OHSU WEST CAMPUS MASTER PLANNEW GSF (MAX.) # OF NEW EMPLOYEES A DCM Commons 4,500 GSF 0 B Surge...

1
BUILDING 1 (VGTI) EXPANSION DCM COMMONS NW 185 TH AVENUE OHSU WEST CAMPUS QUATAMA BATES WALKER ROAD NW HOLLY STREET NW AMBERGLEN PKWY NW 206 TH AVENUE NW WILKINS STREET 2017 OHSU WEST CAMPUS CODE SPACE CATEGORY / NEW BUILDING NEW GSF (MAX.) # OF NEW EMPLOYEES A DCM Commons 4,500 GSF 0 B Surge Building A 12,000 GSF 0 Demolish Existing Research Annex -6,430 SF 0 C Building 1 (VGTI) & Parking Lot Expansion 80,000 GSF 161 D Research Building Renovation 0 6 E Physical Plant Expansion 1,500 GSF 0 F Central Store Relocation 1,600 GSF 0 Demolish Central Stores -2,140 SF 0 G Surge Building B 12,000 GSF 2 H ASA Expansion 4,000 GSF 4 I ASB Expansion 12,000 GSF 11 J PMIC 2 6,200 GSF 6 PHASE ONE TOTAL 125,230 GSF 190 10-YEAR MASTER PLAN, 2017-2027 Legend Existing Building Future Building Pavement Walkway Existing Building Renovation or Expansion A B G D E F C H I J “The OHSU West Campus will be an attractive, secure and vibrant center of biomedical discovery and scholarship that integrates advanced research facilities, high performing workplaces, safe and enriching animal care spaces and the natural environment.” 1 Maintain the forested entry sequence; 2 Maintain the natural campus character; 3 Cluster visitor accessible facilities near the campus entrance; 4 Reconfigure and expand parking to be convenient yet inconspicuous; 10-YEAR OHSU WEST CAMPUS MASTER PLAN 2018 -202 8 DEVELOPED BY ZGF ARCHITECTS VISTION STATEMENT MASTER PLAN GOALS 5 Separate service routes from landscaped walks; 6 Conserve the landscape by building up not out; 7 Cultivate natural screening to provide visual privacy; 8 Preserve and enhance the central green spaces. 1960 OREGON REGIONAL PRIMATE RESEARCH CENTER (ORPRC) WAS ESTABLISHED 1998 ORPRC FORMALLY MERGED WITH OHSU 1998 APPROVED CDP 2018 1998 CDP TO EXPIRE IN APRIL FY 2027-2037 2016 OHSU WEST CAMPUS MASTER PLAN FY 2017-2027 PHASE I, 0-10 YEARS DEVELOPMENT PHASE 2, 10-20 YEARS NOT SEEKING APPROVAL 2002 ORPRC TO OREGON NATIONAL PRIMATE RESEARCH CENTER (ONPRC) 20 YEAR VISION PROJECTED, ACTUAL & PLANNED GROWTH TIMELINE TOTAL GSF PROJECTED/ACTUAL GSF INCREASE PARKING SPACES 1998 192,800 GSF - 254 spaces APPROVED 1998 CDP Plan 1,500,000 GSF +1,307,200 GSF 1 1,446 spaces 2016 372,571 GSF +179,771 GSF 2 528 spaces Phase I 2017-2027 497,801 GSF +125,230 GSF 3 +126 spaces 4 Phase II 2027-2037 787,601 GSF +289,800 GSF +373 spaces 4 PROPOSED LANDSCAPE IMPROVEMENTS COURTYARDS PRESERVE ENTRY SEQUENCE EVENT GATHERING FORMALIZE CENTRAL GREEN LANDSCAPE BUFFER COMPLETE LANDSCAPE BUFFER ORCHARD PONDS INFILL PLANTING VEGETABLE GARDEN Inner Walking Loop Landscape Buffer Walkway/Courtyard Pavement Existing Building Existing Building Renovation or Expansion Future Building (2017-2027) Future Building (2027-2037) NOT SEEKING APPROVAL Outer Service & Walking Loop Legend LANDSCAPE MASTER PLAN

Transcript of OHSU WEST CAMPUS MASTER PLANNEW GSF (MAX.) # OF NEW EMPLOYEES A DCM Commons 4,500 GSF 0 B Surge...

Page 1: OHSU WEST CAMPUS MASTER PLANNEW GSF (MAX.) # OF NEW EMPLOYEES A DCM Commons 4,500 GSF 0 B Surge Building A 12,000 GSF 0 Demolish Existing Research Annex -6,430 SF 0 C Building 1 (VGTI)

BUILDING 1 (VGTI) E XPANSION DCM COMMONS

NW

18

5T

H A

VE

NU

E

OHSU WEST CAMPUS

QUATAMA

BATES

WA L K ER ROA D

N W H O L LY S T R E E T

NW

AM

BE

RG

LE

N P

KW

Y

NW

20

6T

H A

VE

NU

E

N W W I L K I N S S T R E E T

2017 OHSU WEST CAMPUS

CODE SPACE CATEGORY / NE W BUILDING

NE W GSF (MA X.)

# OF NE W EMPLOYEES

A DCM Commons  4,500 GSF 0

B Surge Building A 12,000 GSF 0

Demolish Existing Research Annex -6,430 SF 0

C Building 1 (VGTI) & Parking Lot Expansion 80,000 GSF 161

D Research Building Renovation 0 6

E Physical Plant Expansion 1,500 GSF 0

F Central Store Relocation 1,600 GSF 0

Demolish Central Stores -2,140 SF 0

G Surge Building B 12,000 GSF 2

H ASA Expansion 4,000 GSF 4

I ASB Expansion 12,000 GSF 11

J PMIC 2 6,200 GSF 6

PHASE ONE TOTAL 125,230 GSF 190

10-YEAR MASTER PLAN, 2017-2027

Legend

Existing Building

Future Building

Pavement

Walkway

Existing Building Renovation or Expansion

A

BG

D

E

F

C

H

I

J

“The OHSU West Campus will be an attractive, secure and vibrant center of biomedical discovery and scholarship that integrates advanced research facilities, high performing workplaces, safe and enriching animal care spaces and the natural environment.”

1 Maintain the forested entry sequence;

2 Maintain the natural campus character;

3 Cluster visitor accessible facilities near the campus entrance;

4 Reconfigure and expand parking to be convenient yet inconspicuous;

10-YEAR

OHSU WEST CAMPUS MASTER PLAN 2018-2028D E V E L O P E D B Y Z G F A R C H I T E C T S

VISTION STATEMENT MASTER PLAN GOALS5 Separate service routes from landscaped

walks;

6 Conserve the landscape by building up not out;

7 Cultivate natural screening to provide visual privacy;

8 Preserve and enhance the central green spaces.

1960OREGON REGIONAL PRIMATE RESEARCH CENTER (ORPRC) WAS ESTABLISHED

1998ORPRC FORMALLY MERGED WITH OHSU

1998 APPROVED CDP

20181998 CDP TO EXPIRE IN APRIL

FY 2027-2037

2016OHSU WEST CAMPUS MASTER PLAN

FY 2017-2027PHASE I , 0-10 YEARS DEVELOPMENT

PHASE 2, 10-20 YEARS NOT SEEKING APPROVAL

2002ORPRC TO OREGON NATIONAL PRIMATE RESEARCH CENTER (ONPRC)

20 YE AR V ISION

PROJECTED, ACTUAL & PLANNED GROWTHTIMELINE TOTAL GSF

PROJECTED/ACTUAL GSF INCRE ASE

PARKING SPACES

1998 192,800 GSF - 254 spaces

APPROVED 1998 CDP Plan 1,500,000 GSF +1,307,200 GSF1 1,446 spaces

2016 372,571 GSF +179,771 GSF2 528 spaces

Phase I 2017-2027 497,801 GSF +125,230 GSF3 +126 spaces4

Phase II 2027-2037 787,601 GSF +289,800 GSF +373 spaces4

PROPOSED L ANDSCAPE IMPROVEMENTS

COURTYARDS

PRESERVE ENTRY SEQUENCE

EVENT GATHERING

FORMALIZE CENTRAL GREEN

LANDSCAPE BUFFER

COMPLETE LANDSCAPE BUFFER

ORCHARD

PONDS

INFILL PLANTING

VEGETABLE GARDEN

Inner Walking Loop

Landscape Buffer

Walkway/Courtyard

Pavement

Existing Building

Existing Building Renovation or Expansion

Future Building (2017-2027)

Future Building (2027-2037) NOT SEEKING APPROVAL

Outer Service & Walking Loop

Legend

LANDSCAPE MASTER PLAN