STAMFORD, CT • 203 359-4704 • APCONST.COM
⚪ Demolished existing structure after extensive abatement of hazardous materials.
⚪ Built new core/shell building on same footprint to simplify Planning & Zoning approval.
⚪ Fit out complete interior all on raised floor pedestal system with 138 miles of under-floor pavers and data wiring to systems furniture.
⚪ Completed all sitework and Teflon fabric covered parking structures.
⚪ Infrastructure included emergency generator, UPS system, communications room, fiber optic cabling, dual redundancy power and communication systems, four high speed passenger elevators and one freight elevator.
⚪ Full service state-of-the-art kitchen and cafeteria.
⚪ 38 high tech conference rooms with blackout curtains, large scale flat screen displays, overhead projector systems and video-conferencing.
⚪ Sustainable elements included: natural bluestone lobby floor, clear-double-pane glass, Lutron Daylighting System, xeriscaping, recycled rubber tire carpeting, reclaimed birchwood flooring, recycling of construction debris.
⚪ Highly technical security system at all doors, elevators, floors, lobbies with cameras throughout the building and site.
⚪ Construction management services included: constructability review, budgeting, value engineering, subcontractor bid and award, safety and logistical planning, pre-purchase program, scheduling, phasing, construction and commissioning oversight.
Nokia Corporation Harrison, NY
ServicesConstruction Management
Construction TypeCommercial – Corporate
Size102,000 square feet
Contract$33,600,000
ArchitectStudios Architecture/ Perkins & Will
Nokia Corporation
“A.P. Construction was instrumental in working with the Town of Harrison in classifying our project as a renovation. They handled the site plan approval and covered parking
hearings with utmost professionalism. Their initial value engineering to keep the budget in line, coupled with handling a multitude of design changes throughout the entire
project in an expedient manner, allowed us to have occupancy as scheduled.”
Ken Howell, Director of Construction, Nokia