgrade

Page 55: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

High School Gym/Classroom Addition

2007/2008

CO2 automated calibration check

Automated HP heat/cool test

Extensive alarming

Page 56: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

CO2 Sensor Automatic Calibration Check

2007/2008

Page 57: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Inteface

Page 58: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Results

Page 59: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Automated HP Testing

Page 60: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Inteface

Page 61: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Testing the Test

Page 62: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Testing the Test

Page 63: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Barracks and Administration Building

2009

Barracks

• 4-Pipe Blower coils w/o economizer

Admin

• 4-Pipe Air Handlers w/ economizer

• VAV with HW reheat

Systems selection new to base staff

Base staff interested in automated testing to lower manpower requirements

T.A.C. Controls – iNet Server

Page 64: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Blower Coil Tests Specified

4-Pipe Blower Coils without economizer

• Heating valve leak

• Heating coil capacity

• Cooling valve leak

• Cooling coil capacity

Page 65: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Interface

Page 66: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Testing

Page 67: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Results

• All valve leakage problems identified

• All coil capacity problems identified

Page 68: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

4-Pipe Air Handler Tests Specified

Air Handling Units, 4-Pipe

• Heating valve leak

• Heating coil capacity

• Cooling valve leak

• Cooling coil capacity

• Outside air damper leakage

• Return air damper leakage

Page 69: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The Interface

Page 70: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Testing

Page 71: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Results

All valve leakage problems identified

All coil capacity problems identified

Damper leakage identified but may be hindered by limitations of mixing box and mixed air sensor – work in progress

Page 72: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

VAV Tests Specified

VAV Terminal Units with hot water reheat

• Test 1 - Flow sensor zero

• Test 2 - Air valve leakage

• Test 3 - Cooling air flow control & Test 4 -Heating valve leakage

• Test 5 - Heating air flow control & Test 6 -Heating coil capacity

Page 73: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

The interface – so far

Page 74: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Results

Problems executing specified tests – can’t override zone temperature or set point in code

Will get automated testing of Test 1 – Flow Zero, Test 2 – Air Valve Leak, Test 3 – Heating Valve Leak

Will use VAV summary screen for remainder of tests

Summary screen to include calculated difference of VAV supply air and AHU supply air

Expect that these will function well but not as automated as would like

Page 75: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts and Lessons Learned

Page 76: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Integrated Approach for OCx

Auto Test

Calibration Check

Alarm

Trend

Page 77: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts - Alarms

Confirm alarm requirements in OPR – talk to the Operators

Limit to major, actionable parameters – don’t be too aggressive

Specify delays, limits and enable parameters to prevent nuisance alarms

Be specific, do not leave open for interpretation or at the discretion of the control contractor

Commission the alarmsList alarms and response in OCx Plan

Page 78: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts – Trending

Specify minimum trending requirements, capacity, archiving, etc. in the project documents

Use the same, standard interval for all trend logs

Don’t use event or change of value logging for standard logs

Commission the trend logs

Write detailed instructions on acquisition, analysis and actionable items - include in OCx Plan

Page 79: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts – Data Logging

Use the same, standard interval for all loggers

Synchronize loggers with trend logging if applicable

Write detailed instructions on acquisition, analysis and actionable items - include in OCx Plan

Page 80: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts – Automated Testing

Get buy-in from all stake holders to manage expectations and shift cost of implementation from maintenance/utilities

Don’t be too aggressive at first - KISS

Confirm all requirements in OPR

Consult controls contractor on capabilities if possible

Mixed air sensor location is critical to use in damper tests

Must specify all sensors needed – VAV supply air

Commission the Automated Testing thoroughly

Include companion trending

Write detailed instructions and include in OCx Plan

Page 81: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Key Concepts – OCx Plan

Why, What, Who, When & How

Overview, goals, roles & responsibilities, etc.

Systems to be included

Provide detailed instructions, testing procedures, trending, etc – document it

Include a schedule – integrate into CMMS

Provide an action plan for all elements

Page 82: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

AIA Quality Assurance

Portland Energy Conservation, Inc is a registered provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members are available on request.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 83: Ongoing Commissioning with Building Automation System …USGBC LEED EBOM Sample Work Scope – Ongoing Commissioning EA Credit 2.3: Existing Building Commissioning: ... Discharge Air

Thank you for your time

Bryan Welsh (253)[email protected]

Welsh Commissioning Group, Inc.