Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013

description

Objective ATC 02.7. ESSIP Plan 2013. Ingrid FEIJT DSS/EIPR 13.09.2013. Comprehensive Explanation (1/2). Implementation of Approach Path Monitoring (APM) functions. Can be considered as an extension of MSAW (alert to a/c proximity to terrain or obstacle) in the final approach. - PowerPoint PPT Presentation

Transcript of Objective ATC 02.7

Page 1: Objective ATC 02.7

Objective ATC 02.7

ESSIP Plan 2013

Ingrid FEIJTDSS/EIPR

13.09.2013

Page 2: Objective ATC 02.7

ESSIP Plan 2013 / Objective ATC 02.7 2

Comprehensive Explanation (1/2)

Implementation of Approach Path Monitoring (APM) functions.

Can be considered as an extension of MSAW (alert to a/c proximity to terrain or obstacle) in the final approach.

ECAC applicability (except Georgia, Greece and Slovak Republic).

Depending on airspace organisation, it might include a lower portion of TMAs and CTR. This objective is not applicable to the en-route airspace.

Military applicability: Military ANSPs that provide radar service to GAT traffic.

Page 3: Objective ATC 02.7

Comprehensive Explanation (2/2)

APM checks the extrapolated track positions (based on Surveillance data-current track position performing a linear extrapolation using detected ground speed and rate of climb/descent), applying QHN correction and identifies the predicted or actual conflicts against the terrain during the final approach.

Terrain can be build up using digital terrain data or set of polygons that sufficiently accurate shape the vertical environment.

FP data is not used. APM requires an appropriate presentation of predicted / actual

conflicts to the tactical controllers and ATC supervisor. APM requires careful optimalisation / tuning to minimise false

alarms.

ESSIP Plan 2013 / Objective ATC 02.7 3

Page 4: Objective ATC 02.7

What is new or has changed for ESSIP Plan edition 2013

Removal of Georgia, Greece and Slovak Republic from the applicability list.

ESSIP Plan 2013 / Objective ATC 02.7 4

Page 5: Objective ATC 02.7

Link to European ATM Master Plan

[CM-0801] – Ground Based Safety Nets (TMA, En Route)

ESSIP Plan 2013 / Objective ATC 02.7 5

Page 6: Objective ATC 02.7

Most important SLoA(s)

ASP01 “Implement the APM function. Put into service ground-based safety tool systems and associated procedures supporting the APM function.” ASP to check the compliance of the implemented APM with the

requirements stated in the specification, the related guidance material and the relevant training and safety requirements.

ESSIP Plan 2013 / Objective ATC 02.7 6

Page 7: Objective ATC 02.7

Finalisation Criteria

Ensure that Ground systems have been upgraded to support the APM function.

Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).

Ensure that the APM function is in operational use.

Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of APM functions.

ESSIP Plan 2013 / Objective ATC 02.7 7

Page 8: Objective ATC 02.7

Supporting Material

The EUROCONTROL specification for APM issued in May 2009 (edition 0.9) which is still a draft.

The EUROCONTROL Guidance Material for APM issued in May 2009, Edition 1.0

This if for guidance only, and is not compulsory.

ESSIP Plan 2013 / Objective ATC 02.7 8

Page 9: Objective ATC 02.7

ESSIP Report 2012

The progress implementation is stagnant, compared to 2011.

Majority of the States declared to have plans for implementation by end 2013.

Achieving ATM MP (IP1) in time could be jeopardised.

ESSIP Plan 2013 / Objective ATC 02.7 9

Page 10: Objective ATC 02.7

Contacts

Objective Coordinator:

FEIJT, Ingrid +32 2 729 5044

[email protected]

DNM Objective Expert(s):

BAKKER, Ben +32 2 729 3149

[email protected]

DROZDOWSKI, Stanislaw +32 2 729 3760

[email protected]

ESSIP Plan 2013 / Objective ATC 02.7 10