STAMFORD, CT 203 359-4704 APCONST.COM Demolished existing structure after extensive abatement of hazardous materials. Built new core/shell building on same footprint to simplify Planning & Zoning approval. Fit out complete interior all on raised floor pedestal system with 138 miles of under-floor pavers and data wiring to systems furniture. Completed all sitework and Teflon fabric covered parking structures. Infrastructure included emergency generator, UPS system, communications room, fiber optic cabling, dual redundancy power and communication systems, four high speed passenger elevators and one freight elevator. Full service state-of-the-art kitchen and cafeteria. 38 high tech conference rooms with blackout curtains, large scale flat screen displays, overhead projector systems and video-conferencing. Sustainable elements included: natural bluestone lobby floor, clear-double-pane glass, Lutron Daylighting System, xeriscaping, recycled rubber tire carpeting, reclaimed birchwood flooring, recycling of construction debris. Highly technical security system at all doors, elevators, floors, lobbies with cameras throughout the building and site. Construction management services included: constructability review, budgeting, value engineering, subcontractor bid and award, safety and logistical planning, pre-purchase program, scheduling, phasing, construction and commissioning oversight. Nokia Corporation Harrison, NY Services Construction Management Construction Type Commercial – Corporate Size 102,000 square feet Contract $33,600,000 Architect Studios Architecture/ Perkins & Will

Transcript of Nokia Corporation Harrison, NY - A.P. Constructionapconst.com/pdfs/exp_nokia.pdf · Nokia...

Page 1: Nokia Corporation Harrison, NY - A.P. Constructionapconst.com/pdfs/exp_nokia.pdf · Nokia Corporation Harrison, NY Services Construction Management Construction Type Commercial –

STAMFORD, CT • 203 359-4704 • APCONST.COM

⚪ Demolished existing structure after extensive abatement of hazardous materials.

⚪ Built new core/shell building on same footprint to simplify Planning & Zoning approval.

⚪ Fit out complete interior all on raised floor pedestal system with 138 miles of under-floor pavers and data wiring to systems furniture.

⚪ Completed all sitework and Teflon fabric covered parking structures.

⚪ Infrastructure included emergency generator, UPS system, communications room, fiber optic cabling, dual redundancy power and communication systems, four high speed passenger elevators and one freight elevator.

⚪ Full service state-of-the-art kitchen and cafeteria.

⚪ 38 high tech conference rooms with blackout curtains, large scale flat screen displays, overhead projector systems and video-conferencing.

⚪ Sustainable elements included: natural bluestone lobby floor, clear-double-pane glass, Lutron Daylighting System, xeriscaping, recycled rubber tire carpeting, reclaimed birchwood flooring, recycling of construction debris.

⚪ Highly technical security system at all doors, elevators, floors, lobbies with cameras throughout the building and site.

⚪ Construction management services included: constructability review, budgeting, value engineering, subcontractor bid and award, safety and logistical planning, pre-purchase program, scheduling, phasing, construction and commissioning oversight.

Nokia Corporation Harrison, NY

ServicesConstruction Management

Construction TypeCommercial – Corporate

Size102,000 square feet

Contract$33,600,000

ArchitectStudios Architecture/ Perkins & Will

Page 2: Nokia Corporation Harrison, NY - A.P. Constructionapconst.com/pdfs/exp_nokia.pdf · Nokia Corporation Harrison, NY Services Construction Management Construction Type Commercial –

Nokia Corporation

“A.P. Construction was instrumental in working with the Town of Harrison in classifying our project as a renovation. They handled the site plan approval and covered parking

hearings with utmost professionalism. Their initial value engineering to keep the budget in line, coupled with handling a multitude of design changes throughout the entire

project in an expedient manner, allowed us to have occupancy as scheduled.”

Ken Howell, Director of Construction, Nokia