European Single Sky ImPlementation (ESSIP) Plan - Edition 2014
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.
-
Upload
amelia-rankin -
Category
Documents
-
view
212 -
download
0
Transcript of Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.
![Page 1: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/1.jpg)
Objective FCM01
ESSIP Plan 2013
Octavian CIOARADSS/EIPR
13.09.2013
![Page 2: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/2.jpg)
ESSIP Plan 2013 / Objective FCM01 2
Objective FCM01
• Comprehensive Explanation• What is new or has changed since LSSIP 2012• Link to European ATM Master Plan• Most important SLoA(s)• Finalisation Criteria and Closed Questions• ESSIP Report 2012• Objective Coordinator’s Analysis, recommendations, tips & tricks• Conclusions• Links and contacts
![Page 3: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/3.jpg)
Comprehensive Explanation
ESSIP Plan 2013 / Overview LSSIP 2012 3
This Pan-European objective aims at enhancing tactical flow management services through the introduction of real-time aircraft position and meteorological data to optimise Air Traffic Flow and Capacity Management (ATFCM).
Area of applicability: All ECAC States
Initial Operational Capability (IOC): 08/2001Full Operational Capability (FOC): 12/2006
![Page 4: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/4.jpg)
What is new or has changed since LSSIP 2012
ESSIP Plan 2013 / Overview LSSIP 2012 4
Due to its relationship with the EUR ATM MP, the type of the objective has changed from ECIP to SESAR
![Page 5: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/5.jpg)
Link to European ATM Master Plan
ESSIP Plan 2013 / Overview LSSIP 2012 5
OI Step [IS-0102] – Improved Management of Flight Plan after Departure
![Page 6: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/6.jpg)
Most important SLoA(s)
ESSIP Plan 2013 / Overview LSSIP 2012 6
ASP01 Supply ETFMS with Basic Correlated Position Data
ASP02 Supply ETFMS with Standard Correlated Position Data
ASP03 Receive and process ATFM data from the CFMU
ASP04 Inform CFMU of flight activations and estimates for ATFM purposes
Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Flight Progress Messages document
![Page 7: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/7.jpg)
Finalisation Criteria and Closed Questions
ESSIP Plan 2013 / Overview LSSIP 2012 7
Reception by CFMU of CPRs (in ASTERIX Category 062 format)
ATFM messages received from the CFMU are: • automatically correlated to the ATC Flight Plan data
• presented to the Air Traffic Controllers
Reception by CFMU of the FSA messages
No closed questions available
![Page 8: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/8.jpg)
ESSIP Report 2012
ESSIP Plan 2013 / Overview LSSIP 2012 8
Objective late, but with a good level of implementation of the priority SLoAs.
The States yet to implement the priority SLoAs of this objective have shown a sound commitment to do so.
However, the likelihood of implementing all SLoAs still remains very low.
The main reason for delaying the implementation is of a technical nature and lack of operational justification. Implementation is mostly linked to the deployment of new systems or to major upgrades of existing ones, therefore the stand alone implementation of the objective was not considered beneficial.
Sometimes the objective is perceived as not being operationally justified at local level. However the implementation decisions shall also take into account the network benefits.
![Page 9: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/9.jpg)
Objective Coordinator’s Analysis, recommendations, tips & tricks
ESSIP Plan 2013 / Overview LSSIP 2012 9
Implement the most important SLoA(s)• ASP01
• ASP02
• ASP03
• ASP04
When reporting, be more specific on what has been completed and the prospects for the rest of the SLoAs.
Ensure that there is an effective link with the NMD and the information on the implementation originates from a ODSG member.
![Page 10: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/10.jpg)
Conclusions
ESSIP Plan 2013 / Overview LSSIP 2012 10
The implementation of this objective has a positive impact on:• The reduction of wasted capacity;
• The reduction of delays
• The reduction of unexpected overload situations
Note that the delivery to the NM of Correlated Position Reports containing the SSR transponder code assignments for GAT/IFR is an obligation on the Air Navigation Service Providers, under the NM IR (Commission Regulation (EU) No 677/2011)
![Page 11: Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.](https://reader036.fdocuments.in/reader036/viewer/2022082917/55154e595503465e608b65c3/html5/thumbnails/11.jpg)
Links and contacts
ESSIP Plan 2013 / Overview LSSIP 2012 11
Objective Coordinator: Octavian Cioara +32 2 729 3282
NMD Objective Expert: J. Koolen +32 2 729 9876