Nicholas Tedesco Portfolio
-
Upload
nicholas-tedesco -
Category
Documents
-
view
219 -
download
2
description
Transcript of Nicholas Tedesco Portfolio
TEDESCOPORTFOLIOPORTFOLIO
5 NICHOLAS J TEDESCOPROJECTSPROJECTS
123
PASADENA LOW RISE DEVELOPMENT
LINCOLN HEIGHTS CHARTER HIGH SCHOOL
COLLAPSE OF SUBURBIA
BUILT
4 RESIDENTIAL BATHROOM REMODEL
DESIGN PROJECTS
WORK EXPERIENCE
5 DUTTON ARCHITECTS | INGLISH STUDIO
DESIGN PROJECTS
1 LINCOLN HEIGHTS CHARTER HIGH SCHOOLPROJECTPROJECT
LINCOLN HEIGHTS CHARTER HIGH SCHOOLLOCATION | LINCOLN HEIGHTS, CA
EVERY SCHOOL NEEDS A FIELD. FURTHERMORE, EVERY COMMUNITY NEEDS A RECREATIONAL SPACE. LINCOLN HEIGHTS HAS A RECREATIONAL AREA THAT IS NEXT TO THE PROPOSED SITE FOR THE NEW HIGH SCHOOL; HOWEVER, IT IS CURRENTLY DIFFICULT TO ACCESS AND IT IS UNDER-UTILIZED. BY RETRO-FITTING THE FIELD AREA, THE SCHOOL AS WELL AS THE FIELD BENEFIT. THUS, THE AIM OF THE PROJECT IS TO INTEGRATE THE FIELD AND THE HIGH SCHOOL. FURTHERMORE, THIS SAME IDEA OF INTEGRATION INFLUECED THE CLASSROOM DESIGN. CLASSROOMS WERE DESIGNED IN CLUSTERS THAT ATTACH TO A SHARED ATRIUM SPACE. THE INTERIOR OF THE CLUSTERS CAN BE CHANGED TO ALLOW FOR SHARED LEARNING BETWEEN DIFFERENT SUBJECTS.
FIELD ACCESS
CURRENT PROPOSED
EXTEND TO COMMUNITY
SUSTAINABILITY | DIRT REMOVAL
LARGER PROJECT
PROPOSED SITE INTENDED SITE LA RIVER REMEDIATION PROJECT
IF THE HIGH SCHOOL WAS RESTRAINED BY THE SITE BOUNDRIES.
HIGH SCHOOL OPENS UP AND REACHES OUT TO ITS SURROUNDINGS.
RESULT OF BREAKING SITE BOUNDRIES.
PROPOSED SITE. THE SITE FOR THE SCHOOL IS 16FT. HIGHER THAN THE RECREATIONAL PARK AND FIELD THAT IS DIRECTLY NEXT TO IT.
DIRT REMOVAL REQUIRED FOR SUBTERANEAN PARKING. IT WOULD BE EXPENSIVE TO RE-MOVE THIS AMOUNT OF DIRT AND IT IS NOT SUSTAINABLE TO DO SO.
INSTEAD OF REMOVING A LARGE AMOUNT OF DIRT FOR SUBTERANEAN PARKING, A SMALL AMOUNT IS REMOVED FOR A RAMP. PARKING IS MOVED TO THE FIELD AND REMOVED DIRT IS USED TO EXTEND THE SIDEWALK. THE MONEY SAVED FROM NOT HAVING SUBTERANEAN PARKING IS USED TO RETROFIT THE NEIGHBORING FIELD AND REC. CENTER.
SITE PLAN
COMMUNITY | SCHOOL SPACE
CLUSTER ARRANGEMENTS
ATRIUM FUNCTIONS
SHARED SPACE LIGHT VENTILATION
SITE PLAN
LONGITUDINAL SECTION
ROOF PLAN
SECOND FLOOR PLAN 1-CLASSROOM 2-LIBRARY 3-DINING 4-ATRIUM OPEN TO BELOW 5-ADMINISTRATION 6-COURTYARD 7-GREEN ROOF
1
1
1
1
1
1
2
3
4
4
4
4
4
1
5 5
6
6
7
FLASHING
4” RIGID INSULATION
WPM
METAL DECK
STAINLESS STL. GUTTER
METAL CLIP SYSTEM
FIXING BATTENS
METAL PANELS
DROP CEILING
PRIMARY STL.
WPM
RIGID INSULATION
20 GA. GALV. METAL SHEETING
6” STL. STUDS 4” STL. STUDS
5/8” GYPSUM BOARD
MAIN STRUCTURAL COLUMN
GUTTER
EDGE CLIP
PAINTED TUBE STL. FRAME
AUTOMATED DOOR PISTON
T. STL. FRAME SUPPORT
POLYCARBONATE CLIP
DOOR TRUSS FRAME AT BOTH SIDES
EXTRUDED POLYCARBONATE
5” CONCRETE SLOPE 1/4” PER FT.
ROOF DETAIL
DETAIL 3
DETAIL 2
FLASHING
STAINLESS STL. GUTTER
WPM
FIXING BATTENS
RIGID INSULATION
6” STL. STUDS
WPM
4” RIGID INSULATION
METAL DECK
PRIMARY STL.
METAL CLIP SYSTEM
METAL PANELS
RIGID INSULATION
6” STL. STUDS
METAL CLIP SYSTEM
METAL CLIP SYSTEM
METAL PANEL
METAL PANEL
WPM
FIXING BATTENS
DETAIL SECTION
ROOF DETAIL
DETAIL 2
FLASHING
WPM
METAL DECK
METAL CLIP SYSTEM
FIXING BATTENS
METAL PANELS
DROP CEILING
CONCRETE
DRAINAGE MAT
GLASS RAILING
EARTH
GRASS
WPM
WPM
PRIMARY STL.
6” STL. STUDS
4” STL. STUDS
DUCT
PRIMARY STL.
5/8” GYPSUM BOARD
INSULATION
EDGE CLIP
PAINTED TUBE STL. FRAME
T. STL. FRAME SUPPORT
POLYCARBONATE CLIP
DOOR TRUSS FRAME AT BOTH SIDES
EXTRUDED POLYCARBONATE
HANGAR DOOR
AUTOMATED DOOR PISTON
5” CONCRETE SLOPE 1/4” PER FT.
GUTTER
EARTH
DETAIL CHUNK
CLOSED
MOVING
OPEN
CONCEPT DIAGRAM
2PASADENA LOW RISE DEVELOPMENTPROJECTPROJECT
UNIT MODEL
N
SITE PLAN
4 UNIT LOW RISE DEVELOPMENTLOCATION | PASADENA, CACONCEPT | DESIGN UNITS THAT CAN TRANSFORM AND ADAPT TO PEOPLE’S CHANGING LIVES.
MANY OF THE WALLS IN THE UNITS CAN MOVE TO ENLARGE SPACES OR CREATE NEW SPACES. THE UNITS ARE MADE FROM PREFABRICATED MODULES. THERE IS A SLEEPING, EATING, LIVING, AND PARKING MODULE. EACH OF THESE MOD-ULES IS CREATED FROM A KIT OF PARTS. CLIENTS CAN CHOOSE THE PARTS THEY MOST DESIRE BEFORE CONSTRUCTION.
MODULE CATALOGUE OF PARTS ASSEMBLY
PARKING
LIVING
EATING
SLEEPING
VENTILATION DAY-LING PANEL
SOLAR ROOF
SLIDING WALL VENTILATION DAY-LING PANEL
SOLAR ROOF
SLIDING WALL
VENTILATION DAY-LING PANEL
SLIDING WALL
SOLAR ROOF
FLOOR 2
NORTH ELEVATION
1
1
2
2
3
34
44
4
5 5
5 5
6
75
UNIT C
UNIT D
FLOOR 1
LONGITUDINAL SECTION
UNIT A AND B ARE IDENTICAL. UNIT C AND D ARE IDENTICAL. THEY ARE REPRESENTED IN TWO DIFFERENT FORMS.1-LIVING 2-KITCHEN 3-DINING 4-BATHROOM 5-BEDROOM 6-EXTENDED BALCONY 7-OFFICE
1
1
UNIT A
2
2
3
3
4
4
4
4 4
4
5
5 5
5
6
66
75
UNIT B
UNIT C
UNIT D
5
5
GROUND FLOOR UNIT INTERIOR RENDER
EXTERIOR RENDER
3COLLAPSE OF SUBURBIAPROJECTPROJECT
N
48 UNIT MID RISE BUILDINGLOCATION | CULVER CITY, CACONCEPT | ALLOW USERS THE SAME AMENITIES THAT SUBURBIA OFFERS IN THE CITY. THE PROJECT CHALLENGED THE STAN-DARD MID RISE LIVING MODEL AND WAS INFLUENCED BY THE RELATIONSHIP BETWEEN THE CAR AND THE UNIT.
SUBURBIA WAS NOT LITERALLY PUT INTO THE CITY, BUT IT WAS ADAPTED TO THE CITY AND THE CHANGING LOS ANGELES CULTURE. SOME OF THE AMENITIES IN THE UNITS INCLUDE PARKING IN YOUR DWELLING SPACE, PRIVATE GREEN SPACE, AND OPEN AIR SPACE. AFTER DRIVING INTO A CAR ELEVATOR, CARS CAN PULL INTO THE UNITS. ELECTRIC CARS CAN PLUG IN TO THE DWELLING SPACE. AS PEOPLE IN LOS ANGELES OFTEN USE THEIR CARS AS A SECOND OFFICE, THE CAR WAS BROUGHT INTO THE DWELLING SPACE TO ADAPT TO THIS PHENOMENON AND TO USE AS ADDITIONAL PROGRAM.
SITE PLAN
OLD MODEL URBAN SUBURBIA UNIT
SUBURBIA STACKED
CONCEPT DIAGRAMS
AGGREGATION DIAGRAM
2 BED UNIT
1 BED UNIT
TRANSVERSE SECTION
1 BED UNIT
1- LIVING 2- KITCHEN 3- DINING 4- BATHROOM 5 - BEDROOM 6- PRIVATE YARD 7- PARKING IN UNIT8- CAR ELEVATOR 9- ELEVATOR 10 - STAIR
12
3
4
5
6
789
10
FLOOR 2
2 BED UNIT
FLOOR 1
6
324
1
5
5
44
789
10
FLOOR PLAN
GROUND FLOOR
WEST ELEVATION
BUILT
RESIDENTIAL BATHROOM REMODEL4PROJECTPROJECT
uASC PARKING DAY
RESIDENTIAL BATHROOM REMODELLOCATION | VENTURA, CA
A NEWER AND MORE OPEN BATHROOM WAS DESIRED BY THE CLIENT. THE ENTIRE BATHROOM WAS DEMOLISHED. DEMO INCLUDED THE SHOWER AREA, ALL OF THE TILE, DRY WALL, COUNTERS, AND DIVIDER WALL. A NEW TUB WAS INSTALLED AND HALF WALLS WERE INSTALLED AROUND THE TUB. THE TILING AROUND THE TUB AS WELL AS THE FLOORS WAS ALL RE-DONE.NEW FIXTURES WERE INSTALLED AS WELL AS NEW BASEBOARD AND CHAIR RAIL.
WORK EXPERIENCE
5DUTTON ARCHITECTS | INGLISH STUDIOPROJECTPROJECT
PLANS,EXISTING & PROPOSED
A2.1
639 S. Spring St #4ALos Angeles, CA. 90014
TEL: 323.668.2600FAX: 323.668.2800
•••• ••••
PHOTOGRAPHY STUDIO REMODELLOCATION | WEST HOLLYWOOD, CA
A PHOTOGRAPHER FOR VOGUE ACQUIRED A BUILDING IN WEST HOLLYWOOD, PREVIOUSLY USED FOR FURNITURE MANU-FACTURING, AND DESIRED TO TURN IT INTO A PHOTOGRAPHY STUDIO. ALL INTERIOR WALLS AND ELEMENTS WERE DEMOL-ISHED. THE EXTERIOR WALLS WERE KEPT INTACT. THE CEILING AND BRICK WALLS WERE PAINTED WHITE AND BLEACHED PLYWOOD ELEMENTS WERE ADDED TO THE SPACE THAT HOUSED NEW PROGRAMS.