Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

15
Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984

Transcript of Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Page 1: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Odisha Renewable Energy Development Agency

(OREDA)

Established: 17.2.1984

Page 2: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Promote Research, Development and Popularization of Non-Conventional and

Renewable Sources of Energy

VISION • Provision of minimum illumination to all Remote

Un-electrified Villages/hamlets by 2015

• Increase the share of Renewable Energy to 10% of the total power mix by 2020

• Accelerated use of Renewable Energy Technology in all sectors of economy

Mission

Page 3: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Major Programs being Implemented by OREDA

1. Solar Water Pumping Program for piped drinking water supply

2. Solar water pumping program for Irrigation

3. Rooftop and off-grid solar power plants

4. Distribution of solar lanterns

5. RE Power Projects

6. Implementation of RPO and REC mechanism

7. Village Electrification

8. Unnat Chulla Abhiyan

9. National Program of Biogas and Manure Management

10. IEC and Outreach

Page 4: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

1. Solar Water Pumping Program for piped drinking water supply

Phase I ( RWSS)

For 18 IAP Districts only Target : 1762

No. installed : 1762

Phase II ( RWSS)

For 18 IAP Districts only Target : 1762

No. installed : 1682

Phase III ( RWSS+ MNRE)

For all Districts Target : 2000

No. installed : 312

Page 5: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Solar PV Pumping Program for Irrigation

Project is on the verge of starting

Target for 2014-15: 3000

Steering Committee and finance committee have cleared the project

Financial arrangementTarget : 2610

Cost of each project Rs 5.50 lakh To be finalised through tenders

MNRE Share (CFA) RS 1.21 lakh First advance available

State share through S&T budget Rs 1.99 lakh First Advance available

OLIC share Rs 2.00 lakh Awaited

Farmer’s share Rs 0.30 lakh To be collected

Page 6: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Rooftop and off-grid Solar Power PlantsThe program is mainly implemented for Government buildings, residential schools, hostels, Sevashrams, Health centres, police stations, forest offices, district offices, blocks , Panchayats etc.

Total installed capacity till 14-15: 5.114 MW

Projects Under implementation during 15-16:

Hostels under BJRCY: 25 x 10 KW

SCST hostels/Schools : 19 x 10 KW

Kendu leaf godowns : 17 x 3 KW

District Collectorates : 6 X 10 KW

EMRS schools : 2 x 5 KW

Primary Health Centres : 6x 6 KW

Police stations : 39 x 2.5 KW

Petrol pumps: 2 x 2 KW

Sevasharm schools ( 55 Nos): 297 KW

Page 7: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

RE Power Projects

Total installed capacity:

Solar : 43.0 MW + 5.0 MW under REC

Biomass: 20.0 MW + 30.4 MW under REC

Projects in pipe line

Solar : NIL

Biomass: 10 MW

New Application received

Solar : Nil

Biomass : 12 MW

Page 8: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Implementation of RPO and REC mechanismIn Odisha the RCPO Regulation 2010 is under implementation as per which the quantum of obligation is as under

OERC has come up with a draft regulation as per which the quantum of

obligation is as under

Minimum quantum of purchase in percentage ( in terms of energy consumption in state in KWH)Renewable Co-generation Total

Solar Non Solar2010 -11 - 1.00 3.50 4.50

2011 -12 0.10 1.20 3.70 5.002012 -13 0.15 1.40 3.95 5.502013 -14 0.20 1.60 4.20 6.002014 -15 0.25 1.80 4.45 6.502015 -16 0.30 2.00 4.70 7.00

Year-wise target Solar Source (%)Non Solar sources

(%) Total (%)2015-16 0.40 6.60 7.002016-17 0.80 7.20 8.002017-18 1.20 7.80 9.002018-19 1.60 8.40 10.00

2019-20 2.00 9.00 11.00

Page 9: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Implementation of RPO and REC mechanism (Contd…)

Obligated entities identified in the state : 62

Captive consumers : 50

Open access consumers: 12

Partial compliants: 20

OREDA had filed a petition in OERC against all non compliant

obligated entity 20.11.2014 requesting action under Section 142.

Hearing of the case has been concluded on 5th May 2015 but Order

has been kept reserved.

Page 10: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Projects Accreditated by OREDA Under Energy Certificate (REC) Mechanism

Sl. No.

Name of the R.E. Generator

Installed capacity (in MW)

Date of Registration

Type of RE Project Status Till Date

1 J.K. Paper Mills 5.4 MW 07.09.2012 Biomass Earning and Trading RECs

2 OCL India Limited 2.5MW 20.05.2013 Solar PV Earning and Trading RECs

3 J.K. Paper Mills 25 MW 05.09.2013 Biomass Earning and Trading RECs

4Mahanadi Coalfields Ltd. 2 MW 14.11.2014 Solar PV Commissioned

5Kalinga Institute of Social Science (KISS) 0.5 MW Not yet

Registered Solar PV Commissioned

6 MBPS Control & Power system limited 1 MW Not registered Solar PV Not Commissioned

Page 11: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Village ElectrificationVillages electrified

Under RVEP till 11-12 : 1621

Under pilot project of MNRE : 1

Under DDG : 7 ( work in progress)

Projects in pipe line:

Projects under DDG : 7

Tribal hamlets/ habitation with financial assistance from MoTA: 250

Villages identified for electrification bySTSC Dev. Department : 700

Page 12: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Distribution of Solar Lanterns

The program for distribution of solar lanterns to weavers and handicraft artisans started in 2013-14

Lanterns distributed till end of 2014-15

Weavers : 25,503

Handicraft Artisans: 16,428

Total 41,932

For the current year apart from weavers and handicraft artisans households using kerosene for illumination purpose in KBK region and western Odisha are also being included under the program.

Target for 2015-16 : 20,000

Page 13: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

National Biogas and Manure Management Program (NBMMP)

Total potential of domestic biogas plants : 6 00,000

Plants constructed till 2014-15: 2,38,872

Target for 2015-16: 5,100

Achievement till July 2015: 211

Page 14: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Unnat Chullah Abhiyan

Target for 2015-16

Family Type : 15000

Community Type : 6000

It has been programmed to construct 20,000 PARISHAD model

community chulah ( with chimney) in schools & Anganwadi centers

under MDM with financial support of state Govt. The said chulah has

been tested in IMMT, Bhubaneswar and performance parameter is

found to be satisfactory. 563 chulah have been installed till July 2015

in schools. MNRE may consider CFA for above category of chulah

under UCA . • .

Page 15: Odisha Renewable Energy Development Agency (OREDA) Established: 17.2.1984.

Perspective Plan till 2018-19S/N Description of the sector year wise coverage Total Total

capacity in MW

15-16 16-17 17-18 18-19

1 Solar Pumping for Irrigation 3000 5000 6000 6000 20000 60

2 Solar Pumping for drinking water supply 4000 5000 5000 6000 20000 18

3 Electrification of tribal hamlets/ habitations 500 500 500 500 2000 10

4 Rooftop solar power plants in BJRCY Hostels 49 - - - 49 0.5

5 Rooftop solar power plants and drinking water supply in 6000 hostels under SCST Development Department

500 1500 2000 2000 6000 60

6 Provision of high mast lights and street lights in all Gram panchayats

500 1500 2000 2000 6000 02

7 Solar electrification of government buildings in different districts

5MW 5MW 10 MW 10MW 30 MW 30

8 Solar power to Urban Local Bodies for substitution of power consumption on account of street lights

1MW 3MW 4MW 10MW 10MW 18

9 Distribution of solar lanterns to weavers, handicraft artisans and households using kerosene for illumination purpose in KBK region and western Odisha

20000 30000 50000 50000 150000 1.5

Total capacity 200 MW