PREPARED FOR PRESENTED BY NSPA Procurement Strategy and In-Service Support UAV Technology Eastern Europe 22 September 2016 Antonio Russo Air and Land Combat Systems Programme Office [email protected]

Transcript of NSPA Procurement Strategy and In-Service Support · NSPA Procurement Strategy and In-Service...

PREPARED FOR

PRESENTED BY

NSPA Procurement Strategy and

In-Service Support

UAV Technology Eastern Europe22 September 2016

Antonio RussoAir and Land Combat Systems Programme Office

[email protected]

Agenda

• NSPA Introduction

• Developing UAV requirements and Converting these into procurement

strategy

• NSPA role in equipment acquisition and support

• Findings and lessons learnt

Antonio Russo - LM Programme 2

NSPA Introduction

3Antonio Russo - LM Programme

NSPA Agency introduction

Antonio Russo - LM Programme 4

Reference: NSPO Charter 1 April 2015

Vision:NATO’s premier procurement, logistics and services provider team,

with an integrated network of capabilities for NATO, and its Nations and partners

Mission:… provide acquisition, including armaments

procurement; logistics; operational and systems

support and services…

to NATO, Allies and partner nations.

NSPA Organizational Design

Antonio Russo - LM Programme 5

PROCUREMENT

INFORMATION TECHNOLOGY

HUMAN RESOURCES

FINANCE

SUPPORT

FUNCTIONS

NATO AIRLIFT

MANAGEMENT

(NAM)

NSPA GENERAL MANAGER

LOGISTICS

OPERATIONS

CENTRAL EUROPE

PIPELINE SYSTEM

(CEPS)

1,172 NATO International Civilians

(Approved positions)

NATO NORTH ATLANTIC COUNCIL (NAC)

NSPO AGENCY SUPERVISORY BOARD

BUSINESS UNITS

Geographical Locations

Antonio Russo - LM Programme 6

Southern Operational

Centre

(50) Taranto, ITA

NSPA, HQ &

Logistics Operations

(986) Capellen, LUX

NATO Airlift

Management

Programme

(47) Pápa, HUN

Central Europe

Pipeline System

(35.5) Versailles, FRA

NSPA Embedded Staff

• NATO HQ

• SHAPE, JFCs

• AFGHANISTAN

Country Liaison Officers

19

NSPA Funding Sources 2016

“No profit - No loss”

92%

8%

3.44 BEUR

National and

Multinational

Projects NATO Security

Investment Plan

(NSIP) and Military

Budget Funded

Projects

Antonio Russo - LM Programme 11

Business Trend

8

0

500

1000

1500

2000

2500

3000

3500

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Log Ops CEPS NAM

Source: Actual Commitments 2004-2015

Planned Commitments* 2016

ME

UR

* Commitments: Multi-year contracts are only shown in the first year the contract is placed.

Antonio Russo - LM Programme

UAS requirements and procurement strategy

9Antonio Russo - LM Programme

UAS requirements and procurement strategy

How far you want to see

For how long you want to see

How much better you want to see

Antonio Russo - LM Programme 10

Military Commercial OFF-THE-SHELF

MCOAT

BIDDING

UAS requirements and procurement strategy

The correct identification of a UAS does not imply that operational

requirements will be met

Antonio Russo - LM Programme 11

UAS requirements and procurement strategy

Antonio Russo - LM Programme 12

Logistic Support KPI for Small UAS

UAS requirements and procurement strategy

Antonio Russo - LM Programme 13

Logistic Support KPI for MALE and HALE UAS

UAS requirements and procurement strategy

Because of the UAS Peculiarities, it is mandatory to combine Acquisition

and Logistic Support Contracts in one single Contract (Outline Agreement)

Considering that several factors will play an important role in the acquisition

and in service, OA need to have enough flexibility to cover all the potential

scenarios

The quick configuration changes have to be traced an took in account

during the entire UAS life

Antonio Russo - LM Programme 14

UAS requirements and procurement strategy

By having one single Contractual Counterpart, Airworthiness Certification

and Continued Airworthiness processes can be established easily without

any solution of continuity

By having one single Contractual Counterpart, Continuing Airworthiness

processes are much more easy for the Customers

Contracts have to be used by the UAS operators and supervised by

the appointed National Authorities

Antonio Russo - LM Programme 15

NSPA role in equipment acquisition and support

16Antonio Russo - LM Programme

How NSPA supports its Customers

Antonio Russo - LM Programme 17

Upon the receipt of the Customer’s requirements, NSPA starts the

following activities:

• An assessment with the Customer of the requirements to evaluate

and suggest the best logistic solutions

• NSPA provides to the Customer a business case to inform of the

relevant administrative expenditures for the services requested

• Pending the Customer’s acceptance of business case, NSPA starts

the relevant activities for the provision of the Logistic Services

How NSPA supports its Customers

Antonio Russo - LM Programme 18

NSPA writes a Statement of Work, part of the Contract, that has to be

revised with the Customer’s Support

How NSPA supports its Customers

Antonio Russo - LM Programme 19

NSPA starts all the contractual activities (source identification, RFQ,

negotiation, CAC and contract award) to establish the contract for the

provision of the services requested by the Customer

By having the Contract in place, Customer can

request Logistic Services through NSPA

Contracts are subject to continuous improvements

Customers and NSPA are constantly in contact to identify areas of

improvements or new requirements

NSPA role in equipment acquisition and support

• NSPA Contracts are Outline Agreements

• No workload guaranteed/no commitments

• Contract covers:

o Systems and Spares Parts procurement

o Repairs

o Training

o Depot Maintenance

o Transportation

o Upgrade

o Continued and Continuing Airworthiness

Antonio Russo - LM Programme 20

NSPA role in equipment acquisition and support

• OA has a validity of 3 + 2 years

• Purchase Orders are the real order to

Contractors

• The combination of the services can cover the

majority of the operational needs

• Contractual amendments for new

requirements can be done in 15 days

• More than one NATION can use each OA

• NSPA can consolidate orders

Antonio Russo - LM Programme 21

Findings and lessons learnt

22Antonio Russo - LM Programme

XXXX Upgrade Phase I and II

Antonio Russo - LM Programme 23

Background

• The XXXX Upgrade started with the aim to align the fleet to one single

configuration

• Between 2012 and 2014, 12 Systems were upgraded in 4 lots, training were

provided in parallel

• In 2015, 3 Systems and the Depot Maintenance System were upgraded +

acquisition of Training Simulators, training were provided in parallel

XXXX Upgrade Phase I and II

Antonio Russo - LM Programme 24

• The last Systems are in a different Configuration from the previous

• In addition to the requirements, the Phase III will contain a further upgrade (SW and HD +

training and personnel requalification)

Upgrade programmes that last more than one cycle have to consider more than one

upgrade

2012 2013 2014 2015 2016

3 Systems 9 Systems 3 +1 Systems

2017

Phase I Phase II

Questions

Antonio Russo - LM Programme 25