OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

14
OLSC PLM Workgroup 1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor

Transcript of OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

Page 1: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 1

DOORS input for OSLC Storyboard

V0.2 15/4

Gray Bachelor

Page 2: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 2

Aims and objective

To show how real ALM tools support and represent PLM process and related information

To show how DOORS 9.3 represents the OSLC PLM Reference Model through the selected scenario of a Systems Engineer responds to change in Requirements

Page 3: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 3

Purpose of this document

To summarise the flow of changes to the requirements that DOORS needs to represent

Page 4: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 4

Summary of the key business entities & their relationships

CR

Req Implem

System or product context

Pre-condition (Before

Controlled config

Is based upon or applies to*

Post-condition (After

CR System or product context

Is implemented by

Req Implem

Controlled config

System or product context

Req Implem

Controlled config

* Assuming basic triaging has been done prior to the start of the scenario

At some context version V’

At some new context version V’’

Updated to achieve the CR

Updated to achieve the CR

Page 5: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 5

Overall view of the scenario and naming

Story 1

1st set of changes to requirementsSteps 0.0 to 0.4

Implement the 1st set of changesSteps 1.0 to 1.X

Story 2

2nd set of changes to requirementsSteps 2.0 to 2.X

Implement the 2nd set of changesSteps 3.0 to 3.X

In the kitchenready

Page 6: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 6

Summary of the Scenario flow from a tools perspective – Story 1 0.0 to 0.4

We aim to show the tool status at end phase in the flow

0.0

0.2a

0.2b

0.3

0.4

Page 7: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 7

Story 1 Requirements changes to be shown as DOORS baselines through the scenario Requirement Context from To context Notes

Starting point All 3 exist - Pre condition 0.0

REQ-020181 A

No issatisfiedby

B

No issatisfiedby

Post of Step 0.2a

REQ-020144 A

Issatisfiedby link to

AMG60104/001

B

No issatisfiedby

Post of Step 0.2a

Text changes too Post 02b

AKY251614 A

Association with Product AMG 54556/001 and Implementation AMG60112/001

B

No issatisfiedby

Post Step 0.3

REQ-020144 B

No issatisfiedby

B

Issatisfiedby link to AMG60104/002

Post Step 1.1

AKY251614 B

No issatisfiedby

B

Issatisfiedby link to AMG60112/002

Post Step 1.2

AKY251614 B

Issatisfiedby link to AMG60112/001

B

Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002

Post Step 1.3

Page 8: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 8

Story 2 New and changed requirements to be shown as DOORS baselines through the scenario

Requirement Context from To context Notes

Starting point All 3 exist - Pre condition based on 1.3

REQ-020184 - A

Derived from REQ-020187

REQ-020185 - A

No issatisfiedby

Derived from REQ-020188

REQ-020186 - A

No issatisfiedby

Supports the variants

Post of Step 2.2

REQ-020187 - A

No issatisfiedby

Supports the variants

Post of Step 2.2

REQ-020188 - A

No issatisfiedby

Supports the variants

Post of Step 2.2

REQ-20144 B Issatisfiedby link to AMG60104/002 C

No issatisfiedby

Post of Step 2.3

REQ-20181 B

No issatisfiedby

C

No issatisfiedby

Post of Step 2.5

AKY251614 B Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002

C

No issatisfiedby

Post Step 2.7

REQ-020184 A

Derived from REQ-020187

A

Issatisfiedby link to ??

Decide on Implementation ref

REQ-020185 A

No issatisfiedby

Derived from REQ-020188

A

Issatisfiedby link to ??

Decide on Implementation ref

AKY251614 C

No issatisfiedby

C

iscomposedof REQ-020186

Post Step 2.7

Page 9: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 9

Story 2 New and changed requirements to be shown as DOORS baselines through the scenario Requirement Context from To context Notes

REQ-20144 C

No issatisfiedby

C

Issatisfiedby link to AMG60104/003 ???

Post 3.2

REQ-020187 C

No issatisfiedby

A

Issatisfiedby link to ???

Post 3.2

REQ-020188 C

No issatisfiedby

A

Issatisfiedby link to ???

Post 3.2

AKY251614 C

Issatisfiedby link to ???

C

Issatisfiedby link to ??? And Association with Product AMG 54556/003

Post 3.3

Page 10: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 10

Links

Mike’s page http://open-services.net/bin/view/Main/PlmScena

riosGm Files used at 14/4

HSUVExample_Story_1.pptx: Story 1 (Requirements Change) Step by Step Description with Pictures (updated to match revisions of above)

# HSUVExample_Story_2.pptx (WORK IN PROCESS) Slides describing the Story 2 sequence, which adds two variants of the emissions requirement

Page 11: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 11

Overview from Neal – current status

Page 12: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 12

Changed req after base line

Page 13: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 13

Query contents of a baseline set

Page 14: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.2 15/4 Gray Bachelor.

OLSC PLM Workgroup 14

Changes and issues

V0.2 Update 15/4 with Neal and Mike Implementation refs need checking