Offshore Pipeline InstallationOffshore Pipeline Installation
and Repair and Repair
-
8/18/2019 Offhore Pipeline
2/36
Span Mitigation MethodsSpan Mitigation Methods
-
8/18/2019 Offhore Pipeline
3/36
-
8/18/2019 Offhore Pipeline
4/36
Clamp-on Supports with Telescopic LegsClamp-on Supports with Telescopic Legs
-
8/18/2019 Offhore Pipeline
5/36
Clamp-on Supports with Auger Screw LegsClamp-on Supports with Auger Screw Legs
-
8/18/2019 Offhore Pipeline
6/36
Alteration of Seabed TerrainAlteration of Seabed Terrain
-
8/18/2019 Offhore Pipeline
7/36
uo!anc! moduleuo!anc! module
-
8/18/2019 Offhore Pipeline
8/36
Pipeline installationPipeline installationBefore the actual operation of subsea
pipelines the system is installed on theseabed.
To ensure mechanical integrity, the pipeline
should be able to withstand both static anddynamic stresses involved during theinstallation.
Installation of subsea pipelines is commonlydone according to one of the following threeinstallation methods:
J-lay (intermediate to deep water); J-lay (intermediate to deep water);
S-lay (shallow to intermediate-deepS-lay (shallow to intermediate-deep
-
8/18/2019 Offhore Pipeline
9/36
-
8/18/2019 Offhore Pipeline
10/36
-
8/18/2019 Offhore Pipeline
11/36
-
8/18/2019 Offhore Pipeline
12/36
-
8/18/2019 Offhore Pipeline
13/36
A method for installing subsea pipelines in deepwater is
by J-lay installation. ipe stal!s consisting of si" with atotal length of #$m are upended and welded to theseagoing pipe in a near vertical ramp.
The ramp angle is chosen in such a way that it is in linewith the pipe catenary to the seabed. The J-lay method isvery suitable for deepwater as the pipe leaves the laysystem in an almost vertical position. The pipeline is onlybent once during installation %at the seabed& which is
advantageous for installing pipelines that are sensitiveto fatigue.
'ompared to other lay methods, J-lay has a relatively lowproduction rate due to the single welding station. The J-
lay method is less suitable for shallow waters as thisre uires a de arture an le close to hori)ontal.
J lay J lay
-
8/18/2019 Offhore Pipeline
14/36
*hen using the +-lay installation method, pipe oints
welded onboard leave the vessel hori)ontally and areguided by a stinger - a structure on the bac! of the shipthat supports the seagoing pipe string to control its bendradius.
ue to its high production rate and the possibility toinstall concrete coated pipe, +-lay is e"tremely suitablefor pipe installation in shallow and intermediate waters.
/arger water depths are e(ually possible but re(uire avery long stinger, turning +-lay into a less practical ande0cient solution.
S layS lay
-
8/18/2019 Offhore Pipeline
15/36
A method for installing 1e"ible and rigid subsea pipelinesis by 2eel-lay. /ong pipe segments are welded, tested andcoated onshore and then spooled onto a large verticalpipe reel in one continuous length.
3nce the 2eel-lay vessel is in position, the pipe isunspooled, straightened and over boarded as the vesselmoves forward.
Reel layReel lay
-
8/18/2019 Offhore Pipeline
16/36
-
8/18/2019 Offhore Pipeline
17/36
-
8/18/2019 Offhore Pipeline
18/36
-
8/18/2019 Offhore Pipeline
19/36
-
8/18/2019 Offhore Pipeline
20/36
-
8/18/2019 Offhore Pipeline
21/36
-
8/18/2019 Offhore Pipeline
22/36
-
8/18/2019 Offhore Pipeline
23/36
-
8/18/2019 Offhore Pipeline
24/36
-
8/18/2019 Offhore Pipeline
25/36
-
8/18/2019 Offhore Pipeline
26/36
-
8/18/2019 Offhore Pipeline
27/36
-
8/18/2019 Offhore Pipeline
28/36
-
8/18/2019 Offhore Pipeline
29/36
-
8/18/2019 Offhore Pipeline
30/36
-
8/18/2019 Offhore Pipeline
31/36
-
8/18/2019 Offhore Pipeline
32/36
-
8/18/2019 Offhore Pipeline
33/36
-
8/18/2019 Offhore Pipeline
34/36
-
8/18/2019 Offhore Pipeline
35/36
-
8/18/2019 Offhore Pipeline
36/36