Transcript of Non_Compliance_Notice2.pdf
-
Date :
1. ISSUED TO 2. NCN NO:
Name of Contractor: INSTRUMENTATION INC.
2. DESCRIPTION OF NCN: 3. REFERENCE OF NCN
See attached files.
NCN Issued by: Signature and Date:
J.A.Aguilar/S.L.Sebuc
4. ACTION TAKEN ( PROPOSED CORRECTIVE MEASURE BY CONTRACTOR )
5. APPROVAL OF CORRECTIVE MEASURES Remarks:
6. CQC TEAM REVIEW AND CLOSE OUT
>
OP-C-078-0
D.M Consunji, Inc.
Re- Inspected by: Signature and Date:
Designer /
Consultant
Operationsa.
b. Engineering
c. CQC
d.
e. Owner
15 MW CALAPAN BUNKER FIRED POWER PLANT
D.M. CONSUNJI, INC.
NON COMPLIANCE NOTICE
05-Dec-14
The delivered level switches on site, esp. the devices
with type: X5AA8 132R 04G1, X5AA8 132R 04G3,
and X5AA8 141R 04G2E268 does not match the
flange stub out of the tanks. Because of this, the
subcontractor's work for the installation of level
instruments on tanks were delayed and the
reinstallation and fabrication/procurement of correct
flanges will incur additional costs to DMCI.