OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn...

10
OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH

Transcript of OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn...

Page 1: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

OH

T –

HL

7 C

har

ter

HL7 Tooling Project – Status Report 9th December 2008

Ravi Natarajan

Ken Lunn

NHS CfH

Page 2: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

rHL7 Messaging Tooling

Content

•SMD V0.6 release•SMD V1.0 commission•SMD V1.0 release

•Standalone applications (32 bit)•Windows, Mac, Linux

• Copyright issues with HL7• Funding HL7.org specific

requirements• Harmonisation with IBM/VA

project• Harmonisation with

conformance tooling

•Copyright clearance on necessary HL7 artifacts (MIF Schemas , coremifs etc)

Added

Deleted & Changed

Milestones

Packaging Editions

Dependencies

Pressures

Statistics

•.>$1 million expenditure•>5 person years effort to date

• HL7 V3 instance editor (MIF1 & 2.0.x , on OHT site)

• HL7 V3 documentation editor, OID catalogue maintenance (MIF1, on OHT site)

• MIF-diff (on OHT site)• SMD V0.6 ( MIF 2.1.2 pending HL7

copyright approval, no CMETS and templates)

• SMD V1.0 (MIF 2.1.3 June 2009)

Page 3: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

HL7 tooling

Instance editor, documentation

tooling, MIF-diff

SMD V0.6

SMD V1.0

Q2 2008

Q3 2008

Q4 2008HL7 Copyright

Q1 2009Continuation funding

Q2,3 2009

Page 4: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

rEclipse Static Model Designer v0.6

Q3 2008 Boca ChartContent

• 0.6M1 – July 3, 2008• 0.6M2 – August 14, 2008• 0.6M3 – September 25, 2008 • 0.6RC – October 23, 2008• 0.6 Final Release – November 4, 2008

•Standalone applications (32 bit)•Windows, Mac, Linux

• Delivered on schedule, however both binary and source release on OHT site is delayed due to copyright issues regarding necessary HL7 artifacts

•Copyright clearance on necessary HL7 artifacts – MIF schemas, core MIF (RIM, datatypes, etc).

Added

Deleted & Changed

Milestones

Packaging Editions

Dependencies

Pressures

Statistics•.Regression testing of 0.6 is in progress from HL7 tooling committee.• Next phase is in early inception state.

• HL7 Ecore metamodels o Static o Data type o Vocabulary

• Ballot pack contexto RIM, Data types, Vocabulary

• XMI persistence • Import: MIF 2.1.2, MIF 1 (UK), MIF 1 (UV)• Export: MIF 2.1.2• Validation & conformance framework

o Built-in constraints o Pluggable validation rules (Java, OCL,

oAW Check)• HL7 Static Model Diagram Editor• Rich XHTML annotation editor• Test suite

Page 5: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

Eclipse Static Model Designer v0.6

0.6M1July 3, 2008

0.6M3September 25, 2008

0.6M2August 14, 2008

0.6RCOctober 23, 2008

0.6 Final ReleaseNovember 4, 2008

Page 6: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

Eclipse Static Model Designer – Key Feature’s EMF centric GEF,GMF for graphical editing Import of MIF 1.0 models (HL7,CfH) & MIF 2.1.2 Export to HL7 MIF 2.1.2 Rich Annotation Editor Validation framework with visual notification. Uses coremifs for enforcing model constraints in terms

of allowed attributes in a rim class, datatypes and vocabulary binding.

Page 7: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

Status and Milestone DatesDate Deliverable Version

22 May 2008 Delivery Plan

3 July 2008 Milestone 1 SMD 0.6M1

14 August 2008 Milestone 2 SMD 0.6M2

25 September 2008 Milestone 3 SMD 0.6M3

23 October 2008 Release SMD 0.6RC

04 Nov 2008 Final Release 0.6

Page 8: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

Activities Update

The 0.6 version was released on 04/11/2008. The builds were for platforms Windows, Mac & Linux. HL7 tooling committee & CfH are actively testing the final released product. The SMD project site https://staticmodeldesigner.projects.openhealthtools.org/ was made

public on 03/10/08. The site is used for issue tracking based on the testing feedback. The upload of code & binaries are held due IPR/Licensing issues in using HL7 artefacts

(MIF schemas, coremifs and documents).

Page 9: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

Key Updates – HL7

HL7 Released MIF 2.1.3 schemas, this requires adaption for import and export in phase – II.

Vocab binding principles needs implementation in phase – II.

Page 10: OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.

HL

7 O

HT

Ch

arte

r

What’s Next Further continue testing 0.6 and capture issues and enhancements requests. Resolve HL7 IPR/Licensing issues in order to upload src & binaries into charter

repository. Next phase is in early inception.