NFPA 25 – The Owner’s Manual
Roles & ResponsibilitiesPresented by: Bob Caputo
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 2 Instructor
• Bob is the Executive Vice President of Compliance Solutions with Telgian Corporation. He is the Chairman of the NFPA 16 technical committee and a member of multiple NFPA committees including NFPA 13, NFPA 3 & 4 and NFPA 25. Bob is a contributor of the NFPA 13, and NFPA 25 handbooks and the NFPA Inspection Manual.
• A senior member NFPA and AFSA faculties, Bob has written and presented seminars throughout the world on fire protection and life safety systems. He is a regular speaker at NFPA and AFSA’s annual conventions and is the author of AFSA’s Project Management Tools program. He was named San Diego County “Fire Prevention Officer of the Year” in 1994 and Fire Protection Contractor Magazine’s Person of the Year in 1997. Bob attended the University of Albuquerque, NM and is a US Navy veteran.
2
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 3
DISCLAIMER
This seminar and its content is not a formal interpretation issuedpursuant to NFPA regulations. Any opinion expressed is the personalopinion of the author and presenter and does not necessarily presentthe official position of the NFPA and its Technical Committees.
3
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 4 NFPA 25 Structure
• Scope, Application and General (Ch 1,2,4)
• Definitions (Ch 3)
• Individual System Chapters (Ch 5-12)
• Valves (Ch 13)
• Internal Conditions (Ch 14)
• Impairments (Ch 15)
• Extracts (Ch 16)
4
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 5 Document Scope
NFPA 25 establishes the minimum requirements for the periodic inspection, testing, and maintenance of water-based fire protection systems and the actions to undertake when changes in occupancy, use, process, materials, hazard, or water supply that potentially impact the performance of the water-based system are planned or identified.
5
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 6
What is the scope of NFPA 25?
• Wear and tear driven
• Inspections are not design evaluations
• Not a re-commissioning event
• Management of change is owner driven
• Impact of permitting process
6
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 7 Common Phrases
• “Installed in accordance with generally accepted practice”
• “Adequacy of design”
• “Assumed to have complied at the time of construction/ modification”
1.1.3, 1.1.3.1, & A.4.1.6
7
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 8 Wear and Tear vs Design
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 9 Design Evaluation
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 10 Re-Commissioning
10
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 11 Management of Change
• 4.1.6 & 4.1.7
11
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 12 Is permitting the answer?
12
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 13 Systems Covered
• 1.1.2
131.1.2
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 14 NFPA 72
• 1.1.1 & 1.1.1.1
14
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 15 NFPA 13D
• 1.1.5
15
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 16 Board and Care Exception
16
16.2
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 17 NFPA 25 – Purpose
17
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 18 4.1.1.2 – Competence
• NFPA 25 does not cite specific credentials
• Competent to AHJ
• Understanding of tasks and system components
• Check local/state requirements
18
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 19 Who is qualified?
3.3.34 Qualified. A competent and capable person or company that has met the requirements and training for a given field acceptable to the AHJ.
19
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 20
Roles and Responsibilities
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 21 Who is involved?
• The owner• The owner’s designated representative
• Tenant• Property manager or management firm
• Inspector/contractor• AHJ - fire department personnel• Municipal department (water, health, transportation...etc)• Insurance• Manufacturers
21
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 22 Responsibilities
• Owner− Design evaluation− Management of change− Building conditions− Access− Tag systems− Corrective action
• Inspector/Contractor− Fulfill contractual obligation
• Conduct tests and inspections• Tag systems• Corrective action
22
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 23 Responsibility of Property Owner
23
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 24 Designated Representative
• Contractual agreement with owner
• Assumes owner’s responsibilities
• Part or entire ITM program
24
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 25 Owner or Designated Representative
• Overall ITM execution• Access to systems/components• Freeze protection • Notification to AHJ or supervisory agent• Corrections repairs• Changes in occupancy, use, process, or materials• Recalled products• Design evaluations• Maintain records
25
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 26 Owner or Designated Rep – Overall ITM Execution
26
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 27 Owner or Designated Rep – Access
• 4.1.3 27
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 28
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 29 Owner or Designated Rep – Freeze Protection
• 4.1.2
29
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 30 Owner or Designated Rep – Notification to AHJ or Supervisory Agent
30
4.1.4
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 31 Owner or Designated Rep – Corrections and Repairs
• 4.1.531
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 32 Owner or Designated Rep – Changes in Occupancy, Use, Process, or Materials
• 4.1.6
32
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 33 Owner or Designated Rep –Recalled Products
• A.4.1.5
33
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 34 Owner or Designated Rep – Design Evaluations
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 35 Owner or Designated Rep –Record Retention
• 4.3 & 4.3.5
35
4.3 & 4.3.5
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 36 Records Management
4.3.1.1* Records shall be permitted to be stored and accessed electronically.
36
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 37 Shared ITM Responsibilities
A.4.1.1 Any portion or all of the inspection, testing, and maintenance can be permitted to be contracted with an inspection, testing, and maintenance service.
37
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 38 Owner vs. Inspector
• Inspecting valve positions
• Gauge readings
• Maintaining clearances
• Main drain test
• Fire pump flow test
• Trip testing
38
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 39 Inspector
• Get “qualified”
• Execute your contractual obligations
• Understand the scope of NFPA 25
• Identify field issues
• Communicate with the owner
• Understand safety protocol
39
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 40 Inspector – Execute Contract with Owner
4.1.1.3
40
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 41 Inspector – Understand Scope of NFPA 25 ITM Work
• Inspections from the floor
• Not a design evaluation
• Not looking at concealed spaces
• Wear and tear
• Contract can go above and beyond NFPA 25
41
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 42 Inspector – Get Qualified
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 43 Inspector – Identify Deficiencies and Impairments
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 44 Inspector – Communicate Issues to Owner
44
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 45 Inspector – Safety Equipment
4.9 & 5.2.1.1.5
45
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 46 AHJ – Fire Department
• Approve personnel conducting ITM tasks
• Approve alternate ITM frequencies/ approaches
• Request records as necessary
• Approve impairment plans
• System tagging
46
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 47 AHJ – Approve Personnel Conducting ITM Tasks
47
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 48 AHJ – Approve Alternate ITM Frequencies or Approaches
48
4.7
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 49 AHJ – Request Records
49
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 50 AHJ – System Impairment
Chapter 15
50
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 51 AHJ – System Tagging
15.3
51
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 52 Other AHJs
•Water purveyor
• Transportation agency (road and transit tunnels)
•Building department
•Health and safety agencies
• Insurance representative
52
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 53 Insurance Representative
•Considered an AHJ by definition
•Use NFPA 25 for assessing risk
•Many municipalities have no AHJ
•Fills the role of the fire department
53
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 54 ITM vs. Design Evaluation
• NFPA 25 scope
• Based on roles and responsibilities
• Liability
• Contractual obligation
• “Good” fire protection
54
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 55 Ask Yourself the Questions
• Is this in the scope of NFPA 25?
• Is it broken or was it designed incorrectly?
• What is my role?
• What are my responsibilities?
• What am I looking at?
• Is it something that I am responsible for?
55
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 56
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 57
57
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 58
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 59
59
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 60
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 61
615.2.1.4 & 5.2.1.5
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 62 When Should Design Evaluations Occur?
• Change in hazard, use, occupancy
• Change is building layout
• Change in goods stored or storage arrangement
• Modifications to heating systems that impact water-based systems
62
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 63 How do I conduct a design/hazard evaluation?
• No mandated approach
• Annex E of 2014 Edition (Annex F in 2011)
• Retro-commissioning or re-commissioning per NFPA 3
63
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 64 Addressing Changes in Hazard
• A.4.1.7 See Annex E for an example of a hazard evaluation form. A hazard evaluation is not part of a system inspection.
• Annex E
• Approval of corrections by AHJ
64
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 65 Annex E Hazard Evaluation Form
• Associated with owner’s responsibilities for changes of hazard
• Changes in building occupancy, use or process, or material used or stored create the need for evaluation of the installed fire protection systems. This form is intended to identify and evaluate such changes and should be completed only by an individual properly qualified in the area of system design.
65
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 66
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 67 Identifying Design Issues as Part of ITM Inspection
• Understand contractual obligation
• Understand your liability
• Discuss the depth/breadth of scope of work
67
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 68 Identifying Design Issues as Part of ITM Inspection
• “Good fire protection”
• Side “B” of inspection form
• Separate “good Samaritan report”
• Ethics rule for licensure
• Legal disclaimer
68
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 69 Deficiencies and Impairments
• Chapter 3 definitions
• Annex Table A.3.3.7
• Subjectivity
• Will the system/ component function?
• Tagging
A.3.3.7
69
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 70 Tagging
• Not specifically addressed in NFPA 25
• Jurisdictional requirements vary
• Method for tracking deficiencies
• AHJ’s enforcement of existing system
15.3 70
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 71 Impairment
3.3.21* Impairment. A condition where a fire protection system or unit or portion thereof is out of order, and the condition can result in the fire protection system or unit not functioning in a fire event.
71
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 72 Deficiency
3.3.7* Deficiency. For the purposes of inspection, testing, and maintenance of water-based fire protection systems, a condition which will or has the potential to adversely impact the performance of a system or portion thereof, but does not rise to the level of an impairment.
72
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 73 Critical vs. Non-Critical
• 3.3.7.1 Critical Deficiency. A deficiency that, if not corrected, can have material effect on the ability of the fire protection system or unit to function as intended in a fire event.
• 3.3.7.2 Noncritical Deficiency. A deficiency that does not have a material effect on the ability of the fire protection system or unit to function in a fire event, but correction is needed to meet the requirements of this standard or for the proper inspection, testing, and maintenance of the system or unit.
73
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 74
74
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 75
75
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 76
76
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 77
77
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 78 CONCLUSION
•Questions & Answers
78
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________