    The oshore Renewables revolutionwill be at the oreront o helping theUK meet its greenhouse gas emissions

    targets over the next generation.Engineering innovation across a rangeo disciplines will be essential to yieldthe step change in generating capacitythat is required. Atkins, as one o theworlds leading oshore engineering

    consultancies, are proud to be at thevanguard o this industry transormation.

    Martin Grant, Managing Director Atkins Energy

  • 7/30/2019 Offshore Renewables Brochure

    3/24

    Contents

    The Facts Company Overview Structural Design and Analysis

    Substructure and Foundation Design Electrical Engineering Mechanical Engineering Reliability Engineering and Asset Management Marine Environmental Assessment Saety Engineering

  • 7/30/2019 Offshore Renewables Brochure

    4/24

  • 7/30/2019 Offshore Renewables Brochure

    5/24

    Climate change resulting rom CO2 and other greenhouse gas emisposes a huge threat to human welare. To contain that threat, theworld needs to cut emissions by about 50% by 2050, and to startcutting emissions now. A global agreement to take action is vital. Bglobal agreement will not be possible unless the countries o the rideveloped world provide leadership A air global deal will requirUK to cut emissions by at least 80% below 1990 levels by 2050.

    The Committee on Climate Change

    Oshore Renewables - The Facts:

    The UK is legally obliged to reduce greenhouse gas emissions by 34%1990 levels by 2020The Committee on Climate Change has recommended reductions o 8by 2050Increasing Renewable generation to 30% o the UK generation mix by2020 could reduce power-sector emissions by 40% rom 1990 levels asignicantly contribute to meeting the overall UK emissions reduction There is currently approximately 500MW o oshore wind energy gencapacity installed in the UKThe Crown Estate lease process is introducing a total o 33GW into thdevelopment cycle through Rounds 1, 2 and 3

    Capital expenditure in the oshore Renewables sector to achieve 202

    targets is estimated to peak at 17Bn per annum

    The Facts

  • 7/30/2019 Offshore Renewables Brochure

    6/24

    Bahrain World Tr

    Company Overview

    PlanThe challenges acing our clients are multidimensional, oten becauseo the increasingly complex modern environment. From cost and riskplanning, easibility studies and logistics, to impact assessments and

    stakeholder engagement activity, we plan every aspect o ourclients projects.

    DesignAtkins designs intellectual capital such as management systems andbusiness processes. We also design physical structures such as ocetowers, schools, bridges and highways. Whatever we design, we applythe same passion and creativity combined with the rigorous qualitystandards.

    EnableOur clients choose Atkins because they want to ocus on their coreoperations. They entrust us to look ater the management o projects,people and issues ensuring that deadlines are met, costs arecontrolled and success is delivered.

    In all that we do, excellence is our benchmark. We take pride inunderstanding our clients challenges and delivering excellentsolutions. This means the application o innovative managementtechniques, the use o cutting-edge materials, the deployment otechnology in novel ways and the highest level o client care.

    Breadth and DepthMuch o our work is on capital projects. As the largest multidisciplinaryconsultancy in Europe and the worlds eighth largest internationaldesign rm, we have the breadth and depth o skills our clients need.Were the sae pair o hands entrusted with delivering the mostambitions solutions, as a selection o our work shows:

    Terminal area masterplan and terminal building design orYinchaun Hedong Airport (China)Design, engineering and planning consultancy or the Glasgow

    Airport Rail Link (UK)Wing design and analysis or the Airbus A350 XWB aircrat (UK)Masterplanning and detailed design services or the Durrat AlBahrain resort (Bahrain)Local transport planning policy evaluation or the Department orTransport (UK)Planning and inrastructure support or the London 2012 OlympicPark (UK)Highways management services or Cambridgeshire CountyCouncil (UK)Managing Agent or HBOSs property portolio (UK)Project management and cost estimating or the construction o theWorld Trade Center Memorial and Visitors Center, New York (USA)

  • 7/30/2019 Offshore Renewables Brochure

    7/24

    The Bahrain World TradeCentre is a pioneeringstride or environmentalarchitecture, the rst buildingin the world to incorporatelarge scale integrated windturbines which comprehensiveground tests indicate willgenerate 11-15% o theenergy requirements o thetwo towers.

  • 7/30/2019 Offshore Renewables Brochure

    8/24

    Structural Design and Analysis

    Atkins oshore structural engineering capability dates back tothe 1970s and we have been at the oreront o the disciplineever since. Much o our capability originated in the Oil and Gassector, and we are still heavily involved in this area. However,we have successully transerred many o our skills onto anumber o oshore Renewables projects.

    Atkins undertakes all aspects o structural analysis, ranging romstrength and atigue assessment to extreme loading studies. Theteam has an extensive knowledge o wind turbine technology, havingundertaken independent design audits o 20 wind turbines or majordevelopers. We have also undertaken structural design and analysiscommissions or a number o wave and tidal energy converters,utilising our world leading expertise in wave loading.

    Our expertise encompasses xed and foating structures and includes:Concept, FEED and detailed designStructural integrity managementRepair and modicationAssurance, verication and auditSaety, risk and reliabilityFinite element modellingStrength assessmentFatigue assessmentSurvivability assessmentComputational fuid dynamics

  • 7/30/2019 Offshore Renewables Brochure

    9/24

    Key ContactProessor Mike WillmoreDirector, Oshore Engineering

    Mike is a civil engineer with over 30 years experience. He is reor the development o a technical assurance regime across thdepartment and or establishing technical leadership on key oengineering projects. He is Project Director on a number o moshore projects, including the detailed topsides design o theGalloper Platorm in the North Sea and the concept/FEED desiSolan installation West o Shetlands.

    Atkins has been commissioned by McNultys (Fabrication Contractor)to carry out the detailed design o the topsides or the GalloperWind Farm Oshore Substation Platorm. This encompasses multipledisciplines such as Structural, Utilities, Electrical, Architectural, SaetyEngineering, Mechanical, Piping Design and Telecomms. The completetopsides are expected to be in the order o 1600 tonnes.

    One high voltage oshore substation platorm (OSP) will be used tocollect and transorm the energy generated by the Galloper WindFarm rom 33 kV to 132 kV or transmission to shore. Three phase132-kV high-voltage subsea cables will transport the power to the gridconnection point, which will be located near Sizewell in Suolk.

    The OSP will be designed as a normally unmanned installation. Theplatorm acts as a central hub or the Galloper Wind Farm controlsystem and contains acilities to allow personnel to standby and

    monitor the Wind Farm. Although the OSP is not required to unctionas accommodation, it is required to provide temporary accommodationin the event o stranding o the operations team.

    Case StudyGalloper Wind Farm Oshore Substation Platorm

  • 7/30/2019 Offshore Renewables Brochure

    10/24

  • 7/30/2019 Offshore Renewables Brochure

    11/24

    Key Contact

    Dr Ramsay FraserDirector, Structural Engineering

    Ramsay is a structural engineer with 25 years postgraduate exin oshore engineering. His technical experience includes desiand analysis o oshore structures (jackets, topsides, GBS, jacksemi-submersibles, subsea templates, pipelines and wind turbhydrodynamics o xed and foating structures, non-linear anddynamic FE analysis, structural reliability analysis, and racture atigue damage assessments. He holds a PhD in Finite ElemenPrinciples, and has a thorough understanding o the theory usABAQUS, USFOS, SESAM, STRUREL and FLUENT.

    Atkins was commissioned byTalisman energy to undertake aconcept study or the installationo 5MW turbines in 45m waterdepth. Loading assessments wereundertaken looking at wave,current, wind and sel weight andthese were applied to a numbero design concepts, includingfoating, gravity based, piled and

    jack-up structures.

    Design evaluation o threeshortlisted concepts wasundertaken to consider structuralstrength or transportation and

    installation loads; structural andoundation strength to resistin-place extreme and operatingloads; atigue perormanceto resist cyclic wave loadsand fuctuating wind loads;and dynamic perormance toresist resonance or dynamic

    amplication at blade parequencies, wave and wenergy requencies.

    Fabrication and installatioassessments o the shortconcepts were also undewhich involved consideritraditional and novel instmethodologies. Finally,installation costs and schestimates were derived uMonte Carlo simulation.

    Case StudyBeatrice Wind Farm Concept Study

  • 7/30/2019 Offshore Renewables Brochure

    12/24

    Electrical Engineering

    Atkins has a strong transmission and distribution team,providing electrical engineering consultancy services to keyclients such as National Grid and Central Networks. Servicesrange rom design and procurement o substations, through togrid connection assessments or planned new generation assetsin the conventional, nuclear and Renewable generation sectors.

    By combining our electrical engineering capability with our oshorestructural engineering, Atkins is able to oer a wide range otechnical services to both Wind Farm developers and OFTOs (OshoreTransmission Operators) and we are actively engaged in both sectors.

    Our expertise includes:Network planning and developmentPower system modellingProtection studies and ault calculationsNew connection applications and scheme designEHV/HV substation design and buildEHV Cable DesignPower distribution and protection equipment specication(e.g. Transormers, switchgear, cables, protection relays)Automated controls or substation and process industries DCS/SCADA)Construction management and commissioning

  • 7/30/2019 Offshore Renewables Brochure

    13/24

    Atkins was commissioned by the Arabian Oil Company, Saudi to undertake the FEED (Front End Engineering Design) o a nepower supply link to an existing gas and oil gathering station approximately 40kM oshore in the northern part o the PersThe commission included the design o:

    A 42 km long 40 kV submarine cableOshore utility platorm connected by a bridge to an existLiving QuartersTwo 40 kV, 20 MVA substations (one at each end o the sucable) housing gas insulated switchgears.

    The project included both design elements and management major subcontractor who carried out the cable route survey (43km). It was a multi-disciplined, multi-location design and engproject involving process, mechanical, piping, structural, archit

    civil, electrical, instrumentation and saety disciplines. Electricasystem, load fow and short circuit studies were carried out.

    Case StudyFEED Design o 40kV Submarine Cable and Substations

    Key Contact

    Ingar LotusPrincipal Electrical Engineer

    Ingar is one o our specialists in electrical system developmentHe is a chartered engineer with over 15 years experience in higvoltage electrical engineering. He is principally engaged in thedevelopment o the grid system, both onshore and oshore. Hundertaken master planning or new inrastructure projects wincluding complete easibility studies or the electrical inrastrumajor projects in Central America, Middle East, Arica and theSub-Continent.

  • 7/30/2019 Offshore Renewables Brochure

    14/24

    Mechanical Engineering

    Atkins acquired MG Bennett, a leading mechanical enginconsultancy, in 2008. Working across a wide range o seMG Bennett has undertaken numerous mechanical desigcommissions, including the design o the Falkirk Wheel and the backup system to the Channel Tunnel boring maIn the Renewables sector, MG Bennett has undertaken tcomplete design o a 1MW turbine and is actively engag

    the detailed design o a number o Renewable energy d

    Our expertise includes:Concept designDetailed design including technical drawingStructural analysisFatigue analysisDynamics / seismic analysisFailure analysis

  • 7/30/2019 Offshore Renewables Brochure

    15/24

    Tidal Energy Ltd aredeveloping DeltaStream, a1.2MW capacity tidal energygenerator, distinct romother devices as it does notrequire xing to the sea bed,thereore eliminating mucho the installation cost. Atkinshas been commissioned togenerate design parametersor the DeltaStream device.

    The design parameters includean overview o the operationalenvironment, including predicted

    tidal current fows and survivaldesign conditions based onthe most severe occurrenceexpected over a 50 year period.Operational design loads andabnormal loads (including theeects o various ailure modes)are being calculated or major

    components. Finally, contransportation, installatiodecommissioning loads aassessed.

    The document will be upand maintained as new ddata becomes available simulation or model test

    Case StudyDeltaStream Basis o Design Document

    Key Contact

    Nick CooperTechnical Director, Design

    Nick is the ormer Managing Director o MG Bennett, and is ao both the Royal Academy o Engineering and the Institution Mechanical Engineers. His landmark projects include the desiglarge moving structures such as the Falkirk Wheel and processsuch as the A380 Creep Forming tool.

  • 7/30/2019 Offshore Renewables Brochure

    16/24

    Reliability Engineering andAsset Management

    Working rom our oces in the UK, US and Australia, Atkinshas a long established world class capability in reliability,availability and asset management across many sectors o theenergy industry.

    This capability is ocused on key elements o the energy business,supporting our clients during all phases o the project lie cycle romdesign through procurement and construction, commissioning andin-service operations.

    Our Reliability Engineering and Asset Management expertiseencompasses:

    Reliability Strategy Development and ImplementationMaintenance Strategy Development and OptimisationAvailability and Perormance Simulation ModellingReliability Engineering and Design AssuranceSupply Chain Logistics and Spare Parts OptimisationAsset Management and Reliability Training and Skills development

    These business level services are underpinned by extensive praexperience o reliability and maintenance management at all lacross a number o industries, coupled with widespread experspecialist tools.

  • 7/30/2019 Offshore Renewables Brochure

    17/24

    In large power transormers thequantity o insulating oil canbe substantial and, thereore,can represent a signicant repotential. Recognising thispotential hazard, Atkins ReliabilityGroup, based in Glasgow, wererequested to support an extensiveOshore Wind project, withthe objective o establishing theexpectation o a re/explosiondeveloping as a result o anoil-lled Transormer ailingcatastrophically.

    The analysis included a Failure

    Modes and Eects Analysis(FMEA) to establish criticalaspects o the transormeroperation and maintenance,coupled with detailed ault treeanalysis supporting quanticationo potential hazard requencies.Particular consideration was given

    to common mode actorhad potential to undermthe multiple protection dprocesses incorporated tprevent the onset o somconditions and inhibit eso other developed ault

    The study advised on keyequipments, upon whichthrough lie sae and relioperation o the transorwould depend and the nor actions to address relweaknesses in the designoperation.

    Case StudyTransormer Failure Assessment

    Key ContactDuncan GrayChie Engineer, Reliability Group

    Duncan has over thirty years experience in the oil & gas and eindustries. His career has spanned project management, operdesign, and consultancy roles. In previous employment, DuncaChie Consultant on numerous engineering Asset Managemestudies, each ocused upon developing unique and optimum policies/strategies or clients and based upon use o latest reliaengineering methodologies.

  • 7/30/2019 Offshore Renewables Brochure

    18/24

    Marine Environmental Assessment

    Securing development consent is a key milestone in theconstruction programme or inrastructure projects and carriesthe potential or substantial programme risks. These risksare urther exacerbated by the number o consents currentlyrequired and by the number o consent granting bodiesinvolved.

    As such, a planning led approach is recommended. Atkins employsexpert chartered planners with signicant lead consultant experiencein the eld o inrastructure development who work with engineersand programmers to secure consents as part o the delivery team.

    Atkins is the leading integrated planning and environmentalconsultancy in the UK, recognised through winning the BestConsultancy award or our consecutive years at the prestigious Edie.net awards. In addition to providing a ull suite o Environmental

    Impact Assessment services, we have a proven track record in consentsmanagement or complex inrastructure projects and as such, are wellplaced to support projects through the planning process.

    Our expertise include:Atkins has town planners with relevant experience and enviroexperts in both the marine and terrestrial environment or allenvironmental disciplines including:

    EcologyAir, climate and odourNoise and vibrationLandscape and visual assessmentCultural heritage and material assetsHydrology and hydrogeologyGeology, soils and contaminationSustainabilitySocio economics

    Our solutions are comprehensive providing advice or:ConsentsEnvironmental management plansStrategic Environmental AssessmentAppropriate Assessment (Natura 2000 sites)Stakeholder engagement strategyPlanning risk assessments and mitigationEnvironmental Impact AssessmentSustainability appraisal

  • 7/30/2019 Offshore Renewables Brochure

    19/24

    Atkins was commissionedto provide an assessment oenvironmental managementacross the Estates operations.The aim was to present acomprehensive assessment othe Estates perormance, bothpositive and negative, and topropose a realistic way orward.

    The Crown Estate owns around55% o the oreshore (betweenmean high and mean low water)and approximately hal o thebeds o estuarial areas and tidalrivers in the United Kingdom. It

    also owns the seabed out to the12 mile territorial limit, includingthe rights to explore and exploitthe natural resources o the UKContinental Shel, excludingoil, gas and coal. Our objectivewas to integrate environmentalconsiderations with commercial

    and other demands in orachieve eective stewardthe Crown Estate.

    Inormation on the activithe management o stewoperations across the Estobtained rom numerousincluding workshops, siteand detailed discussions personnel. A report was reviewing the key enviroissues aecting each estathese are managed at prand improvements to theenvironmental managem

    properties.

    Case StudyCrown Estates Environmental Management Assessment

    Key Contact

    Nigel CoulshedHead o Marine Regulation and EIA

    Nigel has over 14 years experience o environmental assessmemanagement within the UK. Nigel has been the project direcproject manager or EIAs and SEAs or numerous inrastructurincluding bridges, ports & harbours, causeways, Renewable enroads, nuclear industry, wastewater and energy projects.

  • 7/30/2019 Offshore Renewables Brochure

    20/24

    Saety Engineering

    Atkins has an enviable reputation in providing an extensiverange o process saety services at various stages o plant lie orxed and foating oshore acilities worldwide. These include:

    HAZOP & HAZID StudiesConceptual, Coarse & Detailed Risk AssessmentSaety Element Design and Modication ReviewsSaety Case DeliveryCompliance, Auditing and InvestigationsDue Diligence

    Atkins is adept at selecting the appropriate techniques and applyingthe highest levels o process engineering experience to obtainmeaningul saety analysis.

    We use a range o well known tools and sotware to deliver thservices eciently and cost eectively. More importantly, Atkinare procient in applying saety theory in a sensible and practiin combination with the commercial and technical realities o operating environment.

    The hazards associated with operating oshore Power Generaacilities are similar to Oil & Gas acilities and thereore many oservices and techniques are transerable. In addition to Oil & acilities, we have also provided saety support to renewable psuch as the Pelamis wave energy converter and Inner GabbardOshore Substation Platorm.

  • 7/30/2019 Offshore Renewables Brochure

    21/24

    Atkins was commissioned bySiemens to carry out a numbero saety studies during thedetailed design o the topsidesor the Inner Gabbard Wind FarmOshore Substation Platorm. Theassessments completed by Atkinsincluded a Fire and Explosionanalysis to determine whetherthe protection measures onboard were suitable. An Escape,Evacuation and Rescue studywas also completed to ensurethat the provisions provided onthe platorm to allow personnel

    to escape were sucient or thevarious manning levels that couldbe present.

    The non-process hazards thatare present on any oshoreacility were also reviewed. Theseincluded helicopter crash, boat

    transer, ship collision anstructural ailures. The ourom these assessments wused to perorm a QuantRisk Assessment (QRA) oplatorm to ensure that tto personnel were As LowReasonably Practical (ALA

    Case StudyInner Gabbard Wind Farm Oshore Substation Platorm

    Key Contact

    Mike GreenChie Engineer, Oshore Saety and Downstream Engin

    Mike, who is Head o the Oil & Gas department in Glasgow, hMSc in petroleum engineering. He has over 25 years experiencOil and Gas Industry and has specialised in oshore saety sincPrior to that, he worked or a major international oil companyhe was involved in engineering, operational and managemento a number o existing and new oshore developments. Mikesignicant proportion o this time at a senior supervisory level with assignments as production oreman, well operations oreOshore Installation Manager. Mike has also provided saety sto the renewables industry, managing Atkins saety support dthe Pelamis and Inner Gabbard projects.

  • 7/30/2019 Offshore Renewables Brochure

    22/24

    The evidence shows that ignoring climate changewill eventually damage economic growth. Ouractions over the coming ew decades couldcreate risks o major disruption to economic

    and social activity, later in this century and in thenext, on a scale similar to those associated withthe great wars and the economic depression othe rst hal o the 20th century. And it will bedicult or impossible to reverse these changes.Tackling climate change is the pro-growthstrategy or the longer term, and it can be donein a way that does not cap the aspirations orgrowth o rich or poor countries. The earliereective action is taken, the less costly it will be.

    Stern Review on the Economics o Climate Change, 2006

    David ParkinThe Hub500 Park AvenueAztec WestAlmondsburyBristolBS32 4RZ

    Tel: +44 (0)7801 716142Fax: +44 (0)1454 663333

    [email protected]

  • 7/30/2019 Offshore Renewables Brochure

    23/24

    This document is printed 9lives 80. It is produced with 80% recovered fibcomprising 10% packaging waste, 10% best white waste, 60% de-inkedfibre and 20% virgin TCF fibre sourced from sustainable forests.

    Atkins Ltd except where stated otherwise.

    The Atkins logo, Carbon Critical Design and the strapline Plan Design Etrademarks of Atkins Ltd.

  • 7/30/2019 Offshore Renewables Brochure

    24/24

    David ParkinThe Hub500 Park AvenueAztec WestAlmondsburyBristolBS32 4RZ

    Tel: +44 (0)7801 716142