Odisha Renewable Energy Development Agency
(OREDA)
Established: 17.2.1984
![Page 2: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/2.jpg)
Promote Research, Development and Popularization of Non-Conventional and
Renewable Sources of Energy
VISION • Provision of minimum illumination to all Remote
Un-electrified Villages/hamlets by 2015
• Increase the share of Renewable Energy to 10% of the total power mix by 2020
• Accelerated use of Renewable Energy Technology in all sectors of economy
Mission
![Page 3: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/3.jpg)
Major Programs being Implemented by OREDA
1. Solar Water Pumping Program for piped drinking water supply
2. Solar water pumping program for Irrigation
3. Rooftop and off-grid solar power plants
4. Distribution of solar lanterns
5. RE Power Projects
6. Implementation of RPO and REC mechanism
7. Village Electrification
8. Unnat Chulla Abhiyan
9. National Program of Biogas and Manure Management
10. IEC and Outreach
![Page 4: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/4.jpg)
1. Solar Water Pumping Program for piped drinking water supply
Phase I ( RWSS)
For 18 IAP Districts only Target : 1762
No. installed : 1762
Phase II ( RWSS)
For 18 IAP Districts only Target : 1762
No. installed : 1682
Phase III ( RWSS+ MNRE)
For all Districts Target : 2000
No. installed : 312
![Page 5: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/5.jpg)
Solar PV Pumping Program for Irrigation
Project is on the verge of starting
Target for 2014-15: 3000
Steering Committee and finance committee have cleared the project
Financial arrangementTarget : 2610
Cost of each project Rs 5.50 lakh To be finalised through tenders
MNRE Share (CFA) RS 1.21 lakh First advance available
State share through S&T budget Rs 1.99 lakh First Advance available
OLIC share Rs 2.00 lakh Awaited
Farmer’s share Rs 0.30 lakh To be collected
![Page 6: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/6.jpg)
Rooftop and off-grid Solar Power PlantsThe program is mainly implemented for Government buildings, residential schools, hostels, Sevashrams, Health centres, police stations, forest offices, district offices, blocks , Panchayats etc.
Total installed capacity till 14-15: 5.114 MW
Projects Under implementation during 15-16:
Hostels under BJRCY: 25 x 10 KW
SCST hostels/Schools : 19 x 10 KW
Kendu leaf godowns : 17 x 3 KW
District Collectorates : 6 X 10 KW
EMRS schools : 2 x 5 KW
Primary Health Centres : 6x 6 KW
Police stations : 39 x 2.5 KW
Petrol pumps: 2 x 2 KW
Sevasharm schools ( 55 Nos): 297 KW
![Page 7: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/7.jpg)
RE Power Projects
Total installed capacity:
Solar : 43.0 MW + 5.0 MW under REC
Biomass: 20.0 MW + 30.4 MW under REC
Projects in pipe line
Solar : NIL
Biomass: 10 MW
New Application received
Solar : Nil
Biomass : 12 MW
![Page 8: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/8.jpg)
Implementation of RPO and REC mechanismIn Odisha the RCPO Regulation 2010 is under implementation as per which the quantum of obligation is as under
OERC has come up with a draft regulation as per which the quantum of
obligation is as under
Minimum quantum of purchase in percentage ( in terms of energy consumption in state in KWH)Renewable Co-generation Total
Solar Non Solar2010 -11 - 1.00 3.50 4.50
2011 -12 0.10 1.20 3.70 5.002012 -13 0.15 1.40 3.95 5.502013 -14 0.20 1.60 4.20 6.002014 -15 0.25 1.80 4.45 6.502015 -16 0.30 2.00 4.70 7.00
Year-wise target Solar Source (%)Non Solar sources
(%) Total (%)2015-16 0.40 6.60 7.002016-17 0.80 7.20 8.002017-18 1.20 7.80 9.002018-19 1.60 8.40 10.00
2019-20 2.00 9.00 11.00
![Page 9: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/9.jpg)
Implementation of RPO and REC mechanism (Contd…)
Obligated entities identified in the state : 62
Captive consumers : 50
Open access consumers: 12
Partial compliants: 20
OREDA had filed a petition in OERC against all non compliant
obligated entity 20.11.2014 requesting action under Section 142.
Hearing of the case has been concluded on 5th May 2015 but Order
has been kept reserved.
![Page 10: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/10.jpg)
Projects Accreditated by OREDA Under Energy Certificate (REC) Mechanism
Sl. No.
Name of the R.E. Generator
Installed capacity (in MW)
Date of Registration
Type of RE Project Status Till Date
1 J.K. Paper Mills 5.4 MW 07.09.2012 Biomass Earning and Trading RECs
2 OCL India Limited 2.5MW 20.05.2013 Solar PV Earning and Trading RECs
3 J.K. Paper Mills 25 MW 05.09.2013 Biomass Earning and Trading RECs
4Mahanadi Coalfields Ltd. 2 MW 14.11.2014 Solar PV Commissioned
5Kalinga Institute of Social Science (KISS) 0.5 MW Not yet
Registered Solar PV Commissioned
6 MBPS Control & Power system limited 1 MW Not registered Solar PV Not Commissioned
![Page 11: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/11.jpg)
Village ElectrificationVillages electrified
Under RVEP till 11-12 : 1621
Under pilot project of MNRE : 1
Under DDG : 7 ( work in progress)
Projects in pipe line:
Projects under DDG : 7
Tribal hamlets/ habitation with financial assistance from MoTA: 250
Villages identified for electrification bySTSC Dev. Department : 700
![Page 12: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/12.jpg)
Distribution of Solar Lanterns
The program for distribution of solar lanterns to weavers and handicraft artisans started in 2013-14
Lanterns distributed till end of 2014-15
Weavers : 25,503
Handicraft Artisans: 16,428
Total 41,932
For the current year apart from weavers and handicraft artisans households using kerosene for illumination purpose in KBK region and western Odisha are also being included under the program.
Target for 2015-16 : 20,000
![Page 13: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/13.jpg)
National Biogas and Manure Management Program (NBMMP)
Total potential of domestic biogas plants : 6 00,000
Plants constructed till 2014-15: 2,38,872
Target for 2015-16: 5,100
Achievement till July 2015: 211
![Page 14: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/14.jpg)
Unnat Chullah Abhiyan
Target for 2015-16
Family Type : 15000
Community Type : 6000
It has been programmed to construct 20,000 PARISHAD model
community chulah ( with chimney) in schools & Anganwadi centers
under MDM with financial support of state Govt. The said chulah has
been tested in IMMT, Bhubaneswar and performance parameter is
found to be satisfactory. 563 chulah have been installed till July 2015
in schools. MNRE may consider CFA for above category of chulah
under UCA . • .
![Page 15: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ee55503460f94bf4772/html5/thumbnails/15.jpg)
Perspective Plan till 2018-19S/N Description of the sector year wise coverage Total Total
capacity in MW
15-16 16-17 17-18 18-19
1 Solar Pumping for Irrigation 3000 5000 6000 6000 20000 60
2 Solar Pumping for drinking water supply 4000 5000 5000 6000 20000 18
3 Electrification of tribal hamlets/ habitations 500 500 500 500 2000 10
4 Rooftop solar power plants in BJRCY Hostels 49 - - - 49 0.5
5 Rooftop solar power plants and drinking water supply in 6000 hostels under SCST Development Department
500 1500 2000 2000 6000 60
6 Provision of high mast lights and street lights in all Gram panchayats
500 1500 2000 2000 6000 02
7 Solar electrification of government buildings in different districts
5MW 5MW 10 MW 10MW 30 MW 30
8 Solar power to Urban Local Bodies for substitution of power consumption on account of street lights
1MW 3MW 4MW 10MW 10MW 18
9 Distribution of solar lanterns to weavers, handicraft artisans and households using kerosene for illumination purpose in KBK region and western Odisha
20000 30000 50000 50000 150000 1.5
Total capacity 200 MW