NOTICE OF MEETING GATEWAY TECHNICAL COLLEGE …

96
To request disability accommodations, contact the Compliance Manager at 262-564-3062/Wisconsin Relay 711, or [email protected], at least three days in advance. March 19, 2018 NOTICE OF MEETING GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Regular Meeting Tuesday, March 27, 2018 – 8:00 a.m. S.C. Johnson iMET Center, Room 104 2320 Renaissance Blvd., Sturtevant, WI 53177 The Gateway Technical College District Board will hold its regular meeting on Tuesday, March 27, 2018 at 8:00 a.m. at the S.C. Johnson iMET Center, Room 104, 2320 Renaissance Blvd., Sturtevant, WI. The agenda is included. Bryan D. Albrecht, Ed.D. President and Chief Executive Officer

Transcript of NOTICE OF MEETING GATEWAY TECHNICAL COLLEGE …

To request disability accommodations, contact the Compliance Manager at 262-564-3062/Wisconsin Relay

711, or [email protected], at least three days in advance.

March 19, 2018

NOTICE OF MEETING

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Regular Meeting

Tuesday, March 27, 2018 – 8:00 a.m. S.C. Johnson iMET Center, Room 104

2320 Renaissance Blvd., Sturtevant, WI 53177

The Gateway Technical College District Board will hold its regular meeting on Tuesday, March 27, 2018 at 8:00 a.m. at the S.C. Johnson iMET Center, Room 104, 2320 Renaissance Blvd., Sturtevant, WI. The agenda is included. Bryan D. Albrecht, Ed.D. President and Chief Executive Officer

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Regular Meeting – Tuesday, March 27, 2018 – 8:00 a.m. S.C. Johnson iMET Center, Room 104, 2320 Renaissance Blvd, Sturtevant, WI 53177

Info./

Disc

Action

Roll Call

AGENDA

Page

I. Call to Order A. Open Meeting Compliance

4

X II. Roll Call 4

X III. Approval of Agenda 5

X

IV.

Approval of Minutes A. February 22, 2018 – Regular Meeting

5

X V. Citizen Comments 10

X X

VI.

Chairperson’s Report A. Dashboard Report B. Board Evaluation Summary

12 13

X X X X

VII.

President’s Report A. Announcements B. Welcome from Campus Dean C. Industry 4.0 D. Big Step

15 16 17 18

VIII. Operational Agenda

X

X

X

A. Action Agenda 1. Resolution Numbers B-2018 C.1 and C.2 - Approval of Project for Racine

Campus Racine Building 2nd Floor Remodeling 2. Resolution Number F-2017-2018E.1 - Authorizing the Issuance of $1,500,000

General Obligation Promissory Notes, Series 2017-2018E B. Consent Agenda

1. Finance a) Financial Statement and Expenditures over $2,500 b) Cash and Investment Schedules

2. Personnel Report 3. Grant Awards 4. Contracts for Instructional Delivery 5. Advisory Committee Activity Report 6. Bids For Approval:

a) Bid No. 1556 – S.C. Johnson iMET Center Parking Lot Remodel - Sturtevant, WI

b) Bid No. 1558 - Horizon Center Emergency Vehicle Operator Course (EVOC) Track - Kenosha Campus

c) Bid No. 1559 - Racine Building 2nd Floor Remodeling, Racine Campus, Bid Package A

d) Bid No. 1561 - FY-18 Academic Building Classroom Remodeling and Science Building Sprinklers - Kenosha Campus

19 20

23

26

27 35 39 41 43 57

64

70

76

81

IX. Policy Governance Monitoring Reports

Info./

Disc

Action

Roll Call

AGENDA

Page

X

X X

X X

A. Ends Statement Monitoring College Ends Policy - The tri-county community benefits from affordable higher education that allows residents to develop knowledge and skills for family-supporting careers that contribute to the growth and sustainability of the local economy at a cost commensurate with the value of services provided. 3) Taxpayers receive a positive return on investment from Gateway’s impact on the local tax base, property values, and overall economic development as well as the contributions of graduates to the tri-county community. Educational Partnerships – Katie Graf, Sam Duczak & Amanda Virzi

B. Executive Limitations a) 3.4 FY18-19 Budget/Forecasting – Bill Whyte b) 3.8 Partnerships/Grants/Contracts – Matt Janisin

C. Policy Governance Review a) Ends Policy #3 b) 3.8 Partnerships

87 90 91 93 94

X X. Board Member Community Reports 95

X

X

XI. Next Meeting Date and Adjourn A. Regular Meeting - Thursday, April 19, 2018, 8:00 am, Elkhorn Campus, Rooms

112/114 B. Adjourn

96

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Regular Meeting Tuesday, March 27, 2018 – 8:00 a.m. S.C. Johnson iMET Center, Room 104

2320 Renaissance Blvd, Sturtevant, WI 53177

I. CALL TO ORDER A. Open Meeting Compliance

II. ROLL CALL

Ram Bhatia _____ Ronald J. Frederick _____

Gary Olsen _____ Bethany Ormseth _____ Kimberly Payne _____ Scott Pierce _____ Roger Zacharias _____ Pamela Zenner-Richards _____

William Duncan _____ Our Positive Core – Gateway Technical College District Board Our shared strengths as a Board that we draw upon to do our work: • Belief in the value of Gateway Technical College • Commitment to our community • Common sense of mission • Mutual respect • Sense of humor • Open-mindedness & willingness to question

March 27, 2018 4

III. APPROVAL OF AGENDA

Items on the Consent Agenda for discussion

IV. APPROVAL OF MINUTES A. February 22, 2018 – Regular Meeting

March 27, 2018 5

DRAFT

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Regular Meeting

February 22, 2018 The Gateway Technical College District Board met on Thursday, February 22, 2018 at the Burlington Center, Room 100, 496 McCanna Pkwy, Burlington, WI. The meeting was called to order at 8:00 a.m. by William Duncan, Chairperson.

I. Call to Order A. Open Meeting Compliance K. Bartlett confirmed the meeting was duly noticed in accordance with state statutes for open meeting

compliance.

II. Roll Call

Also in attendance were Bryan Albrecht, Kelly Bartlett, Mary Harpe and 31 citizens/reporters.

III. Approval of Agenda A. It was moved by R. Frederick and seconded by P. Zenner-Richards and carried to approve the agenda.

IV. Approval of Minutes A. It was moved by S. Pierce, seconded by R. Bhatia and carried to approve the minutes of the January 18,

2018 Regular Meeting.

V. Citizen Comments There were no citizen comments

VI. Chairperson’s Report

A. Dashboard Report items included updates on: • Andis Company agreed to fund the start up of our new Barbering program. • Partnership with Big Step has been formed to on-board students training in construction careers. • Gateway has been recognized as a top employer for SE WI.

B. Board Evaluation Summary • 6 of 7 Attending Trustees Responded to the Survey: Excellent meeting… especially the student

presentations! Excellent presentations by students as well as staff. Presentation by the student leaders was inspiring. The Committee of the Whole presentation was very informative.

VII. President’s Report A. Announcements

Ram Bhatia Present Ronald J. Frederick Present Gary Olsen Excused Bethany Ormseth Excused Kimberly Payne Present Scott Pierce Present Roger Zacharias Present Pamela Zenner-Richards Present William Duncan Present

March 27, 2018 6

DRAFT

• Bryan Albrecht and Zina Haywood attended the national signing day event at Gateway. Over 200 students signed their letter of intent that morning to attend Gateway.

• Stacy Riley spoke on the student services contact center and the number of calls the staff receive per day. This department has been a great addition to Gateway. They are able to connect with contacts via live chat, email, and over the phone.

• Stephanie Sklba spoke to the Trustees about a recent visit to the State of the State address were student, Amber Beale was invited to attend. Amber is a student of Gateway’s electrical engineering technician program and was asked by the Governor to represent Gateway. She toured the capital and attended as a special guest at the State of the State.

• Jeff Robshaw spoke about a smart row unit that is a self-contained server rack. A school from Beloit recently came to see Gateway’s set up and process.

• John Thibodeau spoke about the Pathway Initiatives that have been taking place recently including a visit to Washington D.C last fall for Pathway 2.0 during AACC.

• Matt Janisin spoke about the Industry 4.0 initiatives that have been taking place. Gateway has been hosting events regarding Industry 4.0 including the Racine and Kenosha Chambers Business Blender.

• Bill Whyte spoke on ALICE training for staff and spoke about the Business continuity plans. B. Welcome from Campus Dean

• Terry Simmons welcomed the Trustees to the Burlington Center and gave them a tour of the construction labs and other classrooms. .

C. Promise Students • Ken Riley, Gateway’s Promise Coordinator, introduced students Makayla Jacob and Natalie Stigdon.

Makayla and Natalie both shared their Gateway journeys as Promise students with the Trustees. • Fall 2017 Semester Highlights of the Promise program include: 140/165 students have academic plans,

123/165 students participated in the Student Success workshops, 120/165 students are active in clubs, 100/165 started or completed their financial aid, 145/165 students are registered for Spring 2018 classes - 87.9% retention rate from Fall to Spring, 28/165 student took out loans for the Fall semester - 17% compared to Gateway’s 62% average

D. Barbering Partnership • Bob Gleason, Vice President of HR and Safety with Andis, spoke to the Trustees about the recent

agreement between Gateway and Andis to create a barbering studio in Burlington which has been named, “The Cut at Gateway Technical College: Powered by Andis”. This is Gateway’s third program partnership with Andis.

• Bob Gleason also presented Gateway’s Foundation with a check donation for $80,000.

VIII. Operational Agenda A. Action Agenda

1. Resolution No. F-2017-2018D.2 – Resolution Awarding the Sale of $1,500,000 General Obligation

Promissory Notes, Series 2017-2018D The administration is recommending Board approval of a resolution awarding the sale of $1,500,000 of General Obligation Promissory Notes, Series 2017-2018D for the public purpose of financing building remodeling and improvement projects. The actual sale will take place at the Board meeting. This debt issue is included in the Board-approved budget for FY 2018. Following discussion it was moved by R. Bhatia, seconded by R. Zacharias and carried by roll call vote to approve Resolution No. F-2017-2018D.2 – Resolution Awarding the Sale of $1,500,000 General Obligation Promissory Notes, Series 2017-2018D Aye: 7

March 27, 2018 7

DRAFT

Nay: 0 Abstaining: 0 Absent: 2

B. Consent Agenda It was moved by R. Zacharias, seconded by P. Zenner-Richards and carried that the following items in the consent agenda be approved:

1. Finance a) Financial Statement and Expenditures over $2,500: Approved the financial statement and

expenditures as of January 31, 2018. b) Cash and Investment Schedules: Approved the monthly cash reconciliation, investment

schedule and investment report. 2. Personnel Report: Approved the personnel report of three (3) new hires; one (1) promotion; one (1)

retirement; three (3) resignations; two (2) separations; no employment approvals-casual, non-instructional; and no employment approvals-adjunct faculty.

3. Grants Awards: There were no grant awards for approval. 4. Contracts for Instructional Delivery: Approved the contracts for instructional delivery report for

January 2018 5. Advisory Committee Activity Report: Approved the advisory committee 2017-2018 meeting

schedule and new members as of February 1, 2018

IX. Policy Governance Monitoring Reports A. Ends Policy Monitoring

College Ends Policy – The tri-county community benefits from affordable higher education that allows residents to develop knowledge and skills for family-supporting careers that contribute to the growth and sustainability of the local economy at a cost commensurate with the value of services provided. 2) Businesses benefit from a well-trained, educated workforce and access to customized business and workforce solutions that support a positive business climate. Matt Janisin, Kate Walker and guests from Ellsworth Correctional presented to the Board of Trustees on Customized Training. Michelle Hoffman, Superintendent of Ellsworth Correctional spoke about how beneficial this partnership was for the women at Ellsworth. Following discussion, it was moved by S. Pierce, seconded by R. Zacharias and carried that this report is evidence that the college is making progress on Ends Policy #2.

B. Executive Limitations Bill Whyte presented on 3.7 Communication and Counsel to the Board. Following discussion, it was moved by R. Zacharias, seconded by P. Zenner-Richards and carried to approve 3.7 Communication and Counsel to the Board.

C. Policy Governance Review The Trustees reviewed Ends Policy #2 which is found under Policy Governance, Section 4 – Ends Policy 4.1, Statement #2.

Following discussion, it was moved by S. Pierce, seconded by R. Zacharias and carried to approve the wording of Ends Policy #2.

March 27, 2018 8

DRAFT

X. Board Member Community Reports Kimberly Payne and Pamela Zenner-Richards mentioned the success of the 5.09 program and thanked

Gateway for the partnership with this program. This program allows students to gain high school credentials within 20 weeks.

Ram Bhatia and Bill Duncan attended the Foundation Scholarship event. Bill Duncan attended ACCT in Washington D.C. Pam Zenner-Richards complimented Ram Bhatia on winning the primary election for Mt Pleasant Village

of Trustees. Ram Bhatia asked the Trustees to consider donating to the Gateway Foundation again this year. He was

asking for 100% participation with the Trustees.

XI. Next Meeting Date and Adjourn A. Regular Meeting – Tuesday, March 27, 2018, 8:00 am, S.C. Johnson iMET Center, Room 104 B. At approximately 9:55 a.m. it was moved by R. Frederick, seconded by R. Zacharias and carried that the

meeting was adjourned. Submitted by, Kimberly Payne Secretary

March 27, 2018 9

V. CITIZEN COMMENTS A. The Gateway Technical College District Board has established a

limit of thirty minutes for citizen comments. Individuals will be limited to three to five minutes for their comments depending on the number of individuals who wish to address the Board. Citizens wishing to address the Board are to sign up prior to the meeting on the forms provided at the entrance to the meeting room.

March 27, 2018 10

VI. CHAIRPERSON’S REPORT A. Dashboard Report B. Board Evaluation Summary

March 27, 2018 11

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

CHAIRPERSON’S REPORT Dashboard Report

Governance Process: Policy 1.2 – Governing Philosophy Board Liaison: William Duncan

March 27, 2018 12

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

CHAIRPERSON’S REPORT Board Evaluation Summary

Governance Process: Policy 1.2 – Governing Philosophy Board Liaison: William Duncan

March 27, 2018 13

VII. PRESIDENT’S REPORT A. Announcements B. Welcome from Campus Dean C. Industry 4.0 D. Big Step

March 27, 2018 14

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

PRESIDENT’S REPORT Announcements

Policy/Ends Statement: Policy 2.1

March 27, 2018 15

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

PRESIDENT’S REPORT Welcome from Campus Dean

Policy/Ends Statement: Policy 2.1

March 27, 2018 16

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

PRESIDENT’S REPORT Industry 4.0

Policy/Ends Statement: Policy 2.1

March 27, 2018 17

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action Information __X__ Discussion _____

PRESIDENT’S REPORT Big Step

Policy/Ends Statement: Policy 2.1

March 27, 2018 18

VIII. OPERATIONAL AGENDA A. Action Agenda

1. Resolution Numbers B-2018 C.1 and C.2 - Approval of Project for Racine Campus Racine Building 2nd Floor Remodeling

2. Resolution Number F-2017-2018E.1 - Authorizing the Issuance of $1,500,000 General Obligation Promissory Notes, Series 2017-2018E

March 27, 2018 19

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action __X__ Information _____

Discussion _____

RESOLUTION NUMBERS B-2018 C.1 and C.2

APPROVAL OF PROJECT FOR RACINE CAMPUS RACINE BUILDING 2ND FLOOR REMODELING

Summary of Item: The administration is recommending approval by the Gateway

Technical College District Board of Resolution Numbers B-2018 C.1 and C.2 for the Racine Campus Racine Building 2nd Floor Remodeling project.

The administration also recommends approval from the Wisconsin

Technical College System (WTCS) Board for the Racine Campus Racine Building 2nd Floor Remodeling project.

Attachments: Resolution Numbers B-2018 C.1 and C.2

Ends Statements and/or Executive Limitations: Section 3 - Executive Limitation, Financial Condition Policy 3.5

Section 4 – Ends, College Ends Policy 4.1 Staff Liaison: Thomas Cousino

Top877.docx or .pdf 03/08/18

March 27, 2018 20

GATEWAY TECHNICAL COLLEGE

RESOLUTION NO. B-2018 C.1

WHEREAS, the Gateway Technical College District Board is proposing the project for the Racine

Campus Racine Building 2nd Floor Classroom Remodeling Fiscal Year 2018-2019 and;

WHEREAS, the Racine Campus Racine Building 2nd Floor Classroom Remodeling Fiscal Year

2018-2019 project consists of remodeling 13,270 square feet to accommodate growth and enhance the

student experience. The project cost is estimated at $1,500,000.

NOW, THEREFORE, BE IT RESOLVED, that the Gateway Technical College Board, pursuant to

5.04(2)(a) of the Wisconsin Administrative Code, approves said project.

______________________________

William Duncan Chairperson

______________________________ Kimberly Payne Secretary

March 27, 2018

Date

March 27, 2018 21

GATEWAY TECHNICAL COLLEGE

RESOLUTION NO. B-2018 C.2

WHEREAS, pursuant to 5.04(2)(a) of the Wisconsin Administrative Code, the Gateway

Technical College District Board has approved the project for the Racine Campus Racine Building 2nd

Floor Classroom Remodeling Fiscal Year 2018-2019 which consists of remodeling 13,270 square feet to

accommodate growth and enhance the student experience with a project cost estimate of $1,500,000.

NOW, THEREFORE, BE IT RESOLVED that pursuant to 5.04(2)(b) of the Wisconsin

Administrative Code, the Gateway Technical College District Board requests the Wisconsin Technical

College System Board approve the project.

______________________________ William Duncan

Chairperson

______________________________ Kimberly Payne Secretary

March 27, 2018

Date

March 27, 2018 22

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call __X__ Action _____ Information _____

Discussion _____

RESOLUTION NO. F-2017-2018E.1

RESOLUTION AUTHORIZING THE ISSUANCE OF $1,500,000 GENERAL OBLIGATION PROMISSORY NOTES, SERIES 2017-2018E

Summary of Item: Administration is recommending approval to issue General

Obligation Promissory Notes, Series F-2017-2018E; in the principal amount of $1,500,000 for the public purpose of financing building remodeling and improvement projects. This borrowing is included in the 2017-18 budget. Upon approval, appropriate legal notices will be published in the official district newspapers.

Attachments: Resolution No. F-2017-2018E.1

Ends Statements and/or Executive Limitations: Section 3 - Executive Limitations

Policy 3.5 - Financial Condition Staff Liaison: William Whyte

ROLL CALL Ram Bhatia _____ Ronald J. Frederick _____ Gary Olsen _____ Bethany Ormseth _____ Kimberly Payne _____ Scott Pierce _____ Roger Zacharias _____ Pamela Zenner-Richards _____ William Duncan _____

Top874.docx 03/02/18

March 27, 2018 23

Resolution No. F-2017-2018E.1

RESOLUTION AUTHORIZING THE ISSUANCE OF $1,500,000 GENERAL OBLIGATION PROMISSORY NOTES, SERIES 2017-2018E, OF

GATEWAY TECHNICAL COLLEGE DISTRICT, WISCONSIN

WHEREAS, Gateway Technical College District, Wisconsin (the "District") is presently in need of $1,500,000 for the public purpose of financing building remodeling and improvement projects; and

WHEREAS, the District Board deems it necessary and in the best interest of the District to borrow the monies needed for such purpose through the issuance of general obligation promissory notes pursuant to the provisions of Section 67.12(12), Wis. Stats.;

NOW, THEREFORE, BE IT:

RESOLVED, that the District shall issue general obligation promissory notes in the amount of $1,500,000 for the public purpose of financing building remodeling and improvement projects; and be it further

RESOLVED, THAT:

Section 1. Note Authorization. The District shall issue the general obligation promissory notes authorized above in the aggregate principal amount of $1,500,000 and designated "General Obligation Promissory Notes, Series 2017-2018E" (the "Notes"), the proceeds of which shall be used for the purpose specified above.

Section 2. Notice to Electors. The District Secretary shall, within ten (10) days hereafter, cause public notice of the adoption of this resolution to be given to the electors of the District by publishing notice thereof in the Elkhorn Independent, Kenosha News and Journal Times, the official District newspapers published and having general circulation in the District, which newspapers are found and determined to be likely to give notice to the electors, such notice to be in substantially the form set forth on Exhibit A hereto.

Section 3. Official Statement. The District Secretary shall cause an Official Statement to be prepared by Robert W. Baird & Co. Incorporated. The appropriate District officials shall determine when the Official Statement is final for purposes of Securities and Exchange Commission Rule 15c2-12 and shall certify said Statement, such certification to constitute full authorization of such Official Statement under this resolution.

Adopted this 27th day of March, 2018.

William Duncan Chairperson

Attest: Kimberly Payne Secretary March 27, 2018

24

EXHIBIT A

NOTICE

TO THE ELECTORS OF:

Gateway Technical College District, Wisconsin

NOTICE IS HEREBY GIVEN that the District Board of the above-named District, at a meeting duly called and held on March 27, 2018, adopted pursuant to the provisions of Section 67.12(12) of the Wisconsin Statutes, a resolution providing that the sum of $1,500,000 be borrowed through the issuance of general obligation promissory notes of the District for the public purpose of financing building remodeling and improvement projects.

A copy of said resolution is on file in the District Office, 3520 30th Avenue, Kenosha, Wisconsin, and is available for public inspection weekdays, except holidays, between the hours of 8:00 A.M. and 4:00 P.M.

The District Board need not submit said resolution to the electors for approval unless within 30 days after the publication of this Notice there is filed with the Secretary of the District Board a petition meeting the standards set forth in Sec. 67.12(12)(e)5, Wis. Stats., requesting a referendum thereon at a special election.

Dated March 27, 2018.

BY ORDER OF THE DISTRICT BOARD

District Secretary

March 27, 2018 25

VIII. OPERATIONAL AGENDA B. Consent Agenda

1. Finance a) Financial Statement and Expenditures over $2,500 b) Cash and Investment Schedules

2. Personnel Report 3. Grant Awards 4. Contracts for Instructional Delivery 5. Advisory Committee Activity Report 6. Bids For Approval:

a) Bid No. 1556 – S.C. Johnson iMET Center Parking Lot Remodel - Sturtevant, WI

b) Bid No. 1558 - Horizon Center Emergency Vehicle Operator Course (EVOC) Track - Kenosha Campus

c) Bid No. 1559 - Racine Building 2nd Floor Remodeling, Racine Campus, Bid Package A

d) Bid No. 1561 - FY-18 Academic Building Classroom Remodeling and Science Building Sprinklers - Kenosha Campus

March 27, 2018 26

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Roll Call Action X Information Discussion

FINANCIAL STATEMENT AND EXPENDITURES OVER $2,500 Summary of Item: Summary of revenue and expenditures as of 2/28/18

Ends Statements and/or Executive Limitations

Section 3 - Executive Limitations Policy 3.5 Financial Condition

Staff Liaison: William Whyte

March 27, 2018 27

GATEWAY TECHNICAL COLLEGE

2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

COMBINED FUNDS 2017-18 2017-18 2017-18APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

LOCAL GOVERNMENT 32,997,276$ 33,264,919$ 32,961,964$ 99.09% STATE AIDS 42,484,144 42,049,384 39,970,950 95.06% STATUTORY PROGRAM FEES 14,594,491 15,236,649 15,315,102 100.51% MATERIAL FEES 692,669 723,146 813,475 112.49% OTHER STUDENT FEES 2,827,807 2,907,791 2,592,978 89.17% INSTITUTIONAL 8,581,072 8,581,072 4,748,472 55.34% FEDERAL 27,080,821 27,080,821 21,467,607 79.27% OTHER RESOURCES 13,325,000 16,371,240 13,368,952 81.66%

TOTAL REVENUE & OTHER RESOURCES 142,583,280$ 146,215,022$ 131,239,499$ 89.76%

EXPENDITURES BY FUNCTION:

INSTRUCTIONAL 57,046,830$ 60,127,166$ 35,155,167$ 58.47% INSTRUCTIONAL RESOURCES 1,399,501 1,449,101 837,271 57.78% STUDENT SERVICES 44,847,018 45,175,195 33,980,446 75.22% GENERAL INSTITUTIONAL 11,028,571 11,182,960 7,656,697 68.47% PHYSICAL PLANT 27,470,260 28,243,260 8,346,648 29.55% AUXILIARY SERVICES 650,000 650,000 364,354 56.05% PUBLIC SERVICES 381,100 381,100 193,722 50.83%

TOTAL EXPENDITURES 142,823,280$ 147,208,782$ 86,534,305$ 58.78%

EXPENDITURES BY FUNDS:

GENERAL 79,366,579$ 80,252,081$ 48,852,853$ 60.87% SPECIAL REVENUE - OPERATIONAL 5,277,701 5,746,461 3,735,669 65.01% SPECIAL REVENUE - NON AIDABLE 31,719,000 31,704,000 25,756,406 81.24% CAPITAL PROJECTS 13,350,000 16,396,240 6,475,731 39.50% DEBT SERVICE 12,460,000 12,460,000 1,349,293 10.83% ENTERPRISE 650,000 650,000 364,354 56.05%

TOTAL EXPENDITURES 142,823,280$ 147,208,782$ 86,534,305$ 58.78%

March 27, 2018 28

GATEWAY TECHNICAL COLLEGE2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

GENERAL FUND 2017-18 2017-18 2017-18

APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

LOCAL GOVERNMENT 18,928,071$ 19,195,714$ 18,892,794$ 98.42% STATE AIDS 39,316,969 38,882,209 37,651,805 96.84% STATUTORY PROGRAM FEES 14,594,491 15,236,649 15,315,102 100.51% MATERIAL FEES 692,669 723,146 813,475 112.49% OTHER STUDENT FEES 1,817,807 1,897,791 1,744,363 91.92% FEDERAL REVENUE 30,000 30,000 - 0.00% INSTITUTIONAL 3,986,572 3,986,572 1,688,242 42.35% OTHER RESOURCES - - - 0.00%

TOTAL REVENUE & OTHER RESOURCES 79,366,579$ 79,952,081$ 76,105,781$ 95.19%

EXPENDITURES BY FUNCTION:

INSTRUCTIONAL 51,290,350$ 51,925,852$ 31,550,156$ 60.76% INSTRUCTIONAL RESOURCES 1,389,501 1,389,501 779,929 56.13% STUDENT SERVICES 11,501,548 11,701,548 6,928,571 59.21% GENERAL INSTITUTIONAL 7,747,420 7,797,420 5,134,031 65.84% PHYSICAL PLANT 7,437,760 7,437,760 4,460,167 59.97%

TOTAL EXPENDITURES 79,366,579$ 80,252,081$ 48,852,853$ 60.87%

March 27, 2018 29

GATEWAY TECHNICAL COLLEGE2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

SPECIAL REVENUE-OPERATIONAL FUND 2017-18 2017-18 2017-18

APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

LOCAL GOVERNMENT 2,099,205$ 2,099,205$ 2,099,170$ 100.00% STATE AIDS 1,063,175 1,063,175 490,928 46.18% FEDERAL 1,754,821 1,754,821 878,472 50.06% INSTITUTIONAL 360,500 360,500 188,235 52.22%

TOTAL REVENUE & OTHER RESOURCES 5,277,701$ 5,277,701$ 3,656,805$ 69.29%

EXPENDITURES BY FUNCTION:

INSTRUCTIONAL 2,724,980$ 2,860,674$ 1,772,524$ 61.96% INSTRUCTIONAL RESOURCES - 49,600 46,532 93.82% STUDENT SERVICES 1,616,470 1,749,647 1,297,794 74.17% GENERAL INSTITUTIONAL 580,151 672,440 385,707 57.36% PHYSICAL PLANT - 58,000 39,390 67.91% PUBLIC SERVICES 356,100 356,100 193,722 54.40%

TOTAL EXPENDITURES 5,277,701$ 5,746,461$ 3,735,669$ 65.01%

March 27, 2018 30

GATEWAY TECHNICAL COLLEGE2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

SPECIAL REVENUE-NON AIDABLE FUND 2017-18 2017-18 2017-18

APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

STATE AIDS 2,004,000$ 2,004,000$ 1,828,217$ 91.23% OTHER STUDENT FEES 755,000 755,000 767,112 101.60% INSTITUTIONAL 3,774,000 3,774,000 2,382,814 63.14% FEDERAL 25,146,000 25,146,000 20,589,135 81.88%

TOTAL REVENUE & OTHER RESOURCES 31,679,000$ 31,679,000$ 25,567,278$ 80.71%

EXPENDITURES BY FUNCTION:

STUDENT SERVICES 31,714,000$ 31,699,000$ 25,754,082$ 81.25% GENERAL INSTITUTIONAL 5,000 5,000 2,324 46.49%

TOTAL EXPENDITURES 31,719,000$ 31,704,000$ 25,756,406$ 81.24%

March 27, 2018 31

GATEWAY TECHNICAL COLLEGE2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

CAPITAL PROJECTS FUND 2017-18 2017-18 2017-18APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

STATE AIDS 100,000$ 100,000$ -$ 0.00% FEDERAL 150,000 150,000 - 0.00% INSTITUTIONAL 100,000 100,000 251,982 251.98% OTHER RESOURCES 13,000,000 16,046,240 13,031,240 81.21%

TOTAL REVENUE & OTHER RESOURCES 13,350,000$ 16,396,240$ 13,283,222$ 81.01%

EXPENDITURES BY FUNCTION: INSTRUCTIONAL 3,031,500$ 5,340,640$ 1,832,487$ 34.31% INSTRUCTIONAL - RESOURCES 10,000 10,000 10,810 108.10% STUDENT SERVICES 15,000 25,000 - 0.00% GENERAL INSTITUTIONAL 2,696,000 2,708,100 2,134,635 78.82% PHYSICAL PLANT 7,572,500 8,287,500 2,497,798 30.14% PUBLIC SERVICE 25,000 25,000 - 0.00%

TOTAL EXPENDITURES 13,350,000$ 16,396,240$ 6,475,731$ 39.50%

March 27, 2018 32

DEBT SERVICE FUND 2017-18 2017-18 2017-18APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

LOCAL GOVERNMENT 11,925,000$ 11,925,000$ 11,925,000$ 100.00% INSTITUTIONAL 10,000 10,000 - 0.00% OTHER RESOURCES 325,000 325,000 337,712 103.91%

TOTAL REVENUE & OTHER RESOURCES 12,260,000$ 12,260,000$ 12,262,712$ 100.02%

EXPENDITURES BY FUNCTION:

PHYSICAL PLANT 12,460,000$ 12,460,000$ 1,349,293$ 10.83%

TOTAL EXPENDITURES 12,460,000$ 12,460,000$ 1,349,293$ 10.83%

GATEWAY TECHNICAL COLLEGE2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

March 27, 2018 33

GATEWAY TECHNICAL COLLEGE

2017-18 SUMMARY OF REVENUE & EXPENDITURES AS OF 2/28/18

ENTERPRISE FUND 2017-18 2017-18 2017-18APPROVED WORKING ACTUAL PERCENT

BUDGET BUDGET TO DATE INCURRED

REVENUE:

LOCAL GOVERNMENT 45,000$ 45,000$ 45,000$ 100.00% OTHER STUDENT FEES 255,000 255,000 81,503 31.96% INSTITUTIONAL 350,000 350,000 237,198 67.77% FEDERAL - - - 0.00%

TOTAL REVENUE & OTHER RESOURCES 650,000$ 650,000$ 363,702$ 55.95%

EXPENDITURES BY FUNCTION:

AUXILIARY SERVICES 650,000$ 650,000$ 364,354$ 56.05%

TOTAL EXPENDITURES 650,000$ 650,000$ 364,354$ 56.05%

March 27, 2018 34

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Roll Call Action X Information Discussion

CASH AND INVESTMENT SCHEDULES Summary of Item: Monthly cash and investment schedules Ends Statements and/or Executive Limitations:

Section 3 - Executive Limitations Policy 3.5 Financial Condition

Staff Liaison: Bill Whyte

March 27, 2018 35

Cash Balance December 31, 2017 18,704,091.91$

PLUS:

Cash Receipts 17,874,313.84

36,578,405.75$ LESS:

Disbursement:Payroll 3,722,432.77 Accounts Payable 3,770,258.41 7,492,691.18

Cash Balance January 31, 2018 29,085,714.57$

DISPOSITION OF FUNDS

Cash in Bank 2,422,682.32

Cash in Transit 68,513.86

Investments 26,589,743.39

Cash on Hand 4,775.00

TOTAL: January 31, 2018 29,085,714.57$

GATEWAY TECHNICAL COLLEGE

MONTHLY CASH RECONCILIATION

FOR THE MONTH ENDING JANUARY 31, 2018

March 27, 2018 36

GAT

EWAY

TEC

HN

ICAL

CO

LLEG

E

MO

NTH

LY IN

VEST

MEN

T R

EPO

RT

JULY

201

7 - J

UN

E 20

18Av

erag

eM

onth

lyIn

vest

men

tsIn

vest

men

tsC

hang

e in

Inve

stm

ents

YTD

Rat

e of

at B

egin

ning

at E

ndIn

vest

men

tsIn

com

eIn

vest

men

tsIn

vest

men

tof

Mon

thof

Mon

thfo

r Mon

thfo

r Mon

thIn

com

eIn

com

e

July

-17

35,4

07,9

70$

36,1

86,4

38$

77

8,46

8$

11,1

06$

11

,106

$

0.42

AUG

UST

36,1

86,4

38

41

,344

,260

5,15

7,82

2

14

,248

25,3

54

0.

43

SEPT

EMBE

R41

,344

,260

32,3

95,2

52

(8

,949

,008

)

13

,773

39,1

27

0.

40

OC

TOBE

R32

,395

,252

29,0

60,1

33

(3

,335

,119

)

11

,497

50,6

24

0.

43

NO

VEM

BER

29,0

60,1

33

23

,506

,043

(5,5

54,0

90)

10,0

15

60

,639

0.49

DEC

EMBE

R23

,506

,043

15,7

12,5

08

(7

,793

,535

)

9,

931

70

,570

0.68

Janu

ary-

1815

,712

,508

26,5

89,7

43

10

,877

,235

11,3

32

81

,902

0.56

FEBR

UAR

Y

MAR

CH

APR

IL

MAY

JUN

E

March 27, 2018 37

INVESTMENT SCHEDULE

January 31, 2018

NAME DATE DATE OF INTEREST PRESENT

OF BANK/INST INVESTED MATURITY AMOUNT RATE STATUS

LOCAL GOV'T POOL Various Open 6,754,594$ 1.35 OPEN

JOHNSON BANK Various Open 19,835,150$ 0.30 OPEN

TOTAL 26,589,743$

March 27, 2018 38

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action X Information _____ Discussion _____

PERSONNEL REPORT

Summary of Item: Monthly Personnel Activity Report Employment Approvals: New Hires Promotion(s) Retirement(s) Separation(s) Ends Statements and/or Executive Limitations: Section 3: Executive Limitations Policy 3.3 – Employment, Compensation & Benefits Staff Liaison: William Whyte 03/27/2018

March 27, 2018 39

PERSONNEL REPORT MARCH 2018

EMPLOYMENT APPROVALS: NEW HIRES

John Aschauer, Computer Support Technician, Learning Innovation Division (LID); Kenosha; Annual Salary: $46,800; effective February 19, 2018

Janet Foster, Student Accounts Associate, Student Services; Kenosha; Annual Salary: $43,160; effective February 26, 2018

Edgar Perez, Student Express Associate, Student Services; Racine; Annual Salary: $39,520; effective March 5, 2018

Brittany Werve, Computer Support Technician, LID; SC Johnson iMET Center-Sturtevant; Annual Salary: $44,200; effective February 5, 2018

Crystal Whalen, Academic Operations Aide (24 hours/week); Racine; Hourly Salary: $16.25; effective February 26, 2018

Meghan Wolf, Student Express Associate, Student Services; Kenosha; Annual Salary: $39,520; effective March 5, 2018

PROMOTION(S)

Hans Pedersen, District Infrastructure Technician, LID; Kenosha; Annual Salary: $57,491.20; previously Computer Support Technician; effective February 19, 2018

John David Zehren, Fab Lab Coordinator, Business & Workforce Solutions (BWS); SC Johnson iMET Center-Sturtevant; Annual Salary: $58,760; previously Fab Lab Technician; effective February 19, 2018

RETIREMENT(S)

Mary Jo Maheras, Student Support Specialist, Student Services; Racine; effective March 30, 2018

Jeanne Owen, Facility Management Representative, Building Services; Elkhorn; effective March 6, 2018

SEPARATION(S)

Jolanda Dinkins, Assistant Registrar, Student Services; Racine; effective March 9, 2018

Tina Trainor, Instructor Computer Information Systems, Racine; effective March 9, 2018

March 27, 2018 40

MARCH 2018 GRANT AWARDS  

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call ___ Action X Information ___ Discussion ___

GRANT AWARDS

Summary of Item: The college has received two new grant awards. The

grant from the Wisconsin Department of Health Services will fund the training of Certified Nursing Assistants. The Wisconsin Technical College System grant will fund Closed Captioning support services and information to students and staff.

Attachments: Grant Awards – March 2018 College Strategic Directions and/or Executive Limitations: Wisconsin Statutes 38.14(4)

Section 3 - Executive Limitations Policy 3.5 - Financial Condition

College Strategic Direction #1

Staff Liaison: Anne Whynott

March 27, 2018 41

MARCH 2018 GRANT AWARDS 

  Project 

Number 

Title 

Purpose 

Grant 

Period 

Number 

Served 

Funding Source 

Total B

udget 

Grant 

Award 

Matching 

Funds 

008 

WisC

aregiver Career 

Program 

Through a fede

ral grant, 

this grant w

ill fu

nd th

e training, textboo

ks, 

vaccinations, backgroun

d checks, scrub

s and

 certificatio

n exam

s.  

3/1/2018

 – 

2/29/2020 

2,000 

Wisc

onsin

 De

partmen

t of 

Health Services 

(DHS

$1,260,000

 $1,260,000

 $0

 

038 

Captioning

 Leade

rship 

Provide Closed

 Captio

ning

 supp

ort services a

nd 

inform

ation to stud

ents 

and staff in orde

r to 

increase accessib

ility of the

 college com

mun

ity.  

7/1/2017

 – 

6/30/2018 

500 

Wisc

onsin

 Techn

ical 

College System 

$20,000 

$20,000 

$0 

 

March 27, 2018 42

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Roll Call _____ Action X Information _____ Discussion _____

CONTRACTS FOR INSTRUCTIONAL DELIVERY Summary of Items: 1. 38.14 Contract reports for February 2018

lists all contracts for service completed or in progress 2017/2018 fiscal year.

Ends Statements and/or Executive Limitations: Policy 4.4 College Strategic Directions/Ends Statements #1 and #3 Staff Liaison: Matt Janisin

March 27, 2018 43

BWS

CFS

Boa

rd R

epor

t FY1

8

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

110

00TO

TALS

$3,2

76,0

60.1

52

0001

Keno

sha

Fire

Dep

artm

ent

IN53

1-80

5-1B

BA$1

,006

.40

02/0

7/17

Rob

in W

idm

ar

300

02R

&B G

rindi

ngIN

SU17

: 420

-437

-1ZB

A, 4

62-4

85-1

ZBA,

462

-48

6-1Z

BA; 9

00-0

03-1

ZM1R

$988

.00

172

02/1

4/17

Rob

in W

idm

ar4

0003

Amaz

on --

CAN

CEL

IN44

4-33

9-1Z

BA$0

.00

02/2

8/17

Rob

in W

idm

ar

500

04KA

BAIN

SU17

: 196

-848

-1ZB

A, 1

96-8

48-1

ZBB

-- (1

ZBA

was

can

celle

d)$3

,960

.00

04/1

9/17

Rob

in W

idm

ar6

0005

Badg

er H

igh

Scho

olIN

543-

300-

1ZBA

$4,5

71.1

003

/30/

17M

iche

lle M

iller

700

06W

ilmot

Hig

h Sc

hool

IN54

3-30

0-1Z

BB$4

,571

.10

03/3

0/17

Mic

helle

Mille

r8

0007

Uni

on G

rove

Hig

h Sc

hool

IN54

3-30

0-1Z

BC$4

,571

.10

03/3

0/17

Mic

helle

Mille

r9

0008

Uni

on G

rove

Hig

h Sc

hool

IN54

3-30

0-1Z

BD$4

,571

.10

03/3

0/17

Mic

helle

Mille

r

1000

09R

USD

Hig

h Sc

hool

IN54

3-30

0-1R

BA, 5

43-3

00-1

RBB

, 510

-40

7-1R

BA, 5

10-4

07-1

RBB

$19,

938.

0004

/21/

17M

iche

lle M

iller

1100

10Ke

nall

Mfg

IN60

5-45

8-1Z

BA$5

,940

.00

04/2

1/17

Rob

in W

idm

ar12

0011

WE

Ener

gies

IN42

0-40

8-1C

BA$1

3,36

0.00

05/1

1/17

Rob

in W

idm

ar13

0012

East

Tro

yIN

543-

300-

1ZBE

$4,5

71.1

005

/12/

17M

iche

lle M

iller

1400

13W

hite

wat

er U

nifie

d Sc

hool

Dis

trict

IN53

1-42

7-1z

1a, 5

31-4

27-1

z1b

$756

.96

05/2

6/17

Lori

Mac

cari

1500

14In

Sink

Erat

orSU

17: 6

06-1

11-1

ZBA,

623

-401

C-

1ZBC

, 196

-466

D-1

ZBA

$7,3

69.1

405

/26/

17R

obin

Wid

mar

1600

15Th

e Ab

bey

Res

ort

IN53

1-44

8-1z

1a$8

56.6

505

/02/

17Lo

ri M

acca

ri

1700

16R

acin

e C

ount

y W

orkf

orce

Sol

utio

nsIN

152-

187-

1r1a

, 152

-088

-1r1

a, 1

52-1

84-1

r1a,

152-

182-

1r1a

, 152

-146

-1r1

a, 1

52-0

97-1

r1a,

152-

087-

1r1a

, 152

--183

-1r1

a, 1

52-1

50-1

r1a,

152-

174-

1r1a

$54,

435.

4004

/18/

17M

iche

lle M

iller

1800

17R

acin

e C

ount

y W

orkf

orce

Sol

utio

ns IT

Web

Java

Dev

elop

er B

C S

U19

IN15

2-17

5-2R

1B, 1

52-0

86-2

R1B

, 152

-08

5-2R

1B$1

7,42

7.00

04/1

8/17

Mic

helle

Mille

r19

0018

KABA

INFA

17: 1

96-8

49-2

ZBA,

196

-850

-2ZB

A$3

,960

.00

04/1

9/17

Rob

in W

idm

ar

2000

19St

. Jos

eph'

s N

ursi

ng H

ome

IN50

3-44

7-1Z

BA, 5

03-4

47-1

ZBB,

503

-447

-1Z

BC, 5

03-4

47-1

ZBD

, 503

-447

-1ZB

E, 5

03-

447-

1ZBF

, 503

-447

-1ZB

G, 5

03-4

47-1

ZBH

$2,6

40.0

004

/20/

17R

obin

Wid

mar

2100

20O

EMM

CO

Inc

(Ken

osha

)IN

531-

448-

1k1a

$293

.43

05/0

1/17

Lori

Mac

cari

2200

21El

khor

n H

SIN

533-

126-

2cza

$6,3

45.8

805

/18/

17M

iche

lle M

iller

2300

22U

nion

Gro

ve H

SIN

501-

101-

2eca

$4.0

005

/18/

17M

iche

lle M

iller

2400

23U

nion

Gro

ve H

SIN

809-

188-

2zca

$4,3

01.1

005

/18/

17M

iche

lle M

iller

2500

24W

ater

ford

HS

IN80

9-18

8-2z

cb$4

,301

.10

05/1

8/17

Mic

helle

Mille

r26

0025

Big

Foot

HS

IN50

1-10

1-2e

cb$4

,301

.10

05/1

8/17

Mic

helle

Mille

r27

0026

Burli

ngto

n H

SIN

501-

101-

2ecc

$12,

043.

0805

/18/

17M

iche

lle M

iller

2800

27U

nion

Gro

ve H

SIN

501-

101-

2ecd

$5,5

91.4

305

/18/

17M

iche

lle M

iller

2900

28W

illiam

s Ba

y H

SIN

501-

101-

2ece

$1,7

20.4

405

/18/

17M

iche

lle M

iller

3000

29W

esto

sha

Cen

tral H

SIN

533-

126-

2zcb

$4,0

35.3

605

/18/

17M

iche

lle M

iller

Pag

e 1

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 44

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

3100

30W

ater

ford

HS

IN53

3-12

6-2z

cc$3

,747

.12

05/1

8/17

Mic

helle

Mille

r32

0031

Burli

ngto

n H

SIN

533-

126-

2zcd

$2,0

17.6

805

/18/

17M

iche

lle M

iller

3300

32W

ater

ford

HS

IN80

9-19

8-2z

ca$3

,010

.77

05/1

8/17

Mic

helle

Mille

r34

0033

Wat

erfo

rd H

SIN

809-

198-

2zcb

$7,3

11.8

705

/18/

17M

iche

lle M

iller

3500

34El

khor

n H

SIN

533-

131-

2zca

$2,8

82.4

005

/18/

17M

iche

lle M

iller

3600

35W

illiam

s Ba

y H

SIN

533-

131-

2zcb

$2,8

82.4

005

/18/

17M

iche

lle M

iller

3700

36Ba

dger

HS

IN50

1-10

1-2e

cf$1

1,18

2.86

05/1

8/17

Mic

helle

Mille

r38

0037

Wat

erfo

rd H

SIN

809-

196-

2cca

$6,0

21.5

405

/18/

17M

iche

lle M

iller

3900

38U

nion

Gro

ve H

SIN

809-

196-

2ccb

$7,3

11.8

705

/18/

17M

iche

lle M

iller

4000

39Bu

rling

ton

HS

IN53

3-12

6-2z

ce$3

,170

.64

05/1

8/17

Mic

helle

Mille

r41

0040

Willi

ams

Bay

HS

IN53

3-12

6-2z

cf$2

,882

.40

05/1

8/17

Mic

helle

Mille

r42

0041

Burli

ngto

n H

SIN

533-

126-

2zcg

$2,5

94.1

605

/18/

17M

iche

lle M

iller

4300

42U

nion

Gro

ve H

SIN

533-

126-

2zch

$3,7

47.1

205

/18/

17M

iche

lle M

iller

4400

43W

ater

ford

HS

IN53

3-12

6-2z

cj$2

,594

.16

05/1

8/17

Mic

helle

Mille

r45

0044

Big

Foot

HS

IN53

3-12

6-2z

ck$2

,882

.40

05/1

8/17

Mic

helle

Mille

r46

0045

Burli

ngto

n H

SIN

533-

126-

2zcl

$2,0

17.6

805

/18/

17M

iche

lle M

iller

4700

46W

illiam

s Ba

y H

SIN

533-

128-

2zcm

$5,7

64.8

005

/18/

17M

iche

lle M

iller

4800

47W

esto

sha

Cen

tral H

S - C

ance

lled

IN53

3-12

8-2z

cn$0

.00

05/1

8/17

Mic

helle

Mille

r49

0048

Cat

holic

Cen

tral H

SIN

533-

128-

2zcp

$576

.48

05/1

8/17

Mic

helle

Mille

r50

0049

Big

Foot

HS

IN15

2-12

6-2z

ca$1

,162

.96

05/1

8/17

Mic

helle

Mille

r51

0050

Burli

ngto

n H

SIN

152-

126-

2zcb

$5,8

14.8

005

/18/

17M

iche

lle M

iller

5200

51U

nion

Gro

ve H

SIN

152-

126-

2zcc

$5,2

33.3

205

/18/

17M

iche

lle M

iller

5300

52C

entra

l HS

IN15

2-12

6-2z

cd$1

,162

.96

05/1

8/17

Mic

helle

Mille

r54

0053

Willi

ams

Bay

HS

IN15

2-12

6-2z

ce$5

81.4

805

/18/

17M

iche

lle M

iller

5500

54El

khor

n H

SIN

533-

128-

2zcq

$1,1

53.7

605

/18/

17M

iche

lle M

iller

5600

55Bu

rling

ton

HS

IN53

3-12

8-2z

cr$2

,594

.16

05/1

8/17

Mic

helle

Mille

r57

0056

Wat

erfo

rd H

SIN

533-

128-

2zcs

$1,7

29.4

405

/18/

17M

iche

lle M

iller

5800

57U

nion

Gro

ve H

SIN

533-

128-

2zct

$2,8

84.4

005

/18/

17M

iche

lle M

iller

5900

58G

TCF

- SC

J10

3-80

4Q-1

ZBA

$2,8

20.0

006

/21/

17M

iche

lle M

iller

6000

59G

TCF

- SC

JIN

/TA

444-

331-

1cbr

, 444

-337

-1cb

r, 80

4-37

0-1c

br, 4

44-3

39-1

cbr,

900-

003-

1M1A

, 900

-003

-1m

1a

$37,

836.

7206

/21/

17M

iche

lle M

iller

6100

60G

TCF

- SC

JIN

/TA

801-

302-

2cbr

, 444

-338

-2cb

r, 90

0-00

3-2C

M18

$20,

243.

3306

/21/

17M

iche

lle M

iller

6200

61G

TCF

- SC

JIN

/TA

444-

331-

1ecw

, 444

-337

-1ec

w(re

plac

ed w

ith 4

44-3

37-1

ecf -

2/22

/18

per D

awn)

804

-370

-1ec

w,

444-

339-

1ecw

, 900

-003

-1m

1b

$30,

362.

0406

/21/

17M

iche

lle M

iller

6300

62G

TCF

- SC

JIN

/TA

801-

302-

2ecw

, 444

-338

-2ec

w, 9

00-

003-

2em

18$1

6,71

8.50

06/2

1/17

Mic

helle

Mille

r

Pag

e 2

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 45

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

6400

63Br

unk

Indu

strie

sIN

623-

401C

-1ZB

A, 6

23-4

01C

-1ZB

B$3

,044

.00

05/1

7/17

Rob

in W

idm

ar65

0064

East

Tro

y H

SIN

543-

300-

2EB1

$4,5

71.1

005

/18/

17M

iche

lle M

iller

6600

65W

esto

sha

Cen

tral H

SIN

543-

300-

2EB2

$4,5

71.1

005

/18/

17M

iche

lle M

iller

6700

66El

khor

n H

SIN

543-

300-

2EBA

$4,5

71.1

005

/18/

17M

iche

lle M

iller

6800

67Bu

rling

ton

HS

IN54

3-30

0-2Z

B1$4

,571

.10

05/1

8/17

Mic

helle

Mille

r69

0068

Wat

erfo

rd H

SIN

543-

300-

2ZB2

$4,5

71.1

005

/18/

17M

iche

lle M

iller

7000

69Bu

rling

ton

HS

IN54

3-30

0-2Z

BA$4

,571

.10

05/1

8/17

Mic

helle

Mille

r71

0070

Wat

erfo

rd H

SIN

543-

300-

2ZBB

$4,5

71.1

005

/18/

17M

iche

lle M

iller

7200

71Ba

dger

HS

IN54

3-30

0-2Z

BC$4

,571

.10

05/1

8/17

Mic

helle

Mille

r73

0072

Wilm

ot H

S C

ANC

ELLE

DIN

543-

300-

2ZBD

$4,5

71.1

005

/18/

17M

iche

lle M

iller

7400

73M

ount

Ple

asan

t Pol

ice

Dep

t.IN

504-

484-

1K1A

$200

.00

06/0

6/17

Mol

ly M

eagh

er75

0074

Wal

wor

th C

ount

y Sh

eriff

's O

ffice

IN50

4-48

4-1K

1B$2

00.0

006

/06/

17M

olly

Mea

gher

7600

75Bu

rling

ton

Polic

e D

ept.

IN50

4-48

4-1K

1C$2

00.0

006

/06/

17M

olly

Mea

gher

7700

76Ed

gerto

n Po

lice

Dep

t.IN

504-

484-

1K1D

$200

.00

06/0

6/17

Mol

ly M

eagh

er78

0077

Wat

erfo

rd P

DIN

504-

484-

1K1E

$200

.00

06/0

6/17

Mol

ly M

eagh

er79

0078

KPD

IN50

4-48

1-1K

1C$3

20.5

306

/06/

17M

olly

Mea

gher

8000

79KS

DIN

504-

481-

1K1D

$91.

5806

/06/

17M

olly

Mea

gher

8100

80N

OR

TEC

IN62

0-42

0A-1

ZBA

$1,6

50.0

006

/12/

17R

obin

Wid

mar

8200

81C

atho

lic C

entra

l HS

IN54

3-30

0-1Z

BF$4

57.1

106

/12/

17R

obin

Wid

mar

8300

82U

NFI

, Inc

.TA

900-

003-

1ZBA

$4,0

00.0

006

/15/

17R

obin

Wid

mar

8400

83R

acin

e C

ount

y W

orkf

orce

Sol

utio

nsIN

154-

121-

2R1B

, 154

-126

-2R

1A, 1

07-1

93-

2R1B

, 154

-114

-2R

1C, 1

54-1

22-2

R1A

, 107

-01

6-2R

1A, 1

07-0

17-2

R1A

, 154

-120

-2R

1B,

154-

125-

2R1B

, 15

4-12

4-2R

1A

$62,

521.

0006

/19/

17M

iche

lle M

iller

8500

84Ba

dger

Hig

h Sc

hool

IN1`

/*$7

31.8

506

/15/

17D

awn

Her

rman

n86

0085

Wilm

ot H

igh

Scho

olIN

SEE

GO

OG

LE D

OC

$17,

204.

4006

/15/

17D

awn

Her

rman

n87

0086

NC

3TA

900-

003-

3ZM

1G$3

,900

.00

06/1

6/17

Rob

in W

idm

ar

8800

87G

TCF

- SC

JIN

/TA

444-

337-

1CBN

, 444

-339

-1C

BN, 4

44-

331-

1CBN

, 801

-302

-1C

BN, 9

00-0

03-

1m1c

, 900

-019

-1cm

18

Prim

ary

w/0

089

$31,

476.

7007

/17/

17M

iche

lle M

iller

8900

88G

TCF

- SC

JIN

/TA

444-

338-

2CBN

, 804

-370

-2C

BNPr

imar

y w

/ 009

0 90

0-00

3-2c

m12

$19,

490.

3007

/17/

17M

iche

lle M

iller

9000

89G

TCF

- (KC

JC)

IN/T

A44

4-33

7-1C

BS, 4

44-3

39-1

CBS

, 444

-33

1-1C

BS, 8

01-3

02-1

CBS

Seco

ndar

y on

008

7

$2,3

11.8

707

/17/

17M

iche

lle M

iller

9100

90G

TCF

- (KC

JC)

IN/T

A44

4-33

8-2C

BS, 8

04-3

70-2

CBS

Seco

ndar

y on

008

8$1

,334

.63

07/1

7/17

Mic

helle

Mille

r

9200

91W

CJC

- C

ANC

ELLE

DIN

/TA

SU17

:$0

.00

N/A

Mic

helle

Mille

r93

0092

WC

JC -

CAN

CEL

LED

IN/T

AFA

17:

$0.0

0N

/AM

iche

lle M

iller

9400

93R

esC

are

Keno

sha

TA90

0-00

3-1M

1CB

$3,9

00.0

009

/01/

17R

obin

Wid

mar

9500

94R

esC

are

Keno

sha

- CAN

CEL

TA90

0-00

3-1Z

M1A

-- C

FS 2

017-

0417

$0.0

0N

/AR

obin

Wid

mar

Pag

e 3

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 46

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

9600

95R

esC

are

Keno

sha

TA90

0-00

3-1M

1SB

$3,9

00.0

009

/01/

17R

obin

Wid

mar

9700

96R

esC

are

Milw

TA90

0-00

3-1M

1LB

$3,9

00.0

009

/01/

17R

obin

Wid

mar

9800

97W

alw

orth

Cou

nty

WIO

ATA

900-

003-

1ZM

1D

SEE

2017

-042

3$3

,900

.00

06/2

7/17

Rob

in W

idm

ar99

0098

Res

Car

e Ke

nosh

aTA

900-

003-

1M1D

D$3

,900

.00

09/0

1/17

Rob

in W

idm

ar10

000

99R

esC

are

Keno

sha

TA90

0-00

3-1M

1JD

$3,9

00.0

009

/01/

17R

obin

Wid

mar

101

0100

Res

Car

e Ke

nosh

aTA

900-

003-

2ZM

1B$1

75.0

009

/08/

17R

obin

Wid

mar

102

0101

Res

Car

e M

ilwTA

900-

003-

1M1T

N$3

,900

.00

09/0

1/17

Rob

in W

idm

ar

103

0102

KCJC

- C

NC

HS

BC V

- C

ANC

ELLE

DIN

/TA

444-

331-

1CBK

, 444

-337

-1C

BK, 8

04-

370-

1CBK

, 444

-339

-1C

BK$0

.00

06/2

1/17

Mic

helle

Mille

r

104

0103

KCJC

- C

NC

HS

BC V

- C

ANC

ELLE

DIN

/TA

801-

302-

2CBK

, 444

-338

-2C

BK$0

.00

06/2

1/17

Mic

helle

Mille

r10

501

04M

inia

ture

Pre

cisi

on C

ompo

nent

sTA

900-

019-

1ZBM

$4,6

82.1

009

/08/

17R

obin

Wid

mar

106

0105

WD

C/B

oys

N G

irls

Clu

bIN

504-

458-

1K1B

, 1K1

Y &

1K1Z

$17,

914.

0008

/17/

17M

olly

Mea

gher

107

0106

WI-D

OJ

IN50

4-45

8-1K

1A$1

7,91

4.00

06/2

1/17

Mol

ly M

eagh

er

108

0107

Mon

di A

kros

ilIN

503-

447B

-1ZB

A1, 5

03-4

47B-

1ZBB

1, 5

03-

447B

-1ZB

C1,

503

-447

B-1Z

BD1

$668

.00

06/2

9/17

Rob

in W

idm

ar

109

0108

Wal

wor

th E

mer

genc

y Se

rvic

esIN

531-

892-

1z1a

$504

.90

06/2

6/17

Lori

Mac

cari

110

0109

Prim

ex F

amily

of C

ompa

nies

IN/T

A10

3-41

7C-1

ZBA,

103

-417

C-1

ZBB,

103-

432C

-1ZB

A, 9

00-0

19-1

ZBAP

$5,7

22.0

806

/26/

17R

obin

Wid

mar

111

0110

Mon

di A

kros

ilIN

/TA

620-

431-

1ZBA

, 620

-431

-1ZB

B; 9

00-

003-

1M1M

A$2

,108

.35

169

06/2

7/17

Rob

in W

idm

ar

112

0111

Shilo

h In

dIN

/TA

620-

433-

1ZBA

, 620

-433

-1ZB

B, 4

49-

411-

1ZBA

; 900

-003

-1ZM

1S$2

,306

.00

168

06/2

7/17

Rob

in W

idm

ar

113

0112

RU

SD -

REA

L Sc

hool

IN/T

A60

6-14

1-2C

1A, 6

06-1

41-2

C1B

, 900

-01

9-2C

1A$2

8,16

1.12

08/2

9/17

Rob

in W

idm

ar

114

0113

NC

3TA

900-

019-

1ZC

Q1,

900

-019

-1ZC

QA

$15,

337.

5007

/07/

18R

obin

Wid

mar

115

0114

NC

3 --

VOID

-- S

EE C

FS 2

018-

0235

TA90

0-01

9-2Z

CQ

2, 9

00-0

19-2

ZCQ

B$0

.00

09/0

8/17

Rob

in W

idm

ar

116

0115

Teco

met

IN/T

A90

0-01

0-1Z

BA, 1

96-8

86A-

1ZBA

, 196

-886

B-1Z

BB, 1

96-8

86B-

1ZBC

, 196

-886

B-1Z

BD, 1

96-

886B

-1ZB

E, 1

96-8

86B-

1ZBF

, 196

-886

B-1Z

BG, 1

96-8

86B-

1ZBH

, 196

-886

B-1Z

BJ, 1

96-

886B

-1ZB

K, 1

96-8

86B-

1ZBL

$3,1

63.8

507

/14/

17R

obin

Wid

mar

117

0116

Keno

sha

Cou

nty

Hig

hway

Dep

t.TA

900-

019-

1ZM

1Q$7

,986

.00

07/1

1/18

Rob

in W

idm

ar

118

0117

Knap

p M

fgIN

/TA

623-

812-

1ZBA

, 900

-019

-1ZB

A; 9

00-

003-

1M1K

M$1

,895

.55

146

07/1

2/17

Rob

in W

idm

ar

119

0118

Kena

ll M

anuf

actu

ring

IN60

5-45

8-1Z

BB$6

,012

.00

07/1

4/17

Rob

in W

idm

ar12

001

19R

esC

are

Milw

TA90

0-00

3-2M

1DC

$3,9

00.0

007

/14/

17R

obin

Wid

mar

121

0120

NC

3TA

900-

003-

1M1D

R$3

,900

.00

07/1

4/17

Rob

in W

idm

ar12

201

21R

esC

are/

FSET

Ken

oTA

900-

003-

1M1C

P$2

50.0

007

/14/

17R

obin

Wid

mar

123

0122

SC J

ohns

onIN

$2,0

04.0

007

/20/

17R

obin

Wid

mar

124

0123

Hea

rtlan

d Bu

sine

ss S

yste

ms

IN/T

A15

0-41

7-2C

BA; 9

00-0

03-2

M1H

B$2

,218

.00

165

07/2

0/17

Rob

in W

idm

ar12

501

24D

oole

y &

Asso

ciat

esTA

900-

019-

2ZBA

$1,4

74.9

107

/27/

17R

obin

Wid

mar

126

0125

PPG

Par

tner

s, L

LCIN

531-

448-

1z1b

$538

.50

07/3

1/17

Lori

Mac

cari

Pag

e 4

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 47

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

127

0126

Amaz

onIN

SU17

: 444

-339

-1ZB

A$1

0,33

6.65

11/2

1/17

Rob

in W

idm

ar12

801

27KU

SD -

Trem

per H

SIN

543-

300-

2Z1A

$4,5

71.1

008

/02/

17M

iche

lle M

iller

129

0128

KUSD

- In

dian

Tra

ils H

SIN

543-

300-

2Z1B

, 543

-300

-2Z1

C$9

,142

.20

08/0

2/17

Mic

helle

Mille

r13

001

29R

acin

e Po

lice

Dep

artm

ent

IN53

1-42

7-1z

1c/1

z1d/

2z1a

-2z1

g$6

,938

.80

08/0

8/17

Lori

Mac

cari

131

0130

Goo

d Fo

ods

IN/T

A19

6-80

5D-1

ZBA,

196

-805

E-1Z

BAG

,90

0-01

9-1Z

BAG

$21,

286.

6808

/15/

17R

obin

Wid

mar

132

0131

Snap

-On

-- C

ANC

ELLE

DIN

/TA

606-

425-

1ZBA

, 900

-019

-1ZB

M1

$0.0

008

/15/

17R

obin

Wid

mar

133

0132

BRP

US,

Inc.

IN/T

A10

3-43

2C-2

ZBA,

103

-466

-2ZB

A(C

AN),

900-

019-

2ZBR

P$1

,888

.00

08/1

5/17

Rob

in W

idm

ar

134

0133

S&J

Bus

Serv

ice

IN53

1-42

7-1z

1e$6

30.8

007

/27/

17Lo

ri M

acca

ri13

501

34N

C3

TA90

0-00

3-2M

1CS

$3,9

00.0

008

/17/

17R

obin

Wid

mar

136

0135

NAM

I, Ke

nosh

a C

ount

yTA

900-

019-

2KF4

$4,0

00.0

008

/17/

17M

olly

Mea

gher

137

0136

Med

Tor

que

IN42

0-43

4-2Z

BA, 4

20 4

34-2

ZBB

$4,4

86.2

008

/18/

17R

obin

Wid

mar

138

0137

Wor

kfor

ce D

evel

opm

ent C

tr, R

acin

eIN

504-

458-

1K1Y

$3,4

45.0

008

/17/

17M

olly

Mea

gher

139

0138

KSD

IN50

4-45

8-1K

1Z$6

89.0

008

/17/

17M

olly

Mea

gher

140

0139

Lake

view

HS

INFA

17: 6

28-1

15-2

L1A,

628

-123

-2L1

A, 6

12-1

02-

2L1A

, 628

-124

-2L1

A, 6

28-1

09-2

L1A,

444

-339

-2L

1A, 4

44-3

31-2

L1A,

444

-339

-2L1

B, 6

20-3

02-

2L1A

$91,

598.

0008

/30/

17R

obin

Wid

mar

141

0140

Lake

view

HS

INSP

18: 6

28-1

22-3

L1A,

628

-122

-3L1

B,44

4-33

1-3L

1B$3

5,53

8.40

08/3

0/17

Rob

in W

idm

ar

142

0141

DO

C -

RC

IIN

See

Goo

gle

Doc

Daw

n H

errm

ann

143

0142

DO

C -

RYO

CIN

See

Goo

gle

DO

CD

awn

Her

rman

n14

401

43D

OC

- EL

LSW

OR

THIN

See

Goo

gle

Doc

Daw

n H

errm

ann

145

0144

InSi

nkEr

ator

IN60

5-11

3-2Z

BA, 8

04-3

70-2

ZBA,

606

-111

-2Z

BA, 6

06-1

22-2

ZBA,

606

-160

-2ZB

A$3

5,48

9.44

09/0

8/17

Rob

in W

idm

ar

146

0145

LaVe

lle In

dIN

462-

421A

-1ZB

A, 4

62-4

21A-

1ZBB

, 462

-421

B-1Z

BC, 4

62-4

21B-

1ZBD

; 900

-003

-1M

1LA

$2,6

35.0

017

009

/01/

17R

obin

Wid

mar

147

0146

NC

3TA

900-

003-

2M1A

U$3

,900

.00

08/2

9/17

Rob

in W

idm

ar14

801

47N

C3

TA90

0-00

3-2M

1EP

$3,9

00.0

009

/01/

17R

obin

Wid

mar

149

0148

Kena

ll M

fgIN

/TA

623-

497-

2ZBA

, 623

-498

-2ZB

A, 9

00-

019-

2ZBB

$17,

925.

6609

/05/

17R

obin

Wid

mar

150

0149

Kena

ll M

fgIN

/TA

196-

805F

-2ZB

A, 9

00-0

19-2

ZBC

$5,0

09.8

309

/21/

17R

obin

Wid

mar

151

0150

Adam

s El

ectri

cIN

FA17

: 449

-401

C-2

ZBA,

620

-415

-2Z

BA; 9

00-0

03-2

M1A

E$8

56.8

016

709

/06/

17R

obin

Wid

mar

152

0151

Rac

ine

Polic

e D

epar

tmen

t53

1-42

7-2z

1a th

ru 2

z1g

09/0

7/17

Lori

Mac

cari

153

0152

Clim

bing

Tre

e C

hild

Car

eIN

531-

892-

2z9a

$254

.97

09/0

7/17

Lori

Mac

cari

154

0153

WI D

OJ

CAN

CEL

this

is s

pons

or b

illing

IN50

4-45

8-n/

a09

/11/

17M

olly

Mea

gher

155

0154

NC

3TA

900-

003-

2M1J

J$3

,900

.00

09/1

2/17

Rob

in W

idm

ar

156

0155

Amaz

onIN

SP18

: 444

-337

-3ZB

A, 4

44-3

39-

3ZBA

, 543

-300

-3Z1

1, 8

04-1

23-3

ZB1,

801-

301-

3ZB1

, 501

-101

-3Z3

1, 1

52-

182-

3Z31

01/1

5/18

Rob

in W

idm

ar

Pag

e 5

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 48

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

157

0156

Badg

er H

igh

Scho

olTA

900-

019-

1M1B

A$6

,000

.00

09/1

3/17

Rob

in W

idm

ar15

801

57Bi

g Fo

ot H

igh

Scho

olTA

900-

019-

1M1B

F$6

,000

.00

09/1

3/17

Rob

in W

idm

ar15

901

58Bu

rling

ton

Hig

ht S

choo

lTA

900-

019-

1M1B

U$6

,000

.00

09/1

3/17

Rob

in W

idm

ar16

001

59El

khor

n H

igh

Scho

olTA

900-

019-

1M1E

L$6

,000

.00

09/1

3/17

Rob

in W

idm

ar16

101

60U

nion

Gro

ve H

igh

Scho

olTA

900-

019-

1M1U

G$6

,000

.00

09/1

3/17

Rob

in W

idm

ar16

201

61W

ater

ford

Hig

h Sc

hool

TA90

0-01

9-1M

1WF

$6,0

00.0

009

/13/

17R

obin

Wid

mar

163

0162

Wes

tosh

a C

entra

l Hig

h Sc

hool

TA90

0-01

9-1M

1WC

$6,0

00.0

009

/13/

17R

obin

Wid

mar

164

0163

Willi

ams

Bay

Hig

h Sc

hool

TA90

0-01

9-1M

1WB

$6,0

00.0

009

/13/

17R

obin

Wid

mar

165

0164

NC

3TA

900-

003-

2M1J

B$3

,900

.00

09/1

3/17

Rob

in W

idm

ar

166

0165

KABA

IN19

6-84

8-3Z

BA, 1

96-8

49-3

ZBA,

196

-85

0-3Z

BA$6

,012

.00

09/1

5/17

Rob

in W

idm

ar

167

0166

Badg

er H

SIN

See

Goo

gle

Doc

$177

,021

.44

09/1

4/17

Daw

n H

errm

ann

168

0167

Burli

ngto

n H

SIN

See

Goo

gle

Doc

$104

,573

.30

09/1

4/17

Daw

n H

errm

ann

169

0168

Del

avan

/Dar

ien

HS

INSe

e G

oogl

e D

oc$2

0,99

2.02

09/1

4/17

Daw

n H

errm

ann

170

0169

East

Tro

y H

SIN

See

Goo

gle

Doc

$68,

466.

8009

/14/

17D

awn

Her

rman

n17

101

70El

khor

n H

SIN

See

Goo

gle

Doc

$121

,367

.92

09/1

4/17

Daw

n H

errm

ann

172

0171

KUSD

Bra

dfor

dIN

See

Goo

gle

Doc

$66,

886.

9809

/14/

17D

awn

Her

rman

n17

301

72KU

SD IT

AIN

See

Goo

gle

Doc

$123

,064

.52

09/1

4/17

Daw

n H

errm

ann

174

0173

KUSD

Tre

mpe

rIN

See

Goo

gle

Doc

$92,

359.

9209

/14/

17D

awn

Her

rman

n17

501

74R

USD

Cas

eIN

See

Goo

gle

Doc

$93,

092.

7609

/14/

17D

awn

Her

rman

n17

601

75R

USD

Hor

lick

INSe

e G

oogl

e D

oc$9

9,68

5.50

09/1

4/17

Daw

n H

errm

ann

177

0176

RU

SD P

ark

INSe

e G

oogl

e D

oc$7

0,65

2.32

09/1

4/17

Daw

n H

errm

ann

178

0177

RU

SD R

EAL

INSe

e G

oogl

e D

oc$4

9,55

5.86

09/1

4/17

Daw

n H

errm

ann

179

0178

RU

SD W

alde

nIN

See

Goo

gle

Doc

$9,5

84.5

209

/14/

17D

awn

Her

rman

n18

001

79U

nion

Gro

ve H

SIN

See

Goo

gle

Doc

$60,

935.

8609

/14/

17D

awn

Her

rman

n18

101

80W

ater

ford

HS

INSe

e G

oogl

e D

oc$5

4,93

9.34

09/1

4/17

Daw

n H

errm

ann

182

0181

Wes

t Allis

HS

INSe

e G

oogl

e D

oc$6

,771

.24

09/1

4/17

Daw

n H

errm

ann

183

0182

Wes

tosh

a C

entra

l HS

INSe

e G

oogl

e D

oc$9

6,27

5.90

09/1

4/17

Daw

n H

errm

ann

184

0183

Whi

tew

ater

HS

INSe

e G

oogl

e D

oc$1

0,96

2.96

09/1

4/17

Daw

n H

errm

ann

185

0184

Wilm

ot H

SIN

See

Goo

gle

Doc

$116

,364

.86

09/1

4/17

Daw

n H

errm

ann

186

0185

Wal

wor

th C

ount

y Ja

ilIN

890-

721-

2ZBA

, 854

-733

-2ZB

A, 8

59-

777-

2ZBA

$2,7

44.0

009

/19/

17R

obin

Wid

mar

187

0186

SC J

ohns

onIN

606-

440-

2CBA

$1,4

16.0

009

/19/

17R

obin

Wid

mar

188

0187

Keno

sha

Sher

iff's

Dep

tIN

504-

481-

1K1F

$91.

5809

/20/

17M

olly

Mea

gher

189

0188

Rac

ine

Cou

nty

Sher

iff's

Offi

ceIN

504-

481-

2K1G

$230

.80

09/2

0/17

Mol

ly M

eagh

er19

001

89C

ity o

f Del

avan

IN50

4-47

5-2Z

1A$6

00.0

009

/26/

17M

olly

Mea

gher

191

0190

Wal

wor

th C

ount

y Sh

eriff

's O

ffice

IN50

4-47

5-2Z

1B$4

00.0

009

/26/

17M

olly

Mea

gher

192

0191

Gen

oa C

ity P

olic

e D

ept.

IN50

4-47

5-2Z

1C$2

00.0

009

/26/

17M

olly

Mea

gher

Pag

e 6

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 49

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

193

0192

Tow

n of

Del

avan

PD

IN50

4-47

5-2Z

1D$2

00.0

009

/26/

17M

olly

Mea

gher

194

0193

City

of D

elva

n PD

IN50

4-47

5-2Z

1E$3

00.0

009

/26/

17M

olly

Mea

gher

195

0194

Gen

oa C

ity P

DIN

504-

475-

2Z1F

$100

.00

09/2

6/17

Mol

ly M

eagh

er19

601

95W

alw

orth

Cou

nty

Sher

iff's

Offi

ceIN

504-

475-

2Z1G

$100

.00

09/2

6/17

Mol

ly M

eagh

er19

701

96W

alw

orth

Cou

nty

Sher

iff's

Offi

ceIN

504-

474-

2Z1A

$600

.00

09/2

6/17

Mol

ly M

eagh

er19

801

97C

ity o

f Del

avan

PD

IN50

4-47

4-2Z

1B$2

00.0

009

/26/

17M

olly

Mea

gher

199

0198

Wal

wor

th C

ount

y Sh

eriff

's O

ffice

IN50

4-47

4-2Z

1C$6

00.0

009

/26/

17M

olly

Mea

gher

200

0199

City

of D

elav

an P

DIN

504-

474-

2Z1D

$120

.00

09/2

6/17

Mol

ly M

eagh

er20

102

00To

wn

of H

ayw

ard

Polic

e D

ept.

IN50

4-47

4-2Z

1E$6

0.00

09/2

6/17

Mol

ly M

eagh

er20

202

01W

alw

orth

Cou

nty

Sher

iff's

Offi

ceIN

504-

474-

2Z1F

$540

.00

09/2

6/17

Mol

ly M

eagh

er20

302

02C

ity o

f Del

avan

PD

IN50

4-47

4-2Z

1G$1

20.0

009

/26/

17M

olly

Mea

gher

204

0203

Gen

oa C

ity P

DIN

504-

474-

2Z1H

$120

.00

09/2

6/17

Mol

ly M

eagh

er20

502

04W

alw

orth

Cou

nty

Sher

iff's

Offi

ceIN

504-

474-

2Z1J

$420

.00

09/2

6/17

Mol

ly M

eagh

er20

602

05C

ity o

f Del

avan

PD

IN50

4-47

4-2Z

1K$6

0.00

09/2

6/17

Mol

ly M

eagh

er20

702

06G

reen

dale

PD

IN50

4-47

4-2Z

1L$6

0.00

09/2

6/17

Mol

ly M

eagh

er20

802

07R

CW

SIN

154-

127-

2z1a

, 107

-193

-2z1

a$2

5,25

3.14

10/0

9/17

Rob

in W

idm

ar20

902

08Bu

rling

ton

Was

tew

ater

IN53

1-42

7-2z

1h$3

17.2

009

/28/

17Lo

ri M

acca

ri21

002

09Pr

imex

IN10

3-43

2C-2

ZBB,

900

-019

-2ZB

P$2

,069

.08

09/2

8/17

Rob

in W

idm

ar

211

0210

RU

SDIN

/TA

602-

122-

2Z1A

, 602

-122

-2Z1

B, 6

02-1

22-2

Z1C

,60

2-12

2-2Z

11, 6

02-1

07-2

Z1A,

602

-107

-2Z1

B,60

2-10

7-2Z

1C, 6

02-1

07-2

Z11,

602

-125

-2Z1

A,60

2-12

5-2Z

1C, 6

02-1

04-2

Z11,

602

-124

-2Z1

1,90

0-01

9-2Z

JK

$137

,083

.59

10/0

5/17

Rob

in W

idm

ar

212

0211

GTC

F - S

CJ

IN10

9-12

2-2B

32, 1

09-1

14-2

B32,

109

-10

1-2B

32,

$28,

576.

4310

/04/

17M

iche

lle M

iller

213

0212

WI D

OC

-- E

llsw

orth

IN44

4-33

1-2C

BA, 4

44-3

37-2

CBA

, 444

-33

8-2C

BA, 4

44-3

39-2

CBA

10/0

3/17

Rob

in W

idm

ar

214

0213

NC

3TA

900-

019-

1ZBG

$4,1

62.5

010

/20/

17R

obin

Wid

mar

215

0214

NC

3TA

900-

003-

2M1M

A$3

,900

.00

10/2

5/17

Rob

in W

idm

ar

216

0215

WI-D

OJ

IN50

4-45

8-1K

1V (r

epla

cing

504

-458

-1K

1Z)

$689

.00

10/1

0/17

Mol

ly M

eagh

er

217

0216

WI D

OC

-- R

CI

IN44

4-33

1-2Z

BA, 4

44-3

37-2

ZBA,

444

-33

8-2Z

BA, 4

44-3

39-2

ZBA,

804

-370

-2Z

RC

I

10/1

9/17

Rob

in W

idm

ar

218

0217

UM

OS

IN44

9-41

1-2C

BA, 4

20-4

34A-

2CBA

,42

0-43

8-2C

BA, 1

96-8

21A-

2CBA

$7,1

51.0

010

/18/

17R

obin

Wid

mar

219

0218

UW

Mad

ison

IN19

6-87

0A-2

ZBA

$659

.07

11/1

3/17

Rob

in W

idm

ar22

002

19St

aff E

lect

ricIN

/TA

150-

410-

2CBA

, 900

-019

-2C

BA$9

,496

.00

10/2

0/17

Rob

in W

idm

ar22

102

20W

isco

nsin

Vis

ion

(WVA

)IN

531-

448-

2z1a

$492

.35

10/2

0/17

Lori

Mac

cari

222

0221

Kena

ll M

fgIN

196-

805F

-3ZB

B$4

,842

.83

10/1

9/17

Rob

in W

idm

ar22

302

22Ke

nall

Mfg

IN60

5-45

8-2Z

BA$6

,012

.00

10/2

4/17

Rob

in W

idm

ar22

402

23N

C3

TA90

0-00

3-2M

1DW

$3,9

00.0

010

/25/

17R

obin

Wid

mar

Pag

e 7

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 50

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

225

0224

RC

WS

TA90

0-00

3-1M

1JM

$3,9

00.0

010

/25/

17R

obin

Wid

mar

226

0225

WC

JCTA

900-

003-

1M1J

P$3

,900

.00

10/2

5/17

Rob

in W

idm

ar22

702

26R

esC

are

Keno

sha

TA90

0-00

3-1M

1JU

$3,9

00.0

010

/25/

17R

obin

Wid

mar

228

0227

Res

Car

e Ke

nosh

aTA

900-

003-

2M1M

N$3

,900

.00

10/2

6/17

Rob

in W

idm

ar22

902

28R

esC

are

Keno

sha

TA90

0-00

3-2M

1TB

$3,9

00.0

010

/26/

17R

obin

Wid

mar

230

0229

RC

WS

TA90

0-00

3-2M

1JA

$3,9

00.0

010

/26/

17R

obin

Wid

mar

231

0230

Res

Car

e M

ilwau

kee

TA90

0-00

3-2M

1AM

$3,9

00.0

010

/26/

17R

obin

Wid

mar

232

0231

Res

Car

e Ke

nosh

aTA

900-

003-

2M1J

W$3

,900

.00

10/2

6/17

Rob

in W

idm

ar

233

0232

CC

&NIN

605-

166-

3CBA

, 196

-155

-3C

BA, 6

05-

159-

3CBA

$20,

236.

0011

/01/

17R

obin

Wid

mar

234

0233

GTC

FIN

/TA

444-

337-

3cba

, 444

-339

-3cb

a, 4

44-

338-

3cba

, 444

-331

-3cb

a, 8

04-3

70-

3cba

, 801

-302

-3cb

a. 9

00-0

03-3

M16

,90

0-00

3-3m

1d

$41,

146.

0812

/08/

17M

iche

lle M

iller

235

0234

GTC

FIN

/TA

444-

337-

3cbk

, 444

-339

-3cb

k, 4

44-

338-

3cbk

, 444

-331

-3cb

k, 8

04-3

70-

3cbk

, 801

-302

-3cb

k. 9

00-0

03-3

M16

,90

0-00

3-3m

1d

$12,

086.

7412

/08/

17M

iche

lle M

iller

236

0235

NC

3TA

900-

019-

2M1Q

2, 9

00-0

19-2

ZCQ

2,90

0-01

9-2Z

CQ

B, 9

00-0

19-2

M1Q

B$8

,674

.50

01/2

2/18

Rob

in W

idm

ar

237

0236

NC

3TA

900-

003-

2M1M

P$3

,900

.00

11/0

8/17

Rob

in W

idm

ar23

802

37Ke

nosh

a Po

lice

Dep

t.IN

504-

447-

2K1A

$2,8

50.0

011

/10/

17M

olly

Mea

gher

239

0238

Keno

sha

Cou

nty

Sher

iff's

Dep

t.IN

504-

447-

2K1B

$1,4

25.0

011

/10/

17M

olly

Mea

gher

240

0239

Man

itow

oc C

ount

y Sh

eriff

's O

ffice

IN50

4-44

7-2K

1C$1

,425

.00

11/1

0/17

Mol

ly M

eagh

er24

102

40M

ount

Ple

asan

t Pol

ice

Dep

t.IN

504-

447-

2K1D

$1,4

25.0

011

/10/

17M

olly

Mea

gher

242

0241

Plea

sant

Pra

irie

Polic

e D

ept.

IN50

4-44

7-2K

1E$1

,425

.00

11/1

0/17

Mol

ly M

eagh

er

243

0242

WI D

OC

- R

CI

INSP

17: 4

44-3

31-3

ZBB,

444

-337

-3Z

BB, 4

44-3

38-3

ZBB,

444

-339

-3ZB

B$5

0,32

8.00

11/1

0/17

Rob

in W

idm

ar

244

0243

Sout

h Sh

ore

FDIN

503-

815-

2Z1A

, 503

-815

-2Z1

B, 5

03-

815-

2Z1C

$1,8

56.4

011

/13/

17Lo

ri M

acca

ri

245

0244

Keno

sha

Cou

nty

Sher

iff's

Dep

t.IN

504-

481-

2K1E

$184

.64

11/1

3/17

Mol

ly M

eagh

er24

602

45Bu

rling

ton

PDIN

504-

481-

2K1F

$46.

1611

/13/

17M

olly

Mea

gher

247

0246

Mou

nt P

leas

ant

IN50

4-48

1-2K

1L$4

6.16

11/1

3/17

Mol

ly M

eagh

er24

802

47R

acin

e C

ount

y Sh

eriff

's O

ffice

IN50

4-48

1-2K

1H$4

6.16

11/1

3/17

Mol

ly M

eagh

er24

902

48Sh

eboy

gan

PDIN

504-

481-

2K1J

$46.

1611

/13/

17M

olly

Mea

gher

250

0249

Stur

teva

nt P

DIN

504-

481-

2K1K

$46.

1611

/13/

17M

olly

Mea

gher

251

0250

Wis

cons

in V

isio

n (W

VA)

IN53

1-44

8-2z

1b$3

48.7

511

/20/

17Lo

ri M

acca

ri25

202

51Sw

iss-

Tech

, LLC

TA90

0-01

9-2Z

BNP

$712

.94

11/2

1/17

Rob

in W

idm

ar25

302

52El

khor

n H

SIN

533-

127-

3zca

$3,4

58.8

812

/05/

17M

iche

lle M

iller

254

0253

Uni

on G

rove

HS

IN50

1-10

1-3e

ca$2

,580

.66

12/0

5/17

Mic

helle

Mille

r25

502

54U

nion

Gro

ve H

SIN

809-

188-

3zca

$2,5

80.6

612

/05/

17M

iche

lle M

iller

Pag

e 8

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 51

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

256

0255

Wat

erfo

rd H

SIN

809-

188-

3zcb

$2,5

80.6

612

/05/

17M

iche

lle M

iller

257

0256

Big

Foot

HS

IN50

1-10

1-3e

cb$8

60.2

212

/05/

17M

iche

lle M

iller

258

0257

Burli

ngto

n H

SIN

501-

101-

3ecr

$5,5

91.4

312

/05/

17M

iche

lle M

iller

259

0258

Uni

on G

rove

HS

IN50

1-10

1-3e

cs$5

,161

.32

12/0

5/17

Mic

helle

Mille

r26

002

59C

entra

l HS

IN53

3-12

7-3e

ca$2

,594

.16

12/0

5/17

Mic

helle

Mille

r26

102

60W

ater

ford

HS

IN53

3-12

7-3e

cb$3

,170

.64

12/0

5/17

Mic

helle

Mille

r26

202

61Bu

rling

ton

HS

IN53

3-12

7-3e

cc$1

,729

.44

12/0

5/17

Mic

helle

Mille

r26

302

62W

ater

ford

HS

IN80

9-19

8-3z

ca$3

,440

.88

12/0

5/17

Mic

helle

Mille

r26

402

63W

ater

ford

HS

IN80

9-19

8-3z

cb$3

,870

.99

12/0

5/17

Mic

helle

Mille

r26

502

64Ba

dger

HS

IN50

1-10

1-3e

cc$7

,741

.98

12/0

5/17

Mic

helle

Mille

r26

602

65Bu

rling

ton

HS

IN15

2-15

7-3z

ca$1

,744

.44

12/0

5/17

Mic

helle

Mille

r26

702

66U

nion

Gro

ve H

SIN

152-

157-

3zcb

$3,4

88.8

812

/05/

17M

iche

lle M

iller

268

0267

Willi

ams

Bay

HS

IN53

3-12

7-3e

cd$2

,594

.16

12/0

5/17

Mic

helle

Mille

r26

902

68W

ater

ford

HS

IN80

9-19

6-3z

ca$5

,591

.43

12/0

5/17

Mic

helle

Mille

r27

002

69U

nion

Gro

ve H

SIN

809-

196-

3zcb

$5,1

61.3

212

/05/

17M

iche

lle M

iller

271

0270

Burli

ngto

n H

SIN

533-

127-

3ecf

$864

.72

12/0

5/17

Mic

helle

Mille

r27

202

71Bu

rling

ton

HS

IN53

3-12

7-3e

cg$8

64.7

212

/05/

17M

iche

lle M

iller

273

0272

Uni

on G

rove

HS

IN53

3-12

7-3e

ch$2

,882

.40

12/0

5/17

Mic

helle

Mille

r27

402

73W

ater

ford

HS

IN53

3-12

7-3e

cj$2

,882

.40

12/0

5/17

Mic

helle

Mille

r27

502

74Bi

g Fo

ot H

SIN

533-

127-

3eck

$1,4

41.2

012

/05/

17M

iche

lle M

iller

276

0275

Burli

ngto

n H

S C

ANC

ELLE

D 1

/15/

18IN

533-

127-

3ecl

$0.0

012

/05/

17M

iche

lle M

iller

277

0276

Willi

ams

Bay

IN53

3-12

9-3e

ct$2

88.2

412

/05/

17M

iche

lle M

iller

278

0277

Cat

holic

Cen

tral H

SIN

533-

129-

3ecu

$576

.48

12/0

5/17

Mic

helle

Mille

r27

902

78Bi

g Fo

ot H

SIN

152-

151-

3zca

$581

.48

12/0

5/17

Mic

helle

Mille

r28

002

79Bu

rling

ton

HS

IN15

2-15

1-3z

cb$1

,162

.96

12/0

5/17

Mic

helle

Mille

r28

102

80U

nion

Gro

ve H

SIN

152-

151-

3zcc

$1,1

62.9

612

/05/

17M

iche

lle M

iller

282

0281

Cen

tral H

SIN

152-

151-

3zcd

$1,1

62.9

612

/05/

17M

iche

lle M

iller

283

0282

Elkh

orn

HS

IN53

3-12

9-3e

cm$8

64.7

212

/05/

17M

iche

lle M

iller

284

0283

Burli

ngto

n H

SIN

533-

129-

3ecv

$2,3

05.9

212

/05/

17M

iche

lle M

iller

285

0284

Wat

erfo

rd H

SIN

533-

129-

3ecw

$1,7

29.4

412

/05/

17M

iche

lle M

iller

286

0285

Uni

on G

rove

HS

IN53

3-12

9-3e

cx$5

76.4

812

/05/

17M

iche

lle M

iller

287

0286

Elkh

orn

HS

IN53

3-13

0-3e

ca12

/08/

17M

iche

lle M

iller

288

0287

InSi

nkEr

ator

IN80

4-37

1-3Z

BA, 6

06-1

11-3

ZBA,

623

-18

5-3Z

BA$1

4,61

5.06

11/3

0/17

Rob

in W

idm

ar

289

0288

Kena

ll M

fgIN

420-

434-

2ZBK

, 420

-435

-2ZB

K, 4

20-

493-

2ZBK

$4,0

08.0

012

/07/

17R

obin

Wid

mar

290

0289

Adam

s El

ectri

cIN

SP18

: 605

-461

-3ZB

A, 6

05-4

60-

3ZBA

; 900

-003

-3M

1AE

$1,6

63.2

016

712

/11/

17R

obin

Wid

mar

Pag

e 9

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 52

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

291

0290

HFI

Flu

id P

ower

INSP

18: 4

62-4

96-3

ZBH

, 462

-499

F-3Z

BH, 4

62-4

95-3

ZBH

; 900

-003

-3M

1HF

$2,0

16.0

017

912

/06/

17R

obin

Wid

mar

292

0291

KUSD

-- C

ANC

ELLE

DIN

602-

122-

3H1B

, 602

-107

-3H

1B, 6

02-

104-

3H1B

-- C

ANC

ELLE

D$0

.00

12/0

5/17

Rob

in W

idm

ar

293

0292

GTC

FIN

543-

300-

3R1E

, 861

-107

-3R

1A$3

7,12

8.20

12/0

7/17

Mic

helle

Mille

r29

402

93To

wn

of L

ake

Gen

eva

PDIN

504-

475-

2Z11

$100

.00

12/0

6/17

Mol

ly M

eagh

er29

502

94C

entra

l HS

IN53

3-13

0-3e

cb12

/08/

17M

iche

lle M

iller

296

0295

Wat

erfo

rd H

SIN

533-

130-

3ecc

12/0

8/17

Mic

helle

Mille

r29

702

96Bu

rling

ton

HS

IN53

3-13

0-3e

cd12

/08/

17M

iche

lle M

iller

298

0297

Burli

ngto

n H

SIN

533-

130-

3ece

12/0

8/17

Mic

helle

Mille

r29

902

98Bu

rling

ton

HS

IN53

3-13

0-3e

cf12

/08/

17M

iche

lle M

iller

300

0299

Uni

on G

rove

HS

IN53

3-13

0-3e

cg12

/08/

17M

iche

lle M

iller

301

0300

Wat

erfo

rd H

SIN

533-

130-

3ech

12/0

8/17

Mic

helle

Mille

r30

203

01Bi

g Fo

ot H

SIN

533-

130-

3ecj

12/0

8/17

Mic

helle

Mille

r30

303

02Bu

rling

ton

Hs

IN53

3-13

0-3e

ck12

/08/

17M

iche

lle M

iller

304

0303

Cat

holic

Cen

tral H

SIN

533-

130-

3ecl

12/0

8/17

Mic

helle

Mille

r30

503

04El

khor

n H

SIN

533-

130-

3ecm

12/0

8/17

Mic

helle

Mille

r30

603

05Bu

rling

ton

HS

IN53

3-13

0-3e

cn12

/08/

17M

iche

lle M

iller

307

0306

Wat

erfo

rd H

SIN

533-

130-

3ecp

12/0

8/17

Mic

helle

Mille

r30

803

07U

nion

Gro

ve H

SIN

533-

130-

3ecq

12/0

8/17

Mic

helle

Mille

r

309

0308

GTC

F - C

ANC

ELLE

D S

ee 2

018-

0397

IN/T

A10

9-12

2-3b

3a, 1

09-1

14-3

b3a,

109

-10

1-3b

3an/

a12

/13/

17M

iche

lle M

iller

310

0309

Wal

wor

th C

o Sh

eriff

IN50

4-47

4-2Z

1M$7

20.0

012

/07/

17M

olly

Mea

gher

311

0310

City

of D

elav

an P

DIN

504-

474-

2Z1N

$120

.00

12/0

7/17

Mol

ly M

eagh

er31

203

11W

alw

orth

Co

Sher

iffIN

504-

474-

2Z16

$420

.00

12/0

7/17

Mol

ly M

eagh

er31

303

12C

ity o

f Del

avan

PD

IN50

4-47

4-2Z

17$6

0.00

12/0

7/17

Mol

ly M

eagh

er31

403

13W

alw

orth

Co

Sher

iffIN

504-

474-

2Z19

$720

.00

12/0

7/17

Mol

ly M

eagh

er31

503

14W

alw

orth

Co

Sher

iffIN

504-

474-

2Z18

$540

.00

12/0

7/17

Mol

ly M

eagh

er31

603

15Ke

nosh

a C

ount

y Sh

eriff

's D

ept.

IN50

4-48

4-2K

1A$2

50.0

012

/07/

17M

olly

Mea

gher

317

0316

Jane

sville

Pol

ice

Dep

t.IN

504-

484-

2K1B

$250

.00

12/0

7/17

Mol

ly M

eagh

er31

803

17W

hite

wat

er P

olic

e D

ept.

IN50

4-48

4-2K

1C$2

50.0

012

/07/

17M

olly

Mea

gher

319

0318

Plea

sant

Pra

irie

PDIN

504-

484-

2K1D

$250

.00

12/0

7/17

Mol

ly M

eagh

er32

003

19C

ity o

f Rip

on P

DIN

504-

484-

2K1E

$250

.00

12/0

7/17

Mol

ly M

eagh

er32

103

20W

est B

end

Polic

e D

ept.

IN50

4-48

4-2K

1F$2

50.0

012

/07/

17M

olly

Mea

gher

322

0321

Willi

ams

Bay

Polic

e D

ept.

IN50

4-48

4-2K

1G$2

50.0

012

/07/

17M

olly

Mea

gher

323

0322

Keno

sha

Cou

nty

Sher

iff's

Offi

ceIN

504-

427-

2K1A

$1,2

50.0

012

/08/

17M

olly

Mea

gher

324

0323

Mar

quet

te U

nive

rsity

IN50

4-42

7-2K

1B$5

00.0

012

/08/

17M

olly

Mea

gher

325

0324

Rac

ine

Polic

e D

ept.

IN50

4-42

7-2K

1C$5

00.0

012

/08/

17M

olly

Mea

gher

Pag

e 10

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 53

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

326

0325

Wal

wor

th C

ount

y Sh

eriff

's O

ffice

IN50

4-42

7-2K

1D$5

00.0

012

/08/

17M

olly

Mea

gher

327

0326

Milw

auke

e Po

lice

Dep

t.IN

504-

427-

2K1E

$500

.00

12/0

8/17

Mol

ly M

eagh

er32

803

27Ko

hler

IN50

4-47

8-2Z

1A$3

,000

.00

12/0

8/17

Mol

ly M

eagh

er32

903

28Ke

nosh

a Po

lice

Dep

t.IN

504-

481-

2K1M

$46.

1612

/08/

17M

olly

Mea

gher

330

0329

Rac

ine

Cou

nty

Sher

iff's

Offi

ceIN

504-

481-

2K1N

$46.

1612

/08/

17M

olly

Mea

gher

331

0330

Burli

ngto

n PD

IN50

4-48

1-2K

1O$4

6.16

12/0

8/17

Mol

ly M

eagh

er33

203

31D

OC

- R

CI

INSe

e G

oogl

e D

ocD

awn

Her

rman

n33

303

32D

OC

- R

YOC

INSe

e G

oogl

e D

ocD

awn

Her

rman

n33

403

33D

OC

- El

lsw

orth

INSe

e G

oogl

e D

ocD

awn

Her

rman

n

335

0334

Mon

di A

kros

ilIN

SP18

: 620

-417

A-3Z

BA, 6

20-4

17A-

3ZBB

, 462

-80

1-3Z

BA, 4

62-8

01-3

ZBB,

462

-802

-3ZB

A;90

0-00

3-3M

1MA

$6,4

51.0

016

902

/20/

18R

obin

Wid

mar

336

0335

R&B

Grin

ding

INSP

18: 4

62-4

87-3

ZBA,

620

-479

-3ZB

A, 6

20-

478-

3ZB1

, 462

-499

G-3

ZBA,

462

-803

-3ZB

A,46

2-80

3-3Z

BB; 9

00-0

03-3

M1R

B

$9,0

72.0

017

202

/20/

18R

obin

Wid

mar

337

0336

Trem

per H

S.IN

543-

300-

3Z1A

$4,6

26.6

012

/13/

17M

iche

lle M

iller

338

0337

Indi

an T

rail

H.S

IN54

3-30

0-3Z

1B$6

,939

.90

12/1

3/17

Mic

helle

Mille

r33

903

38In

dian

Tra

il H

.S.

IN54

3-30

0-3Z

1C$4

,626

.60

12/1

3/17

Mic

helle

Mille

r

340

0339

Amaz

on --

VO

ID --

See

CFS

201

8-01

55IN

543-

300-

3Z11

$0.0

012

/13/

17M

iche

lle M

iller

341

0340

GTC

F C

NA

ABE/

ELL

-- VO

ID, D

UPL

ICAT

E --

SEE

CFS

029

2IN

543-

300-

3R1E

$0.0

012

/13/

17M

iche

lle M

iller

342

0341

Whi

tew

ater

H.S

.IN

543-

300-

3EB1

$2,3

13.3

012

/13/

17M

iche

lle M

iller

343

0342

Del

evan

/Dar

ien

H.S

IN54

3-30

0-3E

B2$1

,850

.64

12/1

3/17

Mic

helle

Mille

r34

403

43W

esto

sha

Cen

tral H

.S.

IN54

3-30

0-3E

B3$3

,238

.62

12/1

3/17

Mic

helle

Mille

r34

503

44El

khor

n H

.S.

IN54

3-30

0-3E

BA$2

,775

.96

12/1

3/17

Mic

helle

Mille

r34

603

45Ba

dger

H.S

.IN

543-

300-

3ZBA

$3,7

01.2

812

/13/

17M

iche

lle M

iller

347

0346

Wilm

ot H

.S.

IN54

3-30

0-3Z

BB$1

,850

.64

12/1

3/17

Mic

helle

Mille

r34

803

47Bu

rling

ton

H.S

.IN

543-

300-

3ZBC

$925

.32

12/1

3/17

Mic

helle

Mille

r34

903

48W

ater

ford

H.S

.IN

543-

300-

3ZBD

$2,3

13.3

012

/13/

17M

iche

lle M

iller

350

0349

Burli

ngto

n H

.S.

IN54

3-30

0-3Z

BE$4

62.6

612

/13/

17M

iche

lle M

iller

351

0350

Wat

erfo

rd H

.S.

IN54

3-30

0-3Z

BF$9

25.3

212

/13/

17M

iche

lle M

iller

352

0351

Big

Foot

H.S

.IN

543-

300-

3ZBG

$3,7

01.2

812

/13/

17M

iche

lle M

iller

353

0352

Keno

sha

Polic

e D

ept.

IN50

4-48

4-2K

1H$5

0.00

12/1

4/17

Mol

ly M

eagh

er35

403

53G

TC -

BLD

G S

VCS

DEP

TIN

462-

401F

-2ZB

A$1

,336

.00

12/1

4/17

Rob

in W

idm

ar

355

0354

GTC

Fou

ndat

ion

- SC

J Fu

nds

IN44

3-41

2-3H

BA, 4

43-4

12-3

HBB

, 443

-41

2-3H

BC$7

,515

.00

12/2

2/17

Rob

in W

idm

ar

356

0355

GTC

- M

EIT

DEP

TIN

462-

401F

-1ZB

B$1

,336

.00

01/0

5/18

Rob

in W

idm

ar35

703

56El

khor

n H

SIN

442-

321-

1EBA

, 442

-332

-1EB

A01

/05/

18R

obin

Wid

mar

Pag

e 11

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 54

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

358

0357

GTC

FIN

/TA

444-

337-

3cbw

, 444

-339

-2cb

w, 4

44-

338-

3cbw

, 444

-331

-3cb

w, 8

04-3

70-

3cbw

, 801

-302

-3cb

w,

900-

003-

3M16

, 900

-003

-3m

1d

$3,7

36.3

7M

iche

lle M

iller

359

0358

Burli

ngto

n H

SIN

543-

300-

3zbh

$1,3

87.9

8M

iche

lle M

iller

360

0359

Rac

ine

Cou

nty

Fina

nce

Dep

tIN

196-

479G

-3ZB

A$4

,014

.00

01/1

2/18

Rob

in W

idm

ar

361

0360

GTC

F - R

acin

e St

uden

tsIN

/TA

605-

166-

3cbr

, 605

-197

-3cb

r, 44

9-40

1b-3

cbr,

150-

411-

3cbr

, 196

-155

-3c

br, 8

01-3

02-3

cbr,

804-

370-

3cbr

,60

5-13

4-3c

br, 6

05-4

52-3

cbr,

103-

476g

-3cb

r, 10

3-41

7c-3

cbr.,

900

-003

-3m

1t

$31,

212.

57M

iche

lle M

iller

362

0361

GTC

F - K

enos

ha S

tude

nts

IN/T

A60

5-16

6-3c

bk, 6

05-1

97-3

cbk,

449

-40

1b-3

cbk,

150

-411

-3cb

k, 1

96-1

55-

3cbk

, 801

-302

-3cb

n, 8

04-3

70-3

cbn,

605-

134-

3cbk

, 605

-452

-3cb

k, 1

03-

476g

-3cb

k, 1

03-4

17c-

3cbk

. 900

-003

-3m

1t

$5,2

02.1

0M

iche

lle M

iller

363

0362

Milw

auke

e Po

lice

Dep

tIN

504-

480-

2K1A

$250

.00

01/1

6/18

Mol

ly M

eagh

er36

403

63O

neid

a C

ount

y Sh

eriff

's O

ffice

IN50

4-48

0-2K

1B$2

50.0

001

/16/

18M

olly

Mea

gher

365

0364

Burli

ngto

n Po

lice

Dep

artm

ent

IN50

4-48

1-3K

1B$4

6.16

01/1

7/18

Mol

ly M

eagh

er36

603

65D

elav

an D

arie

n H

Igh

SCho

olIN

543-

300-

3zbJ

$0.0

001

/17/

18M

iche

lle M

iller

367

0366

Wal

wor

th C

ount

y Ja

ilIN

854-

733-

3ZBA

, 890

-721

-3ZB

A, 8

59-

777-

3ZBA

, 856

-740

-3ZB

A$4

,460

.00

01/2

3/18

Rob

in W

idm

ar

368

0367

Faith

Chr

istia

n Sc

hool

IN53

3-12

7-2e

cm$2

88.2

4M

iche

lle M

iller

369

0368

Badg

er H

S37

003

69Bu

rling

ton

HS

371

0370

Del

avan

/Dar

ien

HS

372

0371

East

Tro

y H

S37

303

72El

khor

n H

S37

403

73Ku

sd B

radf

ord

375

0374

KUSD

HAr

bors

ide

376

0375

KUSD

ITA

377

0376

KUSD

Lak

evie

w37

803

77KU

SD T

rem

per

379

0378

RU

SD C

ase

380

0379

RU

SD H

orlic

k38

103

80R

USD

Par

k38

203

81R

USD

Rea

l38

303

82R

USD

Wal

den

384

0383

Uni

on G

rove

HS

385

0384

Wat

erfo

rd H

S38

603

85W

esto

sha

Cen

tral H

S

Pag

e 12

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 55

Con

tract

#Sp

onso

r Nam

eTy

peC

ours

e N

umbe

rsEs

timat

ed C

FSC

ost

WAT

G #

CFS

Dat

e /

Dat

e R

eq.

BY:

387

0386

Wilm

ot H

S38

803

87D

OC

- R

CI

Pris

on C

ontra

cts

18SP

Daw

n H

errm

ann

389

0388

DO

C -

RYO

CPr

ison

Con

tract

s 18

SPD

awn

Her

rman

n39

003

89D

OC

- EL

LSPr

ison

Con

tract

s 18

SPD

awn

Her

rman

n39

103

90R

acin

e C

ount

y Sh

eriff

's O

ffice

IN50

4-48

1-3K

1D$9

4.02

01/2

9/18

Mol

ly M

eagh

er39

203

91G

TCF

316-

170-

1baa

02/0

7/18

Mic

helle

Mille

r39

303

92W

est A

llis H

Sse

e G

oogl

e D

oc02

/05/

18D

awn

Her

rman

n39

403

93Ke

nosh

a C

ount

y H

ighw

ay D

ept.

TA90

0-01

9-3Z

M1Q

$10,

530.

1205

/06/

18R

obin

Wid

mar

395

0394

Brad

shaw

Med

ical

TA90

0-01

9-1M

1BM

$10,

309.

1002

/07/

18R

obin

Wid

mar

396

0395

Brad

shaw

Med

ical

TA90

0-01

9-3M

1BM

$10,

311.

7002

/07/

18R

obin

Wid

mar

397

0396

Swis

s-Te

ch, L

LCIN

420-

439A

-3ZB

B, 4

20-4

39A-

3ZBC

Can

cel:

420-

439-

3ZBA

$1,5

27.5

602

/08/

18R

obin

Wid

mar

398

0397

GTC

FIN

109-

122-

3bca

, 109

-114

-3bc

a, 1

09-

101-

3bca

02/0

8/18

Mic

helle

Mille

r

399

0398

Swis

s-Te

chIN

420-

439A

-3ZB

D$7

63.7

803

/06/

18R

obin

Wid

mar

400

0399

InSi

nkEr

ator

IN10

3-41

7C-3

ZBA,

103

-417

C-3

ZBB,

103-

432C

-3ZB

A, 1

03-4

32C

-3ZB

B$5

,794

.00

02/1

6/18

Rob

in W

idm

ar

401

0400

Tow

n of

Lin

n FD

IN50

3-84

6a-3

z14

$265

.80

02/1

9/18

Lori

Mac

cari

402

0401

Kron

es L

CS

Cen

ter

IN44

4-33

7-3c

bb, 4

44-3

39-2

cbb,

444

-33

8-3c

bb, 4

44-3

31-3

cbb,

804

-370

-3c

bb, 8

01-3

02-3

cbb,

900

-003

-3m

1d

02/2

7/18

Mic

helle

Mille

r

403

0402

Twin

Dis

cTA

900-

019-

3ZBT

D$1

,670

.00

02/2

7/18

Rob

in W

idm

ar40

404

03Fo

rest

Cou

nty

Pota

wat

omi G

amin

g C

omm

issi

onIN

150-

411-

1CBA

& 9

00-0

19-1

CBA

$6,6

37.5

002

/28/

18R

obin

Wid

mar

405

0404

Uni

co, I

nc.

IN10

3-46

6-3Z

BA$1

,448

.50

03/0

2/18

Rob

in W

idm

ar40

604

05G

TCF-

SCJ

IN10

3-80

4Q-3

ZBA

$2,8

20.0

002

/28/

18R

obin

Wid

mar

407

0406

Inte

rtrac

tor A

mer

ica

Cor

pIN

531-

419a

-3e2

a$2

68.3

103

/02/

18Lo

ri M

acca

ri40

804

07N

AMI,

Keno

sha

Cou

nty

TA90

0-01

9-3K

F8$2

,000

.00

03/0

5/18

Mol

ly M

eagh

er40

904

08D

ousm

an T

rans

porta

tion

IN53

1-89

2-3z

1a; 5

31-8

92-3

z1b

$1,3

59.9

003

/06/

18Lo

ri M

acca

ri41

004

09Ke

nosh

a C

o D

A's

Offi

ceIN

531-

448-

3z1a

$696

.96

03/0

6/18

Lori

Mac

cari

411

0410

NC

3TA

900-

003-

3M!C

B$3

,900

.00

03/0

6/18

Rob

in W

idm

ar

Pag

e 13

of 1

3E

xpor

ted

on M

arch

8, 2

018

4:22

:27

PM

CS

T

March 27, 2018 56

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Roll Call ____ Action _x__ Information ____ Discussion ____

ADVISORY COMMITTEE ACTIVITY REPORT

Summary of Item: Approval of: New Members as of March 1, 2018 2017-18 Meeting Schedule as of March 1, 2018

Staff Liaison: John Thibodeau

March 27, 2018 57

GA

TEW

AY

TEC

HN

ICA

L C

OLL

EGE

AD

VIS

OR

Y C

OM

MIT

TEES

--

NEW

MEM

BER

S

As

of M

arch

1,

20

18

PR

OG

RA

M

Nam

e

Jo

b T

itle

E

mp

loyer

Co

un

ty R

ep

resen

ted

  Air Conditioning, Heating, & Refrigeration Technology & Facilities Maintenan

ce 

 Da

nielson, Adam 

 Area

 Con

tractin

g Manager 

  

Trane 

  

  

Out of D

istrict 

 Ha

rp, N

olan

  

 VP

 Facilitie

s Ope

ratio

ns 

  

Aurora Health

 Care 

  

Out of D

istrict 

 Orcho

lski, Ro

bert 

 Plant O

peratio

n Manager 

  

Froe

dtert H

ospital 

  

Out of D

istrict 

 Oscar, Jam

es  

 Hu

ac Tech 

  

  

Aurora Health

care 

  

Out of D

istrict 

 Sankey, G

ary 

  

Facilities S

upervisor 

  

 Proh

ealth

 Care 

  

Out of D

istrict 

 Schaefer, Troy  

 Territo

ry M

anager 

  

 Lenn

ox International  

 Ke

nosha 

 Schm

idt, Greg  

 Vice Presid

ent  

  

 Martin

 Petersen Co

mpany

  

Keno

sha 

 Schu

tte, M

artin

  

Manager Facility Ope

ratio

ns  

 Au

rora W

est A

llis M

edical  

 Out of D

istrict 

 Stanczyk, M

ike 

 Accoun

t Manager 

  

 Trane Co

mpany 

  

Out of D

istrict 

 Willkomm, Charlie 

 Field Technical Con

sulta

nt 

  

Lenn

ox  

  

 Ke

nosha 

  

Automotive M

aintenan

ce Technician & Automotive Technology 

 An

aya, Je

sus 

  

Presiden

t  

  

 An

aya's A

uto Re

pair 

  

Keno

sha 

 Ho

lden

, Dave 

  

Owne

r   

  

 Da

ve's Muffle

r Inc 

  

Keno

sha 

 Maggio, Nicho

las 

 Technical A

dviso

r  

  

Fiat Chrysler A

utom

obiles 

 Out of D

istrict 

 Scho

enbe

ck, M

ichael  

Field Technical Sales  

  

Bosch Au

tomotive Service  

 Ra

cine

  

Woo

ster, D

aniel 

 Educational Con

sulta

nt 

  

WAT

DA 

  

 Ra

cine

    

March 27, 2018 58

Culin

ary Arts, Culin

ary Assistant 

 Co

mbs, Zachary 

 Executive Ch

ef  

  

 Gen

eva Inn 

  

 Walworth 

  Dental A

ssistant 

 Albino

, Blanca  

 De

ntal Assistant 

  

 De

 Rose De

ntal 

  

Racine

  

Boston

, Bria

n  

 De

ntist  

  

  

Aspe

n De

ntal  

  

Keno

sha 

 Ru

iz, M

aldo

nado

 Ana

  De

ntal Assistant 

  

 Familia De

ntal  

  

Keno

sha 

  Diesel Equipment Mechan

ic & Diesel Equipment Technology 

 An

aya, Je

sus 

  

Presiden

t  

  

 An

aya's A

uto Re

pair 

  

Keno

sha 

 Bilotta, Nick 

  

Lead

 Tech 

  

  

Penske Truck Leasin

g  

 Out of D

istrict 

 Getka, Jay 

  

Supe

rintend

ent ‐ Fleet  

  

City of K

enosha

  

 Ke

nosha 

 Jansen

 , Da

n  

 V.P. Produ

ct Sup

port  

  

Miiller B

radford & Risb

erg 

 Out of D

istrict 

 Meyers, Ja

mes 

 Technical Trainer 

  

 CN

H Indu

stria

l   

 Ra

cine

  

Nicho

ls, Chris 

  

Fleet S

upervisor 

  

 City of K

enosha

  

 Ke

nosha 

 Pe

rman, Paul  

 Service Manager 

  

 Am

ston

 Sup

ply, Inc.  

 Ra

cine

  

Pokrzewinski, Brett 

 Service Manager 

  

 Broo

ks Tractor  

  

Keno

sha 

 Scho

enbe

ck, M

ichael  

Field Technical Sales  

  

Bosch Au

tomotive Service  

 Ra

cine

  

Van Alstine, M

ark 

 Ope

ratio

ns M

anager  

  

JX Peterbilt Milw

aukee 

 Out of D

istrict 

 Woo

ster, D

aniel 

 Educational Con

sulta

nt 

  

WAT

DA 

  

 Ra

cine

   Early Child

hood Education & Foundations of Teacher Ed

ucation 

 Bo

rchart, Janice 

 Ch

ild Care  

  

  

Little Saints C

hild Care Ce

nter 

Racine

  

Nasino, M

ary 

  

District Leade

r   

  

Kind

erCare 

  

 Ra

cine

      

March 27, 2018 59

Horticulture 

 Co

llins, Kevin  

 Ha

rdy Ornam

entals/Green

   

 Ch

alet Nursery 

  

Out of D

istrict 

 Ha

sler, Todd

  

 Accoun

t Manager 

  

 Ku

jawa Enterprises, Inc. 

 Out of D

istrict 

 Kape

llusch, Aaron

  

Region

al M

anager ‐ Wisc

onsin

  

Keno

sha Groun

ds Care ‐ Seb

ert 

Keno

sha 

  

Hospitality Man

agement, Foundations of Lodging & Hospitality Man

agement 

 Svita

k, Ed 

  

Presiden

t  

  

 Visit Lake Gen

eva 

  

Walworth 

  

Human

 Services Associate 

 van He

ijningen, Karyn  

Coordinated Re

spon

se to

 Child 

 Co

mmun

ity Im

pact Program

s  Ke

nosha 

  

Gas Utility Construction and Service 

 Allen, Bill 

  

OQ/Q

A Manager 

  

 Intercon

 Con

struction  

 Out of D

istrict 

 Jankow

ski, Bo

b  

Quality Assurance Manager  

 KS

 Ene

rgy Services, LLC 

 Out of D

istrict 

 Lope

z, Saul 

  

Director‐Ope

ratio

ns Sup

port  

 Pe

oples G

as Co. 

  

Out of D

istrict 

 Miller, H

erb 

  

Sr. M

anager 

  

  

Miche

ls Co

rporation 

  

Out of D

istrict 

 Waters, M

iche

lle 

 Area

 Manager  

  

 We En

ergies  

  

Out of D

istrict 

March 27, 2018 60

AD

VIS

OR

Y C

OM

MIT

TEE

20

17

-20

18

MEE

TIN

G S

CH

EDU

LE

as o

f M

arch

1,

20

18

A

DV

ISO

RY

CO

MM

ITT

EE

DE

AN

As

so

cia

teF

AL

L 2

01

7

SP

RIN

G 2

018

Accounting

Accounting A

ssis

tant

J.

Fulli

ngto

nT

uesda

y,

Se

pte

mber

26,

201

75:3

0 p

m -

iM

ET

, ro

om

104

Tuesda

y,

Febru

ary

20,

20

18

5:3

0 p

m –

Insp

ire C

ente

r, R

oo

m 1

31

Adm

inis

trative P

rofe

ssio

nal

Offic

e A

ssis

tant

J.

Fulli

ngto

nT

uesda

y,

Se

pte

mber

26,

201

75:3

0 p

m -

iM

ET

, ro

om

104

Tuesda

y,

Febru

ary

20,

20

18

5:3

0 p

m –

Insp

ire C

ente

r, R

oo

m 1

31

Adult B

asic

Ed

ucatio

n

C.

Jennin

gs

Tuesda

y,

Octo

ber

10,

20

17

2:0

0 p

m -

Bio

Scie

nce,

Room

120

Tuesda

y,

Apri

l 17,

201

82:0

0 p

m -

Ken

osha C

am

pus,

Room

A1

30

Adult H

igh S

ch

ool

C.

Jennin

gs

Wednesda

y,

Octo

ber

18,

201

72:0

0 p

m -

iM

ET

, R

oom

104

Tuesda

y,

Apri

l 10,

201

82:0

0 p

m -

iM

ET

, R

oom

104

Aero

nautics-P

ilot T

rain

ing

J.

Fulli

ngto

nT

hurs

da

y,

Octo

ber

12,

201

711:0

0 a

m -

Hori

zon C

ente

r, R

oom

10

6F

rida

y,

Marc

h 9

, 2018

11:0

0 a

m -

Hori

zon C

ente

r; R

oom

10

6

Air C

on

ditio

nin

g,

Heatin

g,

& R

efr

igera

tion T

echno

log

yF

acili

ties M

ain

tena

nce

R.

Koukari

Mond

ay,

Octo

ber

9,

2017

5:0

0 p

m -

Ken

osha C

am

pus,

Room

T

130

Mond

ay,

Marc

h 5

, 201

85:0

0 p

m -

Ken

osha C

am

pus,

Room

TB

A

Arb

oriculture

/Urb

an F

ore

str

y T

echnic

ian

T.

Sim

mons

Frida

y,

Septe

mber

22,

20

17

8:3

0 a

m -

Ken

osha C

am

pus,

Room

T127

Frida

y,

Fe

bru

ary

23,

2018

9:3

0 a

m -

Ken

osha C

am

pus,

Room

TB

A

Arc

hitectu

ral-S

tructu

ral E

ng

ineeri

ng T

echnic

ian

Civ

il E

ngin

eeri

ng T

echnolo

gy

- F

resh W

ate

r R

esourc

es

Civ

il E

ngin

eeri

ng T

echnolo

gy –

Hig

hw

ay T

echno

log

y

Geospatial S

urv

eyin

g T

echnic

ian

R.

Koukari

Wednesda

y,

Octo

ber

04,

201

75:0

0 p

m -

iM

ET

Cente

r, R

oo

m 1

04

Wednesda

y,

Marc

h 1

4,

20

18

5:3

0 p

m -

iM

ET

Cente

r, R

oo

m 4

01

Auto

motive M

ain

ten

ance T

echnic

ian

Auto

motive T

echnolo

gy

J.

Fulli

ngto

nT

uesda

y,

Octo

ber

10,

20

17

5:3

0 p

m -

Hori

zon C

ente

r, R

oom

106

Tuesda

y,

Marc

h 1

3,

20

18

5:3

0 p

m -

Hori

zon C

ente

r, R

oom

106

Barb

er

Techno

logis

t C

osm

eto

log

y

T.

Sim

mons

Thurs

da

y,

Septe

mber

28,

201

7

Racin

e C

am

pu

s,

Room

108

Tuesda

y,

Marc

h 6

, 201

8

5:1

5 p

m -

Ken

osha C

am

pus,

Room

T

127

Busin

ess M

an

agem

ent

Busin

ess S

erv

ices M

ana

ger

Sm

all

Busin

ess E

ntr

epre

neurs

hip

S

uperv

isory

Mana

gem

ent

J.

Fulli

ngto

nT

uesda

y,

Se

pte

mber

26,

201

75:3

0pm

- iM

ET

, R

oom

104

Tuesda

y,

Febru

ary

20,

20

18

5:3

0pm

– I

nspir

e C

ente

r, R

oo

m 1

31

CN

C P

rod

uctio

n T

echnic

ian

Tool and D

ie T

echn

icia

n

CN

C P

rogra

mm

er

R.

Koukari

Thurs

da

y,

Octo

ber

12,

201

75:3

0 p

m -

iM

ET

Cente

r, R

oo

m 4

01

Thurs

da

y,

Marc

h 0

8,

20

18

5:3

0 p

m -

Elk

horn

Cam

pus,

Room

TB

D

Crim

inal Justice S

tudie

s

Crim

inal Justice –

La

w E

nfo

rcem

ent

72

0 A

ca

dem

yT

. S

imm

ons

Thurs

da

y,

Septe

mber

28,

201

7

11:0

0 a

m -

Burl

ingto

n C

ente

r, R

oom

100

Thurs

da

y,

Marc

h 1

5,

20

19

11:0

0 a

m -

Ke

nosh

a C

am

pus,

Room

T127

March 27, 2018 61

Culin

ary

Art

s

Culin

ary

Assis

tant

T.

Sim

mons

Wednesda

y,

Octo

ber

4,

20

17

5:0

0 p

m -

Racin

e,

Observ

ato

ry K

itch

en

Thurs

da

y,

Apri

l 5,

2018

4:0

0 p

m -

Elk

horn

Cam

pus,

Culin

ary

Are

a

De

nta

l A

ssis

tan

t

M.

O’D

onne

llW

ednesda

y,

Novem

ber

8,

20

17

5:3

0 p

m -

Ken

osha C

am

pus,

Denta

l La

bT

hurs

da

y,

Febru

ary

8,

201

85:3

0pm

- D

enta

l La

b K

en

osh

a C

am

pus

Die

se

l E

qu

ipm

ent

Mecha

nic

D

iese

l E

qu

ipm

ent

Technolo

gy

J.

Fulli

ngto

nW

ednesda

y,

Octo

ber

11,

201

75:3

0 p

m -

Hori

zon C

ente

r, R

oom

106

Wednesda

y,

Marc

h 1

4,

20

18

5:3

0 p

m -

Hori

zon C

ente

r, R

oom

106

Earl

y C

hild

hoo

d E

ducation

Found

atio

ns o

f T

eacher

Education

T.

Sim

mons

Wednesda

y,

Octo

ber

11,

201

710:0

0 a

m -

Ra

cin

e C

am

pus,

Room

113

Mond

ay,

Marc

h 5

, 201

810:0

0 a

m -

Ra

cin

e C

am

pus,

Room

TB

D

Ele

ctr

ical E

ngin

eeri

ng T

echn

olo

gy

Ele

ctr

on

ics

Ele

ctr

on

ics T

echnic

ian F

un

da

menta

ls

R.

Koukari

Wednesda

y,

Octo

ber

4,

20

17

5:0

0 p

m -

iM

ET

Cente

r, R

oo

m 1

04

Wednesda

y,

Marc

h 1

4,

20

18

5:3

0 p

m -

iM

ET

Cente

r, R

oo

m 4

01

EM

MT

-

Ele

ctr

om

echan

ical M

ain

ten

an

ce T

echnic

ian

R.

Koukari

Wednesda

y,

Octo

ber

18,

201

78:0

0 a

m -

Hori

zon C

ente

r, R

oom

106

Wednesda

y,

Febru

ary

7,

201

88:0

0 a

m -

Elk

horn

Cam

pus,

Room

N2

09

Advanced E

MT

Em

erg

ency M

edic

al T

echnic

ian

EM

T P

ara

medic

P

ara

me

dic

Technic

ian

Fire M

edic

T.

Sim

mons

Tuesda

y,

Octo

ber

10,

20

17

10:0

0 a

m -

HE

RO

Cente

r, R

oom

H10

1

Mond

ay,

Marc

h 5

, 201

85:3

0 p

m -

HE

RO

Cente

r, R

oo

m H

101

Firefighte

r T

echnic

ian

T.

Sim

mons

Wednesda

y,

Octo

ber

11,

201

76:0

0 p

m -

HE

RO

Cente

r, R

oo

m H

113

Tuesda

y,

Marc

h 1

3,

20

18

6:0

0 p

m -

HE

RO

Cente

r, R

oo

m H

101

Gas U

tilit

y C

on

str

uction a

nd S

erv

ice

R.

Koukari

Frida

y,

Octo

be

r 13,

2017

8:0

0 a

m -

Ken

osha C

am

pus,

Room

T106

Frida

y,

Marc

h 1

6,

201

88:0

0 a

m -

Ken

osha C

am

pus,

Room

TB

A

Gra

phic

Com

munic

ations

Pro

fessio

nal C

om

munic

atio

ns/

J.

Fulli

ngto

nT

hurs

da

y,

Septe

mber

28,

201

75:3

0 p

m -

iM

ET

Cente

r, R

oo

m 1

04

Thurs

da

y,

Apri

l 12,

201

8

5:0

0 p

m K

enosha C

am

pus,

Room

TB

D

Health I

nfo

rma

tion T

echnolo

gy

M.

O’D

onne

llT

hurs

da

y,

Decem

ber

14,

201

7

2:3

0 p

m

Thurs

da

y,

Apri

l 19,

201

8

2:3

0 p

m -

Racin

e C

am

pus,

Room

10

2

Health U

nit C

oord

inato

r M

. O

’Donne

llW

ednesda

y,

Octo

ber

25,

201

7

11:3

0 a

m -

via

Confe

rence C

all

This

pro

gra

m is c

losed

Will

no lo

ng

er

meet

Hort

iculture

T

. S

imm

ons

Mond

ay,

Se

pte

mber

25,

20

17

6:0

0 p

m -

Pik

e C

reek,

Ro

om

H11

8M

ond

ay,

Marc

h 5

, 201

86:0

0 p

m -

Pik

e C

reek,

Ro

om

H11

8/1

20

Hospitalit

y M

anag

em

ent

Found

atio

ns o

f Lodg

ing a

nd H

ospita

lity M

ana

gem

ent

T.

Sim

mons

Wednesda

y,

Octo

ber

11,

201

72:0

0 p

m -

HE

RO

Cente

r, R

oo

m H

101

Thurs

da

y,

Apri

l 5,

2018

1:3

0 p

m -

Elk

horn

Cam

pus,

Room

TB

D

Hum

an S

erv

ices A

ssocia

te

T.

Sim

mons

Wednesda

y,

Octo

ber

4,

20

17

5:0

0 p

m -

Racin

e C

am

pus,

Room

R

10

2W

ednesda

y,

Marc

h 7

, 201

84:3

0 p

m -

Racin

e C

am

pus,

Room

R1

02

Info

rmation T

echno

log

y -

C

om

pute

r S

up

port

Specia

list

Info

rmation T

echno

log

y -

C

om

pute

r S

up

port

Tech

R.

Koukari

Thurs

da

y,

Septe

mber

21,

201

75:0

0 p

m -

Racin

e C

am

pus,

Mic

hig

an R

oom

Thurs

da

y,

Febru

ary

22,

20

18

5:3

0 p

m -

Ken

osha C

am

pus,

Room

S

10

0A

March 27, 2018 62

Info

rmation T

echno

log

y -

N

etw

ork

Specia

list

Info

rmation T

echnolo

gy -

So

ftw

are

De

ve

lop

er

Info

rmation T

echno

log

y -

We

b S

oft

wa

re D

evelo

per

Info

rmation T

echno

log

y -

We

b P

rogra

mm

er

R.

Koukari

Thurs

da

y,

Septe

mber

21,

201

75:0

0 p

m -

Racin

e C

am

pus,

Mic

hig

an R

oom

Thurs

da

y,

Febru

ary

22,

20

18

5:3

0 p

m -

Ken

osha C

am

pus,

Room

S1

00A

Inte

rior

Desig

n

T.

Sim

mons

Thurs

da

y,

Septe

mber

14,

201

75:3

0 p

m,

Ken

osha C

am

pus,

Room

A1

30

Thurs

da

y,

Apri

l 19,

201

8T

BD

- K

enosh

a C

am

pus,

Ro

om

TB

D

Mark

eting

J.

Fulli

ngto

nT

uesda

y,

Se

pte

mber

26,

201

75:3

0 p

m -

iM

ET

Cente

r, R

oo

m 1

04

Tuesda

y,

Febru

ary

20,

20

18

5:3

0 p

m -

Inspir

e C

ente

r, R

oo

m 1

31

Mecha

nic

al D

esig

n T

echnolo

gy

R.

Koukari

Wednesda

y,

Octo

ber.

4,

20

17

5:0

0 p

m -

iM

ET

Cente

r, R

oo

m 1

04

Wednesda

y,

Marc

h 1

4,

20

18

5:3

0 p

m -

iM

ET

Cente

r, R

oo

m 4

01

Medic

al A

ssis

tant

M.

O’D

onne

llW

ednesda

y,

Octo

ber

18,

201

77:3

0 a

m -

Racin

e C

am

pus,

Room

10

2W

ednesda

y,

Marc

h 7

, 201

8

7:3

0 a

m -

Ken

osha C

am

pus,

Room

S1

05

Nurs

ing A

ssis

tant

V.

Hulb

ack

Tuesda

y,

Octo

ber

17,

20

17

3:3

0 p

m B

url

ingto

n C

ente

r, R

oom

12

2T

uesda

y,

Marc

h 2

0,

20

18

3:3

0 p

m B

url

ingto

n C

ente

r, R

oom

10

0

Nurs

ing A

ssocia

te D

egre

e

V.

Hulb

ack

Thurs

da

y,

Octo

ber

12,

201

72:0

0 p

m -

Inspir

e C

ente

r, R

oo

m i120

Thurs

da

y,

Apri

l 12,

201

82:0

0 p

m -

Inspir

e C

ente

r, R

oo

m i131

Pharm

acy T

echnic

ian

M.

O’D

onne

llW

ednesda

y,

Octo

ber

11,

201

76:0

0 p

m,

Burlin

gto

n C

ente

r, R

oom

12

2

Mond

ay,

Marc

h 1

2,

20

18

4:3

0 p

.m., B

urlin

gto

n C

am

pus,

Room

12

2

Ph

ysic

al T

hera

pis

t A

ssis

tant

M.

O’D

onne

llW

ednesda

y,

Novem

ber

1,

20

17

6:0

0 p

m -

Ken

osha C

am

pus,

Room

A2

01

Wednesda

y,

Marc

h 2

8,

20

18

6:3

0 p

m -

8:0

0 p

m K

enosha C

am

pus

Surg

ical T

echnolo

gy

M.

O’D

onne

llM

ond

ay,

Octo

ber

16,

201

74:0

0 p

m -

Ken

osha C

am

pus,

Room

S1

18

Mond

ay,

Febru

ary

12,

201

84:3

0 p

m -

Ken

osha C

am

pus,

Room

S1

18

Vete

rinary

Assis

tant

Vete

rin

ary

Technic

ian

M.

O’D

onne

llM

ond

ay,

Octo

ber

9,

2017

5:3

0 p

m -

Vete

rinary

Scie

nce

s B

uild

ing

Mond

ay,

Marc

h 1

9,

20

18

5:3

0 p

m -

V

ete

rin

ary

Scie

nces B

uild

ing

Weld

ing

Weld

ing/M

ain

tena

nce &

Fabri

cation

R.

Koukari

Wednesda

y,

Septe

mb

er

20,

2017

5:3

0 p

m -

Burlin

gto

n C

ente

r, R

oom

100

Wednesda

y,

Marc

h 7

, 201

85:3

0 p

m -

Elk

horn

Cam

pus,

Room

N2

09

March 27, 2018 63

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call ___ Action _X_ Information ___ Discussion ___

BID NO. 1556 S C JOHNSON IMET CENTER PARKING LOT REMODEL

STURTEVANT, WI

Summary of Item: Sealed bids were received from various subcontractors for the

S C Johnson iMET Center, Sturtevant, WI. Administration is recommending the contract to provide all

labor and materials required for this project be awarded to: Riley Construction Kenosha, WI Prime Contract (Contract Value for Riley) $556,433 Architect and Engineering Fees: (PIDA Fees, 7.0%) 38,950 Reimbursable Fees 100 GTC Project Costs (Contingency & Testing) 64,517

Total Project Cost: $660,000

Funding Source: FY 17 Reserves

Attachments: Letter of Recommendation for Award of Bid and Tabulation of

Bids from Partners In Design

Ends Statements and/or Executive Limitations: Section 3 – Executive Limitations,

Policy 3.5, Financial Condition

Staff Liaison: Thomas Cousino

Top876.docx or .pdf 03/15/18

March 27, 2018 64

March 05, 2018

Mr. William Whyte

Gateway Technical College

3520 30th

Avenue

Kenosha, Wisconsin 53140

RE: SC Johnson iMET Center

Parking Lot Remodel

Offical Notice No. 1556

Dear Mr. Whyte:

On Thursday February 01, 2018 at the office of your construction

manager, Riley Construction, we received subcontractor bids for the

iMET Center Parking Lot Remodeling project. John Thielen, Tom Cousino,

Rhonda Cerminara and Vicki Christensen were in attendance on behalf of

Gateway Technical College. Erin Anderson and Amanda Toepel were in

attendance on behalf of Riley Construction, and I was in attendance on

behalf of Partners In Design Architects for the receipt of bids.

The iMET Center Parking Lot Remodeling project consisted of one base

bid package and one alternate bid. The alternate bid is to provide

underdrains within stone base course to increase longevity of the

asphalt.

After reviewing the bids with John Thielen, Tom Cousino and Riley

Construction, we are recommending the college accept the iMET Center

Parking Lot Remodeling project base bid and alternate bid number 1.

Based on our bid evaluation we are recommending that the contract

value for Riley Construction be $556,433.00 for the iMET Center Parking

Lot Remodeling project. Gateway Technical College should also budget

approximately $39,050.00 for architectural and engineering fees related

to the competitive bid process and reimbusable fees. Additionally we are

recommending the college hold a contingency of $64,517 for testing

services and any unforeseen bad soil conditions.

Prime Contract: $ 556,433.00 (Contract Value for Riley)

A&E Fees: $ 38,950.00 (PIDA Fees7.0%)

Reimbursable Fees $ 100.00 (Reimbursable Fees)

GTC Project Costs $ 64,517.00 (Contingency & Testing)

Total Project Cost: $ 660,000.00

March 27, 2018 65

Page 2 of 2

Date: March 6, 2018

Should you have any questions regarding our recommendation, please

do not hesitat to give me a call.

Sincerely,

Jeffrey E. Bridleman

March 27, 2018 66

CSI # DESCRIPTION

11/30/17

BUDGET

TOTAL GMP*

(2/1/18 BIDS) CONTRACTOR

010000 General Conditions 93,093 93,093 Riley Construction

265629 Site Electrical 11,500 26,072 Pieper Electric

310000 Earthwork 229,674 95,790 Wanasek Corp.

321216 Asphalt Paving 174,578 174,925 Asphalt Contractors

321650 Curbs 26,000 23,587 J & A Pohl

321615 Site Concrete 24,615 3,123 J & A Pohl

330000 Site Utilities 33,955 35,585 Wanasek Corp.

329000 Landscaping 13,500 27,231 Breezy Hill Nursery

Subtotal 606,915 479,406

Inflation EXCLUDED EXCLUDED

Contingency 60,692 47,941

Subtotal 667,607 527,347

Builders Risk Insurance BY OWNER BY OWNER

Building Permit 2,482 2,482

General Liability Insurance 3,338 2,637

Subtotal 673,427 532,465

Overhead & Profit 20,128 15,900

Preconstruction Fee 3,355 2,650

A/E Fee 43,611 BY OWNER

Subtotal 740,521 551,015

Subguard (1% of Subs) 4,813 NOT INCLUDED

Performance Bond - 5,418

A/E Reimbursables 4,500 BY OWNER

Geotechnical & Materials Testing 10,000 BY OWNER

TOTAL 745,334$ 556,433$

* Total GMP includes Alternate #1 - Parking Lot Underdrains.

Cost Summary

Gateway Technical College

iMet Parking Lot RepairsSturtevant, WI

Construction Documents PhaseMarch 5, 2018

March 27, 2018 67

Pro

ject

:

Pro

ject

No

.:B

id P

ack

ag

e:

GT

C P

.O.:

Co

ntr

act

No

.D

esc

rip

tio

nA

wa

rde

d B

idd

er

Oth

er

Bid

de

r(s)

Bid

Am

ou

nt

Tim

e R

ece

ive

dB

id R

ev.

1D

ate

Bid

Re

v. 2

Da

teB

id R

ev.

3D

ate

Bid

Re

v. 4

D

ate

Co

ntr

act

Am

ou

nt

Da

te

Pie

pe

r E

lect

ric

25

,81

4.0

0$

2/1

/18

9:3

6 A

M$

25

8.0

00

3/0

5/1

82

6,0

72

.00

$

03

/05

/18

Lee

Ele

ctri

c2

9,4

00

.00

$

2

/1/1

8 1

2:0

0 A

M2

9,4

00

.00

$

03

/05

/18

EC

I2

7,1

98

.00

$

2

/1/1

8 1

2:0

0 A

M2

7,1

98

.00

$

03

/05

/18

Su

pe

r W

est

ern

14

9,0

00

.00

$

2

/1/1

8 7

:45

AM

14

9,0

00

.00

$

03

/05

/18

AW

Oa

kes1

13

5,0

00

.00

$

2

/1/1

8 1

0:1

4 A

M1

35

,00

0.0

0$

0

3/0

5/1

8

Wa

na

sek

Co

rp.

95

,79

0.0

0$

2/1

/18

11

:47

AM

$0

.00

03

/05

/18

95

,79

0.0

0$

0

3/0

5/1

8

Will

kom

m E

xca

vati

ng

96

,00

0.0

0$

2/1

/18

12

:18

PM

96

,00

0.0

0$

0

3/0

5/1

8

Sta

rk P

ave

me

nt

16

3,2

10

.00

$

1

/30

/18

3:0

6 P

M$

0.0

0N

/A1

63

,21

0.0

0$

0

3/0

5/1

8

Asp

ha

lt C

on

tra

cto

rs1

48

,99

1.0

0$

2/1

/18

1:0

5 P

M$

9,6

00

.00

02

/16

/18

$2

,40

0.0

00

3/0

5/1

81

60

,99

1.0

0$

0

3/0

5/1

8

Cic

chin

i Asp

ha

lt1

88

,83

1.0

0$

2/1

/18

2:0

0 P

M$

0.0

0N

/A1

88

,83

1.0

0$

0

3/0

5/1

8

Asp

ha

lt C

on

tra

cto

rs2

6,2

20

.00

$

2

/1/1

8 1

:05

PM

26

,22

0.0

0$

0

3/0

5/1

8

D.C

. B

urb

ach

22

,75

0.0

0$

2/1

/18

8:3

3 A

M2

2,7

50

.00

$

03

/05

/18

J&A

Po

hl2

,42

2,8

36

.74

$

1

/25

/18

3:3

6 P

M$

75

0.0

00

3/0

5/1

82

3,5

86

.74

$

03

/05

/18

AW

Oa

kes1

34

,20

0.0

0$

2/1

/18

10

:14

AM

34

,20

0.0

0$

0

3/0

5/1

8

Rile

y C

on

stru

ctio

n3

3,2

82

.00

$

1/3

1/1

8 1

:28

PM

$3

09

.00

01

/31

/18

3,5

91

.00

$

0

3/0

5/1

8

J&A

Po

hl2

,42

,82

8.6

5$

1

/25

/18

3:3

6 P

M$

29

4.0

00

2/0

8/1

8In

cl.

Ab

ove

03

/05

/18

3,1

22

.65

$

0

3/0

5/1

8

AW

Oa

kes1

7,2

00

.00

$

2/1

/18

10

:14

AM

$2

56

.00

02

/12

/18

7,4

56

.00

$

0

3/0

5/1

8

Wa

na

sek

Co

rp.

35

,58

5.0

0$

2/1

/18

11

:47

AM

$0

.00

03

/05

/18

35

,58

5.0

0$

0

3/0

5/1

8

Will

kom

m E

xca

vati

ng

43

,59

0.0

0$

2/1

/18

12

:18

PM

43

,59

0.0

0$

0

3/0

5/1

8

AW

Oa

kes1

67

,00

0.0

0$

2/1

/18

10

:14

AM

67

,00

0.0

0$

0

3/0

5/1

8

Ke

no

sha

Gro

un

ds

Ca

re2

9,9

27

.00

$

1

/30

/18

2:0

0 P

M$

0.0

0N

/A2

9,9

27

.00

$

03

/05

/18

Th

e B

rist

ol G

rou

p5

29

,60

1.1

8$

2/1

/18

9:0

5 A

M($

3,0

86

.95

)0

2/1

6/1

82

6,5

14

.23

$

03

/05

/18

Bre

ezy

Hill

Nu

rse

ry2

6,8

59

.61

$

2

/1/1

8 1

1:4

8 A

M$

0.0

0N

/A$

37

1.1

50

3/0

5/1

82

7,2

30

.76

$

03

/05

/18

Asp

ha

lt C

on

tra

cto

rs1

3,9

34

.00

$

2

/1/1

8 1

:05

PM

Incl

. A

bo

ve0

3/0

5/1

81

3,9

34

.00

$

03

/05

/18

Su

pe

r W

est

ern

16

,00

0.0

0$

2/1

/18

7:4

5 A

M1

6,0

00

.00

$

03

/05

/18

Sta

rk P

ave

me

nt

27

,50

0.0

0$

1/3

0/1

8 3

:06

PM

27

,50

0.0

0$

0

3/0

5/1

8

Cic

chin

i Asp

ha

lt1

5,8

31

.00

$

2

/1/1

8 2

:00

PM

15

,83

1.0

0$

0

3/0

5/1

8

Wa

na

sek

Co

rp.

15

,60

0.0

0$

2/1

/18

11

:47

AM

15

,60

0.0

0$

0

3/0

5/1

8

Will

kom

m E

xca

vati

ng

21

,52

8.0

0$

2/1

/18

12

:18

PM

21

,52

8.0

0$

0

3/0

5/1

8

1 A

W O

ake

s su

bm

itte

d a

co

mb

ine

d b

id f

or

ea

rth

wo

rk,

curb

& g

utt

er,

sit

e c

on

cre

te,

an

d s

ite

uti

litie

s o

n t

he

ir b

id f

orm

fo

r $

23

8,9

20

.50

. D

ocu

me

nta

tio

n f

rom

th

e b

idd

er

sho

win

g t

he

co

st b

rea

kou

t is

att

ach

ed

.2 J

&A

Po

hl s

ub

mit

ted

a c

om

bin

ed

bid

fo

r b

oth

cu

rb &

gu

tte

r a

nd

sit

e c

on

cre

te o

n t

he

ir b

id f

orm

fo

r $

25

,66

5.3

9.

Do

cum

en

tati

on

fro

m t

he

bid

de

r sh

ow

ing

th

e c

ost

bre

ako

ut

wa

s p

rovi

de

d w

ith

in t

he

bid

.3

Rile

y C

on

stru

ctio

n w

as

sele

cte

d a

s th

e lo

w b

idd

er

for

the

sit

e c

on

cre

te w

ork

be

cau

se b

oth

J&

A P

oh

l an

d A

W O

ake

s d

ecl

ine

d t

o p

erf

orm

th

e s

ite

co

ncr

ete

wo

rk if

th

ey

we

re n

ot

aw

ard

ed

th

e c

urb

an

d g

utt

er

wo

rk.

31

.03

4 J

&A

Po

hl w

as

sele

cte

d a

s th

e lo

w b

idd

er

for

curb

& g

utt

er

an

d s

ite

co

ncr

ete

be

cau

se t

he

ir c

om

bin

ed

bid

wa

s lo

we

r th

an

an

y o

the

r co

mb

ina

tio

n o

f b

ids

for

the

se c

on

tra

ct p

ack

ag

es.

5 T

he

Bri

sto

l Gro

up

wa

s d

isq

ua

lifie

d f

rom

bid

din

g.

Pl e

ase

co

nta

ct R

iley

Co

nst

ruct

ion

fo

r fu

rth

er

exp

lan

ati

on

.

ALT

#1

Un

de

rdra

ins

31

.04

33

.01

33

.02

Bid

Ad

min

istr

ato

r:

Ad

dre

ss B

ids

Re

ceiv

ed

:

Bid

Du

e D

ate

& T

ime

:

Lan

dsc

ap

ing

Sit

e U

tilit

ies

Sit

e C

on

cre

te

Cu

rb &

Gu

tte

r

Ga

tew

ay

Te

chn

ica

l C

oll

eg

e

Bid

Ta

bu

lati

on

Fo

rm

31

.02

Ele

ctri

cal

15

56

N/A

Asp

ha

lt P

ave

me

nt

31

.01

Ea

rth

wo

rk

Rile

y C

on

stru

ctio

n

53

01

99

th A

ven

ue

, K

en

osh

a,

WI

53

14

4

2/1

/18

2:0

0 P

M

26

.01

Stu

rte

van

t C

en

ter

- S

C J

oh

nso

n iM

ET

Ce

nte

r -

Pa

rkin

g L

ot

Re

mo

de

l

March 27, 2018 68

Pro

ject

:

Pro

ject

No

.:B

id P

ack

ag

e:

GT

C P

.O.:

Bid

Re

visi

on

Co

ntr

act

No

.Su

bco

ntr

act

or

Do

cum

en

tati

on

Att

ach

ed

To

tal C

ha

ng

e in

Va

lue

Acc

ep

ted

or

De

clin

ed

Rile

y C

on

stru

ctio

nSe

e O

rig

ina

l Bid

$3

09

.00

J&A

Po

hl

Ye

s2

94

.00

$

A

cce

pte

d

AW

Oa

kes

Ye

s$

25

6.0

0

Ke

no

sha

Gro

un

ds

Ca

reSe

e O

rig

ina

l Bid

No

t In

clu

de

d

Th

e B

rist

ol G

rou

pY

es

(3,0

86

.95

)$

Bre

ezy

Hill

Nu

rse

rySe

e O

rig

ina

l Bid

No

t In

clu

de

dA

cce

pte

d

Sta

rk P

ave

me

nt

No

t R

eq

ue

ste

dN

ot

Re

qu

est

ed

Asp

ha

lt C

on

tra

cto

rsY

es

$9

,60

0.0

0A

cce

pte

d

Cic

chin

i Asp

ha

ltN

ot

Re

qu

est

ed

No

t R

eq

ue

ste

d

Pie

pe

r E

lect

ric

Ye

s$

25

8.0

0P

en

din

g/I

ncl

ud

ed

Wa

na

sek

Co

rp.

Ye

sN

o C

ha

rge

Pe

nd

ing

/In

clu

de

d

Asp

ha

lt C

on

tra

cto

rsY

es

$2

,40

0.0

0P

en

din

g/I

ncl

ud

ed

J&A

Po

hl

Ye

s$

75

0.0

0P

en

din

g/I

ncl

ud

ed

Bre

ezy

Hill

Nu

rse

ryY

es

$3

71

.15

Pe

nd

ing

/In

clu

de

d

4A

llA

dd

itio

na

l co

st t

o p

rovi

de

a P

erf

orm

an

ce,

Lab

or,

an

d M

ate

ria

ls B

on

d,

cove

rin

g a

ll

ma

teri

als

, p

roce

du

res,

an

d la

bo

r in

th

e p

en

al s

um

of

10

0%

of

the

co

ntr

act

pri

ce.

23

3.0

2

De

du

ct 7

5 C

Y o

f to

pso

il fr

om

La

nd

sca

pin

g b

ids

(pla

n c

on

tra

dic

tio

n -

Ge

ne

ral L

an

dsc

ap

e

No

tes

on

Sh

ee

t L-

2 c

all

for

top

soil

to b

e p

rovi

de

d b

y e

xca

vati

ng

co

ntr

act

or,

bu

t

Re

fere

nce

No

tes

Sch

ed

ule

on

sa

me

sh

ee

t sh

ow

s th

at

the

lan

dsc

ap

ing

co

ntr

act

or

is t

o

pro

vid

e 7

5 C

Y o

f to

pso

il).

Ea

rth

wo

rk c

on

tra

cto

r h

as

incl

ud

ed

sp

rea

din

g t

op

soil

in t

he

bid

fo

r C

on

tra

ct N

o.

33

.01

.

33

1.0

2

Pa

ve t

he

bin

de

r co

urs

e o

f a

sph

alt

in 2

01

8,

ram

p t

he

bin

de

r co

urs

e u

p t

o m

ee

t th

e t

op

ed

ge

of

the

cu

rb (

to p

reve

nt

da

ma

ge

by

sno

w p

low

s),

an

d s

trip

e t

he

ne

w a

sph

alt

are

as.

Re

turn

in 2

01

9 t

o m

ill d

ow

n t

he

ra

mp

ed

asp

ha

lt a

t th

e c

urb

s, c

lea

n a

nd

sw

ee

p t

he

pa

vem

en

t, p

ave

th

e s

urf

ace

co

urs

e,

an

d r

e-s

trip

e t

he

ne

w a

sph

alt

are

as.

Bid

Re

visi

on

De

scri

pti

on

13

1.0

4

Re

vise

mo

torc

ycle

pa

rkin

g t

o h

ea

vy d

uty

co

ncr

ete

pa

vem

en

t (8

") a

nd

sid

ew

alk

to

lig

ht

du

ty c

on

cre

te p

ave

me

nt

(5")

, d

ow

el n

ew

co

ncr

ete

into

exi

stin

g,

an

d in

cre

ase

co

ncr

ete

stre

ng

th t

o 4

,00

0 P

SI.

15

56

N/A

Bid

Re

vis

ion

Tra

ckin

g F

orm

Ga

tew

ay

Te

chn

ica

l C

oll

eg

e

Stu

rte

van

t C

en

ter

- SC

Jo

hn

son

iME

T C

en

ter

- P

ark

ing

Lo

t R

em

od

el

March 27, 2018 69

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call ___ Action _X_ Information ___ Discussion ___

BID NO. 1558 HORIZON CENTER EMERGENCY VEHICLE OPERATOR COURSE

(EVOC) TRACK – KENOSHA CAMPUS

Summary of Item: Sealed bids were received from various subcontractors for the

Horizon Center Emergency Vehicle Operator Course (EVOC) Track project, Kenosha Campus.

Administration is recommending the contract to provide all

labor and materials required for this project be awarded to: Riley Construction Kenosha, WI Prime Contract (Contract Value for Riley) $1,293,742 Architect and Engineering Fees: (PIDA Fees, 6.5% 122,940 + Alternates)

Reimbursable Fees: 45,498 GTC Costs: (DNR Wetland Credits) 37,820 Total Project Cost: $1,500,000

Funding Source: GO Promissory Notes Series F-2017-2018C

Attachments: Letter of Recommendation for Award of Bid and Tabulation of

Bids from Partners In Design

Ends Statements and/or Executive Limitations: Section 3 – Executive Limitations,

Policy 3.5, Financial Condition

Staff Liaison: Thomas Cousino

Top880.docx or .pdf 03/13/18 March 27, 2018

70

March 13, 2018

Mr. William Whyte

Gateway Technical College

3520 30th

Avenue

Kenosha, Wisconsin 53140

RE: Kenosha Campus

Horizon Center EVOC Track

Offical Notice No. 1558

Dear Mr. Whyte:

On Thursday, February 15, 2018, at the office of your construction

manager, Riley Construction, we received subcontractor bids for the

EVOC Track project. Larry Paruszkiewicz, Rhonda Cerminara, and Vicki

Christensen were in attendance on behalf of Gateway Technical College.

Erin Anderson and Patrick Mayew were in attendance on behalf of Riley

Construction, and I was in attendance on behalf of Partners In Design

Architects for the receipt of bids.

The Horizon Center EVOC Track project consisted of one base bid and

two alternate bids. The scope of the base bid and alternate bid are as

follows:

Base Bid: Develop the entire site including earthwork and

underground utilities in the areas east and west of the skills pad.

Provide Soil reinforcement, limestone and asphalt pavement at

the skills pad only.

Alternate No. 1: Provide soil reinforcement, limestone and

asphalt pavement in lieu of topsoil, erosion control and

restoration east of the skills pad.

Alternate No. 2: Provide soil reinforcement, limestone and

asphalt pavement in lieu of topsoil, erosion control and

restoration west of the skills pad.

On bid day this project was over budget and since that time we have

been working with the apparent low bidder to reduce the scope of the

project and provide a project value that is within budget. The following

bid revisions were requested:

Bid Revision No. 1: Eliminate the earthwork work for the three

furthest west retention basins.

Bid Revision No. 2: Eliminate the Utility work for the three

furthest west retention basins.

Bid Revision No. 3: Eliminate new work at existing access drive

except curb cut and patch as required.

Bid Revision No. 4: Provide TX5 geogrid in lieu of TX7.

Bid Revision No. 5: Eliminate the geogrid from the scope.

Bid Revision No. 6: Eliminate new work at existing access drive

except asphalt patching as required.

March 27, 2018 71

Page 2 of 2

Date: March 13, 2018

After reviewing the bids and bid revisions with Larry Paruszkiewicz, Tom

Cousino and Riley Construction, we are recommending the college

accept the Horizon Center EVOC Track project Base and Bid Revisions 1,

2, 3, 4 and 6.

Based on our bid evaluation we are recommending that the contract

value for Riley Construction be $1,293,742.00 for the Horizon Center

EVOC Track project. Gateway Technical College should also budget

approximately $122,940.00 for architectural and engineering fees related

to the competitive bid process, Environmental Assessments, DNR Fees,

Wetland Fill Permitting and reimbursable fees.

Prime Contract: $ 1,293,742.00 (Contract Value for Riley)

A&E Fees: $ 122,940.00 (PIDA Fees & Alternates 6.5%)

Reimbursable Fees $ 45,498.00 (Reimbursable Fees)

GTC Project Costs $ 37,820.00 (DNR Wetland Credits)

Total Project Cost: $ 1,500,000.00

Should you have any questions regarding our recommendation, please

do not hesitate to give me a call.

Sincerely,

Jeffrey E. Bridleman

March 27, 2018 72

Description Amount

Construction

Construction Budget 1,166,642$

Landscape Allowance 7,500$

Erosion Control Permit Fees 2,000$

Subtotal 1,176,142$

Contingency 51,672$

Subtotal 1,227,814$ Insurance

Builders Risk Insurance By Owner

General Liability Insurance 6,139$

Subtotal 1,233,953$ Fees

Const. Mngmt / Gen. Contractor Fee 41,441$

Preconstruction Services 6,907$

A/E Fee By Owner

Subtotal 1,282,301$ Bonds

Performance Bond (Overall) 11,441$

Riley GMP 1,293,742$ Allowances for Owner Costs

Owner Purchase of WWCT Credits By Owner

Property Surveys -$

Geotechnical & Materials Testing -$

Bid Document Reproductions -$

Utility Charges -$

Hazardous Materials Survey & Testing -$

Hazardous Materials Abatement -$

Land Cost -$

Security System -$

Audio Visual System -$

Telephone/Communication Equipment -$

Computer Systems -$

Furnishings -$

Special Equipment (Radio Equipment) -$

Legal Fees -$

Financing Costs -$

Moving Expenses -$ Owner Contingency -$

Total Project Cost (GMP) 1,293,742$

Overall Project Costs (GMP)

Gateway Technical College

EVOC Horizon CenterKenosha, WI

Construction Documents PhaseMarch 12, 2018

March 27, 2018 73

Pro

ject

:

Pro

ject

No

.:B

id P

ack

ag

e:

GT

C P

.O.:

No

t A

cce

pte

dN

ot

Acc

ep

ted

Co

ntr

act

No

.D

esc

rip

tio

nA

wa

rde

d B

idd

er

Oth

er

Bid

de

r(s)

Ba

se B

id A

mo

un

tA

lt #

1A

lt #

2T

ime

Re

ceiv

ed

Bid

Re

v. 1

Da

teB

id R

ev.

2D

ate

Bid

Re

v. 3

Da

teB

id R

ev.

4D

ate

Co

ntr

act

Am

ou

nt

Da

te

Re

esm

an

1,0

78

,31

6.0

0$

1

0,7

95

.00

$

31

,25

0.0

0$

1

:25

PM

Wa

na

sek

85

9,9

00

.00

$

44

,65

5.0

0$

6

8,4

80

.00

$

1:3

0 P

M($

53

,98

0.0

0)

02

/27

/18

($4

3,8

55

.00

)0

2/2

7/1

8($

5,7

60

.00

)0

2/2

7/1

8($

24

,80

0.0

0)

02

/27

/18

73

1,5

05

.00

$

03

/12

/18

AW

Oa

kes

87

5,0

00

.00

$

5,0

00

.00

$

20

,00

0.0

0$

1

:20

PM

Sup

er

We

ste

rn1

,13

2,0

00

.00

$

22

,00

0.0

0$

5

6,0

00

.00

$

11

:25

AM

Will

kom

m1

,02

2,3

64

.00

$

(3,0

94

.00

)$

(7

,12

5.0

0)

$

11

:00

AM

Ve

it1

,31

8,6

75

.00

$

(12

,00

0.0

0)

$

(3

9,4

00

.00

)$

9:3

5 A

M

Sta

rk5

02

,63

2.2

2$

1

20

,55

8.2

3$

31

4,4

21

.02

$

1

:15

PM

Cic

chin

i3

68

,13

8.0

0$

8

7,8

31

.00

$

21

2,1

38

.00

$

1

1:2

5 A

M(1

1,0

00

.00

)$

02

/27

/18

35

7,1

38

.00

$

03

/12

/18

Alu

m.

Fen

ce C

orp

33

,50

5.0

0$

1

:30

PM

Ce

ntu

ry2

7,2

19

.00

$

1:2

0 P

M

No

rth

wa

y4

2,5

00

.00

$

1:0

0 P

M

Sta

tew

ide

24

,81

6.0

0$

3

:40

PM

24

,81

6.0

0$

0

3/1

2/1

8

15

58

Ga

tew

ay

Te

chn

ica

l C

oll

eg

e

Bid

Ta

bu

lati

on

Fo

rm

Fen

cin

g

Rile

y C

on

stru

ctio

n

53

01

99

th A

ven

ue

, K

en

osh

a,

WI

53

14

4

2/1

5/1

8 2

:00

PM

1.1

1.2

EV

OC

Ho

rizo

n C

en

ter

Bid

Ad

min

istr

ato

r:

Ad

dre

ss B

ids

Re

ceiv

ed

:

Bid

Du

e D

ate

& T

ime

:

1.3

Asp

ha

lt P

avi

ng

Ea

rth

wo

rk/S

ite

Uti

litie

s

March 27, 2018 74

Pro

ject

:

Pro

ject

No

.:B

id P

ack

ag

e:

GT

C P

.O.:

Bid

Re

vis

ion

Co

ntr

act

No

.S

ub

con

tra

cto

rD

ocu

me

nta

tio

n

Att

ach

ed

To

tal

Ch

an

ge

in

Va

lue

Acc

ep

ted

or

De

clin

ed

11

.1 (

Ea

rth

wo

rk/U

tilit

ies)

Wa

na

sek

YE

S($

53

,98

0.0

0)

Acc

ep

ted

21

.1 (

Ea

rth

wo

rk/U

tilit

ies)

Wa

na

sek

YE

S($

43

,85

5.0

0)

Acc

ep

ted

31

.1 (

Ea

rth

wo

rk/U

tilit

ies)

Wa

na

sek

YE

S($

5,7

60

.00

)A

cce

pte

d

31

.2 (

Asp

ha

lt P

avi

ng

)C

icch

ini

YE

S($

11

,00

0.0

0)

Acc

ep

ted

41

.1 (

Ea

rth

wo

rk/U

tilit

ies)

Wa

na

sek

YE

S($

24

,80

0.0

0)

Acc

ep

ted

51

.1 (

Ea

rth

wo

rk/U

tilit

ies)

Wa

na

sek

YE

S($

67

,25

0.0

0)

De

clin

ed

Va

lue

En

gin

ee

rin

g D

esc

rip

tio

n

15

58

N/A

Elim

ina

te t

he

uti

lity

wo

rk w

est

of

ba

se b

id p

ave

me

nt,

co

nst

ruct

on

ly r

ete

nti

on

ba

sin

s #

4,

#5

,

an

d #

6.

Elim

ina

te n

ew

wo

rk a

t e

xist

ing

acc

ess

dri

ve (

exc

ep

t cu

rb c

ut/

pa

tch

as

req

uir

ed

)

Pro

vid

e T

X 5

ge

og

rid

i.l.

o.

TX

7

Bid

Re

vis

ion

Tra

ckin

g F

orm

Ga

tew

ay

Te

chn

ica

l C

oll

eg

e

EV

OC

Ho

rizo

n C

en

ter

**

No

te:

Aft

er

con

firm

ing

sco

pe

s o

f lo

w b

idd

ers

, o

nly

th

e l

ow

Ea

rth

wo

rk a

nd

Asp

ha

lt b

idd

ers

we

re a

ske

d t

o s

ub

mit

re

vise

d p

rici

ng

fo

r V

.E o

pti

on

s. T

he

se o

pti

on

s su

mm

ari

zed

list

ed

ab

ove

.

Elim

ina

te t

he

ea

rth

wo

rk a

nd

su

bg

rad

e p

rep

ara

tio

n w

est

of

ba

se b

id p

ave

me

nt,

co

nst

ruct

on

ly r

ete

nti

on

ba

sin

s #

4,

#5

, a

nd

#6

.

Elim

ina

te g

eo

gri

d in

it's

en

tire

ty f

rom

sco

pe

Elim

ina

te n

ew

wo

rk a

t e

xist

ing

acc

ess

dri

ve (

exc

ep

t cu

rb c

ut/

pa

tch

as

req

uir

ed

)

March 27, 2018 75

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call ___ Action _X_ Information ___ Discussion ___

BID NO. 1559 RACINE BUILDING 2ND FLOOR REMODELING, RACINE CAMPUS

BID PACKAGE A

Summary of Item: Sealed bids were received from various subcontractors for the Racine

Building 2nd Floor Remodeling Project, Racine Campus - Bid Package A. Administration is recommending the contracts to provide all labor and

materials required for this project be awarded to: Bid Package A - Remodeling Camosy Construction Kenosha, WI Prime Contract (Contract Value for Camosy) $1,372,897 Architect and Engineering Fees: (PIDA Fees, 8.25%) 119,348 Reimbursable Fees 2,955 GTC Project Costs (F.O.B.’s) 4,800 Total Project Cost Bid Package A: $1,500,000

Funding Source: GO Promissory Notes Series F-2017-2018D

Attachments: Letters of Recommendation for Award of Bid and Tabulation of Bids from

Partners In Design

Ends Statements and/or Executive Limitations: Section 3 – Executive Limitations,

Policy 3.5, Financial Condition

Staff Liaison: Thomas Cousino Top878.docx or .pdf 03/16/18

March 27, 2018 76

March 8, 2018

Mr. William Whyte

Gateway Technical College

3520 30th

Avenue

Kenosha, Wisconsin 53140

RE: Racine Campus

Racine Building 2nd

Floor Remodeling

Offical Notice No. 1559

Dear Mr. Whyte:

On Thursday February 15, 2018 at the office of your construction

manager, Camosy Construction, we received subcontractor bids for the

Racine Building 2nd

Floor Remodeling project. Larry Paruszkiewicz,

Rhonda Cerminara and Vicki Christensen were in attendance on behalf of

Gateway Technical College. Tyler Thiel, Bob Nikolai and John Camosy

were in attendance on behalf of Camosy Construction, and Loren Kolek

and I were in attendance on behalf of Partners In Design Architects for

the receipt of bids.

The Racine Building 2nd

Floor Remodeling project consisted of two bid

packages and four alternate bids. The scope for the alternate bid are as

follows:

Alternate No. 1: Update the east and west stairwell railings to

meet the current code and new finishes.

Alternate No. 2: Update and renovate the finishes mens and

womens toilet rooms on this floor.

Alternate No. 3: Provide punched window opening in the east wall

of the connecting corridor to the Tech Building.

Alternate No. 3.1: Provide new gypsum board finishes and

insulation along the east and west exterior corridor walls of the

connecting corridor to the Tech Building.

After reviewing the bids with John Thielen, Tom Cousino and Camosy

Construction, we are recommending the college accept the Racine

Building 2nd

Floor Remodeling project bid Package A and alternate bid

number 1.

Based on our bid evaluation we are recommending that the contract

value for Camosy Construction be $1,372,897.00 for the Racine Building

2nd

Floor Remodeling project. Gateway Technical College should also

budget approximately $122,303.00 for architectural and engineering fees

related to the competitive bid process and reimbusable fees.

March 27, 2018 77

Page 2 of 2

Date: March 8, 2018

Prime Contract: $ 1,372,897.00 (Contract Value for Camosy)

A&E Fees: $ 119,348.00 (PIDA Fees8.25%)

Reimbursable Fees $ 2,955.00 (Reimbursable Fees)

GTC Project Costs $ 4,800.00 (F.O.B.’s)

Total Project Cost: $ 1,500,000.00

Should you have any questions regarding our recommendation, please

do not hesitat to give me a call.

Sincerely,

Jeffrey E. Bridleman

March 27, 2018 78

March 27, 2018 79

March 27, 2018 80

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call ___ Action _X_ Information ___ Discussion ___

BID NO. 1561 FY-18 ACADEMIC BUILDING CLASSROOM REMODELING AND

SCIENCE BUILDING SPRINKLERS – KENOSHA CAMPUS

Summary of Item: Sealed bids were received from various subcontractors for the

FY-18 Academic Building Classroom Remodeling and Science Building Sprinklers project, Kenosha Campus.

Administration is recommending the contract to provide all

labor and materials required for this project be awarded to: Riley Construction Kenosha, WI Prime Contract (Contract Value for Riley) $514,945 Architect and Engineering Fees: (PIDA Fees, 9.0% 51,511 + Alternates)

Reimbursable Fees: 650 GTC Costs: (Abatement, Commission and F.O.B.’s) 32,894 Total Project Cost: $600,000

Funding Source: GO Promissory Notes Series F-2017-2018E - $500,000

GO Promissory Notes Series F-2016-2017C - $100,000

Attachments: Letter of Recommendation for Award of Bid and Tabulation of

Bids from Partners In Design

Ends Statements and/or Executive Limitations: Section 3 – Executive Limitations,

Policy 3.5, Financial Condition

Staff Liaison: Thomas Cousino

Top879.docx or .pdf 03/14/18 March 27, 2018

81

March 13, 2018

Mr. William Whyte

Gateway Technical College

3520 30th

Avenue

Kenosha, Wisconsin 53140

RE: Kenosha Campus

FY-18 Classroom Remodel and Science Building Sprinklers

Offical Notice No. 1561

Dear Mr. Whyte:

On Thursday February 22, 2018 at the office of your construction

manager, Riley Construction, we received subcontractor bids for the FY-

18 Classroom Remodel and Science Building Sprinklers projects. Larry

Paruszkiewicz, Rhonda Cerminara and Vicki Christensen were in

attendance on behalf of Gateway Technical College. Erin Anderson,

Amanda Toepel and John Gleason were in attendance on behalf of Riley

Construction, and I was in attendance on behalf of Partners In Design

Architects for the receipt of bids.

The FY-18 Classroom Remodel and Science Building Sprinklers projects

consisted of two bid packages and six alternate bids. The scope for the

the bid packages and alternate bid are as follows:

Bid Package A: Renovate classrooms A134, A136 and A138.

Bid Package B: Provide fire protection sprinkler heads and piping

in the remainder of the science building.

Alternate No. 1: Provide carpet in the remainder of the west

cooridor.

Alternate No. 2: Replace the existing toilet rooms on the west

side of the Academic Building with a new Veterans Lounge, USG

Office and two single fixture toilet rooms.

Alternate No. 3: Replace the existing toilet rooms on the west

side of the Academic Building with a new Veterans Lounge, USG

Office and a Custodial Room.

Alternate No. 4: Provide perimeter base board heat in classrooms

A134, A136 and A138.

Alternate No. 5: Modify the vacated USG Office and Veterans

Lounge located on the first and second floor to be new Janitor

Closets.

Alternate No. 6: Revise the HVAC Control Sequence for the Five

VAV boxes servicing classrooms A102, A104, A112, A114 and

A116.

On bid day this project was over budget and since that time we have

been working with the apparent low bidders to reduce scope and provide

a project value that is within budget. All the bid revisions are indicated

on the attached “Bid Revision Tracking Form”.

March 27, 2018 82

Page 2 of 2

Date: March 13, 2018

After reviewing the bids and bid revisions with Larry Paruszkiewicz, Tom

Cousino and Riley Construction, we are recommending the college

accept the FY-18 Classroom Remodel Bid Package A and Alternate Bid No.

2.

Based on our bid evaluation we are recommending that the contract

value for Riley Construction be $514,945.00 for the FY-18 Classroom

Remodel and Science Building Sprinklers project. Gateway Technical

College should also budget approximately $52,161.00 for architectural

and engineering fees related to the competitive bid process and

reimbusable fees.

Prime Contract: $ 514,945.00 (Contract Value for Riley)

A&E Fees: $ 51,511.00 (PIDA Fees 9.0% + Alternates)

Reimbursable Fees $ 650.00 (Reimbursable Fees)

GTC Project Costs $ 32,894.00 (Abatement, Commission and

F.O.B.’s)

Total Project Cost: $ 600,000.00

Should you have any questions regarding our recommendation, please

do not hesitat to give me a call.

Sincerely,

Jeffrey E. Bridleman

March 27, 2018 83

Proj

ect:

Proj

ect N

o.:

Bid

Pack

age:

GTC

P.O

.:

Cont

ract

No.

Desc

riptio

nAw

arde

d Bi

dder

Oth

er B

idde

r(s)

Bid

Pack

age

ATi

me

Rece

ived

Alte

rnat

e Bi

d N

o. 1

Alte

rnat

e Bi

d N

o. 2

Alte

rnat

e Bi

d N

o. 3

Alte

rnat

e Bi

d N

o. 4

Alte

rnat

e Bi

d N

o. 5

Alte

rnat

e Bi

d N

o. 6

Bid

Pack

age

BBi

d Re

v. 1

Dat

eBi

d Re

v. 2

Date

Bid

Rev.

3D

ate

Cont

ract

Am

ount

Dat

eRi

ley

Cons

truc

tion

13,1

17.0

0$

2/

21/1

8 1:

54 P

MN

o Bi

d9,

548.

00$

9,54

8.00

$

N

o Bi

d18

0.00

$

No

Bid

649.

00$

22

,665

.00

$

03/0

8/18

Rile

y Co

nstr

uctio

n5,

419.

00$

2/21

/18

1:54

PM

No

Bid

31,0

45.0

0$

22

,186

.00

$

No

Bid

553.

00$

N

o Bi

dN

o Bi

d(7

,395

.00)

$

03/0

6/18

(6,0

89.0

0)$

03

/06/

1829

,069

.00

$

03/0

8/18

Tow

n an

d Co

untr

y7,

550.

00$

02/2

1/18

11:

00am

No

Bid

No

Bid

No

Bid

No

Bid

No

Bid

(2,8

00.0

0)$

03

/12/

182,

800.

00$

03

/12/

182,

800.

00$

03

/12/

187,

550.

00$

03/0

8/18

Davc

o39

,463

.00

$

02/2

2/18

1:0

0pm

No

Bid

23,0

00.0

0$

21

,000

.00

$

No

Bid

500.

00$

N

o Bi

dN

o Bi

d39

,463

.00

$

03/0

8/18

NJ S

chau

b29

,435

.00

$

02/2

2/18

10:

00am

No

Bid

19,0

45.0

0$

18

,285

.00

$

No

Bid

775.

00$

N

o Bi

d1,

960.

00$

48,4

80.0

0$

03

/08/

18N

o Bi

dPo

stor

ino

Deco

ratin

g12

,660

.00

$

02/2

2/18

11:

00am

No

Bid

No

Bid

No

Bid

No

Bid

767.

00$

(2

,410

.00)

$

03/0

2/18

2,60

0.00

$

03/0

2/18

2,30

0.00

$

03/0

2/18

15,1

50.0

0$

03

/08/

18Q

ualit

y Ce

iling

s7,

990.

00$

02/2

2/18

9:0

0am

No

Bid

4,06

0.00

$

3,

270.

00$

No

Bid

560.

00$

N

o Bi

d1,

515.

00$

12,0

50.0

0$

03

/08/

18

Full

Spec

Flo

ors1

36,7

88.0

0$

02

/22/

18 1

:00p

mN

o Bi

dN

o Bi

dN

o Bi

dN

o Bi

dN

o Bi

dN

o Bi

dN

o Bi

d36

,788

.00

$

03/0

8/18

BSI

14,6

99.0

0$

02

/22/

18 1

:00p

m17

,628

.00

$

19,7

68.0

0$

11

,942

.00

$

No

Bid

No

Bid

No

Bid

5,17

6.00

$

34

,467

.00

$

03/0

8/18

Lipp

ert F

loor

ing

15,6

27.0

0$

02

/22/

18 6

:00a

m15

,594

.00

$

15,8

76.0

0$

5,

955.

00$

No

Bid

509.

00$

N

o Bi

d46

8.00

$

31,5

03.0

0$

03

/08/

18D.

E. F

loor

Cov

erin

gs1

10,6

69.0

0$

02

/21/

18 1

2:00

pm21

,762

.00

$

12,7

10.0

0$

4,

859.

00$

No

Bid

No

Bid

No

Bid

1,50

0.00

$

23

,379

.00

$

03/0

8/18

Carp

et L

and

Floo

ring3

14,5

25.0

0$

02

/21/

18 3

:00p

m16

,600

.00

$

3,54

0.00

$

N

o Bi

d39

5.00

$

No

Bid

290.

00$

12

,215

.00

$

03/0

6/18

8,95

0.00

$

03/0

7/18

30,2

80.0

0$

03

/08/

18BS

I8,

533.

00$

02/2

2/18

1:0

0pm

No

Bid

8,28

5.00

$

8,

503.

00$

No

Bid

No

Bid

No

Bid

4,11

0.00

$

16

,818

.00

$

03/0

8/18

Post

orin

o De

cora

ting

4,49

9.00

$

02

/22/

18 1

1:00

amN

o Bi

d3,

594.

00$

3,70

2.00

$

N

o Bi

d31

3.00

$

No

Bid

1,62

5.00

$

8,

093.

00$

03/0

8/18

Sout

hpor

t35,

800.

00$

02/2

2/18

1:0

0pm

No

Bid

990.

00$

99

0.00

$

No

Bid

No

Bid

No

Bid

10,7

50.0

0$

6,

790.

00$

03/0

8/18

Deck

er F

ire P

rote

ctio

n13

,833

.00

$

02/2

2/18

10:

00am

No

Bid

6,71

5.00

$

6,

715.

00$

No

Bid

No

Bid

No

Bid

88,9

66.0

0$

20

,548

.00

$

03/0

8/18

Sout

hpor

t3,

100.

00$

02/2

2/18

1:0

0pm

No

Bid

20,4

00.0

0$

8,

000.

00$

No

Bid

12,5

00.0

0$

N

o Bi

dN

o Bi

d(1

,400

.00)

$

03/0

5/18

22,1

00.0

0$

03

/08/

18M

artin

Pet

erse

n Co

.6,

500.

00$

02/2

2/18

1:0

0pm

No

Bid

38,5

00.0

0$

20

,900

.00

$

No

Bid

10,3

00.0

0$

N

o Bi

d6,

500.

00$

(3,8

10.0

0)$

03

/02/

1841

,190

.00

$

03/0

8/18

Lee

Plum

bing

-$

02

/22/

18 1

:00p

mN

o Bi

d24

,777

.00

$

13,7

50.0

0$

N

o Bi

d11

,777

.00

$

No

Bid

No

Bid

(2,5

00.0

0)$

03

/03/

18(1

,500

.00)

$

03/0

8/18

1,50

0.00

$

03/0

8/18

22,2

77.0

0$

03

/08/

18

Sout

hpor

t37

,600

.00

$

02/2

2/18

1:0

0pm

No

Bid

16,4

00.0

0$

15

,900

.00

$

18,6

00.0

0$

4,

500.

00$

2,20

0.00

$

N

o Bi

d54

,000

.00

$

03/0

8/18

Mar

tin P

eter

sen

Co.

52,5

00.0

0$

02

/22/

18 1

:00p

mN

o Bi

d18

,800

.00

$

17,6

00.0

0$

47

,550

.00

$

3,65

0.00

$

3,

000.

00$

No

Bid

71,3

00.0

0$

03

/08/

18Le

e H

VAC

44,0

00.0

0$

02

/22/

18 1

:00p

mN

o Bi

d17

,600

.00

$

17,3

00.0

0$

25

,300

.00

$

4,10

0.00

$

2,

200.

00$

1,50

0.00

$

61

,600

.00

$

03/0

8/18

Nex

t Ele

ctric

61,2

00.0

0$

02

/22/

18 1

:00p

mN

o Bi

d46

,600

.00

$

44,5

00.0

0$

N

o Bi

dN

o Bi

dN

o Bi

dN

o Bi

d(5

,200

.00)

$

02/2

7/18

5,20

0.00

$

02/2

7/18

102,

600.

00$

03

/08/

18Re

wal

d El

ectr

ic54

,950

.00

$

02/2

2/18

1:0

0pm

No

Bid

46,7

50.0

0$

44

,830

.00

$

No

Bid

No

Bid

No

Bid

5,40

0.00

$

-

$

02/2

7/18

101,

700.

00$

03

/08/

18Pi

eper

Ele

ctric

61,9

24.0

0$

02

/22/

18 1

2:00

pmN

o Bi

d54

,153

.00

$

52,1

08.0

0$

N

o Bi

dN

o Bi

dN

o Bi

d7,

186.

00$

-$

02

/27/

1811

6,07

7.00

$

03/0

8/18

-$

1

Thes

e bi

dder

s w

ere

disq

ualif

ied

due

to b

iddi

ng w

ith n

on-u

nion

labo

r, w

hich

was

a re

quire

men

t lis

ted

in th

e fr

ont e

nd d

ocum

ents

.2 T

his b

idde

r was

cho

sen

due

to o

vera

ll co

mbi

ned

bid

(bas

e bi

d an

d al

tern

ate

#2) b

eing

low

est.

3 Thi

s bid

der w

as d

isqu

alifi

ed d

ue to

inco

mpl

ete

scop

e of

wor

k.

Bid

Tabu

latio

n Fo

rmG

atew

ay T

echn

ical

Col

lege

Bid

Adm

inis

trat

or:

Rile

y Co

nstr

uctio

nG

TC K

E FY

-18

Acad

emic

Bui

ldin

g Cl

assr

oom

Ren

ovat

ion

1561

A &

BAd

dres

s Bi

ds R

ecei

ved:

5301

99t

h Av

enue

, Ken

osha

, WI

5314

4Bi

d Du

e Da

te &

Tim

e:Fe

brua

ry 2

2, 2

018

@ 2

:00

PM

1.00

Sele

ctiv

e De

mol

ition

2.00

Gen

eral

Tra

des

3.00

Gla

ss a

nd G

lazi

ng

4.00

Stee

l Stu

ds &

Dry

wal

l

5.00

Acou

stic

al S

yste

ms

6.00

Floo

ring

10.0

0H

VAC

11.0

0El

ectr

ical

7.00

Pain

ting

8.00

Fire

Pro

tect

ion

9.00

Plum

bing

March 27, 2018 84

Proj

ect:

Proj

ect N

o.:

Bid

Pack

age:

GTC

P.O

.:

Bid

Revi

sion

Cont

ract

No.

Subc

ontr

acto

rD

ocum

enta

tion

Atta

ched

Tota

l Cha

nge

in V

alue

Acce

pted

or D

eclin

edRi

ley

Cons

truc

tion

Yes

($7,

395.

00)

Acce

pted

Rile

y Co

nstr

uctio

nYe

s($

6,08

9.00

)D

eclin

ed

Post

orin

oYe

s($

2,41

0.00

)D

eclin

edQ

ualit

yN

/A$0

.00

Post

orin

o D

ecor

atin

gYe

s$2

,600

.00

Dec

lined

Qua

lity

Ceili

ngs

N/A

$0.0

0

Post

orin

o D

ecor

atin

gYe

s$2

,300

.00

Dec

lined

Qua

lity

Ceili

ngs

N/A

$0.0

0

Full

Spec

Flo

ors1

N/A

$0.0

0BS

IN

/A$0

.00

Lipp

ert F

loor

ing

N/A

$0.0

0D

.E. F

loor

Cov

erin

gs1

N/A

$0.0

0Ca

rpet

Lan

d Fl

oorin

gYe

s12

,215

.00

$

D

eclin

edFu

ll Sp

ec F

loor

s1N

/A$0

.00

BSI

N/A

$0.0

0Li

pper

t Flo

orin

gN

/A$0

.00

D.E

. Flo

or C

over

ings

1N

/A$0

.00

Carp

et L

and

Floo

ring

Yes

$8,9

50.0

0D

eclin

edSo

uthp

ort

Yes

($1,

400.

00)

Acce

pted

Mar

tin P

eter

sen

Co.

Yes

($3,

810.

00)

Lee

Plum

bing

Yes

($2,

500.

00)

Sout

hpor

tN

/A$0

.00

Acce

pted

Mar

tin P

eter

sen

Co.

N/A

$0.0

0Le

e Pl

umbi

ngYe

s($

1,50

0.00

)

Sout

hpor

tN

/A$0

.00

Acce

pted

Mar

tin P

eter

sen

Co.

N/A

$0.0

0Le

e Pl

umbi

ngYe

s$1

,500

.00

Nex

tYe

s($

5,20

0.00

)Re

wal

dN

/A$0

.00

Acce

pted

Piep

erN

/A$0

.00

Nex

t Ele

ctric

Yes

$5,2

00.0

0Re

wal

d El

ectr

icN

/A$0

.00

Acce

pted

Piep

er E

lect

ricN

/A$0

.00

Bid

Revi

sion

Tra

ckin

g Fo

rmG

atew

ay T

echn

ical

Col

lege

GTC

KE

FY-1

8 Ac

adem

ic B

uild

ing

Clas

sroo

m R

enov

atio

n15

61A

& B

29.

00

25.

00

35.

00

16.

00

6.00

2 19.

00

15.

00

Rem

oved

Mill

wor

k an

d Si

nks f

rom

Offi

ces.

App

lies

to A

ltern

ate

2.

Bid

Revi

sion

Des

crip

tion

12.

00

22.

00

Cost

of B

PA -

Bas

e Bi

d w

as in

clud

ed in

Alte

rnat

e 2.

Red

uced

Cos

t.

Rem

oved

Mill

wor

k an

d Si

nks f

rom

Offi

ces.

App

lies

to A

ltern

ate

3.

Cost

of b

ase

bid

redu

ced.

Cos

t mov

ed to

Alte

rnat

es 2

&3

Cost

of A

ltern

ate

#2 w

as in

clud

ed in

BPA

- Ba

se B

id. C

ost a

dded

to A

ltern

ate

2

Cost

of A

ltern

ate

#3 w

as in

clud

ed in

BPA

- Ba

se B

id. C

ost a

dded

to A

ltern

ate

#3

Adde

d Ti

le a

nd C

oncr

ete

Seal

er to

Alte

rnat

e 2.

Mis

sing

Cost

for A

lt. 3

Rem

oved

Mill

wor

k an

d Si

nks f

rom

Offi

ces.

App

lies

to A

ltern

ate

2 &

3.

39.

00Co

st o

f bas

e bi

d w

as in

clud

ed in

Alte

rnat

e 2.

Mov

ed to

bas

e bi

d.

111

.00

Cost

of B

id P

acka

ge B

was

incl

uded

in b

ase

bid

of B

id P

acka

ge A

. Rem

oved

from

bas

e bi

d of

Bid

Pac

kage

A.

211

.00

Cost

of B

id P

acka

ge B

was

incl

uded

in b

ase

bid

of B

id P

acka

ge A

. Add

ed to

bas

e bi

d of

Bi

d Ba

ckag

e B.

March 27, 2018 85

CS

I #D

ES

CR

IPT

ION

12

/5/1

7 B

UD

GE

TC

OS

T/S

FB

PA

Bid

AM

OU

NT

CO

ST

/SF

CO

NT

RA

CT

OR

Alt

2:

A2

AP

PR

OV

ED

TO

TA

L(B

ase

Bid

& A

lt. 2

)01

0000

Gen

eral

Con

ditio

ns72

,547

12.7

3$

80,1

9914

.07

$

0

N/A

80,1

9902

4119

Sel

ectiv

e D

emol

ition

42,9

177.

53$

13

,117

2.30

$

Rile

y9,

548

22,6

6500

0000

Gen

eral

Tra

des

39,0

056.

84$

5,

419

0.95

$

Rile

y23

,650

29,0

6908

8000

Alu

min

um S

yste

ms

/ Gla

zing

7,59

01.

33$

7,

550

1.32

$

Tow

n an

d C

ount

ry0

7,55

009

2000

Ste

el S

tuds

& D

ryw

all

72,1

8012

.66

$

29

,435

5.16

$

NJ

Sch

aub

19,0

4548

,480

0960

00F

loor

ing

36,9

696.

49$

15

,627

2.74

$

Lipp

ert

15,8

7631

,503

0951

00A

cous

tical

Cei

ling

12,6

852.

23$

7,

990

1.40

$

Qua

lity

4,06

012

,050

0990

00P

aint

ing

& W

all C

over

ing

s18

,173

3.19

$

4,49

90.

79$

P

osto

rino

3,59

48,

093

2110

00F

ire P

rote

ctio

n11

,970

2.10

$

13,8

332.

43$

D

ecke

r6,

715

20,5

4822

0000

Plu

mbi

ng28

,000

4.91

$

3,10

00.

54$

S

outh

port

19,0

0022

,100

2300

00H

VA

C61

,650

10.8

2$

37,6

006.

60$

S

outh

port

16,4

0054

,000

2600

00E

lect

rica

l11

0,10

019

.32

$

54

,950

9.64

$

Rew

ald

46,7

5010

1,70

0

Sub

tota

l51

3,78

690

.14

$

27

3,31

947

.95

$

16

4,63

843

7,95

7

Con

stru

ctio

n C

ontin

gen

cy25

,689

4.51

$

13,6

662.

40$

8,

232

21,8

98

Des

ign

Con

ting

ency

25,6

894.

51$

9,

655

1.69

$

6,45

616

,111

Sub

tota

l56

5,16

599

.15

$

29

6,64

052

.04

$

17

9,32

647

5,96

6

Bui

lder

s R

isk

Insu

ranc

eB

y O

wne

r-

$

By

Ow

ner

-$

B

y O

wne

rB

y O

wne

r

Bui

ldin

g P

erm

it6,

816

1.20

$

6,81

61.

20$

In

Bas

e B

idIn

Bas

e B

id

Gen

eral

Lia

bilit

y In

sura

nce

2,82

60.

50$

1,

483

0.26

$

897

2,38

0

Sub

tota

l57

4,80

610

0.84

$

304,

939

53.5

0$

180,

223

485,

162

Ove

rhea

d &

Pro

fit22

,720

3.99

$

11,9

252.

09$

7,

209

19,1

34P

reco

nstr

uctio

n F

ee2,

840

0.50

$

4,05

50.

71$

In

Bas

e B

id4,

055

A/E

Fee

51,1

198.

97$

B

y O

wne

rB

y O

wne

rB

y O

wne

rS

ubto

tal

651,

485

11

4.30

$

32

0,91

9

56.3

0$

187,

431

50

8,35

0

S

ubg

uard

(1%

of

Sub

s)6,

515

1.

14$

E

XC

LUD

ED

-$

EX

CLU

DE

DE

XC

LUD

ED

Per

form

ance

Bon

d (N

/A)

6,59

5

1.16

$

6,59

5

1.16

$

6,59

5T

OT

AL

664,

595

$

11

6.60

$

32

7,51

4$

57.4

6$

187,

431

$

51

4,94

5$

H

azar

dous

Mat

eria

ls A

bate

men

t40

,000

7.02

$

32,8

94

5.

77$

32

,894

T

OT

AL

704,

595

$

12

3.61

$

36

0,40

8$

63.2

3$

187,

431

$

54

7,83

9

P

roje

ct S

quar

e F

oota

ge5,

700

5,70

0

March 27, 2018 86

IX.

POLICY GOVERNANCE MONITORING REPORTS A. End Statement Monitoring

College Ends Policy - The tri-county community benefits from affordable higher education that allows residents to develop knowledge and skills for family-supporting careers that contribute to the growth and sustainability of the local economy at a cost commensurate with the value of services provided. 3) Taxpayers receive a positive return on investment from Gateway’s impact on the local tax base, property values, and overall economic development as well as the contributions of graduates to the tri-county community.

Educational Partnerships

March 27, 2018 87

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action X Information _____ Discussion _____

POLICY GOVERNANCE MONITORING REPORTS Ends Statement Monitoring

College Ends Policy - The tri-county community benefits from affordable higher education that allows residents to develop knowledge and skills for family-supporting careers that contribute to the growth and sustainability of the local economy at a cost commensurate with the value of services provided.

3) Taxpayers receive a positive return on investment from Gateway’s impact on the

local tax base, property values, and overall economic development as well as the contributions of graduates to the tri-county community.

Staff Liaison: Katie Graf, Sam Duczak, and Amanda Virzi

March 27, 2018 88

IX.

POLICY GOVERNANCE MONITORING REPORTS B. Executive Limitations

a) 3.4 FY18-19 Budget/Forecasting – Bill Whyte b) 3.8 Partnerships/Grants/Contracts – Matt Janisin

March 27, 2018 89

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD Roll Call ___ Action X_ Information ___ Discussion ___

POLICY GOVERNANCE MONITORING REPORTS Executive Limitations Policy 3.4

Budgeting/Forecasting

Executive Limitations Policy Budgeting for any fiscal year or the remaining part of any

fiscal year shall not deviate materially from the Board’s Ends policy, risk fiscal jeopardy, fail to reflect credible projections of income and expenses, or fail to align with the college’s strategic plan.

Ends Statements and/or Executive Limitations: Executive Limitations

Budgeting/Forecasting 3.4

Staff Liaison: William Whyte

Top829.docx 03/02/18

March 27, 2018 90

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action X Information _____ Discussion _____

Executive Limitations Policy 3.8 Partnerships/Grants/Contracts

The President shall not enter into any formal or informal partnership, grant, or contractual arrangement that fails to emphasize the accomplishment of Board Ends policy, avoid unacceptable means, or protect the college’s fiscal integrity or public image. Without limiting the foregoing statement, the President shall not: Accept gifts or grants which obligate the College to make significant, long-term expenditures of funds or other resources, other than those created by the gift or grant, or which are not in the best interest of the college.

Staff Liaison: Matt Janisin

March 27, 2018 91

IX.

POLICY GOVERNANCE MONITORING REPORTS C. Policy Governance Review

a) Ends Policy #3 b) 3.8 Partnerships

March 27, 2018 92

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action X Information _____ Discussion _____

POLICY GOVERNANCE REVIEW Review Ends Policy #3

SECTION 4 – ENDS POLICY 4.1, STATEMENT 3 The tri-county community benefits from affordable higher education that allows residents to develop knowledge and skills for family-supporting careers that contribute to the growth and sustainability of the local economy at a cost commensurate with the value of services provided.

3. Taxpayers receive a positive return on investment from Gateway’s impact on the local tax base, property values, and overall economic development as well as the contributions of graduates to the tri-county community.

Governance Process: Policy 1.4 – Board Policy Creation and Review Board Liaison: William Duncan

March 27, 2018 93

GATEWAY TECHNICAL COLLEGE DISTRICT BOARD

Roll Call _____ Action X Information _____ Discussion _____

POLICY GOVERNANCE REVIEW Review Policy 3.8

SECTION 3 - EXECUTIVE LIMITATIONS POLICY 3.8 PARTNERSHIPS/GRANTS/CONTRACTS The President shall not enter into any formal or informal partnership, grant, or contractual arrangement that fails to emphasize the accomplishment of Board Ends policy, avoid unacceptable means, or protect the college’s fiscal integrity or public image. Without limiting the foregoing statement, the President shall not:

1. Accept gifts or grants which obligate the College to make significant, long-term expenditures of funds or other resources, other than those created by the gift or grant, or which are not in the best interest of the college.

Governance Process: Policy 1.4 – Board Policy Creation and Review Board Liaison: William Duncan

March 27, 2018 94

X.

BOARD MEMBER COMMUNITY REPORTS

March 27, 2018 95

XI.

NEXT MEETING DATE AND ADJOURN A. Regular Meeting – Thursday, April 19, 2018, 8:00 am, Elkhorn Campus,

Rooms 112/114 B. Adjourn

March 27, 2018 96