OAL Optimization Proposal Technical Sep 2014

16
8/12/2019 OAL Optimization Proposal Technical Sep 2014 http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 1/16

Transcript of OAL Optimization Proposal Technical Sep 2014

Page 1: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 1/16

Page 2: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 2/16

ICT sector has evolved over the year and has presented manychallenges to the operators, manufactures and users.The change is driven by desire to improve service offeringand value addition to the existing products in order to remaincompetitive and relevant.Oriolec Africa LTD has recognized the need to offer servicesthat are in sync with the changing technological and serviceenvironment.To this end, Oriolec Africa LTD has undertaken a deliberateeffort to develop capacity in areas that focus on new servicesand value addition on its existing service portfolio.

OAL

Page 3: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 3/16

Page 4: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 4/16

Page 5: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 5/16

Summary of Activities:Soft TRX Upgrade Done for Platinum Cluster (Nairobi) cells

There was improvement on TCH Blocking Rate in the cluster .There was also improvement in HR Utilization in the cluster where softupgrade was implemented.Significant reduction in the count of cells outside Baseline in all CapacityKPIs.

Upgrade /Optimization done on Top Worst Blocking cells in the PlatinumCluster

Blocking cleared for all re-current out of baseline Nairobi cells. Newcapacity sites requirement were identified and recommended in areaswhere existing site were already fully upgraded.

New Parameter Feature Trial – Dual Threshold Dynamic PDCH Parameter Feature trialed andImplemented in All Nairobi BSC’s.The BSC’s have shown improvement in TCH Blocking while maintaininggood PS performance.

2G SUMMARY

OAL

Page 6: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 6/16

Summary of Activities:

Split cellsSplit cells have been implemented with several capacity gains beingrealized.Both CS/PS traffic has increased for the split cells.All split cells parameters standardized ( matched with mother cell).Neighbor optimization has been in progress and has show improvementin both CS and PS drops optimization.3G-2G neighbor optimization completed for the clusterCongestion reduced(power and code).Performance monitoring and acceptance ongoing.

BBU swapBBU swaps carried out to redistribute lower version BBUs to areas withlow utilization and higher version BBUs to areas with high utilization.Performance monitoring and acceptance ongoing.

3G SUMMARY

OAL

Page 7: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 7/16

Network performance managementOur team has a technical capacity to handle :-◦

Network retainability◦ Call quality for both 2G and 3G.◦ KPI monitoring and analysis.

Network Planning and optimizationIntroduction of new sites both micro and macro have an

impact on the overall network performance, Our team in hasthe capacity to undertake nominal planning, frequencyplanning and optimization for new and existing site.

G planning and optimizationIntroduction of 3G and LTE has brought about a skill challengeamong the upcoming engineers due to limited training.

The team is trained and has acquired experience locally andinternationally and capable of handling 3G optimization aswell as LTE.

The team is among the pioneers of introduction of 3G in

Kenya and east Africa. OAL

Page 8: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 8/16

Resource offering

Oriolec Africa LTD offer human resources to operators tocomplement the existing team.Deals with short term resource deficiency and knowledge transfer.

Cluster optimization

This approach assigns a group of sites in the same geographical areato Oriolec Africa LTD with a view to undertake optimization.It gives ownership and accountability to the service provider, in thiscase Oriolec Africa LTD.

Turnkey network managementThis approach give the operator time to focus on strategic issues ofthe business while allowing the services providers to plan ,implement and maintain the network.

The full scope covers :- Planning, implementation, optimization ,and performance management. OAL

Page 9: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 9/16

Based on our experience and success of thecurrent and previous projects we would like topropose the following:-

Oriolec Africa LTD to allocate resources tooperator to clear back log of the capacityplans.

The operator allocates a trial cluster to Oriolec

Africa LTD to Optimize with set KPI targetsand time lines.

Oriolec Africa LTD has capacity to handle 2Gor 3G clusters optimization.

OAL

Page 10: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 10/16

Our proposal offers the following benefits:-Improved network quality at a reasonable cost.End to end monitoring of KPIs for the clusterKPI ownership and accountabilityOptimization process efficiency.Resource utilization efficiencyTraining cost reduction

One stop shop solution for all network challengesClient has time to concentrate on businessplanning and technology evolution strategies

OAL

Page 11: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 11/16

Capacity management for a local operator.Initial site verification for the operatorsCoverage verification – pre- election coverageverification.In building design◦ Local Stadium◦ High-rise Buildings – more than 15 floors◦ Government Buildings◦ Cinema Halls/Auditoriums.

Note: Scope included walk-test, in-buildingdesign, implementation, post implementationanalysis.

Projects handled

OAL

Page 12: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 12/16

NAME Qualifications Specialization Andrew Koech 7 Years

BSC-ITPlanning and

Optimization Engineer

RF Planning GSM, UMTS Optimization GSM, UMTS networks

Drive testing and analysis IBS- In Building solutions NSN Multi Radio, Flexi Edge, Gemini (RG10) Siemens BR9 Huawei M2000 (GBS9) Actix, Map Info, Atoll, Tems Investigation, NemoAlcatel Lucent (OMCR,NPO) Transmission planning (LOS) using pathloss

Dennis Khakame 6 years

BSC-ElectricalPlanning andOptimization Engineer

Transmission planning (LOS) using pathloss RF Planning GSM, UMTS Optimization GSM, UMTS networks IBS- In Building solutions Drive testing and analysis Project Management Huawei M2000 (GBS9), Netact Actix, Map Info, Atoll, Tems Investigation, Nemo, Genex Nastar

Alphonce Mwathani8 years

BSC-ElectricalPlanning andOptimization Engineer

RF Planning GSM, UMTS Optimization GSM, UMTS networks Drive testing and analysis IBS- In Building solutions NSN Multi Radio, Flexi Edge Siemens BR9 Huawei M2000 (GBS9)

Actix, Map Info, Atoll, Tems Investigation, NemoTransmission planning (LOS) using pathloss

Key resources

OAL

Page 13: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 13/16

NAME Qualifications Specialization Benedict Sakari6 years

BSC-ElectricalPlanning and Optimization

Engineer

RF Planning GSM, UMTS Optimization GSM, UMTS networks

Drive testing and analysis NSN Multi Radio, Flexi Edge, Gemini (RG10) Siemens BR9 Huawei M2000 (GBS12) Actix, Map Info, Atoll, Tems Investigation, NemoAlcatel Lucent (OMCR,NPO Transmission planning (LOS) using pathloss

Teddy Otieno 7 years

BTECH -TelecommunicationEngineeringPlanning and OptimizationEngineer

RNO Project Management 2G & 3G Radio Network planning & Optimization 3G Parameter tuning and performance monitoring Node B installation acceptance, SSV and testing IUbfor full performance. 3G parameter standardization

LTE Cell planning Caleb Wekesa 5 years

BSC-Electrical Drive testing and analysis Optimization 2G and umtsNominal planning BTS Installation and commissioning Transmission planning LOS using pathloss Power Maintenance, Heavy duty Generator

maintenance OAL

Page 14: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 14/16

Page 15: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 15/16

Page 16: OAL Optimization Proposal Technical Sep 2014

8/12/2019 OAL Optimization Proposal Technical Sep 2014

http://slidepdf.com/reader/full/oal-optimization-proposal-technical-sep-2014 16/16

TH NK YOU

OAL