October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control...
-
Upload
bartholomew-lawrence -
Category
Documents
-
view
217 -
download
1
Transcript of October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control...
Megapulse
October 28, 2002 International Loran Association
Modernization of Nii Jima Transmitter Control
Presented by Michael Weisenbloom
Megapulse
Goals and Objectives
• Reduce cost of ownership– Remote capability for unattended transmitter operation– Modern, reduced component count for greater reliability and tighter
integration
• Improve operator control and interface– Graphical user interface display and control at local and remote
locations – Time synchronization to UTC-USNO via built-in GPS
Megapulse
Goals and Objectives
• Provide easy upgrade path for current systems– Existing transmitter cables and equipment fully compatible– Fits in existing footprint and power requirements
• Provide for future upgrades and growth– Flexible system architecture with embedded software and
programmable hardware, each with designed in reserve– Commercial off-the-shelf modules and subcomponents
Megapulse
Transmitter Control System Diagram
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
06:05:02
06:05:02
27
27
Accufix 7520 Transmitter ControlSubsystem (TCS)
Accufix 7523 LoranTimer Subsystem (LTS)
Accufix 7500 Transmitter Control Unit (TCU)
Nii JimaReplace 4 rack Control Console Unit with new 3 rack software controlled
Transmitter Control Unit
ChibaReplace 1 rack Remote Control Unit
rack with PC workstation and graphical remote control software
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
A B C D E F G HSELECTED
ON-LINE
AC Power
New graphical display and user interface
Remote networked interface for unattended transmitter operation
NTT lease line network
Time sync to UTC via built-in GPS
Redundant PC workstation with UPS back-up
UPS and battery backup
Direct connection to existing transmitter cables
Similar installation upgrades also planned for Gesashi and Tokatibuto stations in NW Pacific chain for 2003 and 2004
Megapulse
Transmitter Control Unit
• Replace existing CCU with new Transmitter Control Unit (TCU)– 3 Rack System
– Modern off-the-shelf parts
– Software and graphical user interface control
– UPS and battery backup
– Ethernet/HUB interface to NTT leased network for Chiba remote control
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
06:05:02
06:05:02
27
27
Accufix 7520 Transmitter ControlSubsystem (TCS)
Accufix 7523 LoranTimer Subsystem (LTS)
Accufix 7500 Transmitter Control Unit (TCU)
Megapulse
Loran Timer Subsystem (LTS)
• Loran Timer Assemblies– Generates Loran pulse timing
(MPTs)
• UTC Sync Assemblies- Provides UTC synchronized
timing source from GPS
06:05:02
06:05:02
27
27
Accufix 7523 LoranTimer Subsystem (LTS)
Loran Receivers(Locus)
Loran Timer Assemblies (LTAs)
UTC Sync Assemblies (USAs)
Cesium Units
Megapulse
Loran Timer Assembly (LTA)
Circuit board
Top View Inside Chassis
19”
Power Supply
Front Panel View
3U
• Generates dual-rate Loran pulse timing
• Automatic detection and adjustment of transmitted pulse reference
• Local and remote user controlled phase adjust
• Single board design with embedded software and logic
• 19” wide by 3U rack mounted assembly
Megapulse
UTC Sync Assembly
• Cesium clock synchronization to GPS UTC
• Time-of-coincidence generation and error checking
• Time-of-day setting and error checking with external GPS
• Single board design with embedded software and logic
• 19” wide by 2U rack mounted assembly
Circuit board
Top View Inside Chassis
19”
Power Supply
Front Panel View
2U
Megapulse
Loran Timer Subsystem Interconnect Diagram
LoranReceiver(Locus)
LoranReceiver(Locus)
Sync
Multipulse Triggers (MPT)
Multipulse Triggers (MPT)
Modulation Data
Modulation Data
Time ofTransmission
Controller(Optional)
EurofixProcessor(Optional)
EurofixProcessor(Optional)
Time ofTransmission
Controller(Optional)
LoranTimer
Assem.(LTA)
Timing
Timing
UTCSync
Assem.(USA)
GPS Rx
5Mhz
Cesium RS232
1PPS,RS232
1PPS,RS232
UTCSync
Assem.(USA)
1PPS,RS232
1PPS,RS232
GPS Rx
Cesium
5Mhz
RS232
Power
Power
LoranTimer
Assem.(LTA)
PCI
RS232 (2)
RS232
PCI
RS232 (2)
To/From TransmitterControl Console #1
in TCU
To/From TransmitterControl Console #2
in TCU
To/FromTCC #1, #2
To/FromTCC #1, #2
Megapulse
Transmitter Control Subsystem (TCS)
5U
1U
9U
4U
1U
BLANK
BLANK
10U
1U
2U
5U
1U
9U
4U
1U
BLANK
BLANK
10U
1U
2U
Alarm/Status Panel
Touchscreen Display
Retractable Keyboard Tray
TCA (Transmitter Control Assembly)
AC Input Power Phase Switcher
UPSFan
Assembly
Cable Connector Assembly (CCA)
TCC (Transmitter Control Console) #1
TCC (Transmitter Control Console) #2
Redundant Transmitter Control Consoles
Megapulse
Chiba Control Workstation for Nii Jima
• Install new control workstation at Chiba– Remote operator control of
Nii Jima TCU and transmitter
– Graphical user interface
– Ethernet/HUB interface to NTT leased network
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
Load BatteryLineOn On
BatterySmartBoost
ReplaceBattery
Test
A B C D E F G HSELECTED
ON-LINE
AC Power