Rooftop Solar Proliferation Support to OREDA
Transcript of Rooftop Solar Proliferation Support to OREDA
Supported under UNDP Eco-Cities Program
User Manual
2
1. Net Metering Application Process for Consumer
Start
Already
Registered
Consumer Login
DashboardApply for Net
Metering
Pay Application
FeeEnd
New Consumer
Register
NM Application Process
Expression of Interest
Start
Already
Registered
Consumer Login
Dashboard EOISelect multiple
vendor & SubmitEnd
New Consumer
Register
View Selected
Vendor
Financial
Finalise L1
vendor
3
Web enabled Online toolhttp://www.rts.juscoltd.co.in
4
Rooftop Calculator
5
Login Screen for Consumer
For all stakeholder uses the same login page.
Login page contain different tab as per the stakeholder i.e. Consumer, Vendor, Discom’s
If Consumer want to login in web tool select Consumer tab and enter User id, password and captcha and click on login button.
On successful login each stakeholder redirect to their respective dashboard.
6
Applicant Dashboard After Login
Click here for
Net Metering
Application
7
Net Metering Application Sample
8
Net Metering Application Fee
Sl. No Connected Load / Contract Demand of Eligible Consumer Amount
1. Up to 50 kW / 63 kVA Rs. 250
2. Above 50 kW and up to 1 MW Rs. 750
3. Above 1 MW and up to 2 MW Rs. 1500
Net Metering Application Fee
The amount of application fee for eligible consumer and third party other than the owner of the premises shall be the amount mentioned above.
9
2. Subsidy Application Process for Consumer
Start
Already
Registered
Consumer Login
DashboardApply for
Subsidy Select L1 Vendor
End
New Consumer
Register
Subsidy Application Process
Vendor Fill-up
the technical
details of panel
Pay Registration
Fee
10
Applicant Dashboard After Login
Click here for
Subsidy Application
11
Subsidy Application Sample
After Net metering installation you can apply for subsidy from discom through consumer dashboard
12
Subsidy Application Sample
Consumer fill-up important particulars details.
Select vendor ,capacity details & upload photograph
Save the application
Rest of application fill by vendor
13
Subsidy Application Sample
Sl. No Connected Load / Contract Demand of Eligible Consumer Amount
1. Up to 50 kW / 63 kVA Rs. 1000
2. Above 50 kW and up to 1 MW Rs. 2500
3. Above 1 MW and up to 2 MW Rs. 5000
Subsidy Registration Fee
The amount of registration fee for eligible consumer and third party other than the owner of the premises shall be the amountmentioned above
14