Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The Executive Engineer Shimla Division No.I, HPPWD, Shimla Subject: Avoidance of accidents on MRR-Suggestions thereof As road user, I am to bring to your kind information the following suggestions for implementation as travelling on some of critical locations on MRR during day/night could be at risk. 1. Two major accident prone/run-off the road locations on MRR, one just at Talland and other in front of Army Building (knollswood curve) are asking for immediate improvement on uphill side for maneuvering of standard size buses and erection of W-Beam crash barriers on other side on both locations. Present Y-intersection at Talland does not allow standard size bus maneuvering in one go, which creates bottleneck for next bus and through traffic and bus could run-off the road beside results in conflict with pedestrian/waiting passengers. This is oldest congested location without proper maneuvering space. 2. Y-Intersection involving MRR & NH Bypass (just at Tourist Information Centre) is another major bottleneck for free flow of traffic and source of major conflict with Pedestrian movement/waiting passengers. Intersection needs widening & improvement to ensure safe operation & maneuvering by using adequate land on valley side; Zebra crossing marking for pedestrian/vulnerable road users along with directional Pavement Marking (including arrow marking) on NH & MRR needs to be provided. There is an urgent need of providing an Octagonal ‘STOP’/’Give-way’ (triangle) signage at this location on both ends. Dismantle rain shelter from present location and re-locate at some distance (like the one, exist at old Bus stop). 3. To control both way movements of traffic, install speed limit signs of 20-30 KMPH at entry and exit from MRR and ensure enforcement through traffic Police. Signage erected by Shimla Police needs to be modified as these distract the road user and act more as an advertisement hoardings on PWD Road Infrastructure and are in contravention to IRC: 67 Guidelines. The size, quality & matter for all signage should be as per standard. A large number of signage on MRR are not facing road users because these have been turned toward inner side because of hit by vehicles.

Transcript of No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter...

Page 1: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 1 of 8

No. RAU/Road Safety/2013/18 Dated: 27-04-2014

To

The Executive Engineer

Shimla Division No.I, HPPWD, Shimla

Subject: Avoidance of accidents on MRR-Suggestions thereof

As road user, I am to bring to your kind information the following

suggestions for implementation as travelling on some of critical locations on MRR during day/night could be at risk.

1. Two major accident prone/run-off the road locations on MRR, one just at

Talland and other in front of Army Building (knollswood curve) are asking for immediate improvement on uphill side for maneuvering of standard size

buses and erection of W-Beam crash barriers on other side on both locations. Present Y-intersection at Talland does not allow standard size bus maneuvering in one go, which creates bottleneck for next bus and through

traffic and bus could run-off the road beside results in conflict with pedestrian/waiting passengers. This is oldest congested location without

proper maneuvering space.

2. Y-Intersection involving MRR & NH Bypass (just at Tourist Information Centre) is another major bottleneck for free flow of traffic and source of

major conflict with Pedestrian movement/waiting passengers. Intersection needs widening & improvement to ensure safe operation & maneuvering by using adequate land on valley side; Zebra crossing marking for

pedestrian/vulnerable road users along with directional Pavement Marking (including arrow marking) on NH & MRR needs to be provided. There is an

urgent need of providing an Octagonal ‘STOP’/’Give-way’ (triangle) signage at this location on both ends. Dismantle rain shelter from present location

and re-locate at some distance (like the one, exist at old Bus stop).

3. To control both way movements of traffic, install speed limit signs of 20-30

KMPH at entry and exit from MRR and ensure enforcement through traffic Police. Signage erected by Shimla Police needs to be modified as these

distract the road user and act more as an advertisement hoardings on PWD Road Infrastructure and are in contravention to IRC: 67 Guidelines. The size, quality & matter for all signage should be as per standard. A large number

of signage on MRR are not facing road users because these have been turned toward inner side because of hit by vehicles.

Page 2: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 2 of 8

4. Erect hazard marker at take–off to Boileuganj, Khalini and other such

locations and delineators for better night visibility of road boundaries.

5. Reduce multiple signage and hoardings on right of way for clear sight

distance on MRR.

Remembrance for road

traffic victims

Yours faithfully,

Sd/-

(RAUJIF )

MBA, MSc. (Env.), BE

State Nodal Road Safety Auditor (PMGSY)

EE, Nirman Bhawan, Shimla-2

Safe Roads for a Safer Future Investment in roadway safety saves lives

Cc to: The Superintending Engineer, 4th Circle, HPPWD, Shimla

(RAUJIF)

Page 3: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 3 of 8

Accident-prone Location at Talland

(W-Beam/Delineators for night visibility)

Page 4: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 4 of 8

Run-off Road Location at Knollswood-Chhota Shimla

(Erection of W-Beam crash barrier & Delineators for better night visibility)

Page 5: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 5 of 8

Pedestrian–Traffic conflict (No scope for movement)

(Pavement marking for crossings with safety fences on rails

Page 6: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 6 of 8

Pedestrian Safety at risk during day & night

(Safety Fencing & proper closing of edges)

Page 7: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 7 of 8

Y-Intersection involving MRR & NH Bypass

Conflict of traffic with Pedestrian

(Intersection needs widening & improvement adequate land on valley side

available; Pavement marking for pedestrian/vulnerable road user required)

Page 8: No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The ...himachalservices.nic.in/hpridc/letter RSA_MRR27042014.pdf · Page 1 of 8 No. RAU/Road Safety/2013/18 Dated: 27-04-2014 To The

Page 8 of 8

Y-Intersection at Railway Station

(Intersection needs improvement/Give-Way or STOP Signage)

Reduce Advertising/non-standard/multiplesignage on MRR