Page 1: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

1

Els Pauwels

NuReDrain: Nutrient Removal and Recovery from Drainage Water

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Page 2: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

NuReDrain

2

• Nutrient Removal and Recovery from Drainage water

Interreg project North Sea Region

– NSR = intensive farming area

– Nutrient (N + P) input from land to rivers, lakes, coastal zones

– Eutrophication: less oxygen, less water quality, less aquatic biodiversity, toxins

– Affects drinking water production

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Page 3: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• Actively remove N and P in agricultural (waste)waters

Adsorption on filters

- Drainage discharges (low N and P, discontinuous)

- Greenhouse effluent (high N and P, small volume)

- Surface water (low N and P, big volume)

Project goals

Page 4: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• Actively remove N and P in agricultural (waste)waters

• Recover P from filter materials and reuse it as fertilizer

Project goals

Page 5: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• Actively remove N and P in agricultural (waste)waters

• Recover P from filter materials and reuse it as fertilizer

• Advise to growers to lead to a better quality of surface water

• Measure the impact in 2 catchment areas in the NSR

• Provide implementation guidelines for the NSR

1/03/2017 – 30/09/2020 (= 42 months)

Project goals

Page 6: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Universities and research stations

6© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

• Production filtermaterial (DiaPure (P) and Zero valent iron (N))

• Modelling: impact filtersystems on ecosystem

• N and P-removal: lamel-filter (sediment + P) + cocoschips

• Database characteristics available P-filter materials• MBBR: N-removal• ICS: P-removal

• N-removal: follow up filter techniques drainage discharges in open field

• Production filter materials • Study of available filter materials

Page 7: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Practical research in agri- and horticulture

7© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

• Fieldtrials: open field and container

• Field demonstrations Dümmer-lake• P-filtersystems for drainage water of agriculture

=> Vulgarisation of knowledge to agri-and horticulture

• Filterinstallations (N en P- removal)

• Fieldtrials: azalea and nursery stock

Page 8: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Drinking water companies

8© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

• Drink water production De Blankaart (West-Flanders).

• Testing 3 filters with as filtermaterial: ICS and Vito A and Vito B

• Oldenburgische-Ostfriesische Wasserverband

• Drinkwaterproduction Nedersaksen

• Field demonstrations on the river Lethe

Page 9: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Selection of filtermaterials

Identification of suitable filter materials and filter configurations for the removal of P @ 3 concentration levels

High nutrient loaded waste streams: 25 mg PO4-P/L and - KU Leuven

Low nutrient loaded waste streams: 0.5 mg PO4-P/L - UGent

Medium nutrient loaded waste streams and discontinuous flows 5 mg PO4-P/L - VITO

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 9

Page 10: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Selection of filtermaterials

10© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Adsorption capacity, price, availability, desorption-characteristics

Screening/selection of 11 filter materials → 4

FerroSorb Redmedite ICS LiDonit BaseLith Vito sorbent A

DiaPure Phoslock

Page 11: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• PO4-P solution: 0.5 ppm P

• Bed height: 14 cm corresponds with a bed volume of 150 mL

• Temperature: 20 °C, Flow rate: 0.66 L/24 h

• Downscale industrial filter application handling 4.4 m3 of water per day and per m3

filter material = slow filtration rate

• Materials: ICS, Diapure, Redmedite, BaseLith, LiDonit, Vito A, Vito B, LDH, FerroSorp

P-removal – column tests

Page 12: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• 0.5 ppm P: Breakthrough curves Breakthrough point is reached

Influent P concentratie

Effluent P concentratie

P-removal – column tests

Page 13: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

40% N- removal

60% N-removal

N-removal from run off water (Denmark)

Field demonstrations: drainage water - DK

Page 14: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal from drainage water (Denmark)

50% P- removal

Field demonstrations: drainage water - DK

Page 15: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal from drainage water (Belgium)

90% P- removal

Field demonstrations: drainage water - BE

Page 16: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Collector

16

Percolation reed bed (30 m²)

Storage pond (120 m³)Root zone reed bed (55

m²)

Time switches Flow meters

P filters (ICS) P filters (pellet) Disposal of filtered water (analysis)© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Field demonstrations: greenhouse effluent- BE

OR

Page 17: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

N-removal at PCS – Constructed wetland

17© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

40% N- removal

Page 18: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

N-removal at PCS – MBBR (KUL)

18© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Page 19: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal at PCS – ICS grains and pellets

19© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

Pellets

ICS grains

95% P- removal

Page 20: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal at PCS – ICS grains and pellets

20© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

0.0

5.0

10.0

15.0

20.0

25.0

Storage pondICS granulesPelletsP

(m

g/l

)

Page 21: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal at floristry Meuninck

21© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

90% P- removal

Page 22: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

NuReDrain Video: www.pcsierteelt.be

N en P-removal from greenhouse effluent (Belgium)

Field demonstrations: greenhouse effluent- BE

Page 23: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal from buffer basin for drinking water production (Belgium)

Field demonstrations: drinking water production BE

Page 24: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-removal form drainage water (Germany)

setup drainage filter system for field demonstrations

o exchange battery/ bottles: 7-10 dayso trafficability has to be ensured (field/bank)

drain: 1.00 -1.30 m below surface

filter height:min. 0.50 m

max. 0.25 m

+P -P

(P)P(P) P

(P)

P

P P

(P)

(P)gravel filterICS

coconut mat

Field demonstrations: drainage water - D

Page 25: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-filter shaft: installation of pre-filter

Field demonstrations: drainage water - D

Page 26: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

• North-Western Germany

• River length: 36.5 km

• Catchment area: 180 km²

• Sum fish pond area: 120 ha

• Area nature reserve: 465 ha

• No continuity between

Upper- and Lower-Lethe

2

a)

b)

Field demonstrations: river water - D

P- removal

Page 27: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Field demonstrations: river water

• Wood chips as C-source for denitrification

• Retention time around 8h

• Increasing efficiency with increasing N-

concentrations

- 60-80% NO3 removal

• 9-10 years until re-filling with wood chips

• Depth: 1.20m + 1.30m (depth of pre-existing

drainage pipes)

• Construction costs: 60,000€ for two plants

- One big and one small

- Area of big plant: 180m²

13

Page 28: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Nitrate removal and Nitrogen recovery from Agricultural Drainage Water using a filter system

based on Zero-Valent Iron and Zeolite - DK

Page 29: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

29© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

28/05/2018 13/06/2018 18/06/2018

17/07/2018 30/07/2018 03/08/2018

09/08/2018 13/08/2018 04/09/2018

P-recovery and re-use

Page 30: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-recovery and re-use

30© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

• Start trial: 15/05/2018

• 30% ICS added – evaluation after 4 weeks (14/06/2018)

left without ICS – right with ICS

Page 31: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

P-recovery and re-use

31© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018

• Evaluation at end of trial (16/07/2018)

left without ICS – right with ICS

Page 32: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Modeling of the impact of filter techniques

Doel: Impact of reduction measures on N and P losses in drained catchments

32

Examples

% reductie

N 0 % 40 % 5 %

P 70 % 0 % 20 %

P-Filter CW Buffer strips

Overall reductionN: 20 %P: 35 %

Page 33: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 33

Modeling of the Kemmelbeek

Page 34: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 34

Impact of example:• P Filter Box

• Constructed wetlands

• Buffer strips

• Results of the P Filter Box and other measures will be upscaled to the Warnow basin

• Overall load reduction for N and P will be estimated at catchment scale

Modellering van de impactModeling of the impact of filter techniques

Page 35: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 35

Targeted regulation of nitrogen in Denmark

implementation of measures to reduce drainage nutrient losses

Page 36: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 36

Targeted regulation of nitrogen in Denmark

Page 37: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 37

Targeted regulation of nitrogen in Denmark

Page 38: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 38

Targeted regulation of nitrogen in Denmark

Page 39: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

© Almeria | NuReDrain, Fertinnowa, 3-5 October 2018 39

Targeted regulation of nitrogen in Denmark

Page 40: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Met steun van

• Interreg North Sea Region

• Province of West-Flanders, East-Flanders and Antwerp

Sponsors

Page 41: NuReDrain: Nutrient Removal and Recovery from Drainage Water - … · 2019-02-03 · NuReDrain 2 •Nutrient Removal and Recovery from Drainage water Interreg project North Sea Region

Visit our website www.pcsierteelt.beFollow PCS on LinkedIn proefcentrum-voor-sierteelt

Any questions?

E:[email protected]