NO-8 NO-9 NO-10...T D N A R N A I N Y A D N AX15 NO-9 NO-12 AX16 AX17 AX20 NO-8 NO-10 NO-11 AX19...
Transcript of NO-8 NO-9 NO-10...T D N A R N A I N Y A D N AX15 NO-9 NO-12 AX16 AX17 AX20 NO-8 NO-10 NO-11 AX19...
PAYT
ON
WILD
ERNE
SS
WildlifeSub
AX1
AX5
NO-6 AX3
AX4
NO-7
NO-9
AX2
NO-8
04
15
030102
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1Distribution Structures
Existing Distrib ution StructureProposed Transmission Structures
Tub ular Ste e l Pole (TSP)Lattic e Ste e l Towe r (LST)Rack
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
N e w Te le com U nd e rground Alignme ntConstruction Areas
Distrib ution Disturb anc e Are aTe le com Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )W ild life Sub station Are a
Page 1 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 1 of 15
ACOR
N
PAYT
ON
RICK
ENBA
CKER
WINT
ERHA
VEN
CENTRAL
JURUPA
04
15
030102
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Distribution StructuresExisting Distrib ution Structure
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Te le com Disturb anc e Are a
Page 2 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 2 of 15
CRES
T
RUTL
AND
JULIAN
ALABAMA
RICK
ENBA
CKER
WINT
ERHA
VEN
ROSSINICHULA VISTA
AUSTIN
PEDLEY
JURUPA
BRADFORD VAN BUREN
AX15
NO-9
NO-12
AX16
AX17AX20
NO-8
NO-10
NO-11
AX18AX19
04
15
030102
05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureProposed Transmission Structures
Tub ular Ste e l Pole (TSP)Lattic e Ste e l Towe r (LST)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme ntN e w Te le com U nd e rground Alignme nt
Construction Areas Distrib ution Disturb anc e Are aTe le com Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 3 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 3 of 15
JURUPA
AULD
ONTARIO
IDYLL
WILD
CRES
T
JULIAN
MACY
MEDALLION
COBB
CHULA VISTA
DUNN
AUSTIN
TYLER
IDYLLWILD
D2
AX20
AX21/D1
D3
D5
AX19
D4
D6D7D8
04
15
0301
0602
05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureN e w Distrib ution Structure
Proposed Transmission StructuresTub ular Ste e l Pole (TSP)Lattic e Ste e l Towe r (LST)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme ntN e w Te le com U nd e rground Alignme nt
Construction Areas Distrib ution Disturb anc e Are aTe le com Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 4 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 4 of 15
D15D7D8D9D10D11D12D13D14
0408
15
030607 05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 386 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Distribution StructuresExisting Distrib ution Structure
Proposed Transmission StructuresTub ular Ste e l Pole (TSP)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Te le com Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 5 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 5 of 15
D15
D17I4
D14
D16
D18/I1I2
I5
04
10
0809
11
0607 05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 386 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureN e w Distrib ution Structure
Proposed Transmission StructuresTub ular Ste e l Pole (TSP)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w Ove rhe ad Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Distrib ution Disturb anc e Are aTe le com Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 6 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 6 of 15
FILLY
CALIF
ORNI
A PEDL
EY S
UBST
ATIO
NGRULLA
V15
V16
JB2BJB2A
I6/JA1
JA2A/JB1A
I4
I5
V16
10
0809
11
0607 05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 386 feetFeatures depicted herein are pla n n in g level a c c ura c y, a n d in ten ded
for in formation a l purposes on ly. Dista n c es a n d loc ation s ma y b edistorted at this sc a le. Alwa ys c on sult with the proper lega ldoc umen ts or a gen c ies rega rdin g suc h fea tures. Rea l PropertiesDepartmen t.T homas Bros. Maps is a registered tra demark of Ra n d McNa lly &Compa n y.Reproduc ed with permission gra n ted b y Ra n d Mc Na lly &Compa n y. © Ra n d Mc Na lly & Compa n y. All rights reserved.S ervic e L a yer Credits: Con ten t ma y n ot reflect Nation a l Geographic 'sc urren t map polic y. S ourc es: Nation a l Geographic , Esri, DeL orme,HERE, U NEP-WCMC, U S GS , NAS A, ES A, MET I, NRCAN, GEBCO,NOAA, in cremen t P Corp.
Da te: 11/18/2016File Na me: RT RP_ CPU C_ DefRequest4_ Num1.mxd
V ersion #: 1Proposed Guard S truc ture
Distribution StructuresExistin g Distrib ution S truc tureNew Distrib ution S truc ture
Proposed Transmission StructuresT ub ula r S teel Pole (T S P)L a ttic e S teel Tower (L S T )Riser pole (T S P)V a ult
Proposed T elec om V a ults*(Adja c en t to Electric a l V a ults per T elec om design )
Proposed Transmission AlignmentO verhea d Proposed Align men tU n dergroun d Proposed Align men t
Proposed Distribution AlignmentExistin g O verhea d Align men tNew O verhea d Align men tNew U n dergroun d Align men t
Proposed Telcom AlignmentRepla c e Exisitin g T elecom O verhea d Align men tNew T elec om U n dergroun d Align men t
Construction Areas Distrib ution Disturb a n c e AreaT elec om Disturb a n c e AreaGroun d Disturb a n c e Area Data (GDAD)/ Buffer Area (Hyb rid Route)
Pa ge 7 of 15
DescriptionBuffer area s depic ted represen t the exten t of the gen era l loc a tion inwhic h the c on struc tion a n d groun d disturb in g a c tivity will oc c ur fora temporary or perma n en t Projec t fea ture as desc rib ed a n d
dimen sion ed in ta b le 2.5-3 of the RT RP DEIR, a n d a re in ten ded toprovide users of this da ta a gen era l a rea in whic h to limit the
eva lua tion of the Project impa c ts as required b y the CPU C or otherGovern men ta l/Resourc e Agen c y for Projec t permittin g requiremen tsper CEQA/NEPA or other regula tion s a n d c odes. T he in ten tion ofthe b uffer area is to a llow the temporary or perma n en t c on struc tionarea to even tua lly b e loc a ted to a spec ific a rea within the b uffertha t will fa c ilita te c on struc tion a n d a void impa c ts to kn own a n d/or
future iden tified ES As, to the exten t fea sib le.
U se L imitation sBuffer area s are in itia lly developed b a sed on the loc a tion oftemporary or perma n en t projec t fea tures, as iden tified per theProjec t’s en gin eerin g design a n d c on struc tion description .T he a c c ura c y of this b uffer area is rela tive to the a c c ura c ylevel of the en gin eerin g design . As the Project’s en gin eerin gdesign is modified a n d/or upda ted a n d the projec t fea ture(s)is/are fin a lized, the assoc ia ted b uffer(s) a n d disturb a n c e
a rea (s) will b e refin ed to reflec t the temporary a n d perma n en tcon struc tion footprin ts.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 7 of 15
65TH
68TH
PATS
RAN
CH
SMITH
CITR
INE
GOLDSTONE
GEODE
TANZ
ANITE
AMET
RINE
CARN
ELIA
N
IVORY
LUCR
ETIA
MORG
ANITE
SELENITE
KUNZ
IE
ROSE
QUA
RTZ
CORD
IERI
TE
DANA
FRAN
K
HOLMES
68TH
WINE
VILLE
V6
V7
V8V9
V10V11
V12V13
V14
V15
V16
JB2BJB2A JA2A/JB1A
V12
V16
V14
V8
V6
V10
10
0809
11
0607 05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 385 feetFea tures d epicted herein a re pla nning level a c cura c y, a nd intend ed
fo r info rm a tio na l purpo ses o nly. Dista nc es a nd lo c a tio ns m a y b ed isto rted a t this sc a le. Alwa ys c o nsult with the pro per lega ld o c um ents o r a genc ies rega rd ing suc h fea tures. Rea l Pro pertiesDepa rtm ent.T ho m a s Bro s. M a ps is a registered tra d em a rk o f Ra nd M cNa lly &Co m pa ny.Repro d uc ed with perm issio n gra nted b y Ra nd M c Na lly &Co m pa ny. © Ra nd M c Na lly & Co m pa ny. All rights reserved .Servic e La yer Cred its: Co ntent m a y no t reflect Na tio na l Geo gra phic 'scurrent m a p po lic y. So urc es: Na tio na l Geo gra phic , Esri, DeLo rm e,HERE, U NEP-W CM C, U SGS, NASA, ESA, M ET I, NRCAN, GEBCO,NOAA, inc rem ent P Co rp.
Da te: 11/18/2016File Na m e: RT RP_CPU C_DefRequest4_Num 1.m xd
V ersio n #: 1
Proposed Transmission StructuresLa ttic e Steel T o wer (LST )Riser po le (T SP)V a ultPro po sed T elec o m V a ults*(Ad ja c ent to Elec tric a l V a ults per T elec o m d esign)
Proposed Transmission AlignmentOverhea d Pro po sed Alignm entU nd ergro und Pro po sed Alignm ent
Proposed Telcom AlignmentRepla c e Exisiting T elec o m Overhea d Alignm entNew T elec o m U nd ergro und Alignm ent
Construction Areas Gro und Disturb a nc e Area Da ta (GDAD)/ Buffer Area (Hyb rid Ro ute)
Pa ge 8 o f 15
Desc riptio nBuffer a rea s d epic ted represent the extent o f the genera l lo c a tio n inwhic h the c o nstructio n a nd gro und d isturb ing a c tivity will o c c ur fo ra tem po ra ry o r perm a nent Pro jec t fea ture a s d esc rib ed a nd
d im ensio ned in ta b le 2.5-3 o f the RT RP DEIR, a nd a re intend ed topro vid e users o f this d a ta a genera l a rea in whic h to lim it the
eva lua tio n o f the Pro ject im pa c ts a s required b y the CPU C o r o therGo vernm enta l/Reso urc e Agenc y fo r Pro jec t perm itting requirem entsper CEQA/NEPA o r o ther regula tio ns a nd c o d es. T he intentio n o fthe buffer a rea is to a llo w the tem po ra ry o r perm a nent c o nstructio na rea to eventua lly b e lo c a ted to a spec ific a rea within the buffertha t will fa c ilita te c o nstructio n a nd a vo id im pa c ts to kno wn a nd /o r
future id entified ESAs, to the extent fea sib le.
U se Lim ita tio nsBuffer a rea s a re initia lly d evelo ped b a sed o n the lo c a tio n o ftem po ra ry o r perm a nent pro jec t fea tures, a s id entified per thePro jec t’s engineering d esign a nd c o nstructio n d esc riptio n.T he a c c ura c y o f this buffer a rea is rela tive to the a c c ura c ylevel o f the engineering d esign. As the Pro ject’s engineeringd esign is m o d ified a nd /o r upd a ted a nd the pro jec t fea ture(s)is/a re fina lized , the a sso c ia ted b uffer(s) a nd d isturb a nc e
a rea (s) will b e refined to reflec t the tem po ra ry a nd perm a nentc o nstructio n fo o tprints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 8 of 15
65TH
64TH
RUBY
CRES
T
SILVER
TIGER
S EYE
RED G
ARNE
T
SUNSTONE
AMETHYST
BLAC
K HOR
SE
SPINEL
WELL
S SPR
ING
PUERTA
MOON
RIVE
R
SOLITAIRE
KUNZ
IE
GOLD
EN C
LUB
MEADOWVALE
ROSE
QUA
RTZ
CORD
IERI
TE
PATS
RANCH
OCAS
A
SILVER
64TH
WINE
VILLE
I-15 F
RWY
LIMONITE
V1 V2
V3
V4
V5
V6
JD8AJD8B
V4
V2
V6
12
10
0809
11
0607
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 385 feetFeatures depicted herein are pla n n in g level a c c ura c y, a n d in ten ded
for in form ation a l purposes on ly. Dista n c es a n d loc ation s m a y b edistorted at this sc a le. Alwa ys c on sult with the proper lega ldoc um en ts or a gen c ies rega rdin g suc h fea tures. Rea l PropertiesDepartm en t.T hom a s Bros. Maps is a registered tra dem a rk of Ra n d McNa lly &Compa n y.Reproduc ed with perm ission gra n ted b y Ra n d Mc Na lly &Compa n y. © Ra n d Mc Na lly & Com pa n y. All rights reserved.S ervic e L a yer Credits: Con ten t m a y n ot reflect Nation a l Geographic 'sc urren t m ap polic y. S ourc es: Nation a l Geographic , Esri, DeL orm e,HERE, U NEP-WCMC, U S GS , NAS A, ES A, MET I, NRCAN, GEBCO,NOAA, in crem en t P Corp.
Da te: 11/18/2016File Na m e: RT RP_ CPU C_ DefRequest4_ Num 1.m xd
V ersion #: 1
Proposed Transmission StructuresRiser pole (T S P)V a ultProposed Telec om V a ults*(Adja c en t to Elec tric a l V a ults per Telec om design )
Proposed Transmission AlignmentO verhea d Proposed Align m en tU n dergroun d Proposed Align m en t
Proposed Telcom AlignmentRepla c e Exisitin g T elec om O verhea d Align m en tNew T elec om U n dergroun d Align m en t
Construction Areas Groun d Disturb a n c e Area Data (GDAD)/ Buffer Area (Hyb rid Route)
Pa ge 9 of 15
DescriptionBuffer area s depic ted represen t the exten t of the gen era l loc a tion inwhic h the c on struc tion a n d groun d disturb in g a c tivity will oc c ur fora tem porary or perm a n en t Projec t fea ture as desc rib ed a n d
dim en sion ed in ta b le 2.5-3 of the RT RP DEIR, a n d a re in ten ded toprovide users of this da ta a gen era l a rea in whic h to lim it the
eva lua tion of the Project im pa c ts as required b y the CPU C or otherGovern m en ta l/Resourc e Agen c y for Projec t perm ittin g requirem en tsper CEQA/NEPA or other regula tion s a n d c odes. T he in ten tion ofthe b uffer area is to a llow the tem porary or perm a n en t c on struc tionarea to even tua lly b e loc a ted to a spec ific a rea within the b uffertha t will fa c ilita te c on struc tion a n d a void im pa c ts to kn own a n d/or
future iden tified ES As, to the exten t fea sib le.
U se L im ita tion sBuffer area s are in itia lly developed b a sed on the loc a tion oftem porary or perm a n en t projec t fea tures, as iden tified per theProjec t’s en gin eerin g design a n d c on struc tion description .T he a c c ura c y of this b uffer area is rela tive to the a c c ura c ylevel of the en gin eerin g design . As the Project’s en gin eerin gdesign is m odified a n d/or upda ted a n d the projec t fea ture(s)is/are fin a lized, the assoc ia ted b uffer(s) a n d disturb a n c e
a rea (s) will b e refin ed to reflec t the tem porary a n d perm a n en tcon struc tion footprin ts.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 9 of 15
OCAS
A
PEAC
HTRE
E
BOCA
PUERTA
WINE
VILLE
OCAS
A
I-15 F
RWY
JD8AJD8B
JD9A
JD12
JD10
JD11
12
10
0809
14
11
13
0607
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 385 feetFea tures d epicted herein a re pla nning level a c cura c y, a nd intend ed
fo r info rm a tio na l purpo ses o nly. Dista nc es a nd lo c a tio ns m a y b ed isto rted a t this sc a le. Alwa ys c o nsult with the pro per lega ld o c um ents o r a genc ies rega rd ing suc h fea tures. Rea l Pro pertiesDepa rtm ent.T ho m a s Bro s. M a ps is a registered tra d em a rk o f Ra nd M cNa lly &Co m pa ny.Repro d uc ed with perm issio n gra nted b y Ra nd M c Na lly &Co m pa ny. © Ra nd M c Na lly & Co m pa ny. All rights reserved .Servic e La yer Cred its: Co ntent m a y no t reflect Na tio na l Geo gra phic 'scurrent m a p po lic y. So urc es: Na tio na l Geo gra phic , Esri, DeLo rm e,HERE, U NEP-W CM C, U SGS, NASA, ESA, M ET I, NRCAN, GEBCO,NOAA, inc rem ent P Co rp.
Da te: 11/18/2016File Na m e: RT RP_CPU C_DefRequest4_Num 1.m xd
V ersio n #: 1
Proposed Transmission StructuresT ubula r Steel Po le (T SP)La ttic e Steel T o wer (LST )Riser po le (T SP)V a ultPro po sed T elec o m V a ults*(Ad ja c ent to Elec tric a l V a ults per T elec o m d esign)
Proposed Transmission AlignmentOverhea d Pro po sed Alignm entU nd ergro und Pro po sed Alignm ent
Proposed Telcom AlignmentRepla c e Exisiting T elec o m Overhea d Alignm entNew T elec o m U nd ergro und Alignm ent
Construction Areas Gro und Disturb a nc e Area Da ta (GDAD)/ Buffer Area (Hyb rid Ro ute)
Pa ge 10 o f 15
Desc riptio nBuffer a rea s d epic ted represent the extent o f the genera l lo c a tio n inwhic h the c o nstructio n a nd gro und d isturb ing a c tivity will o c c ur fo ra tem po ra ry o r perm a nent Pro jec t fea ture a s d esc rib ed a nd
d im ensio ned in ta b le 2.5-3 o f the RT RP DEIR, a nd a re intend ed topro vid e users o f this d a ta a genera l a rea in whic h to lim it the
eva lua tio n o f the Pro ject im pa c ts a s required b y the CPU C o r o therGo vernm enta l/Reso urc e Agenc y fo r Pro jec t perm itting requirem entsper CEQA/NEPA o r o ther regula tio ns a nd c o d es. T he intentio n o fthe buffer a rea is to a llo w the tem po ra ry o r perm a nent c o nstructio na rea to eventua lly b e lo c a ted to a spec ific a rea within the buffertha t will fa c ilita te c o nstructio n a nd a vo id im pa c ts to kno wn a nd /o r
future id entified ESAs, to the extent fea sib le.
U se Lim ita tio nsBuffer a rea s a re initia lly d evelo ped b a sed o n the lo c a tio n o ftem po ra ry o r perm a nent pro jec t fea tures, a s id entified per thePro jec t’s engineering d esign a nd c o nstructio n d esc riptio n.T he a c c ura c y o f this buffer a rea is rela tive to the a c c ura c ylevel o f the engineering d esign. As the Pro ject’s engineeringd esign is m o d ified a nd /o r upd a ted a nd the pro jec t fea ture(s)is/a re fina lized , the a sso c ia ted b uffer(s) a nd d isturb a nc e
a rea (s) will b e refined to reflec t the tem po ra ry a nd perm a nentc o nstructio n fo o tprints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 10 of 15
GLORY
BREEZE
TREA
SURE
SHAD
YHARMONY
HIGH
BURY
BELLEGRAVE
I-15 FRWY
WINE
VILLE
JD13
JD16
JD12
JD14
JD15
12
10
0809
14
11
13
0607
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureProposed Transmission Structures
Tub ular Ste e l Pole (TSP)Proposed Transmission Alignment
Ove rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Distrib ution Disturb anc e Are a
Ground Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )Page 11 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 11 of 15
SULPHUR
GENIL
BELLEGRAVE
WINE
VILLE
I-15 F
RWY
JD19 JD22
JD16
JD17
JD18
JD20 JD21
JD23
12
1009
14
11
13
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureProposed Transmission Structures
Tub ular Ste e l Pole (TSP)Lattic e Ste e l Towe r (LST)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Distrib ution Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 12 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 12 of 15
WINE
VILLE
MADA
LENA
CANTU-GALLEANO RANCH
CANTU-GALLEANO RANCH
JD26
JD25
M1-T2
JD23
JD24
12
10
14
11
13
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Fe e t1 in = 385 fe e tFe ature s d e p icte d he re in are p lanning le ve l ac curacy, and inte nd e d
for informational p urp ose s only. Distanc e s and locations may b ed istorte d at this scale . Always consult with the p rop e r le gald ocume nts or age nc ie s re gard ing such fe ature s. Re al Prop e rtie sDe p artme nt.Thomas Bros. Map s is a re giste re d trad e mark of Rand Mc N ally &Comp any.Re p rod uc e d with p e rmission grante d b y Rand Mc N ally &Comp any. © Rand Mc N ally & Comp any. All rights re se rve d .Se rvic e Laye r Cre d its: Conte nt may not re fle ct N ational Ge ograp hic'scurre nt map p olicy. Sourc e s: N ational Ge ograp hic, Esri, De Lorme ,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, incre me nt P Corp .
Date : 11/18/2016File N ame : RTRP_CPU C_De fRe que st4_N um1.mxd
V e rsion #: 1
Prop ose d Guard StructureDistribution Structures
Existing Distrib ution StructureProposed Transmission Structures
Tub ular Ste e l Pole (TSP)Lattic e Ste e l Towe r (LST)
Proposed Transmission AlignmentOve rhe ad Prop ose d Alignme nt
Proposed Distribution AlignmentExisting Ove rhe ad Alignme ntN e w U nd e rground Alignme nt
Proposed Telcom AlignmentExisting Transmission Ove rhe ad Alignme ntRe p lac e Exisiting Te le com Ove rhe ad Alignme nt
Construction Areas Distrib ution Disturb anc e Are aGround Disturb anc e Are a Data (GDAD)/ Buffe r Are a (Hyb rid Route )
Page 13 of 15
De scrip tionBuffe r are as d e p icte d re p re se nt the e xte nt of the ge ne ral location inwhic h the construction and ground d isturb ing activity will oc cur fora te mp orary or p e rmane nt Proje ct fe ature as d e scrib e d and
d ime nsione d in tab le 2.5-3 of the RTRP DEIR, and are inte nd e d top rovid e use rs of this d ata a ge ne ral are a in whic h to limit the
e valuation of the Proje ct imp acts as re quire d b y the CPU C or othe rGove rnme ntal/Re sourc e Age nc y for Proje ct p e rmitting re quire me ntsp e r CEQA/N EPA or othe r re gulations and cod e s. The inte ntion ofthe b uffe r are a is to allow the te mp orary or p e rmane nt constructionare a to e ve ntually b e locate d to a sp e c ific are a within the b uffe rthat will facilitate construction and avoid imp acts to known and /or
future id e ntifie d ESAs, to the e xte nt fe asib le .
U se LimitationsBuffe r are as are initially d e ve lop e d b ase d on the location ofte mp orary or p e rmane nt p roje ct fe ature s, as id e ntifie d p e r theProje ct’s e ngine e ring d e sign and construction d e scrip tion.The ac curacy of this b uffe r are a is re lative to the ac curacyle ve l of the e ngine e ring d e sign. As the Proje ct’s e ngine e ringd e sign is mod ifie d and /or up d ate d and the p roje ct fe ature (s)is/are finalize d , the assoc iate d b uffe r(s) and d isturb anc e
are a(s) will b e re fine d to re fle ct the te mp orary and p e rmane ntconstruction footp rints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 13 of 15
PARK
HURS
T
CANTU-GALLEANO RANCH
ETIW
ANDA
HARREL
12
10
14
11
13
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 385 feetFea tures d epicted herein a re pla nning level a c cura c y, a nd intend ed
fo r info rm a tio na l purpo ses o nly. Dista nc es a nd lo c a tio ns m a y b ed isto rted a t this sc a le. Alwa ys c o nsult with the pro per lega ld o c um ents o r a genc ies rega rd ing suc h fea tures. Rea l Pro pertiesDepa rtm ent.Tho m a s Bro s. Ma ps is a registered tra d em a rk o f Ra nd Mc N a lly &Co m pa ny.Repro d uc ed with perm issio n gra nted b y Ra nd Mc N a lly &Co m pa ny. © Ra nd Mc N a lly & Co m pa ny. All rights reserved .Servic e La yer Cred its: Co ntent m a y no t reflect N a tio na l Geo gra phic 'scurrent m a p po lic y. So urc es: N a tio na l Geo gra phic , Esri, DeLo rm e,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, inc rem ent P Co rp.
Da te: 11/18/2016File N a m e: RTRP_CPU C_DefRequest4_N um 1.m xd
V ersio n #: 1
Proposed Telcom AlignmentExisting Tra nsm issio n Overhea d Alignm entN ew Telec o m U nd ergro und Alignm ent
Construction Areas Telec o m Disturb a nc e Area
Tenta tive Ma teria l Ya rd sPa ge 14 o f 15
Desc riptio nBuffer a rea s d epic ted represent the extent o f the genera l lo c a tio n inwhic h the c o nstructio n a nd gro und d isturb ing a c tivity will o c c ur fo ra tem po ra ry o r perm a nent Pro jec t fea ture a s d esc rib ed a nd
d im ensio ned in ta b le 2.5-3 o f the RTRP DEIR, a nd a re intend ed topro vid e users o f this d a ta a genera l a rea in whic h to lim it the
eva lua tio n o f the Pro ject im pa c ts a s required b y the CPU C o r o therGo vernm enta l/Reso urc e Agenc y fo r Pro jec t perm itting requirem entsper CEQA/N EPA o r o ther regula tio ns a nd c o d es. The intentio n o fthe buffer a rea is to a llo w the tem po ra ry o r perm a nent c o nstructio na rea to eventua lly b e lo c a ted to a spec ific a rea within the buffertha t will fa c ilita te c o nstructio n a nd a vo id im pa c ts to kno wn a nd /o r
future id entified ESAs, to the extent fea sib le.
U se Lim ita tio nsBuffer a rea s a re initia lly d evelo ped b a sed o n the lo c a tio n o ftem po ra ry o r perm a nent pro jec t fea tures, a s id entified per thePro jec t’s engineering d esign a nd c o nstructio n d esc riptio n.The a c c ura c y o f this buffer a rea is rela tive to the a c c ura c ylevel o f the engineering d esign. As the Pro ject’s engineeringd esign is m o d ified a nd /o r upd a ted a nd the pro jec t fea ture(s)is/a re fina lized , the a sso c ia ted b uffer(s) a nd d isturb a nc e
a rea (s) will b e refined to reflec t the tem po ra ry a nd perm a nentc o nstructio n fo o tprints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 14 of 15
CLAY
63RD
LAKEVIEW
PEDL
EY
GENERAL
HAVEN VIEWDAVID
LANSING
HEAT
HERW
OOD
CARLYLE
LINARES
BALD
WIN
CALLIE
PEGGY
EASTON
TOWNSEND
HAMPTON
EL PALOMINO
CLAUDETTE
PEDLEY
LINARESLINARES
CLAY
VAN BUREN
04
15
030102
05
Path:
P:\PR
OJEC
TS\M
PO_P
roject
s\Rive
rside
Tran
smiss
ionRe
liabil
ityPro
ject_W
LD\D
ata\C
PUC\
2016
1130
_CPU
CData
DefR
eque
st\De
f4_Nu
m1\RT
RP_C
PUC_
DefR
eque
st4_N
um1.m
xd
Riverside Transmission Reliability Project Hybrid Route CPUC Deficiency Request #4 - No.1 0 230 460115
Feet1 in = 385 feetFea tures d epicted herein a re pla nning level a c cura c y, a nd intend ed
fo r info rm a tio na l purpo ses o nly. Dista nc es a nd lo c a tio ns m a y b ed isto rted a t this sc a le. Alwa ys c o nsult with the pro per lega ld o c um ents o r a genc ies rega rd ing suc h fea tures. Rea l Pro pertiesDepa rtm ent.Tho m a s Bro s. Ma ps is a registered tra d em a rk o f Ra nd Mc N a lly &Co m pa ny.Repro d uc ed with perm issio n gra nted b y Ra nd Mc N a lly &Co m pa ny. © Ra nd Mc N a lly & Co m pa ny. All rights reserved .Servic e La yer Cred its: Co ntent m a y no t reflect N a tio na l Geo gra phic 'scurrent m a p po lic y. So urc es: N a tio na l Geo gra phic , Esri, DeLo rm e,HERE, U N EP-W CMC, U SGS, N ASA, ESA, METI, N RCAN , GEBCO,N OAA, inc rem ent P Co rp.
Da te: 11/18/2016File N a m e: RTRP_CPU C_DefRequest4_N um 1.m xd
V ersio n #: 1
Tenta tive Ma teria l Ya rd sPa ge 15 o f 15
Desc riptio nBuffer a rea s d epic ted represent the extent o f the genera l lo c a tio n inwhic h the c o nstructio n a nd gro und d isturb ing a c tivity will o c c ur fo ra tem po ra ry o r perm a nent Pro jec t fea ture a s d esc rib ed a nd
d im ensio ned in ta b le 2.5-3 o f the RTRP DEIR, a nd a re intend ed topro vid e users o f this d a ta a genera l a rea in whic h to lim it the
eva lua tio n o f the Pro ject im pa c ts a s required b y the CPU C o r o therGo vernm enta l/Reso urc e Agenc y fo r Pro jec t perm itting requirem entsper CEQA/N EPA o r o ther regula tio ns a nd c o d es. The intentio n o fthe buffer a rea is to a llo w the tem po ra ry o r perm a nent c o nstructio na rea to eventua lly b e lo c a ted to a spec ific a rea within the buffertha t will fa c ilita te c o nstructio n a nd a vo id im pa c ts to kno wn a nd /o r
future id entified ESAs, to the extent fea sib le.
U se Lim ita tio nsBuffer a rea s a re initia lly d evelo ped b a sed o n the lo c a tio n o ftem po ra ry o r perm a nent pro jec t fea tures, a s id entified per thePro jec t’s engineering d esign a nd c o nstructio n d esc riptio n.The a c c ura c y o f this buffer a rea is rela tive to the a c c ura c ylevel o f the engineering d esign. As the Pro ject’s engineeringd esign is m o d ified a nd /o r upd a ted a nd the pro jec t fea ture(s)is/a re fina lized , the a sso c ia ted b uffer(s) a nd d isturb a nc e
a rea (s) will b e refined to reflec t the tem po ra ry a nd perm a nentc o nstructio n fo o tprints.
A.15-04-013 RTRP-CPUC Deficiency Report-SCE-004 Supplemental 2 Q.01 Attachment 2 of 3
Page 15 of 15