Offshore Technical Ser +MORE
Transcript of Offshore Technical Ser +MORE
• A registered Chinese company, headquartered at Shekou-Shenzhen, wholly owned by a Hong Kong registered entity.
• Company founded by technical, and operations specialists from Oil & Gas industry with a great depth of international experience:
! China ! Brazil ! Africa ! Russia ! GOM
• Organization’s objectives:
i. Complete challenging oil and gas engineering projects
ii. Facilitate technology exchange between China and overseas technology companies
iii. Maintain a focus on HS&E and legal or regulatory compliance
• Partnered with industry leading firms exclusively representing their business activities within China.
Summary Introduction
• Areas of Expertise
– Project Management and Technical Staffing
– Drilling Operations and Well Planning
– Fracturing operations – design, analysis and on-site supervision
– Completions and Artificial Lift design
– Flow assurance and Process Modeling (Hysim and Olga)
– Asset Integrity Management and Materials Selection
– Operational Readiness Documentation and Commissioning Services
– Production Chemistry and Materials Selection
• Field Operations and Development Projects – Application of Lessons Learned
• 24 years per consultant average experience based in China
– Feasibility, Based on Life of Field • What makes sense based on the actual well and reservoir history
– Design and Integration Requirements • From the reservoir, to well, to the production facility to export
What can we do?
Husky China • Prepared operators documentation for the Liwan gas project (11 volumes) • Development of deep-water Asset Integrity Management Program (Proposal Submitted) Newfield China • Completed Flow Assurance Study – subsea pipeline design • Developing and supporting procurement of electric submersible pumping (ESP) system,
power supply and associated equipment • Drilling and Completions Program appraisal and verification • Well Testing Program Development and Management • Commissioning Management and Staff for LuFeng 7-2 platform��including
arrangement of resident visas and offshore work permits)
Roc Oil • Materials selection and asset integrity management training program
Shell China • Completed pre-qualification requirements for JinQiu FEED study tender
Example Projects in China
• Multi-discipline engineering staff – mechanical, electrical, power generation
• Asset Integrity and Inspection Specialists
• Deepwater Production Operations Personnel
• Technical Documentation Specialists
• Rig Supervisors and Tool Pushers
• Completions Engineers
• Materials Managers
• Drilling fluids and cementing engineers
• HS&E
• QC/QA Supervisors and Inspectors
• Third Party Technical Staff
Project Positions�
Case History 3 FEED Study
• FEED and Project Study for Perdido, Shell Gulf of Mexico – Mudline boosting system for water depth of 2,600 meters
– Design based on US patent authored by Profundo staff – Production rates up to 25,000 BFPD
• Initial Design and Functional Validation – Identification and validation of the system to the component level
– Key requirements for command and control structure
– Scope of Supply
– Qualification Plan
– Integration Requirements
– Factory Acceptance Testing (FAT) Requirements
– Systems Integration Testing (SAT) Requirements
Deepwater Feed Study - Case History No. 1
Offshore Gas Project - Case History No. 2
• Petrobras - Peroa Cangoa Gas Field – Sub-sea well completions in water depths to 100 to 500+ meters
– Initial 4 well design in varying water depths
– First wet gas sub-sea umbilical pipeline within Brazil.
– Design envelope of 0.5 to 2.3 million scm per day • 8 to 350 m3 per day of condensate
– Completed flow assurance study – Oversaw offshore and onshore
facility commissioning
Case History 5 FEED Study and Project Management Case History No. 3
• FEED and Project Management Jubarte Field – Petrobras, Brazil – Water Depth 1400 m - Deepest subsea Electric Submersible Pump completion
(2006) • 6000m Pipeline and Tie Back
• Design Production Rate 22,000 BFPD (3500 M3FPD)
• Sea Bed temperature 40F (4C) – 17 API Crude, Flow Assurance Challenges - Modeling
• Well sizing and design prior to drilling operations – Largest Horsepower system ever installed (2006) – 1200 Hp
– Designed to be produced initially with Gas Lift (GL) then transition to ESP production
– Interface and Project Management • Tree Interface Design and Qualification
• Oversight of drilling operations
• Onsite rig supervision during completion
Case History 2 Artificial Lift Design
Exeter - Mutineer Project Design, Santos Australia, – Water depth of 140 meters – Step-outs up to 7 km – Production rates 12,000 to 20,000 BFPD
• Design of dual (redundant) ESP systems
– Surface and down hole string design – component level
– Scope of supply
• Tree Interface Design and Qualification • Command and Control Structure • Qualification Plan • Integration Requirements • Factory Acceptance Testing (FAT) • Systems Integration Testing (SIT)
Artificial Lift Design - Case History No. 4
Construction and Commissioning Case History 5
• Olowi Project, CNR Int. – Gabon Africa
– $1.6+ billion USD Project – 35 meters of water - oil rim/gas reservoir – Managed construction and pipe laying – Used ENI HLV and Bokalis pipe laying vessels – Well tubing heat traced and also flow lines – (paraffinic crude oil) – Contract management of FPSO and MPVs – Managed successful commissioning of system
Addi$onal)Case)Histories)
• Amerada Hess Oil Refinery (HOVIC - HOVENSA) – 600,000 bpd • Processing of sour crudes and storage with tank capacities of 32,000,000 barrels • Corrosion monitoring of crude units, lines and tankage. • H2S scavenging process - results reduced corrosion by 92% in tankage
• Agip (ENI) Congo – Kitina Platform – 28,000 bpd • Development of the line cleaning and preparation procedures for export line prior to
commissioning – including batch treatment of chemicals • Implemented asset integrity management plan and also corrosion inhibition program
• Exxon Mobil – Kizomba Projects (Blk 15) – 485,000 bpd • Predictive modeling of the flow characteristics in the flow lines (1300 meters water depth) • Development of corrosion monitoring – ER and weight loss corrosion coupons, Fe+ levels etc. • Failure analyses – ship deck on new build vessel, and also heat exchanger tubes
Offering complete staffing solutions for offshore oil and gas facilities: • Will develop staffing plans from commissioning phase through to
ongoing operations.
• A depth of staffing resources to fill challenging positions.
• Management possesses extensive oil and gas deepwater operations experience.
• Projects co-ordinated or managed by professional staff based at Shekou Shenzhen employed by a registered Chinese entity.
• Ongoing staffing projects such as staffing a combination drilling – production rig (LuFeng 7-2) operating in the South China Sea.
• Flexibility with respect to contracting services structure
Summary Value)Proposi$on)