October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build...

34
for the CGI Advantage ® community October 27 – 29 Loews Portofino Bay Hotel at Universal Orlando ® | Orlando, Florida

Transcript of October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build...

Page 1: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

for the CGI Advantage® community

October 27 – 29Loews Portofino Bay Hotel at Universal Orlando® | Orlando, Florida

Page 2: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

ContentsOverview

Dates and location .............................................................................. 1

Why attend? ........................................................................................ 1

Users’ Group Steering Committee ..................................................... 2

Education Schedule at-a-glance.......................................................................... 3

Sessions by Field of Study.................................................................. 4

Session descriptions ........................................................................... 6

Collaboration Networking ........................................................................................ 21

Keynote speaker ............................................................................... 21

Showcase.......................................................................................... 21

Peer-to-peer roundtable luncheon.................................................... 22

Community Past attendees .................................................................................. 27

Special events ................................................................................... 28

Plan to attend Registration ....................................................................................... 29

Hotel information............................................................................... 29

Transportation ................................................................................... 29

Build your schedule.............................................. 30

Page 3: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 1

Overview

DatesOctober 27 – 29, 2013

LocationDiscover la dolce vita—the sweet life—at Loews Portofino Bay Hotel at Universal Orlando®, located on-site at Universal Orlando® Resort. Nestledalong a picturesque bay, this well-appointed hotel inspires visitors to journey toward discovery, recreatingthe charm and freshness of the sunnyseaside village of Portofino, Italy.

Why attend?CGI Forum 2013 is the premier networking and educational event for the CGI Advantage® community. With numerous in-depth product sessions and abundantnetworking opportunities, the Forum is the must-attend event for government professionals to share experiences and best practices with peers and experts in the field.

Sessions cover financial management, procurement, human resource management,budgeting, and reporting, as well as numerous technical and general interest topics.This can’t miss event provides a unique experience including:

Education. Sessions cover all CGI Advantage modules, are taught by CGI expertsand your fellow government users and are tailored for attendees with various levelsof expertise—allowing you to customize your educational experience according toyour needs.

Collaboration. The event is designed to maximize your current investment by pro-viding best practices from across the country that will position your organization toaddress complex challenges today and in the future. We'll also feature new releasefunctionality and you'll contribute directly to planning for future product releases.

Community.With both daytime activities and evening events, the Forum offers anopportunity to network, discuss solutions and best practices and build relationshipsacross the industry.

Best of all, each CGI Advantage client site receives one complimentary registration, making it easy to participate in this important event.

Schedule for 2013: The program will begin late Sunday afternoon and conclude at 5:20 pm on Tuesday. Please make travel arrangements accordingly.

Register byAugust 30 to receive our early birdregistrationrate.

Page 4: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

2 CGI Forum 2013 | www.cgi.com/forum2013

Users’ Group Steering Committee Members of the CGI Advantage Users’ Group Steering Committee serve a very important role in representing the interests ofthe user community. They evaluate proposed enhancements for future releases, assist in the creation of session content for theForum and act as a channel of communication between the Users’ Group and CGI. The 2013 Steering Committee members arelisted below for the area they represent. Each member’s name is followed by the end date of their current 3-year term. If youhave questions or comments, the Steering Committee members would love to hear from you!

JuneMarie Perkowski Baltimore County, MD (2014)Email: [email protected]

Leah MetzgerBaltimore County Public Schools, MD (2013)Email: [email protected]

Idalia Ow County of Monterey, CA (2015)Email: [email protected]

Doug Cotnoir State of Maine (2013)Email: [email protected]

Robert Davis Los Angeles County, CA (2013)Email: [email protected]

Angela Schlemeyer City of Midland, TX (2015)Email: [email protected]

Rachelle Wilkins Commonwealth of Kentucky (2014)Email: [email protected]

Tasha Burkett City of Roanoke, VA (2015) Email: [email protected]

Robert Morita City and County of Honolulu, HI (2014)Email: [email protected]

Johnna RogersWake County, NC (2013)Email: [email protected]

Janet Laszlo City of Anaheim, CA (2013)Email: [email protected]

Dharmesh PatelState of Iowa (2015) Email:[email protected]

Application Administration/Technical

Budget

Business Intelligence

Financial Management

Human Resource Management

Page 5: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 3

EducationSchedule at-a-glanceSunday, October 27 Start End

Onsite Registration 1:00 pm 8:00 pm

Internet Cafe 1:00 pm 8:00 pm

Showcase 4:00 pm 7:00 pm

Showcase Reception 6:00 pm 7:00 pm

Welcome Reception 7:00 pm 9:00 pm

Monday, October 28 Start End

Continental Breakfast 7:15 am 8:15 am

Onsite Registration 7:15 am 5:30 pm

Internet Cafe 7:15 am 5:30 pm

General Session 8:15 am 9:30 am

Showcase 9:30 am 12:00 pm

Breakout Sessions 9:45 am 10:45 am

Breakout Sessions 11:00 am 12:00 pm

Peer-to-Peer Roundtable Luncheon 12:00 pm 1:30 pm

Breakout Sessions 1:30 pm 2:30 pm

Showcase 2:30 pm 5:30 pm

Breakout Sessions 2:45 pm 3:45 pm

General Session 4:00 pm 4:20 pm

Breakout Sessions 4:20 pm 5:30 pm

Special Event 6:30 pm 10:30 pm

Tuesday, October 29 Start End

Continental Breakfast 7:15 am 8:15 am

Onsite Registration 7:15 am 5:30 pm

Internet Cafe 7:15 am 5:30 pm

General Session 8:15 am 9:30 am

Showcase 9:30 am 12:00 pm

Breakout Sessions 9:45 am 10:45 am

Breakout Sessions 11:00 am 12:00 pm

Users’ Group Luncheon 12:00 pm 1:30 pm

Breakout Sessions 1:30 pm 2:30 pm

Showcase 2:30 pm 5:00 pm

Breakout Sessions 2:45 pm 3:45 pm

Breakout Sessions 4:00 pm 5:00 pm

Closing General Session 5:00 pm 5:20 pm

Page 6: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

4 CGI Forum 2013 | www.cgi.com/forum2013

Education

Budget114 Product Direction: CGI Advantage

Performance Budgeting

124 A Detailed Look into the NewRelease 3.10 Integration Featuresin Performance Budgeting

134 Using Performance BudgetingBeyond Budget Approval Part 1:Forecasting

144 Using CGI AdvantagePerformance Budgeting BeyondBudget Approval Part 2: BudgetManagement – Revisions andPositions

156 Building the Business Case toUpgrade from BRASS to CGIAdvantage PerformanceBudgeting

214 The Biennial Budget: Is it Right for You?

224 Leveraging Salary and BenefitProjections in PerformanceBudgeting

234 Performance Budgeting Reportfrom the Field: Release 3.10

244 Transparency: How to GetInformation Out

254 A Look at Outcome BasedBudgeting

Business Intelligence115 Product Direction: CGI

infoAdvantage

125 Spread the Word with CGIinfoAdvantage Publications andScheduling Features

135 Lock Down Your EnterpriseInformation through AdvancedSecurity Features

145 Optimizing Your BusinessIntelligence Resources throughMetadata Management andAuditing

155 Best Practices for Report Designand Discussion with Client Panelof Experts

215 CGI Enterprise Intelligence360 inAction: Transparency, Mobility,and Exploration

225 Planning Your Migration toBusinessObjects 4.0

235 Powerful Reporting Brought to Life

245 Diving into Dashboards Planningand Creation Strategies

Financial111 Product Direction: CGI Advantage

Financial Management

121 What's New in CGI AdvantageFinancial Management Release3.10

131 Introduction to CGI AdvantageCash Management

141 Grants: Report from the Field onGrants Lifecycle Management andCost Accounting

211 Exploring Options for Automatingthe Addition of Fixed AssetsRecords in CGI AdvantageFinancial Management

221 Maximizing User Efficiency byLeveraging User InterfaceEnhancements and Other Optionsfor Increasing Productivity

231 Leveraging CAFR Reporting forNon-CAFR and CAFR Reports

241 Panel Discussion: Banking in CGI Advantage

251 Maximizing Cash In-Flow fromAccounts Receivable

258 Tracking Indirect Costs: UsingCost Allocation, Overhead, andInternal Costing

General Interest127 Developing the Business Case for

Managed Advantage

137 Advantage Collections: How YouCan Leverage CGI Advantage toGenerate a Significant Increase inRevenue

147 Driving Revenue throughPermitting Automation

151 K-12 User Group Meeting

152 State and Large Government UserGroup Meeting

153 DOT User Group Meeting

154 Small and Mid-Size GovernmentUser Group Meeting

157 Maximizing the Support ServicesProvided by the CustomerSupport Group

158 Managing for Results

217 Enterprise Readiness BestPractices

227 Change Management andDeployment Readiness LessonsLearned

237 Minor Release UpgradeMethodology and Best Practices(Part 1)

238 CGI’s UK Local GovernmentExperience in BusinessTransformation – How Not to Fail!

247 Minor Release UpgradeMethodology and Best Practices:Report from the Field (Part 2)

257 Take the Ugh Out of Upgradingwith CGI Accelerate

Sessions by Field of StudySessions are offered in multiple fields of study—all targeted to your specific product and area of interest. Take multiple sessions fromone field of study or pick and choose to customize the perfect schedule for you. Also available, numerous general interest sessions.

Page 7: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 5

HR/Payroll113 Product Direction: CGI Advantage

Human Resource Management(HRM)

123 What's New in CGI AdvantageHuman Resource Management(HRM) Release 3.10

133 Now Introducing the New CGIAdvantage Employee Self Service(ESS)!

143 New Self Service Capabilities forManagers

213 End-to-End EmployeePerformance Management UsingCGI Advantage Human ResourceManagement (HRM), ManagerSelf Service (MSS), and EmployeeSelf Service (ESS)

223 Can CGI Advantage HumanResource Management (HRM)Calculate FLSA and OtherOvertime Calculations? Yes it can!

233 Security Features and SetupOptions that Human ResourceManagement (HRM) Users ShouldKnow About

243 New Ways to Track EmployeeIncidents and Grievances withCGI Advantage Human ResourceManagement (HRM) and CaseManagement

253 Getting to Know PAM in CGIAdvantage Human ResourceManagement (HRM) and CGIinfoAdvantage

255 Maximizing Workflow Featuresand Functions in CGI AdvantageHuman Resource Management(HRM)

Partner Spotlight138 Building the "Government of the

Future" with Big Data and SmartAnalytics from SAP

218 The CGI/Kronos “Advantage”:Volusia County Case Study

228 Enterprise Content Management(ECM) with OpenText

248 HP 3PAR StoreServ Storage:Storage for the Next Era

Procurement112 What's New in CGI Advantage

Procurement 3.10

122 Product Direction: CGI AdvantageProcurement

132 The Contract ManagementLifecycle – Part 1

142 Simplify Your CatalogManagement Process

212 Maximize Your Use of CGIAdvantage Vendor Self Service(VSS)

222 The Contract ManagementLifecycle – Part 2

232 Managing Inventory and Non-Capitalized Assets via CGIAdvantage

242 Invoicing, Tolerances and theAutomated Match Process

252 The Art of ProcurementReporting: A Panel Discussion

Technical/Admin116 Product Direction: CGI Advantage

Administration

126 Advanced Technology Topics inCGI Advantage EnterpriseResource Planning (ERP)

136 Advantage CSI: ComputerForensics for Troubleshooting CGI Advantage Issues

146 Operational Excellence: BestPractices for CGI AdvantageOperations

216 Turn Your CGI infoAdvantageYugo into a Ferrari

226 Reduce Your Total Cost ofOwnership (TCO) with EnterpriseContent Management (ECM)

236 Are You Secure?

246 Mobile Computing Best Practices

Page 8: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

6 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

F

Product Direction: CGI AdvantageFinancial Management111Monday 9:45 am – 10:45 amType/Level: Update

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAs trends in government and technology continueto evolve rapidly, CGI continues to adapt ourlonger-term initiatives for release 3.11 (and beyond) to meet the needs of change. Join thissession for an overview of our current productroadmap, including an overview of CGI’s vision formobile technology to address the needs of an in-creasingly mobile workplace. We will update youon the plans for release 3.11 and allow you tooffer input into the future direction of the CGI Advantage Financial Management (FM) solution.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall proposed enhancements included in CGI Advantage release 3.11

• Describe the overall strategic direction of FM

P F

What's New in CGI AdvantageProcurement 3.10112Monday 9:45 am – 10:45 amType/Level: Overview

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditState and local governments continue to look forways to streamline their purchasing processes, reduce costs and increase efficiency. Release3.10 provides additional enhancements to addressthese needs. This session provides an overview ofthe key enhancements that will be available in theCGI Advantage Procurement, Inventory and VendorSelf Service (VSS) modules. Enhancements in-clude a new 'shopper' experience, the ability todefine and manage mandatory use contracts,greater flexibility to manage zero dollar inventoryitems and streamlined catalog management viavendor catalog upload in CGI Advantage VSS.

Learning ObjectivesAfter completing this session the attendee shouldbe able to apply the concepts for the key procure-ment, inventory and VSS enhancements in release3.10.

HR/P

Product Direction: CGI AdvantageHuman Resource Management(HRM)113Monday 9:45 am – 10:45 amType/Level: Update

CPE Subject Area: Personnel/HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditNew enhancements are included in each CGI Advantage release providing more functionality to support essential HRM and Payroll businessprocesses by making the solution more powerful,flexible, and user friendly. CGI will present theproduct roadmap and discuss the selectionprocess for new enhancements during this session. Attendees will be briefed on how to submit their own enhancement requests via theCGI Advantage Support Center. Presenters willalso cover key enhancements scheduled for re-lease 3.11 of CGI Advantage HRM, Employee SelfService, and Manager Self Service, in addition tosharing a preview of enhancements under consid-eration for release 3.12 and beyond. Attendeeswill have the opportunity to give input on areas forfuture investment. Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Discuss the CGI Advantage HRM product direction

• Recall key enhancements included in future releases of CGI Advantage HRM

• Identify new features in the next release thatthey can begin to prepare their site to implement

B

Product Direction: CGI AdvantagePerformance Budgeting114Monday 9:45 am – 10:45 amType/Level: Update

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAs the budgetary landscape continues to changewith new trends, requirements and regulatory de-mands, CGI Advantage Performance Budgeting (PB)continues to evolve to stay ahead of the curve. Inthis session, presenters will highlight the functional-ity in release 3.10, review the product roadmap,and give you a sneak peek into release 3.11. You'llhave an opportunity to cast your vote on where theproduct should go moving forward and hear aboutrecent upgrades and go-lives. Attend this session tofind out what’s new in the client community.Learning ObjectivesAfter completing this session the attendee shouldbe able define strategic direction and key upcom-ing enhancements for PB.

BI

Product Direction: CGIinfoAdvantage115Monday 9:45 am – 10:45 amType/Level: Update

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditState and local governments require a solutionthat provides easy access to information acrossthe organization to drive improved decision mak-ing. CGI infoAdvantage continues to add additionalfeatures and functionality to enhance reportingand information gathering processes. Significantchanges are planned in the next few years. Thissession will address the product direction of CGIinfoAdvantage, including exciting new featuresplanned for release 3.11 and beyond.Learning ObjectivesAfter completing this session the attendee shouldbe able to define strategic direction and key upcoming enhancements for CGI infoAdvantage.

MONDAY, OCTOBER 28

Page 9: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 7

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

T/A

Product Direction: CGI AdvantageAdministration116Monday 9:45 am – 10:45 amType/Level: Update

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditState and local governments require a powerfulcombination of standard, scalable technology andcomprehensive, integrated, built-for-governmentERP software. This session defines the underlyingtechnologies that CGI Advantage is built upon, addresses current technology trends and providesa look ahead at future enhancements under consideration.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the CGI Advantage technology direction

• Identify planning considerations for CGI Advantage upgrades

• Identify planning considerations for strategicalignment of other planned information technology projects

• Identify potential software license change andemployee training planning considerations

F

What's New in CGI AdvantageFinancial Management Release3.10121Monday 11:00 am – 12:00 pmType/Level: Overview

CPE Subject Area: Accounting

Duration in hours: 1.0 hourOnsite credits: 1.0 creditBy listening to clients and analyzing market demands, CGI continues to enrich the functionalityprovided in CGI Advantage Financial Management.Attend this session to hear about enhancements to future document triggering, new accountingjournal download capabilities, support for cost accounting reference table attachments and manymore exciting new developments.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall features about the new Debt Managementmodule

• Summarize existing Treasury Accounting functionality and recent enhancements in this area

P F

Product Direction: CGI AdvantageProcurement122Monday 11:00 am – 12:00 pmType/Level: Update

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditEach release adds new capabilities and improvescurrent product features to increase the value ofyour CGI Advantage solution. This session providesthe vision for the future of the Procurement, Inventory and Vendor Self Service (VSS) modules.Presenters will highlight key enhancements thatare being considered for release 3.11 and beyond,including mobile technology and expanded optionsfor eProcurement.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the key procurement, inventory, and VSSenhancements in release 3.10

• Identify the timeline and key features in the CGIAdvantage roadmap

• Discuss the CGI Advantage product vision forprocurement, inventory and VSS

HR/P

What's New in CGI AdvantageHuman Resource Management(HRM) Release 3.10123Monday 11:00 am – 12:00 pmType/Level: Overview

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage HRM release 3.10 includes a broadrange of new features and functions supportingmultiple business processes. This session willhighlight specific release 3.10 features selected bythe Steering Committee and the general approachfor how sites should implement them. Release3.10 also includes general improvements through-out the HRM application in addition to the new features and functions. The improvements to the application increase the usability of existing documents and activity folders across multiplebusiness areas. Presenters will demonstrate specific examples and how they remove past limitations. Attend this session to learn how thesenew enhancements will extend the depth, breadthand usability of CGI Advantage HRM.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe enhancements included in CGI Advantage HRM release 3.10• Use documentation materials to find informationrelated to CGI Advantage HRM release 3.10 enhancements• Assess CGI Advantage HRM release 3.10 enhancements demonstrated and determine relevance as it relates to their site

Page 10: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

8 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

B

A Detailed Look into the NewRelease 3.10 Integration Featuresin Performance Budgeting 124Monday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe ability to make effective budget decisions isdependent on having accurate information readyand available. Join us to discuss the new integra-tion options available between CGI Advantage Performance Budgeting (PB), CGI Advantage Financial Management (FM) and CGI AdvantageHuman Resource Management (HRM). We'll pro-vide a detailed look at the new features and toolsavailable within PB to simplify the transfer of dataand discuss best practices for when to bring datainto PB.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Apply concepts of bidirectional budget data information transfers between FM and PB

• Apply concepts of budget data informationtransfers from HRM to PB

• Apply best practices for when to transfer datainto/from PB

BI

Spread the Word with CGIinfoAdvantage Publications and Scheduling Features 125Monday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditLearn how to leverage scheduling and publicationfeatures within the CGI infoAdvantage solution toreach a broader range of end users. This sessionwill include discussion on key aspects of planningyour publication approach and security impacts toconsider as part of the planning process.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Set up scheduling and publishing based on thesites' business needs

• Establish security and identify users for securityassignments

T/A

Advanced Technology Topics in CGI Advantage EnterpriseResource Planning (ERP)126Monday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe session will introduce some advanced techni-cal concepts related to modules being released aspart of CGI Advantage release 3.10. Presenterswill cover CGI Advantage Business Integration(ABI) and mobile applications. ABI includes a novelway of creating server clusters that provides highavailability of integration services, as well as, faulttolerance (server outage). It also includes a faulttolerant task distributor that aims to increase processing throughput by distributing integrationtasks throughout the server cluster. The CGI Advantage mobile framework incorporates advanced technologies like the Google Web Toolkit(GWT) for view rendering on the targeted smartdevices while also adapting the existing presenta-tion framework to expose new data services. Keytechnologies and architecture details, includingsecurity features, will be shared in this session.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Identify fault tolerance and high availability aspects of ABI release 3.10

• Have insight and background in configuring theclustering properties for ABI release 3.10

• Identify how mobile apps connect to CGI Advantage data services to render content

• Identify security aspects of the mobile apps andthe data service

GI

Developing the Business Case for Managed Advantage 127Monday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditA business case often supports an objective assessment as to both the financial and qualitativeconsiderations behind a successful move to amanaged services delivery model, such as CGI’sManaged Advantage offering. This session will in-troduce you to a template based methodology thatsupports documenting and evaluating total cost ofownership and other differences between an inter-nally managed CGI Advantage deployment and aManaged Advantage approach. Hear from bothCGI experts and Managed Advantage clients as tohow a business case factors into the evaluationprocess, including first-hand examples and theability for you to pose questions.Learning ObjectivesAfter completing this session the attendee shouldbe able to apply a structured methodology andframework to build a business case for ManagedAdvantage.

F

Introduction to CGI AdvantageCash Management 131Monday 1:30 pm – 2:30 pmType/Level: Basic

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe new Cash Management module combines existing Treasury Accounting functionality andDebt Management capabilities just introduced inrelease 3.10. CGI Advantage Financial Manage-ment has expanded in a very significant way to include a means for you to define, manage, andreport on your bond authorizations, individual bondissues, leases, and loans. Once defined, each canbe referenced in almost every area of the applica-tion to track spending, revenue, budget, and anyother type of accounting to an individual debt instrument. All the necessary accounting over thelife of the debt instrument can also be performedautomatically for you. Attendees will also be pro-vided with a reminder of Cash Sweep and Income

MONDAY, OCTOBER 28

Page 11: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 9

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

Allocation functionality and release 3.10 enhance-ments in this area.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Discuss features of the Cash Management module

• Describe the new functionality of Cash Management and list implementation benefits

P F

The Contract ManagementLifecycle – Part 1132Monday 1:30 pm – 2:30 pmType/Level: Overview

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe journey does not end with the award of a contract, instead there is a wealth of informationto capture and analyze throughout the life of thecontract. This session will review the key featuresthat are available in CGI Advantage Procurementto support the full contract lifecycle.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the key capabilities in CGI AdvantageProcurement to support the full contract lifecycle

• Apply learning to integrate unused features tocurrent business processes

HR/P

Now Introducing the New CGI Advantage Employee Self Services (ESS)!133Monday 1:30 pm – 2:30 pmType/Level: BasicCPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe new CGI Advantage ESS release 3.10 in-cludes a completely new and redesigned user interface with a broad range of new features. Thissession will include the demonstration of specificnew features and the general approach for howsites should implement them. General improve-ments have been made throughout the ESS application to increase the usability of existing

documents and activity folders across all businessareas. Presenters will demonstrate how the newfeatures work and how they eliminate past limita-tions and increase usability. Additionally, new ESSfeatures have already been targeted for release3.11 and will be discussed to explain how theywill expand upon the capabilities of release 3.10.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Understand the new ESS user interface• Apply tips and tricks from the beta test site andother implementations

• Discuss the ESS product roadmap and demon-strate an understanding as to what is coming inthe 3.11 release

B

Using Performance BudgetingBeyond Budget Approval Part 1:Forecasting 134Monday 1:30 pm – 2:30 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditEffective budgeting and forecasting are vital com-ponents of successful budgeting. A budget shouldprovide an accurate forecast of anticipated rev-enues and a roadmap for anticipated spending.Join this session to learn how CGI Advantage Performance Budgeting (PB) can help in these endeavors. We will show examples of how clientshave setup up data within PB to perform such actions as cash forecasting, end of year revenueforecasting, and use models and historical data toforecast future spending. We'll also touch on theintegration with CGI Advantage Financial Manage-ment needed to perform effective forecasting.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define different forecasting options available toaid in effective budgeting

• Describe system configuration options to supportforecasting for both revenues and expenditures

• Describe best practices for when to completeforecasting during the budget cycle

• Define the integration points needed as inputsfor forecasting

BI

Lock Down Your EnterpriseInformation through AdvancedSecurity Features 135Monday 1:30 pm – 2:30 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditSecurity configuration does not have to end withyour initial implementation effort. The CGI infoAdvantage community benefits from severaladvanced security features. Come learn aboutstrategies for implementing two of these advancedfeatures; row level security and data masking.Learning ObjectivesAfter completing this session the attendee shouldbe able to analyze, develop, and implement rowlevel security and data masking based on theirbusiness needs.

T/A

Advantage CSI: ComputerForensics for Troubleshooting CGI Advantage Issues 136Monday 1:30 pm – 2:30 pmType/Level: Basic

CPE Subject Area: Computer Science

Duration in hours: 1.0 hourOnsite credits: 1.0 creditApplication administrators are not only responsiblefor managing the CGI Advantage application, butare the first ones called when an end-user runsinto an error. This session provides a demonstra-tion on troubleshooting and resolving commontechnical application and configuration relatedproblems such as null pointers, out of memory errors, certificate issues, exceptions, database errors, and other technical issues. Learn the toolsthat are commonly used for identifying and resolving technical issues within CGI Advantage.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define methodology and approach for troubleshooting CGI Advantage issues

• Apply useful troubleshooting tools

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 12: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

10 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

• Define the most common types of errors andhow to approach troubleshooting for each

• Define the approach for analyzing the health ofeach application tier

• Define the approach for troubleshooting of batch jobs

• Define the approach to pinpoint performance issues

GI

Advantage Collections: How YouCan Leverage CGI Advantage toGenerate a Significant Increase in Revenue 137Monday 1:30 pm – 2:30 pmType/Level: Intermediate

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditIn today’s tough economic times, solutions that increase government revenues without increasingtaxes deserve close attention. CGI Advantage Collections leverages data that is currently avail-able within your ERP system along with businessintelligence and case management to find the bestcases and payment strategies to enhance collec-tions. CGI has consistently shown the ability to increase collection of delinquent debts by 10% to 40%. This session will show you how CGI Advantage Collections, when coupled with CGI Advantage Accounts Receivable, new businessprocesses, and centralization of collections, canresult in a significant increase in revenue for yourorganization. The result can literally increase revenues by tens of millions of additional dollarsper year depending on the size of your accountsreceivable.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the benefits that can be derived fromutilizing data that is currently in their enterpriseresource planning (ERP) system

• Describe how their jurisdiction will be able tobenefit from the centralizing of their govern-ments debt

• Describe steps needed to start achieving a significant increase in revenue

PS BI

Building the "Government of theFuture" with Big Data and SmartAnalytics from SAP138Monday 1:30 pm – 2:30 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleAttend this session to learn how enterprise busi-ness intelligence is evolving to enable the nextgeneration of state and local government. Learnhow you can leverage technologies such as bigdata, advanced visualization, search, and predic-tive analytics to enable your organization to runbetter. You will hear real use cases from cities,states and other government organizations whoare building the future, today.

F

Grants: Report from the Field onGrants Lifecycle Managementand Cost Accounting141Monday 2:45 pm – 3:45 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAre you looking for ways to improve your manage-ment of grants, both to receive more awards andto optimize the grant awards you have? CGI Advantage Grants Lifecycle Management (GLM)has been in use at some CGI Advantage sites forseveral years. Come hear about lessons learned,best practices, and the results that GLM hasbrought these organizations. More general use ofcost accounting functions like grant budgeting andautomated reimbursement will also be discussed.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the process of grant application tracking and understand how it ties to increasing grant revenue

• Define a strategy to implement cost accountingfeatures to streamline grant management

P F

Simplify Your CatalogManagement Process142Monday 2:45 pm – 3:45 pmType/Level: Overview

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditYou may be using internally hosted catalogs today,but have you tried vendor hosted catalogs via procurement PunchOut? Join us to learn how yourfellow members in the CGI Advantage communityhave streamlined their catalog managementprocess via PunchOut catalogs and the lessonslearned along the way. You will also learn aboutoptions to support an additional catalog formatand the ability for vendors to load catalogs via CGIAdvantage Vendor Self Service. These options pro-vide the opportunity to increase vendor adoptionand further streamline catalog management.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• List the electronic catalog options available inCGI Advantage

• Define the key benefits, risks and challenges ofimplementing PunchOut catalogs

• Define the self-service option for vendors to upload electronic catalogs

HR/P

New Self Service Capabilities for Managers 143Monday 2:45 pm – 3:45 pmType/Level: Overview

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage Manager Self Service (MSS) was introduced in release 3.9 and release 3.10includes a broad range of new capabilities. Thissession will include the demonstration of specificrelease 3.10 features and the general approachfor how sites should implement them. Strategicenhancements have been made to the MSS appli-cation to increase the depth of functionality for keybusiness processes. These enhancements includeenhanced navigation and workflow administration,overtime and leave requests for time and leavemanagement, support for incident and perform-

MONDAY, OCTOBER 28

Page 13: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 11

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

ance management, and mobile approvals. Additionally, potential MSS features that could betargeted for future releases will be explored to as-sess how they might expand upon the existing capabilities of the application and increase thebenefits provided to employee supervisors.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall new features of CGI Advantage MSS toimprove usability of MSS

• Describe tips and tricks from the beta test siteand other implementations

• Discuss the MSS product roadmap.

B

Using CGI AdvantagePerformance Budgeting BeyondBudget Approval Part 2: BudgetManagement – Revisions andPositions 144Monday 2:45 pm – 3:45 pmType/Level: Advanced

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditIn this session we will explore using CGI Advantage Performance Budgeting (PB) for budgetchanges, both for budget revisions and for positionchanges. We will discuss the option of originatingbudget transfers from within PB. We will shareclient examples of how to handle both internaltransfers as well as budget changes using budgetforms, including the workflow options available.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Understand the different options available forbudget changes within the CGI Advantage ERP

• Describe system configuration options to support internal budget transfers

• Describe system configuration options to support internal budget changes

• Define the integration points needed for budget changes

BI

Optimizing Your BusinessIntelligence Resources throughMetadata Management andAuditing 145Monday 2:45 pm – 3:45 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditGet the most out of understanding the data aboutyour data and how and when your data may beused. This session will provide real world examplesof how clients have deleted obsolete business in-telligence content and refined application settingsdue to changes in system usage and the benefitsachieved.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define metadata and know how and when touse it

• Understand and leverage the metadata toolsprovided for CGI infoAdvantage

• Configure the audit functionality in the BusinesObjects Enterprise

• Perform an assessment of the business intelligence content in their BusinessObjects Enterprise

T/A

Operational Excellence: Best Practices for CGI Advantage Operations146Monday 2:45 pm – 3:45 pmType/Level: Advanced

CPE Subject Area: Computer Science

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCongratulations! CGI Advantage is live. What doyou do now to keep things running smoothly? Thissession will cover operational best practices forCGI Advantage including backups, cleaning upfiles and logs, scheduling, monitoring your system,applying operating system and database patches,clearing out database data such as rejected/draftdocuments and job logs, and other operationaltasks. We will also discuss key activities to be

performed at different timeframes after go-live (3 months, 6 months, 1 year, 2 years etc.), so theadministrators can schedule these activities. Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Apply best practices recommended by CGI and peers for database administration, systemadministration, and application administration inCGI Advantage for improvement at their ownsites

• Describe basic network administration tasks required for CGI Advantage

GI

Driving Revenue throughPermitting Automation147Monday 2:45 pm – 3:45 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleLearn how permit process automation, customerself-service, and advanced analytics can drive revenue collection for your organization. The CGIAdvantage Permitting module enables integrationacross your enterprise by linking together permits,licenses, registrations, inspections, and fees withfinancial management information. This sessionwill demonstrate how CGI clients have utilized CGIAdvantage Permitting to streamline fee payments,target non-registered entities and automateprocesses.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe how permit process automation, customer self-service and advanced analyticscan drive revenue collection

• Describe how CGI’s Advantage Permitting module enables integration across the enter-prise by linking together permits, licenses, registrations, inspections and fees with financialmanagement information

• Describe how CGI Advantage Permitting has enabled streamlining of fee payments, targetingnon-registered entities and process automation

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 14: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

12 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

GI

K-12 User Group Meeting 151Monday 4:15 pm – 5:30 pmCPE Subject Area: Not CPE Eligible

GI

State and Large Government User Group Meeting 152Monday 4:15 pm – 5:30 pmCPE Subject Area: Not CPE Eligible

GI

DOT User Group Meeting 153Monday 4:15 pm – 5:30 pmCPE Subject Area: Not CPE Eligible

GI

Small and Mid-Size GovernmentUser Group Meeting 154Monday 4:15 pm – 5:30 pmCPE Subject Area: Not CPE Eligible

BI

Best Practices for Report Designand Discussion with Client Panelof Experts 155Monday 4:15 pm – 5:30 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI infoAdvantage provides users at all levels withreal-time access to data in searchable online re-ports to quickly visualize key metrics and manageday-to-day operations. This session provides anopportunity to learn about report design and development best practices including how usersovercame challenges and helpful suggestions forreport implementation. This session will also in-clude a panel of CGI and client community expertsto share best practices and lessons learned. Comewith questions!

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Demonstrate a general understanding of the re-port development methodology and framework

• Describe how to use the report design template• Describe best practices for designing reportsviewed on a mobile device

B

Building the Business Case to Upgrade from BRASS to CGI Advantage PerformanceBudgeting156Monday 4:15 pm – 5:30 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleThinking about upgrading from BRASS to CGI Advantage Performance Budgeting (PB)? Join usfor this discussion to hear how to build the busi-ness case to move your upgrade forward. You willhave the opportunity to ask questions about PBfunctionality and the upgrade process.Learning ObjectivesAfter completing this session the attendee shouldbe able to describe the benefits of upgrading fromBRASS to PB in support of building a business case.

GI

Maximizing the Support ServicesProvided by the CustomerSupport Group 157Monday 4:15 pm – 5:30 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleThe Customer Support Group (CSG) plays a crucialrole in the ongoing maintenance and support ofyour applications once your implementation effortis complete. Join CSG for a discussion on how tomaximize the online CGI Advantage Support Center (ASC) and other topics including the issuesportal, changes to overall standard maintenancesupport and general service improvements. Learnfrom CSG’s staff how you can maximize supportand, most importantly, meet the team memberssupporting you behind the phones and online!

GI

Managing for Results 158Monday 4:15 pm – 5:30 pmType/Level: Intermediate

CPE Subject Area: Business Management

Duration in hours: 1.0 hourOnsite credits: 1.0 creditLearn how CGI Advantage clients have built a culture of managing for results and how the CGIAdvantage ERP solution can provide the funda-mental building blocks. This session will presentthe challenges overcome by organizations adopt-ing a Managing for Results culture and ideas on how to configure CGI Advantage Financial Management, Human Resource Management,Procurement, and Performance Budgeting to provide the necessary data.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe methodologies and experiences fromother clients who have successfully created aManaging for Results culture

• Utilize your existing ERP investment to imple-ment new functionality and configurations tosupport MFR

F

Exploring Options for Automatingthe Addition of Fixed AssetsRecords in CGI AdvantageFinancial Management 211Tuesday 9:45 am – 10:45 amType/Level: Intermediate

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage Financial Management providesseveral methods for the addition of fixed assetrecords. This session will include an overview ofeach method and provide context for the usage ofeach method. Both automated methods, includingprogram asset generation, fixed asset shell gener-ation and fixed asset intent processing, and man-ual methods will be addressed. Attendees willbecome more familiar with options they may nothave previously considered, but may be appropri-ate for future rollout.

MONDAY, OCTOBER 28

Page 15: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 13

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

Learning ObjectivesAfter completing this session the attendee shouldbe able to define options for the addition of assetrecords.

P F

Maximize Your Use of CGIAdvantage Vendor Self Service (VSS)212Tuesday 9:45 am – 10:45 amType/Level: Overview

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage VSS continues to evolve with eachnew release of CGI Advantage. Is your organizationkeeping up with the changes and realizing thebenefits of the entire self service offering? Thissession will provide insight into the latest functionsand features available in release 3.9 and beyondand include examples of clients that continue toexpand and maximize their VSS investment.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define key capabilities in VSS releases 3.9 and 3.10

• Describe the benefits and key challenges fromrecent implementations

• Identify planned enhancements for release 3.11and beyond

HR/P

End-to-End EmployeePerformance Management UsingCGI Advantage Human ResourceManagement (HRM), ManagerSelf Service (MSS), and EmployeeSelf Service (ESS)213Tuesday 9:45 am – 10:45 amType/Level: Overview

CPE Subject Area: Personnel/HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditRelease 3.10 of CGI Advantage HRM, ESS, and

MSS includes new performance management features that considerably expand previous capa-bilities. These features allow sites to track moreinformation in the system than ever before andprovide the ability for all CGI Advantage compo-nents to be involved in the employee evaluationprocess. This session will include a comprehen-sive end-to-end employee evaluation demonstra-tion including all three CGI Advantage modulesand the general approach for how sites should implement the new functionality. Strategic en-hancements that will be covered include the abilityto set ratings and expectations for multiple levelsof an organization that can be included on a newEmployee Expectations document, which can thenbe included in a redesigned Employee Evaluationdocument that can be routed to a manager for approval and sign-off by an employee. By attend-ing this session, CGI Advantage users will get exposure to all three modules focused on one coordinated business process.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall the features of Performance Managementwithin CGI Advantage HRM

• Summarize 3.10 enhancements related to Performance Management

• Understand an example of employee evaluationusing HRM, ESS, and MSS

B

The Biennial Budget: Is it Right for You?214Tuesday 9:45 am – 10:45 amType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAs budgets continue to grow larger and morecomplicated, many governments are moving toward a biennial budget preparation cycle. In thissession, we will examine the biennial budgetprocess and discuss the advantages and disad-vantages. We will highlight client examples fromsites that are doing a biennial budget and thosethat have a two year outlook prepared annually,and show how the forms are set up in CGI Advantage Performance Budgeting to accomplisheach. They will share tips and recommendationsfor those sites thinking of moving to this approach.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the different options for biennial budgets• Understand the configurations needed to support the biennial budget process

• Apply best practices for biennial budgets

BI

CGI Enterprise Intelligence360 inAction: Transparency, Mobility,and Exploration 215Tuesday 9:45 am – 10:45 amType/Level: Basic

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditLearn how some sites are leveraging the power ofbusiness intelligence tools to meet the needs ofvarying audiences within their organization. Thissession will include examples of dashboards andexplorer information spaces deployed to a usercommunity. There will also be a deeper dive intonew CGI Enterprise Intelligence360 content avail-able with release 3.10 including the transparencysolution, information spaces, and mobility.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Identify and demonstrate business intelligencecontent that leverages CGI Advantage and non-CGI Advantage data

• Describe the requirements for transparency demanded by public interest groups

• Describe business intelligence trends in stateand local government (mobility, self service/exploration of data)

• Define a use case that illustrates leveraging the broader toolset and access to non-CGI Advantage ERP data to meet a customer’s business needs

TUESDAY, OCTOBER 29

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 16: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

14 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

T/A BI

Turn Your CGI infoAdvantageYugo into a Ferrari 216Tuesday 9:45 am – 10:45 amType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe CGI infoAdvantage software suite is a highlyconfigurable, customized, multi-tiered business intelligence solution that runs on diverse platformconfigurations. It is often not monitored and tunedoptimally. This introductory session provides anoverview of the CGI infoAdvantage architecturethat should be tuned and monitored to ensure thatyour system is running efficiently. Monitoring andtuning for both ETL and Business Objects report-ing will be covered including Business Objects Auditor, database monitoring, database tuning,and Business Objects set up.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define monitoring areas and tools recomendedfor CGI infoAdvantage

• Learn methodologies for tracking down perform-ance issues

• Understand basics of what must be tuned at theOS level, DB level, ETL level, and report level

• Identify what items are required for reportingtuning issues to customer support

GI

Enterprise Readiness BestPractices 217Tuesday 9:45 am – 10:45 amType/Level: Intermediate

CPE Subject Area: Business Management

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session reviews the key activities of success-ful ERP implementations and what state and local clients need to plan prior to and during an implementation. Presenters will cover CGI’s rec-ommended practices of what should be includedto prepare their departments and end users toadopt the system and business processes thatmake CGI Advantage ERP implementations gosmoothly.

Learning ObjectivesAfter completing this session the attendee shouldbe able to identify key activities to undertake to either increase the success of Go Live adoption oroptimize the use of already implemented systems.

PS HR/P

The CGI/Kronos “Advantage”:Volusia County Case Study218Tuesday, 9:45 am – 10:45 amType/Level: Overview

CPE Subject Area: Not CPE EligibleVolusia County has been a CGI Advantage® cus-tomers since 1984. With an upgrade to AdvantageHRM 3.7 on the horizon, it was the right opportu-nity to evaluate their time and attendance needs.The county selected Kronos’ Workforce Centralsolution in 2005 to complement their existing CGI Advantage® investment. Decreasing payrollprocess time is just one example of the benefitsachieved with this integrated solution. Hear fromKronos and Volusia County as they walk throughthe integration of the two systems, the benefits realized, and lessons learned along the way.

F P

Maximizing User Efficiency byLeveraging User InterfaceEnhancements and Other Optionsfor Increasing Productivity 221Tuesday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditRelease 3.8 introduced a major overhaul to theuser interface (UI) across the ERP suite. Release3.11 will see further improvements to the UI. Thissession will examine how existing UI options canbe leveraged to enhance the experience of CGIAdvantage Financial Management users. In addi-tion, the session will explore data entry savingmechanisms and related best practices for increasing efficiency and productivity.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the benefits of user preferences

• Define options for increasing user productivityusing user preferences

P F

The Contract ManagementLifecycle – Part 2222Tuesday 11:00 am – 12:00 pmType/Level: Overview

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditIn this session you will learn how the addition ofCGI Advantage Case Management provides theopportunity to extend the contract managementcapabilities of CGI Advantage Procurement. Examples that will be discussed include the abilityfor procurement specialists and departments towork collaboratively to efficiently and consistentlycreate solicitations, evaluate vendor responses,and award contracts. The session will also describethe natural touch points with CGI Advantage Procurement and Vendor Self Service.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall key features of CGI Advantage Case Management

• Discuss the use of Case Management tostreamline the end to end procurementprocesses

HR/P

Can CGI Advantage HumanResource Management (HRM)Calculate FLSA and OtherOvertime Calculations? Yes it can!223Tuesday 11:00 am – 12:00 pmType/Level: Intermediate

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage HRM provides multiple ways of automatically calculating FLSA and other types ofsite defined overtime. By utilizing these automatedmethods, sites can eliminate manual entry of overtime codes by employees and time and attendance staff to streamline business processes.This session will include a presentation of how to

TUESDAY, OCTOBER 29

Page 17: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 15

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

configure FLSA and client compensation overtime.Additionally, generating overtime using automatedpay criteria will be covered. Presenters willdemonstrate how to generate an overtime calcula-tion and will cover the impact of calculating overtime for employees with multiple rates of payand multiple appointments.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall key configurations for FLSA and clientcompensation overtime

• Understand how to calculate overtime for employees having multiple rates of pay andmultiple appointments

B

Leveraging Salary and BenefitProjections in PerformanceBudgeting 224Tuesday 11:00 am – 12:00 pmType/Level: Advanced

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditEmployee salaries and benefits make up the ma-jority of public sector operating budgets making itessential to regularly monitor expenses and theresulting effect on the budget. In this session, wewill discuss how salary and benefits projectionswithin CGI Advantage Performance Budgeting canbe used to ensure that costs and adjustments areeffectively tracked. We'll walk through several examples of how changes can be setup and managed within the salary projection functionality.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Identify the options for salary and benefitchanges

• Understand the configurations needed to support the salary projection functionality

BI

Planning Your Migration toBusinessObjects 4.0225Tuesday 11:00 am – 12:00 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditLearn about the new capabilities available withBusinessObjects 4.0 (commonly referred to as BI4.0). This session will introduce key enhancementsthat the CGI infoAdvantage end user and systemadministrator will benefit from when moving to BI4.0. Presenters will discuss planning for a BI 4.0upgrade, the upgrade path, system considerations,and the tools available to support an upgrade.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe BI 4.0 capabilities• Describe what to expect during the upgrade• Plan and execute the upgrade

T/A

Reduce Your Total Cost ofOwnership (TCO) with EnterpriseContent Management (ECM)226Tuesday 11:00 am – 12:00 pmType/Level: Overview

CPE Subject Area: Computer Science

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe session provides an overview of ECM includ-ing the market trends and best practices. We willdiscuss which CGI Advantage customers useECM, how ECM can reduce total cost of owner-ship, and how CGI Advantage customers leverageECM in their operations.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define ECM• Identify the benefits of ECM• Identify ways to leverage ECM with CGI Advantage

• Identify ways to reduce the total cost of owner-ship with ECM

GI

Change Management andDeployment Readiness LessonsLearned 227Tuesday 11:00 am – 12:00 pmType/Level: Intermediate

CPE Subject Area: Business Management

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session presents real CGI Advantage stateand local customers who are willing to describetheir wild successes and agonies of defeat whilepreparing their workforce for the CGI Advantageimplementation. A similar session was deliveredlast year and was touted during the conference asone of the best sessions where attendees learnedtips and techniques of other site implementations.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Identify other state and local lessons learned • Identify which things are deemed “the most“ important Enterprise Readiness activities thatwould apply or should be tried at their locationfor communications, training, agency readiness,overcoming resistance, and leadership alignment.

PS

Enterprise Content Management(ECM) with OpenText228Tuesday, 11:00 am – 12:00 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleInformation is a high value asset and Governmentorganizations have massive amounts of it to manage. This session will examine InformationGovernance principles and methods that bringyour content, processes, and disparate systemstogether to improve citizen services, internalprocesses and information security. It will examinehow to gain the most advantage from your infor-mation while reducing risks and costs associatedwith it. Whether on premise or in the cloud, manyGovernment organizations are achieving greatvalue from their Information Governance pro-grams. Join us to hear how.

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 18: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

16 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

F BI

Leveraging CAFR Reporting forNon-CAFR and CAFR Reports 231Tuesday 1:30 pm – 2:30 pmType/Level: Intermediate

CPE Subject Area: Accounting

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe CAFR/Financial Reporting module was intro-duced in Release 3.9. This module offers the ability to automate many of the complex financialand non-financial statements. CGI Advantage Financial Management does not contain all of yournecessary financial data and very little of the non-financial, or statistical data; therefore, this moduleprovides a central repository of additional informa-tion, allowing for the elimination of many of theexternal spreadsheets and systems that are usedin statement preparation. This session exploresone of the best kept secrets in the CGI AdvantageERP suite, introducing financial managers to themodule with samples for report building, selection,input of external data, and reports.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall configuration steps for implementingCAFR Reporting

• Understand CAFR Reporting in CGI Advantage

P F

Managing Inventory and Non-Capitalized Assets via CGI Advantage 232Tuesday 1:30 pm – 2:30 pmType/Level: Overview

CPE Subject Area: Production

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAre you looking for opportunities to manage yourinventory or track non-capitalized assets? If so,join us for this session to learn how CGI AdvantageInventory can be used to manage these processesand increase or maximize your CGI Advantage ERPinvestment.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Understand the general capabilities of CGI Advantage Inventory

• Identify potential uses of CGI Advantage Inventory

HR/P

Security Features and SetupOptions that Human ResourceManagement (HRM) Users Should Know About 233Tuesday 1:30 pm – 2:30 pmType/Level: Intermediate

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditAlthough security is usually considered an administrative function that applies to both CGIAdvantage Financial and CGI Advantage HRM,there are aspects to security administration thatare unique to CGI Advantage HRM. This sessionwill focus on CGI Advantage HRM specific securityfeatures, including HRDOC and its major compo-nents, changing user access options, generatingnotifications to security administration staff viapersonnel action processing, implementing activityfolder tab based security, and masking social secu-rity numbers. Presenters will discuss the featuresand how to implement them, and demonstrateessential security functions from the perspectiveof a system end user. The session is not intendedto be focused on general system security training.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the use of the HRDOC in CGI AdvantageHRM

• Recall the HRDOC document components• Discuss security options for managing access to human resource management documentsunique to CGI Advantage HRM system users

• Discuss concepts which may streamline business process and eliminate manualworkarounds

B

Performance Budgeting Reportfrom the Field: Release 3.10234Tuesday 1:30 pm – 2:30 pmType/Level: Update

CPE Subject Area: Not CPE EligibleJoin us for a panel discussion on the latest CGIAdvantage Performance Budgeting (PB) release–release 3.10! Hear from current PB and BRASSclients who are in the process of upgrading to thelatest release. The panel will share insights on thenew features, as well as lessons learned.Learning ObjectivesAfter completing this session the attendee shouldbe able to: • Demonstrate an understanding of the most popular features of PB release 3.10

• List upgrade challenges and lessons learned

BI

Powerful Reporting Brought to Life235Tuesday 1:30 pm – 2:30 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session is for report developers and peopleinterested in getting the most out of the CGI infoAdvantage toolset. Empower managers andusers with actionable decision-making capabilitiesto proactively identify and resolve issues early.Learn how to create information spaces to enableself-exploration of information for root causeanalysis. Use advanced reporting features like drilldown and input controls to focus on important information and avoid data overload.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe how to develop a simple explorer infor-mation space

• Apply concepts to develop reports that includealerts with scorecard, drill down, drill thru withlink reports, and input controls with a graph

TUESDAY, OCTOBER 29

Page 19: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 17

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

T/A

Are You Secure?236Tuesday 1:30 pm – 2:30 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session is intended to help security adminis-trators better understand the advanced securityfeatures of CGI Advantage and position them toimplement these mechanisms with confidence to the meet complex and evolving security requirements of their site. We will give practical demonstrations on how to leverage combinationsof these features to satisfy site-specific require-ments. With an emphasis on the CGI AdvantageFinancial Management and CGI Advantage HumanResource Management applications, this sessionis intended empower security administrators looking to move “beyond the basics” and put theory into practice.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe how to apply “row filtering”• Describe how to apply “data field security”• Describe how to apply “organizational security”• Describe how to apply “user interface field security”

GI

Minor Release UpgradeMethodology and Best Practices(Part 1)237Tuesday 1:30 pm – 2:30 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditStaying current with available releases is impor-tant to maintaining your organization’s access toCGI maintenance services. It also allows you totake advantage of new features and functionalityto support your business needs. This session focuses on the recommended upgrade methodol-ogy and best practices associated with planningand executing a streamlined, successful upgradeprocess. Topics include hardware planning, data-

base upgrade approach, customizations, inter-faces, forms, and report migration. If you arethinking about or currently planning an upgradefor your current CGI Advantage 3.x release, youdon’t want to miss this session.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• List the key success factors for a successful upgrade

• Describe the upgrade methodology for each ofthe project phases

GI

CGI’s UK Local GovernmentExperience in BusinessTransformation – How Not to Fail!238Tuesday 1:30 pm – 2:30 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleCGI’s recent merger with Logica has infused intothe company a leading provider of ERP solutionsfor UK local government. Using CGI’s UK LocalGovernment Framework to transform supportservices, CGI has helped local governments re-lease additional funding to citizen centric serviceswhen central government funding is reduced.Transformation and change are not the same andthis session will explain what distinguishes trans-formation from change in the UK local governmentcontext.CGI’s experience in implementing ERP solutionsfor UK local government demonstrates that tech-nology is only a part of transforming support services operations, business services processesand managers’ effectiveness. Too many UK localgovernment ERP implementations have failed todeliver fully on all the expected benefits. This session will look at some of the causes in the UKand give you a practical approach to how CGI facilitated successful ERP enabled transformation.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the difference between transformationand change

• Describe how to apply an approach, proven inthe UK, to construct and manage a successfulERP enabled transformation program

• Define how to establish the essential businessreadiness to operate new ways of working

F

Panel Discussion: Banking in CGI Advantage 241Tuesday 2:45 pm – 3:45 pmType/Level: Intermediate

CPE Subject Area: FinanceThe CGI Advantage Financial Management appli-cation is designed to interact with banks in manyways. Join this panel session to explore many ofthose automated interfaces and related best prac-tices in areas, such as, fraud prevention for ourstate and local government clients. Discover newtrends in areas such as electronic funds transferand ePayables, and how those changes have beenand continue to be addressed in the future direc-tion of the product.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe all existing and planned bank function-ality and interfaces

• Describe best practices in fraud prevention andsaving money

P F

Invoicing, Tolerances and theAutomated Match Process 242Tuesday 2:45 pm – 3:45 pmType/Level: Overview

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditJoin us in this session to learn about the variousoptions to receive and process invoices for com-modity based purchase orders and contracts. In addition, you will learn how system enforcedtolerances and the automated three way matchprocess can help streamline your accountspayable environment.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Identify the current and planned future optionsto receive and process invoices

• Describe how document tolerances allow vari-ances in documents within a transaction chain

• Define the automated match options, process,and benefits

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 20: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

Session descriptions

18 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

HR/P

New Ways to Track EmployeeIncidents and Grievances withCGI Advantage Human ResourceManagement (HRM) and CaseManagement 243Tuesday 2:45 pm – 3:45 pmType/Level: Basic

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session will discuss the emergence of casemanagement and how it has evolved to supportingERP for state and local governments today. The vision of how CGI Advantage Case Managementworks with the core CGI Advantage componentswill be presented along with a demonstration ofnew integration that has been introduced in the3.10 release. Learn how the addition of CGI Advantage Case Management can be used to extend the capabilities of CGI Advantage HRM toimprove and streamline business processes re-lated to employee relations and potentially otherbusiness areas. In addition to demonstrating howto manage employee incidents and grievances,presenters will also introduce new ways for HRstaff and supervisors to collaborate, so they canmore efficiently and consistently manage the em-ployee performance management process. Comejoin this session to see the latest evolution of theCGI Advantage ERP suite and how implementingCGI Advantage Case Management can benefityour organization.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Recall the key features of CGI Advantage CaseManagement

• Describe how CGI Advantage Case Managementcan help streamline grievance and incidentprocesses

B

Transparency: How to GetInformation Out 244Tuesday 2:45 pm – 3:45 pmType/Level: Advanced

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hour

Onsite credits: 1.0 creditWith the growing trend towards increasing gov-ernment transparency, the question of how to getinformation out to constituents becomes evenmore important. Join us for this session where wewill discuss what information sites are currentlypresenting and how effective the process hasbeen. Hear from Wake County, NC about theiraward winning "Wake WATCH" site and learn theprocess and steps they took to get informationout. We'll also investigate the challenges andtechnological limitations that have been encoun-tered and discuss various options to overcomethese obstacles. Presenters will also discuss somerecommendations of how information can be entered in CGI Advantage Performance Budgeting(PB) to help to facilitate this process.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define the different types of data that are beingshared with constituents and the format of thedata

• Understand best practices for collecting datawithin PB to easily consolidate and present theinformation externally

BI

Diving into Dashboards Planningand Creation Strategies 245Tuesday 2:45 pm – 3:45 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe CGI infoAdvantage dashboard opens up a newworld of reporting and communication possibilitiesusing a rich, interactive, graphical user interface.This session dives deeper into features and bene-fits of the CGI infoAdvantage dashboard, such asthe ability to easily view progress, the ability tofocus on high-level trends and measures, how todrill down into the details, and the ability to makereports and dashboards readily available in CGIAdvantage.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe how to incorporate dashboards and reports into CGI Advantage

• Identify the new dashboards available in release3.10

• Understand how to add a drill down URL to adashboard

• Understand how to use business intelligenceworkspaces for dashboards and reports

T/A

Mobile Computing Best Practices246Tuesday 2:45 pm – 3:45 pmType/Level: Intermediate

CPE Subject Area: Computer Science

Duration in hours: 1.0 hourOnsite credits: 1.0 creditMobile devices, such as smart phones and tablets,are rapidly becoming a staple in our lives. Thissession discusses CGI’s strategic direction forsupporting mobile devices. Learn about the differ-ences between native, hybrid and mobile web applications, mobile security, mobile user interfacedesign best practices, mobile development & deployment best practices, monitoring, analyticsand current trends in enterprise mobility.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define CGI's mobile device support direction• Apply concepts to plan for handling security ofmobile applications

• Define native, hybrid, and mobile web apps anddemonstrate an understanding why CGI haschosen its strategy

• Describe best practices in designing user interfaces for a mobile app

• Understand mobile app development and deployment best practices

• Identify tools and current trends in managingenterprise mobility

GI

Minor Release UpgradeMethodology and Best Practices:Report from the Field (Part 2)247Tuesday 2:45 pm – 3:45 pmType/Level: Advanced

CPE Subject Area: Not CPE EligiblePart two of this two-part series features yourpeers discussing their real-life experiences with

TUESDAY, OCTOBER 29

Page 21: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 19

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

utilizing the advised upgrade methodology (pre-sented in Part 1) and the benefits realized throughthis approach. Hear how partnering both CGI andclient resources resulted in ensuring the optimalplanning, execution, and subsequent go-livephases of an upgrade from one minor release ofCGI Advantage to another. Project specifics frominception to completion will be shared to paint acomplete picture of the lifecycle of a successfulupgrade engagement.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the CGI Advantage upgrade methodology• Recall approaches and best practices to ensureupgrade success

PS

HP 3PAR StoreServ Storage:Storage for the Next Era248Tuesday 2:45 pm – 3:45 pmType/Level: Overview

CPE Subject Area: Not CPE EligibleIn 2012, HP acquired 3PAR for $2.4 Billion mak-ing it the largest acquisition in the company’s his-tory. Since then, 3PAR has become HP’s flagshipSAN solution seeing 75%+ Y/Y growth. The port-folio offers a wide range of models ideal for clientsof all industry and size sharing the same OS, Man-agement, Support, and Advanced Tier 1 Function-alities. This session will take you through thevarious features that make 3PAR the most innova-tive solution to support server virtualization, deliverIT as a Service, and accelerate new applicationdeployment such as CGI’s Advantage.In this session we will provide you with a high leveloverview of how 3Par lets you serve unpredictableand mixed workloads, support unstructured andstructured data growth, meet your file and blockstorage needs, and your object storage needs asthey emerge. We will discuss how 3PAR continuesto be the most efficient SAN in the industrythrough its unique thin provisioning capabilities al-lowing for decreased capacity requirements. Wewill also review how 3PAR continues to top SPC-1performance benchmarks through its distinctivearchitecture.In this era, organizations are constantly battlingwith a “do more with less” mentality while datagrowth continues to skyrocket. 3PAR was specifi-cally designed to meet these challenges whileproviding IT with a simplified platform for manage-ment. At the conclusion of this session, you will

walk away with a great understanding of why3PAR continues to be the preferred SAN platformby the CGI Advantage team.

F

Maximizing Cash In-Flow fromAccounts Receivable 251Tuesday 4:00 pm – 5:00 pmType/Level: Intermediate

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThe Accounts Receivable module includes some ofthe more under-employed functionality in the CGIAdvantage ERP suite. Attend this session to seehow some of this functionality can be used to fa-cilitate increased collection of outstanding debtand improve your overall cash position. Paymentplans, finance charges and vendor intercepts arethree of the mechanisms that will be explored forthe collection of outstanding debt.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe how payment plans allow customers topay back an outstanding receivable over an ex-tended period of time

• Recall the process for assessing penalties andinterest to past due receivables

• Describe how vendor intercepts are being usedto collect outstanding debt without receivingcash directly from the customer

P F

The Art of ProcurementReporting: A Panel Discussion 252Tuesday 4:00 pm – 5:00 pmType/Level: Overview

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCGI Advantage captures a wealth of procurementinformation, but are you able to get to that infor-mation when you need it? This panel discussionwill describe the strategies and categories of re-ports and dashboards that are being used by yourCGI Advantage colleagues to assess and improvetheir procurement organizations.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the reporting and dashboard strategies that are being utilized at sample client organizations

• Define the categories of reports and dashboardsthat are produced at the sample organizations

• List the benefits of sharing experiences via theCGI Advantage Artifact Library

HR/P

Getting to Know PAM in CGIAdvantage Human ResourceManagement (HRM) and CGIinfoAdvantage 253Tuesday 4:00 pm – 5:00 pmType/Level: Advanced

CPE Subject Area: Personnel / HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditThis session will provide an overview of PAM witha focus on how to reconcile results that are gener-ated by the process using the standard online inquiries in CGI Advantage HRM and by using CGI infoAdvantage reports and ad hoc queries.Presenters will cover how both CGI AdvantageHRM and CGI infoAdvantage can be used in a collaborative way to reconcile the distribution ofpayroll related details. CGI will demonstrate thenew drill down reporting capabilities now sup-ported by CGI infoAdvantage in release 3.10 during the session.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Use online inquiries to reconcile payroll account-ing management results incorporating baselineCGI infoAdvantage reports and ad hoc inquiries

• Describe the payroll accounting managementprocess

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 22: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

20 CGI Forum 2013 | www.cgi.com/forum2013

The session schedule is subject to change. Check the registration site for the most up-to-date information on session names, times and descriptions. No advance preparation for sessions is required, unless otherwise stated.

B

A Look at Outcome BasedBudgeting 254Tuesday 4:00 pm – 5:00 pmType/Level: Advanced

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditWith the increasing pressure to align spendingwith priorities, many governments are redesigningthe way they build their budgets, and make invest-ment decisions. The new design is an outcome-based budget that helps to aid decision makers inprioritizing dollars that align with the requestedservices. Join us for a discussion on outcomebased budgeting, a look at the functionality withinCGI Advantage Performance Budgeting that canassist in taking this alternate view on budgeting,and hear from clients who are moving towardsthis methodology.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Understand the basic concepts and principles of outcome based budgeting

• Describe system configuration options to support budgeting based on outcomes

• Apply best practices for outcome based budgeting

HR/P

Maximizing Workflow Featuresand Functions in CGI AdvantageHuman Resource Management(HRM)255Tuesday 4:00 pm – 5:00 pmType/Level: Intermediate

CPE Subject Area: Personnel/HR

Duration in hours: 1.0 hourOnsite credits: 1.0 creditTypically CGI Advantage workflow is considered asystem administration function that applies to bothCGI Advantage Financial and CGI Advantage HRM.However, there are aspects to workflow administra-tion that are unique to HRM, like the Supervisorworklist. There are other features like the sendpage document function and setting workflow gen-erated notifications for non-approver and additionalroles that can be utilized in slightly different ways

in HRM. Presenters will discuss the features andhow to implement them and demonstrate essentialworkflow functions from the perspective of a sys-tem end user. This session is not intended to be fo-cused on general workflow configuration training.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe CGI Advantage workflow and identifycomponents unique to CGI Advantage HRM

• Recall concepts discussed which can be utilizedto streamline business processes and eliminatemanual processes

GI

Take the Ugh Out of Upgradingwith CGI Accelerate 257Tuesday 4:00 pm – 5:00 pmType/Level: Intermediate

CPE Subject Area: Specialized Knowledge and Applications

Duration in hours: 1.0 hourOnsite credits: 1.0 creditDo you want to take advantage of recent productimprovements to improve efficiency? Are you concerned with prior release or third party productsupport timeframes? Are you strapped for the timeand resources to take on an upgrade? If thesechallenges are familiar, then attend this session tolearn how CGI Accelerate provides quality, time-saving services and deliverables to implementyour upgrade faster than ever before. The sessionwill provide an in-depth overview of the CGI Accelerate process, detailing how it is used tocompress CGI Advantage upgrade timelines, validate CGI Advantage compatibility releases,and/or assist with new functionality implementa-tions. Clients that have utilized CGI Accelerate willdescribe their experiences. Finally, you will havethe opportunity to discuss available options for developing a strategy that revolves around CGI Accelerate.

Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Describe the CGI Accelerate service• Discuss how CGI Accelerate fits into an overallupgrade plan

• Identify the project phases where clients canachieve savings to reduce time required to golive

• Describe how CGI Accelerate can be used forother situations, such as implementing CGI Advantage archiving functionality

F

Tracking Indirect Costs: UsingCost Allocation, Overhead, andInternal Costing258Tuesday 4:00 pm – 5:00 pmType/Level: Intermediate

CPE Subject Area: Finance

Duration in hours: 1.0 hourOnsite credits: 1.0 creditCharging indirect costs is an important way totrack the full cost of delivering services and tomaximize reimbursements from grantors. CGI Advantage provides a number of methods to capture indirect costs. Learn about the tools in the software that you have and how to apply eachone based on real-life business scenarios from the CGI Advantage community.Learning ObjectivesAfter completing this session the attendee shouldbe able to:• Define indirect costs and why they are importantto track

• Describe the major tools in CGI Advantage forindirect costs, when they apply, and where to go for more information

TUESDAY, OCTOBER 29

B Budget BI Business Intelligence F Financial GI General Interest HR/P HR/Payroll PS Partner Spotlight P Procurement T/A Technical/Admin

Page 23: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 21

NetworkingThe Forum provides outstanding networking opportunities for attendeesto share best practices and build relationships with CGI Advantage usersand experts from across the country.

Keynote speakerWalter BondTuesday Morning Keynote Speaker

Like many young men growing up in Chicago, Walter Bonddreamed of becoming an NBA athlete. Facing injuries andother challenges with unusual determination, he rose from

being a reserve player coming off the bench to become the first rookie Free Agentto start for the Dallas Mavericks. This astonishing journey provides the foundationfor the powerful principles Walter teaches today.

Walter's stories will give you a roadmap that you can follow to reinvent yourselfand rediscover the confidence you need to focus, align and deliver results. Drawing on lessons learned in the trenches both in sales and as an entrepreneur,Walter’s keynote speech will open up new ways of looking not only at businesschallenges but also the world.

ShowcaseThe Showcase is your opportunity to explore all aspects of the CGI Advantage ERP solution, including Financial Management, Procurement, Human ResourceManagement, Performance Budgeting, Case Management, Collections, Permittingand infoAdvantage. Staffed with CGI Advantage subject matter experts, the Showcase is the place to gain in-depth knowledge about the solution and importanttopics, or to ask detailed questions. Once again, we’re offering the ability to schedule one-on-one time with our product experts in the Showcase—providing an opportunity to get answers to your most pressing questions.

The Showcase is also the venue to meet CGI’s valued partners. These best-of-breed solution providers partner with CGI to enhance our ERP solution. Stop by to learn how our partners strengthen our solutions and how your organization canoptimize its ability to get the most out of CGI Advantage.

“The Forum is a one-of-a-kind opportunity to buildconnections through in-person networking withyour peers and CGI experts. The contactsyou make at the Forumbecome invaluable resources that you cango to with questions orto share ideas even afterthe event ends.”

Johnna RogersSteering Committee Chair and

Deputy County ManagerWake County, North Carolina

Showcase Start EndSchedule

Sun., Oct. 27 4:00 pm 7:00 pm

Mon., Oct. 28 9:30 am 12:00 pm

2:30 pm 5:30 pm

Tues., Oct. 29 9:30 am 12:00 pm

2:30 pm 5:00 pm

Collaboration

Page 24: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

22 CGI Forum 2013 | www.cgi.com/forum2013

Peer-to-peer roundtable luncheon Roundtables give participants an opportunity to learn from their peers by sharing expertise and best practices, discussing practical approaches to success in their field and developing strong networks. Participants will find information and ideas totake away with them, and are given an opportunity to discover and resolve common issues. You will have the opportunity tosign-up for your preferred table topic when you register online for the conference.

1.

2.

3.

4.

5.

6.

7.

Budgeting

Budgeting

Budgeting

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

BRASS to CGIAdvantagePerformanceBudgeting Upgrades

Capital BudgetingProcesses inPerformanceBudgeting

Executing Rollover inPerformanceBudgeting

The ESMT Document –For Payroll or HumanResources?

Affordable Care Act –Impact on CGIAdvantage HRM

California PublicEmployee’s PensionReform Act

Pension Reform

Join other BRASS users and CGI members to discussthe topic of upgrading from BRASS to PerformanceBudgeting. We’ll focus the discussion around the up-grade path and any challenges you face to upgrading.We’ll also discuss the benefits and new functionality thatCGI Advantage Performance Budgeting provides compared to BRASS.

Discuss how to handle budgeting for capital projects, in-cluding the budget forms setup to capture capital projectcosts, what data and information is being collected, andthe approval and ranking process followed.

Join to discuss how you run your end-of-year processeswithin Performance Budgeting and hear about what othersites are doing to prepare for the coming budget year.

Discuss how sites manage the submission and approvalof the ESMT document. Depending on what type ofchange a system user makes, the impact of updating anemployee’s profile could have either human resource orpayroll related consequences. We’ll focus on how sitescurrently manage the document and access to the information that is updated in the Employee Profile Management activity folder.

How is your site managing the provisions of the Afford-able Care Act? We’ll focus on how sites currently managethe provisions, the impacts on CGI Advantage HRM, andexternal business processes.

Intended for CGI Advantage HRM sites that operate inthe State of California. We’ll focus on how sites are man-aging the provisions of the California Public Employees'Pension Reform Act of 2013 (PEPRA) legislation, impactson CGI Advantage HRM, and business processes thattake place external from the system.

Intended for CGI Advantage HRM sites in states otherthan California experiencing pension reform legislationchanges. We’ll focus on how sites are currently managingnew legislation, impacts on CGI Advantage HRM, andbusiness processes that take place external from theirsystems.

# Topic Area Topic Topic Description

Page 25: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 23

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

HumanResourceManagement

Procurement

Procurement

Procurement

Procurement

CGI Advantage HRMfor School Districts

CGI Advantage HRMfor Cities

CGI Advantage HRMfor Counties

Family and MedicalLeave Act (FMLA)Tracking

Managing theTransition to the NewEmployee Self Service

How to Leverage CGIAdvantage CaseManagement toEnhance your HRProcesses

ConductingSolicitations in VendorSelf Service

The Mobile World ofProcurement andInventory

E-invoicing

The ShoppingExperience

Meet other attendees from CGI Advantage HRM schooldistrict sites. We’ll focus on networking and discussion of topics that specifically impact the operation of schooldistricts.

Meet other attendees from CGI Advantage HRM city gov-ernment sites. We’ll focus on networking and discussionof topics that specifically impact the operation of citygovernments.

Meet other attendees from CGI Advantage HRM countygovernment sites. We’ll focus on networking and discus-sion of topics that specifically impact the operation ofcounty governments.

How does your site currently manage the provisions ofFMLA? Discuss methods for tracking the leave using CGI Advantage HRM and supporting external systems or processes.

Is your site currently using the pre 3.10 versions of Employee Self Service (ESS) and considering an upgradeto the new 3.10 release? The refresh of the ESS user interface is considerable. We’ll discuss how to prepareorganizations for the transition.

CGI Advantage Case Management is a new componentof the CGI Advantage ERP suite. Learn the ways you can leverage Case Management to enhance your HRprocesses. We’ll focus on employee relations processeslike incidents and grievances and others functions likedecentralizing personnel actions.

Discuss the successes and challenges you have had inusing Vendor Self Service (VSS) for online solicitationposting and responses.

Share your thoughts regarding procurement and inven-tory functions that you feel should be enabled in the mobile world.

Discuss your current approach to invoice processing andfuture consideration for various forms of e-invoicing.

Share your thoughts on the 3.9 and 3.10 user interfacechanges that continue to streamline the CGI Advantageshopping experience and any suggestions for future improvements.

# Topic Area Topic Topic Description

Page 26: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

24 CGI Forum 2013 | www.cgi.com/forum2013

Peer-to-peer roundtable luncheon

18.

19.

20.

21.

22.

23.

24.

25.

Procurement

FinancialManagement

FinancialManagement

FinancialManagement

FinancialManagement

FinancialManagement

FinancialManagement

Technical/Administration

How to Leverage CGIAdvantage CaseManagement toEnhance yourProcurementProcesses

Trends in AccountsPayable andDisbursements

Department ofTransportationImplementations

Collections andAccounts Receivable

Cashiering andCustomer Self Service

Cost Allocation

Comprehensive AnnualFinancial Report(CAFR) Reporting

Disaster Recovery

Are you familiar with Case Management, the newest addition to the CGI Advantage offering? Learn the waysyou can leverage CGI Advantage Case Management toenhance your procurement processes. We’ll focus onprocesses like solicitation, evaluation and contracting aswell as features to enhance collaboration, versioning andapproval of document attachments.

The use of electronic funds transfer (EFT) and e-payablescontinues to grow. Join to discuss ways of increasing thepercentage of disbursements that are paid via EFT and e-payables.

Intended for state-level Departments of Transportation(DOT). Join to discuss DOT-specific areas of interest suchas project accounting and FHWA billing.

Discuss how users of CGI Advantage are managing pastdue receivables and how they interact with external col-lection agencies. Ideas and options for developing morerobust collections capabilities in CGI Advantage will bediscussed.

Intended to allow participants to discuss various customerpayment methods from receiving cash over-the-counterto web payments. Join to provide input to allow CGI to determine if there is an appetite for a more robust customer self service solution--allowing customers to payinvoices over the web. Related topics include: PaymentCard Industry (PCI) compliance and the potential need forintegration with point-of-sale (POS) solutions.

Learn more about fixed percentage, statistical and directfinancial cost allocation methods, and when and wherethey are used.

Hear the various approaches to CAFR reporting and howthe new CAFR Reporting module may now be used tocreate many of the required CAFR statements.

Discuss the types of disaster recovery solutions availabledepending on your recovery point objectives and recov-ery time objectives. Also discuss planning for a disasterrecovery site, periodic disaster recovery, and the licenseimplications of implementing different types of disasterrecovery.

# Topic Area Topic Topic Description

Page 27: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 25

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

Technical/Administration

Technical/Administration

Technical/Administration

Technical/Administration

BusinessIntelligence

BusinessIntelligence

BusinessIntelligence

BusinessIntelligence

BusinessIntelligence

BusinessIntelligence

Advanced TechnologyTopics

Enterprise ContentManagement (ECM)

Security

Archiving

Business Intelligenceand MicrosoftIntegration

Use of Dashboards

Business ObjectsReporting

Leveraging Warehousevs. AlternateApproaches

Business Intelligenceat your Fingertips –Mobility

Combining CGIAdvantage and Non-CGI AdvantageReporting Information

Join for a general discussion of advanced technologytopics related to CGI Advantage ERP. Topics may include:CGI’s mobility strategy, our new integration strategy withABI 3.10 and beyond, browser support, new technologyfeatures in release 3.10, and our plans for new technol-ogy features in release 3.11.

Experiencing information overload? Trying to match your paper/microfilm archive to your iPhone/Facebookcitizen’s expectations? Join this group to discuss ECM in the digital decade.

Discuss a variety of CGI Advantage security topics withyour peers.

Are you considering options for archiving large amountsof historical data? Come share your strategies for manag-ing long-term database growth.

Discuss all topics related to infoAdvantage with particularfocus on business intelligence integration with Microsoftsolutions (Office, SharePoint, etc.).

Discuss all topics related to infoAdvantage with particularfocus on dashboard development best practices andconsideration for deployment of dashboards.

We’ll focus on new CGI Enterprise Intelligence360 components, mobility, peer discussion on lessonslearned and best practices with infoAdvantage, and moving to enterprise wide business intelligence solutions.

Discuss the pros and cons of using a warehouse vs. alternate approaches. Discuss how to educate the usercommunity depending on the selected approach.

Learn about adoption of business intelligence deliveredthrough mobile solutions and approaches that sites areconsidering or have taken to move a mobile initiative forward.

Discover how sites currently manage leveraging CGI Advantage data with non-CGI Advantage data to produce reports, dashboards and other reporting information required by users.

# Topic Area Topic Topic Description

Page 28: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

26 CGI Forum 2013 | www.cgi.com/forum2013

Peer-to-peer roundtable luncheon

36.

37.

38.

39.

40.

41.

42.

General Interest

General Interest

General Interest

General Interest

General Interest

General Interest

General Interest

Mobile Computing

CGI AdvantageManaged Services

Upgrades

Using ChangeManagement toStructure Transition

End User Training

Leveraging CGIAdvantage Collectionsto Achieve HigherRevenues

Driving Revenuethrough PermittingAutomation

Mobile computing is changing the way we do business.Discuss mobile computing applications for CGI Advantage.

Explore Managed Advantage options with peers who areusing this delivery method. Join if you are interested inCGI’s custom maintenance and/or hosting services tosee if any are a fit for your organization.

What determines when an upgrade is needed? What can you expect when you upgrade? Share your upgradeexperiences and ask your upgrade questions.

Discuss scope, approach, and impact of change management best practices during CGI Advantage implementations.

Discuss your organization’s training needs and hear how other sites have successfully utilized CGI’s trainingprogram.

CGI Advantage Collections is the solution module calledupon by clients who need a strong collections solution.This solution has proven to increase collections by 10-45%. Discuss collection capabilities, funding options,and implementation options.

Increase your revenue opportunities through automationof your permitting and licensing processes. CGI will leada conversation on how CGI Advantage clients can pro-vide better service to citizens and businesses as well asincrease revenue potential through use of advanced permitting and licensing tools.

# Topic Area Topic Topic Description

Page 29: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 27

CommunityPast attendeesAttendees identify networking as their number one reason for attending the Forum year over year. Be a part of the CGI Advantage community! Join the list of organizations from across the country that have participated in past Forums.

Aldine Independent School District(TX)

Anne Arundel County PublicSchools (MD)

Baltimore County (MD)

Baltimore County Public Schools(MD)

California Department of Transportation (CA)

City and County of Honolulu (HI)

City of Anaheim (CA)

City of Cleveland (OH)

City of Dallas (TX)

City of Gainesville (FL)

City of Garland (TX)

City of Mesa (AZ)

City of Midland (TX)

City of New York (NY)

City of Norfolk (VA)

City of Roanoke (VA)

City of Rockville (MD)

City of Springfield (IL)

City of Tucson (AZ)

Cobb County (GA)

Colorado Division of Wildlife (CO)

Columbus Consolidated Gov't. (GA)

Commonwealth of Kentucky (KY)

Commonwealth of Massachusetts(MA)

County of Maricopa (CA)

Denver International Airport (CO)

Fulton County (GA)

Idaho Transportation Department(ID)

Lane County (OR)

Los Angeles County (CA)

Mecklenburg County (NC)

Monterey County (CA)

Oakland Intermediate School District (MI)

Ocean County (NJ)

Olmsted County (MN)

Orange County (CA)

Palm Beach County (FL)

Pima County (AZ)

Prince William County PublicSchools (VA)

San Diego County (CA)

School District of Philadelphia (PA)

Southwest Florida Water Mgmt. District (FL)

State of Alaska (AK)

State of Colorado (CO)

State of Iowa (IA)

State of Maine (ME)

State of Utah (UT)

State of West Virginia (WV)

Tulare County (CA)

Ventura County (CA)

Wake County (NC)

Westchester County (NY)

Page 30: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

28 CGI Forum 2013 | www.cgi.com/forum2013

Community

Special eventsSunday, October 27 – Showcase ReceptionDon't miss the opportunity to chat with Showcase partner vendors and CGI productexperts. Get started on learning more about CGI Advantage and partner productsand find the answers you've been looking for in this relaxed kick-off to CGI Forum2013.

Sunday, October 27 – Food & Wine Festival Welcome Reception Join CGI and your fellow attendees for a welcome reception outside on the HarborPiazza. Enjoy an array of authentic Italian and European fare while reconnecting with industry colleagues.

Monday, October 28 – Peer-To-Peer Roundtable LuncheonRoundtables give attendees an opportunity to learn from their peers by sharing expertise and discussing practical approaches to success in their field—all while developing stronger networks. Table leads will be on hand to spark conversation.The table topics can be found on page 22 of this brochure. You will have the opportunity to sign-up for your preferred table topic when you register online for the conference.

Monday, October 28 – The Wizarding World of Harry Potter™& The Lost Continent® ReceptionGet ready for an unforgettable celebration at Universal’s Islands of Adventure®

theme park. We’ve reserved The Wizarding World of Harry Potter™ just for you! Allnight long, you’ll enjoy unlimited access to incredible rides and attractions includingthe Dragon Challenge™ coasters and the groundbreaking Harry Potter and the Forbidden Journey™. Plus, you can relax and enjoy a reception in the nearby landThe Lost Continent®. It’s an entire evening of thrills and excitement—and it’s all yours!

Tuesday, October 29 – CGI Advantage Users’ Group Business LuncheonEnjoy lunch while networking with your fellow user community members and listening to remarks and important updates by your Users’ Group Steering Committee.

SponsorsCGI welcomes our partners to join us insponsoring CGI Forum2013. For information onPlatinum, Gold or Silversponsorship opportuni-ties, please contact Sami Boudriga [email protected].

HARRY POTTER, characters, names and related indicia are trademarks of and © Warner Bros. Entertainment Inc. Harry Potter Publishing Rights © JKR.

(s13)

Universal elements and all related indicia TM & © 2013 Universal Studios. © 2013 Universal Orlando. All rights reserved.

Page 31: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

CGI Forum 2013 | www.cgi.com/forum2013 29

Plan to attendRegistrationCGI provides all CGI Advantage sites with one complimentary registration. Redemp-tion details will be sent to your site’s primary contact. Additional registrations areavailable at the fees listed below. Registration includes complimentary conference re-ceptions and scheduled meals.

Early Bird Registration (on or before August 30) $895Late Registration (after August 30) $1,095

For conference inquiries contact:

Michelle RivesCGI Event Manager11325 Random Hills RoadFairfax, Virginia [email protected]

Remember the early birddiscount expires after August 30. Register earlyto save $200 and secureyour spot.

TransportationThe Loews Portofino Bay Hotel is located14 miles from Orlando International Airport (MCO). Total transportation timeto the hotel is about 15–20 minutes depending on traffic and time of day.There are several options for groundtransportation listed below.**

Shared ride shuttleMears Motor Shuttle operates a non-exclusive, shared ride van shuttle fromeach of the terminals. Tickets can bepurchased at any of the Mears boothsconveniently located on Level 1 in eachterminal or online. The shuttle departsthroughout the day and evening every

30–40 minutes from Level 1 at OrlandoInternational Airport. Reservations arerequired for your return to the airport.

The cost is $30.00 round-trip for adults.Download the Forum Conferencecoupon from our website athttp://www.cgi.com/en/Forum2013/hotel-transportation and save $4.00.

Taxi cabsTaxis are available on both the A and Bsides of the Main Terminal, on theGround Transportation Level (Level 1)at the airport. Taxis are approximately$40–$60 each way. Cash and creditcard payments are accepted.

Rental carsOrlando is the largest rental car marketin the world, with most of the major carrental companies located on-airport.The rental car companies are located in Terminal A and Terminal B on theGround Transportation Level (Level 1).

Hotel parking• Self-Parking Overnight: $18.00 (subjects to change without notice)

• Valet Parking Overnight: $25.00 (subject to change without notice)

**Transportation rates are estimated and aresubject to change

Hotel informationA block of rooms has been set aside at the Loews Portofino Bay Hotel at UniversalOrlando®.

5601 Universal Blvd., Orlando, Florida 32819Phone: (407) 503-1000 Fax: (407) 503-1010

Room Rate: $185 USD per night (single/double occupancy) + tax

Hotel Cut-off Date: Friday, October 4, 2013*

There are two ways to make a reservation:

1. Contact hotel reservations at 1-866-360-7395 and reference “CGI Forum 2013”

2. Visit the CGI Forum 2013 reservations website athttp://www.loewshotels.com/en/Portofino-BayHotel/GroupPages/CGIForum2013

* Please note: Once the room block is filled or the hotel reservation cut-off date has passed, rooms willbe reserved on a space-available basis and may be subject to higher rates.

Page 32: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

3030

MY MONDAY SESSIONS

9:45 am – 10:45 am Sessions

1st Choice # Title

2nd Choice # Title

11:00 am – 12:00 pm Sessions

1st Choice # Title

2nd Choice # Title

12:00 pm – 1:30 pm Topic

Peer-to-peer lunch topic # 1

Peer-to-peer lunch topic # 2

Peer-to-peer lunch topic # 3

1:30 pm – 2:30 pm Sessions

1st Choice # Title

2nd Choice # Title

2:45 pm – 3:45 pm Sessions

1st Choice # Title

2nd Choice # Title

4:15 pm – 5:30 pm Sessions

1st Choice # Title

2nd Choice # Title

MY TUESDAY SESSIONS

9:45 am – 10:45 am Sessions

1st Choice # Title

2nd Choice # Title

11:00 am – 12:00 pm Sessions

1st Choice # Title

2nd Choice # Title

1:30 pm – 2:30 pm Sessions

1st Choice # Title

2nd Choice # Title

2:45 pm – 3:45 pm Sessions

1st Choice # Title

2nd Choice # Title

4:00 pm – 5:00 pm Sessions

1st Choice # Title

2nd Choice # Title

Visit www.cgi.com/forum2013 for additional event details and to register for CGI Forum 2013.

Use this worksheet to plan your session schedule and then go online towww.cgi.com/forum2013 to complete your registration for CGI Forum 2013.

for the CGI Advantage community

Build your schedule

Page 33: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

3131CGI Forum 2013 | www.cgi.com/forum2013

We thank the following sponsors for their support of CGI Forum 2013.

PLATINUM

SILVER

Computerized Facility Integration, L.L.C.

GOLD

Page 34: October 27 – 29 - CGI · opportunity to network, discuss solutions and best practices and build relationships across the industry. Best of all, each CGI Advantage client site receives

32 CGI Forum 2013 | www.cgi.com/forum2013

CGI Forum 2013 content is copyright ©2013 by CGI Group Inc. The CGI logo and CGI Advantage are trademarks ofCGI Group Inc. All rights reserved.

11325 Random Hills RoadFairfax, VA 22030

www.cgi.com/forum2013

About CGI

Founded in 1976, CGI Group Inc.is one of the largest independentinformation technology and businessprocess services firms in the world.CGI provides end-to-end services withapproximately 69,000 professionalslocated in offices and centers ofexcellence in the United States,Canada, Europe and Asia Pacific.